The Clackamas River is an approximately 83-mile (134 km) tributary of the Willamette River in northwestern Oregon , in the United States. Draining an area of about 940 square miles (2,435 km), the Clackamas flows through mostly forested and rugged mountainous terrain in its upper reaches, and passes agricultural and urban areas in its lower third. The river rises in eastern Marion County , about 55 miles (89 km) east-southeast of Salem . The headwaters are on the slopes of Olallie Butte in the Mount Hood National Forest , about 10 miles (16 km) north of Mount Jefferson , at an elevation of 4,909 feet (1,496 m) in the Cascade Range . The Clackamas flows briefly north and then flows northwest through the mountains, passing through North Fork Reservoir and Estacada . It then emerges from the mountains southeast of Portland . It joins the Willamette near Oregon City and forms the boundary between Oregon City and Gladstone .
79-470: The Clackamas provides hydroelectric power and drinking water for some of the Portland metropolitan area, and it supports runs of Coho salmon , spring and fall Chinook salmon , and summer and winter steelhead . The river's old-growth forests , its habitat for several species of birds, its healthy fish runs, and the recreational opportunities that it provides—such as fishing and whitewater rafting —led to
158-745: A greenhouse gas . According to the World Commission on Dams report, where the reservoir is large compared to the generating capacity (less than 100 watts per square metre of surface area) and no clearing of the forests in the area was undertaken prior to impoundment of the reservoir, greenhouse gas emissions from the reservoir may be higher than those of a conventional oil-fired thermal generation plant. In boreal reservoirs of Canada and Northern Europe, however, greenhouse gas emissions are typically only 2% to 8% of any kind of conventional fossil-fuel thermal generation. A new class of underwater logging operation that targets drowned forests can mitigate
237-463: A low-head hydro power plant with hydrostatic head of few meters to few tens of meters can be classified either as an SHP or an LHP. The other distinction between SHP and LHP is the degree of the water flow regulation: a typical SHP primarily uses the natural water discharge with very little regulation in comparison to an LHP. Therefore, the term SHP is frequently used as a synonym for the run-of-the-river power plant . The largest power producers in
316-426: A dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel -powered energy plants. However, when constructed in lowland rainforest areas, where part of
395-421: A flood and fail. Changes in the amount of river flow will correlate with the amount of energy produced by a dam. Lower river flows will reduce the amount of live storage in a reservoir therefore reducing the amount of water that can be used for hydroelectricity. The result of diminished river flow can be power shortages in areas that depend heavily on hydroelectric power. The risk of flow shortage may increase as
474-809: A large natural height difference between two waterways, such as a waterfall or mountain lake. A tunnel is constructed to take water from the high reservoir to the generating hall built in a cavern near the lowest point of the water tunnel and a horizontal tailrace taking water away to the lower outlet waterway. A simple formula for approximating electric power production at a hydroelectric station is: P = − η ( m ˙ g Δ h ) = − η ( ( ρ V ˙ ) g Δ h ) {\displaystyle P=-\eta \ ({\dot {m}}g\ \Delta h)=-\eta \ ((\rho {\dot {V}})\ g\ \Delta h)} where Efficiency
553-451: A larger amount of methane than those in temperate areas. Like other non-fossil fuel sources, hydropower also has no emissions of sulfur dioxide, nitrogen oxides, or other particulates. Reservoirs created by hydroelectric schemes often provide facilities for water sports , and become tourist attractions themselves. In some countries, aquaculture in reservoirs is common. Multi-use dams installed for irrigation support agriculture with
632-592: A positive risk adjusted return, unless appropriate risk management measures are put in place. While many hydroelectric projects supply public electricity networks, some are created to serve specific industrial enterprises. Dedicated hydroelectric projects are often built to provide the substantial amounts of electricity needed for aluminium electrolytic plants, for example. The Grand Coulee Dam switched to support Alcoa aluminium in Bellingham, Washington , United States for American World War II airplanes before it
711-548: A relatively constant water supply. Large hydro dams can control floods, which would otherwise affect people living downstream of the project. Managing dams which are also used for other purposes, such as irrigation , is complicated. In 2021 the IEA called for "robust sustainability standards for all hydropower development with streamlined rules and regulations". Large reservoirs associated with traditional hydroelectric power stations result in submersion of extensive areas upstream of
790-540: A result of climate change . One study from the Colorado River in the United States suggest that modest climate changes, such as an increase in temperature in 2 degree Celsius resulting in a 10% decline in precipitation, might reduce river run-off by up to 40%. Brazil in particular is vulnerable due to its heavy reliance on hydroelectricity, as increasing temperatures, lower water flow and alterations in
869-448: A small TV/radio). Even smaller turbines of 200–300 W may power a few homes in a developing country with a drop of only 1 m (3 ft). A Pico-hydro setup is typically run-of-the-river , meaning that dams are not used, but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before returning it to the stream. An underground power station is generally used at large facilities and makes use of
SECTION 10
#1732772914457948-455: A source of low-cost renewable energy. Alternatively, small hydro projects may be built in isolated areas that would be uneconomic to serve from a grid, or in areas where there is no national electrical distribution network. Since small hydro projects usually have minimal reservoirs and civil construction work, they are seen as having a relatively low environmental impact compared to large hydro. This decreased environmental impact depends strongly on
1027-414: A start-up time of the order of a few minutes. Although battery power is quicker its capacity is tiny compared to hydro. It takes less than 10 minutes to bring most hydro units from cold start-up to full load; this is quicker than nuclear and almost all fossil fuel power. Power generation can also be decreased quickly when there is a surplus power generation. Hence the limited capacity of hydropower units
1106-581: A total of 1,500 terawatt-hours (TWh) of electrical energy in one full cycle" which was "about 170 times more energy than the global fleet of pumped storage hydropower plants". Battery storage capacity is not expected to overtake pumped storage during the 2020s. When used as peak power to meet demand, hydroelectricity has a higher value than baseload power and a much higher value compared to intermittent energy sources such as wind and solar. Hydroelectric stations have long economic lives, with some plants still in service after 50–100 years. Operating labor cost
1185-491: A year's worth of rain fell within 24 hours (see 1975 Banqiao Dam failure ). The resulting flood resulted in the deaths of 26,000 people, and another 145,000 from epidemics. Millions were left homeless. The creation of a dam in a geologically inappropriate location may cause disasters such as 1963 disaster at Vajont Dam in Italy, where almost 2,000 people died. South Fork Clackamas River The South Fork Clackamas River
1264-435: Is electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity , almost 4,210 TWh in 2023, which is more than all other renewable sources combined and also more than nuclear power . Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has
1343-452: Is hydroelectric power on a scale serving a small community or industrial plant. The definition of a small hydro project varies but a generating capacity of up to 10 megawatts (MW) is generally accepted as the upper limit. This may be stretched to 25 MW and 30 MW in Canada and the United States. Small hydro stations may be connected to conventional electrical distribution networks as
1422-606: Is a tributary, roughly 8 miles (13 km) long, of the Clackamas River in the U.S. state of Oregon . Beginning near South Fork Mountain in the western Cascade Range , the river flows generally north through Clackamas County to meet the larger river at Big Cliff. Most of the South Fork's drainage basin lies within the Mount Hood National Forest . The lower reaches of the river are part of
1501-635: Is also usually low, as plants are automated and have few personnel on site during normal operation. Where a dam serves multiple purposes, a hydroelectric station may be added with relatively low construction cost, providing a useful revenue stream to offset the costs of dam operation. It has been calculated that the sale of electricity from the Three Gorges Dam will cover the construction costs after 5 to 8 years of full generation. However, some data shows that in most countries large hydropower dams will be too costly and take too long to build to deliver
1580-470: Is highest in the winter when solar energy is at a minimum. Pico hydro is hydroelectric power generation of under 5 kW . It is useful in small, remote communities that require only a small amount of electricity. For example, the 1.1 kW Intermediate Technology Development Group Pico Hydro Project in Kenya supplies 57 homes with very small electric loads (e.g., a couple of lights and a phone charger, or
1659-663: Is home to the last significant run of wild late-winter coho salmon in the Columbia Basin, which generally spawn on the main stem of the Clackamas above the North Fork Reservoir. The watershed also has one of only two remaining runs of spring chinook in the Willamette basin and supports a significant population of winter steelhead, cutthroat trout, and native lamprey. Forty-seven miles (76 km) of
SECTION 20
#17327729144571738-445: Is initially produced during construction of the project, and some methane is given off annually by reservoirs, hydro has one of the lowest lifecycle greenhouse gas emissions for electricity generation. The low greenhouse gas impact of hydroelectricity is found especially in temperate climates . Greater greenhouse gas emission impacts are found in the tropical regions because the reservoirs of power stations in tropical regions produce
1817-480: Is moderately difficult, and has an elevation gain of 900 feet (270 m). It runs from Forest Road 45 west of the river to a campsite along the stream. Trail uses include hiking, mountain biking, backpacking, and access to catch-and-release fishing for trout . Vegetation along the trail consists mainly of Douglas-firs and Western hemlocks with an understory of salal , sword fern , and Oregon-grape . A 70-foot (21 m) waterfall 0.4 miles (0.6 km) from
1896-462: Is not an energy source, and appears as a negative number in listings. Run-of-the-river hydroelectric stations are those with small or no reservoir capacity, so that only the water coming from upstream is available for generation at that moment, and any oversupply must pass unused. A constant supply of water from a lake or existing reservoir upstream is a significant advantage in choosing sites for run-of-the-river. A tidal power station makes use of
1975-452: Is not generally used to produce base power except for vacating the flood pool or meeting downstream needs. Instead, it can serve as backup for non-hydro generators. The major advantage of conventional hydroelectric dams with reservoirs is their ability to store water at low cost for dispatch later as high value clean electricity. In 2021, the IEA estimated that the "reservoirs of all existing conventional hydropower plants combined can store
2054-410: Is often higher (that is, closer to 1) with larger and more modern turbines. Annual electric energy production depends on the available water supply. In some installations, the water flow rate can vary by a factor of 10:1 over the course of a year. Hydropower is a flexible source of electricity since stations can be ramped up and down very quickly to adapt to changing energy demands. Hydro turbines have
2133-569: Is privately owned. Private timber companies own some of the land between the national forest and the lower watershed, and some of it is public land managed by the Bureau of Land Management . Roughly 72 percent of the watershed is on public land; 25 percent is private, and 3 percent is owned by Native American tribes. The watershed's estimated population in 1995 was 63,702. The Clackamas River supplies drinking water to more than 200,000 people. The City of Estacada, Clackamas River Water,
2212-679: The Bonneville Dam in 1937 and being recognized by the Flood Control Act of 1936 as the premier federal flood control agency. Hydroelectric power stations continued to become larger throughout the 20th century. Hydropower was referred to as "white coal". Hoover Dam 's initial 1,345 MW power station was the world's largest hydroelectric power station in 1936; it was eclipsed by the 6,809 MW Grand Coulee Dam in 1942. The Itaipu Dam opened in 1984 in South America as
2291-549: The Industrial Revolution would drive development as well. In 1878, the world's first hydroelectric power scheme was developed at Cragside in Northumberland , England, by William Armstrong . It was used to power a single arc lamp in his art gallery. The old Schoelkopf Power Station No. 1 , US, near Niagara Falls , began to produce electricity in 1881. The first Edison hydroelectric power station,
2370-806: The International Exhibition of Hydropower and Tourism , with over one million visitors 1925. By 1920, when 40% of the power produced in the United States was hydroelectric, the Federal Power Act was enacted into law. The Act created the Federal Power Commission to regulate hydroelectric power stations on federal land and water. As the power stations became larger, their associated dams developed additional purposes, including flood control , irrigation and navigation . Federal funding became necessary for large-scale development, and federally owned corporations, such as
2449-633: The National Wild and Scenic Rivers System . Recreational opportunities in the basin include hiking, camping, and fishing for trout. A 70-foot (21 m) waterfall prevents salmon and other migratory fish from swimming upriver beyond the first 0.4 miles (0.6 km). Originating near South Fork Mountain in the Cascade Range, the river runs generally north through rugged terrain in the Mount Hood National Forest. Near
Clackamas River - Misplaced Pages Continue
2528-808: The Roaring River Wilderness . Another 4.2 miles (6.8 km) of the South Fork Clackamas River were designated as Wild and Scenic along with the creation of the Clackamas Wilderness in 2009. In March 2008, the United States Geological Survey (USGS) released a report entitled "Pesticide Occurrence and Distribution in the Lower Clackamas River Basin, Oregon, 2000–2005." It details pesticide pollution in
2607-736: The South Fork Clackamas River from the left opposite a landform known as Big Cliff. About 2 miles (3.2 km) later, the river enters North Fork Reservoir and soon receives the North Fork Clackamas River from the right. The Clackamas reaches the Faraday Dam , formerly known as the Cazadero Dam , about 28 miles (45 km) from the mouth and passes Faraday Lake, which is on the river's left about 2 miles (3.2 km) later. Shortly thereafter,
2686-581: The Tennessee Valley Authority (1933) and the Bonneville Power Administration (1937) were created. Additionally, the Bureau of Reclamation which had begun a series of western US irrigation projects in the early 20th century, was now constructing large hydroelectric projects such as the 1928 Hoover Dam . The United States Army Corps of Engineers was also involved in hydroelectric development, completing
2765-583: The Vulcan Street Plant , began operating September 30, 1882, in Appleton, Wisconsin , with an output of about 12.5 kilowatts. By 1886 there were 45 hydroelectric power stations in the United States and Canada; and by 1889 there were 200 in the United States alone. At the beginning of the 20th century, many small hydroelectric power stations were being constructed by commercial companies in mountains near metropolitan areas. Grenoble , France held
2844-505: The Warm Springs Indian Reservation to fish and to gather berries near Estacada through the 1930s. The river basin, made up of 16 subwatersheds, drains an area of about 940 square miles (2,400 km). Most of the upper half of the basin lies within the rugged Mount Hood National Forest, managed by the U.S. Forest Service , while most of the lower watershed, partly agricultural and more heavily populated,
2923-506: The potential energy of dammed water driving a water turbine and generator . The power extracted from the water depends on the volume and on the difference in height between the source and the water's outflow. This height difference is called the head . A large pipe (the " penstock ") delivers water from the reservoir to the turbine. This method produces electricity to supply high peak demands by moving water between reservoirs at different elevations. At times of low electrical demand,
3002-400: The water frame , and continuous production played a significant part in the development of the factory system, with modern employment practices. In the 1840s, hydraulic power networks were developed to generate and transmit hydro power to end users. By the late 19th century, the electrical generator was developed and could now be coupled with hydraulics. The growing demand arising from
3081-483: The Clackamas River receives Squirrel Creek from the left bank and Lemiti Creek from the right bank before entering Clackamas County about 76 miles (122 km) from the mouth. Over its next 10 miles (16 km), much of which is in a relatively level stretch known as Big Bottom , the river receives Cub Creek from the left, Sisi Creek from the right, then Hunter, Fawn, Rhododendron, and Lowe creeks, all from
3160-533: The Clackamas River, from Big Springs to Big Cliff, are federally protected as part of the NWSRS. Of these, 20 miles (32 km) are designated as "scenic" and 27 miles (43 km) as "recreational". The protected portion of the Clackamas features five categories of resources that are considered to be "outstandingly remarkable", defined by the NWSRS as having "importance to the region or nation". The five are opportunities for recreation such as white water rafting near
3239-416: The Clackamas receives Lingleback Creek from the right, passes under Oregon Route 211 at Estacada, receives Dubois Creek from the left, and reaches River Mill Dam . It flows by Milo McIver State Park , south of the river between 24 miles (39 km) and 20 miles (32 km) from its mouth. The river then flows by Bonnie Lure State Recreation Area , which lies to the north, and receives Eagle Creek from
Clackamas River - Misplaced Pages Continue
3318-518: The Clackamas receives the Collawash River from the left. At the confluence, Two Rivers Picnic Area is on the left and Riverford Campground is on the right. About 1 mile (1.6 km) further downstream, Trout Creek enters from the left, and Riverside Campground is on the right. Shortly thereafter, Tag Creek enters from the right, and at about 53 miles (85 km) from the mouth, the Clackamas River receives Oak Grove Fork Clackamas River from
3397-596: The Columbia River valley from Celilo Falls to the Pacific Ocean. The Clackamas lands, reaching into the Cascade Range foothills, included the lower Willamette River from Willamette Falls at what became Oregon City to the confluence with the Columbia. When Lewis and Clark visited the area in 1806, the Clackamas tribe consisted of about 1,800 people living in 11 villages. Big villages lay near
3476-463: The IEA released a main-case forecast of 141 GW generated by hydropower over 2022–2027, which is slightly lower than deployment achieved from 2017–2022. Because environmental permitting and construction times are long, they estimate hydropower potential will remain limited, with only an additional 40 GW deemed possible in the accelerated case. In 2021 the IEA said that major modernisation refurbishments are required. Most hydroelectric power comes from
3555-422: The Mount Hood National Forest. The Clackamas Ranger District of the U.S. Forest Service manages 79 percent of the land, the Bureau of Land Management 18 percent, while private owners control 3 percent. Elevations within the watershed vary from 4,852 feet (1.479 km) at South Fork Mountain to 676 feet (206 m) at the river mouth. Watersheds bordering the South Fork basin are Fish Creek to
3634-530: The Portland metropolitan area; anadromous fish habitat supporting wild late winter coho , spring chinook , and winter steelhead ; habitat for the federally threatened bald eagle and northern spotted owl ; potential habitat for the threatened peregrine falcon ; the forests of old-growth Douglas-fir along its banks; and historic importance. All 13.5 miles (21.7 km) of a tributary, the Roaring River , are designated as Wild and Scenic and are within
3713-464: The ability to transport particles heavier than itself downstream. This has a negative effect on dams and subsequently their power stations, particularly those on rivers or within catchment areas with high siltation. Siltation can fill a reservoir and reduce its capacity to control floods along with causing additional horizontal pressure on the upstream portion of the dam. Eventually, some reservoirs can become full of sediment and useless or over-top during
3792-595: The balance between stream flow and power production. Micro hydro means hydroelectric power installations that typically produce up to 100 kW of power. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without purchase of fuel. Micro hydro systems complement photovoltaic solar energy systems because in many areas water flow, and thus available hydro power,
3871-785: The combined Oak Lodge Water District and Sunrise Water Authority, the South Fork Water Board, and the City of Lake Oswego all draw water from the Clackamas. The Clackamas River Basin Council, with diverse representatives from over 20 stakeholder groups, fosters partnerships with organizations and private individuals to advocate natural resource conservation and preserve the watershed for future generations. Stakeholders include (but are not limited to) those involved in agriculture, education, fish and wildlife, hydropower, recreation, timber production, and government agencies. The watershed
3950-404: The daily rise and fall of ocean water due to tides; such sources are highly predictable, and if conditions permit construction of reservoirs, can also be dispatchable to generate power during high demand periods. Less common types of hydro schemes use water's kinetic energy or undammed sources such as undershot water wheels . Tidal power is viable in a relatively small number of locations around
4029-505: The dams, sometimes destroying biologically rich and productive lowland and riverine valley forests, marshland and grasslands. Damming interrupts the flow of rivers and can harm local ecosystems, and building large dams and reservoirs often involves displacing people and wildlife. The loss of land is often exacerbated by habitat fragmentation of surrounding areas caused by the reservoir. Hydroelectric projects can be disruptive to surrounding aquatic ecosystems both upstream and downstream of
SECTION 50
#17327729144574108-535: The designation of more than half of the length of the river into the National Wild and Scenic Rivers System (NWSRS). This environment also allowed Native Americans to settle in the river's basin as early as 10,000 years ago. Regulation of the river began in 1905 with the Cazadero Dam . In 1912, the River Mill Dam intercepted wood and coarse sediment. Later dams at North Fork , Oak Grove, Stone Creek, and Timothy Lake also intercepted wood sediment on
4187-705: The effect of forest decay. Another disadvantage of hydroelectric dams is the need to relocate the people living where the reservoirs are planned. In 2000, the World Commission on Dams estimated that dams had physically displaced 40–80 million people worldwide. Because large conventional dammed-hydro facilities hold back large volumes of water, a failure due to poor construction, natural disasters or sabotage can be catastrophic to downriver settlements and infrastructure. During Typhoon Nina in 1975 Banqiao Dam in Southern China failed when more than
4266-399: The excess generation capacity is used to pump water into the higher reservoir, thus providing demand side response . When the demand becomes greater, water is released back into the lower reservoir through a turbine. In 2021 pumped-storage schemes provided almost 85% of the world's 190 GW of grid energy storage and improve the daily capacity factor of the generation system. Pumped storage
4345-415: The falls and the mouth of the Clackamas River; others lay near Estacada and Eagle Creek . In the winter, families stayed in the villages, but at other times they used an extensive system of trails to visit seasonal camps. Epidemics of smallpox , malaria , and measles reduced the Clackamas population to 88 by 1851, and in 1855 the tribe surrendered its lands. Remnants of the tribe continued to travel from
4424-534: The forest is inundated, substantial amounts of greenhouse gases may be emitted. Construction of a hydroelectric complex can have significant environmental impact, principally in loss of arable land and population displacement. They also disrupt the natural ecology of the river involved, affecting habitats and ecosystems, and siltation and erosion patterns. While dams can ameliorate the risks of flooding, dam failure can be catastrophic. In 2021, global installed hydropower electrical capacity reached almost 1,400 GW,
4503-409: The fourth and final time. From here to near Gladstone, the river flows south and west of the highway, which is on its right. Below Carter Bridge, the Clackamas River receives Hellion Creek from the left about 40 miles (64 km) from the mouth, passes Big Eddy Campground, receives Moore Creek from the right, and passes Lazy Bend Campground. Around 35 miles (56 km) from the mouth, the river receives
4582-419: The headwaters, the 8-mile (13 km) river flows northwest, passing under Forest Road 4540, which parallels the river's left bank for about 1 mile (1.6 km). At this point the river flows under Forest Road 45, a loop road that follows ridges to the left and right of the South Fork for much of the rest of its course. Beyond Forest Road 45, the river turns to the northeast. At 4.2 miles (6.8 km) from
4661-506: The highest among all renewable energy technologies. Hydroelectricity plays a leading role in countries like Brazil, Norway and China. but there are geographical limits and environmental issues. Tidal power can be used in coastal regions. China added 24 GW in 2022, accounting for nearly three-quarters of global hydropower capacity additions. Europe added 2 GW, the largest amount for the region since 1990. Meanwhile, globally, hydropower generation increased by 70 TWh (up 2%) in 2022 and remains
4740-768: The larger river's confluence with the Willamette River . The 4.2 miles (6.8 km) of the South Fork Clackamas River between the East Fork of the South Fork and the mainstem Clackamas River were designated "wild" in the National Wild and Scenic Rivers System in 2009. Designated rivers are classified as either wild, scenic, or recreational depending on the degree of access and amount of nearby development. The South Fork Clackamas River basin covers 17,648 acres (71.42 km ) or about 27.6 square miles (71.5 km ) of rugged terrain, most of which lies within
4819-519: The largest renewable energy source, surpassing all other technologies combined. Hydropower has been used since ancient times to grind flour and perform other tasks. In the late 18th century hydraulic power provided the energy source needed for the start of the Industrial Revolution . In the mid-1700s, French engineer Bernard Forest de Bélidor published Architecture Hydraulique , which described vertical- and horizontal-axis hydraulic machines, and in 1771 Richard Arkwright 's combination of water power ,
SECTION 60
#17327729144574898-750: The largest, producing 14 GW , but was surpassed in 2008 by the Three Gorges Dam in China at 22.5 GW . Hydroelectricity would eventually supply some countries, including Norway , Democratic Republic of the Congo , Paraguay and Brazil , with over 85% of their electricity. In 2021 the International Energy Agency (IEA) said that more efforts are needed to help limit climate change . Some countries have highly developed their hydropower potential and have very little room for growth: Switzerland produces 88% of its potential and Mexico 80%. In 2022,
4977-516: The left, followed by Wall, Pinhead, and Campbell creeks, all from the right, Kansas Creek from the left, and Cabin Creek and Lost Creek, both from the right. About 61 miles (98 km) from the mouth, Granite Creek enters from the left, and the river flows by Austin Hot Springs and Picnic Area. Shortly thereafter, Switch Creek enters from the right, and at about 57 miles (92 km) from the mouth,
5056-579: The left. Thereafter, Rock Creek enters from the right and Johnson Creek from the left before the river passes under Interstate 205 and then Oregon Route 99E (McLoughlin Boulevard) between Oregon City to the south and Gladstone to the north. Clackamette Park lies to the left of the river's last stretch as it enters the Willamette 25 miles (40 km) above its confluence with the Columbia River . Before 1800, coniferous forests covered most of
5135-441: The lower Clackamas River, its tributaries, and in pre- and post-treatment drinking water. In all, 63 pesticide compounds: 33 herbicides, 15 insecticides, 6 fungicides, and 9 pesticide degradates were detected in samples collected during storm and nonstorm conditions. Fifty-seven pesticides or degradates were detected in the tributaries (mostly during storms), whereas fewer compounds (26) were detected in samples of source water from
5214-415: The lower mainstem Clackamas River, with fewest (15) occurring in drinking water. The study concluded, "Given their frequent and widespread occurrence, especially during storms, pesticides have the potential to affect aquatic life and the quality of drinking water derived from the lower river," and laid out areas for further study. Hydroelectric power Hydroelectricity , or hydroelectric power ,
5293-624: The lower river. The Clackamas River arises on the western slopes of the Cascade Range near Olallie Butte , between Mount Hood and Mount Jefferson in the Mount Hood National Forest . Flowing generally northwest and then west for about 83 miles (134 km), it joins the Willamette River at Gladstone . The river falls nearly 4,900 feet (1,500 m) between its source and its mouth . Originating in Marion County ,
5372-429: The mouth, it receives the East Fork of the South Fork Clackamas River from the right. Further downstream, Oscar Creek enters from the right, then Memaloose Creek from the right only 0.55 miles (0.89 km) from the mouth. Shortly thereafter the river plunges over the 70-foot (21 m) South Fork Clackamas River Falls (or South Fork Falls) before joining the Clackamas River at Big Cliff, about 35 miles (56 km) from
5451-456: The mouth. Near this point, Roaring River Campground is on the right. Shortly thereafter, Murphy Creek enters from the right, and Fish Creek enters from the left about 42 miles (68 km) from the mouth. Over the next few miles, the river flows by Fish Creek Campground and Armstrong Campground, where it passes under Route 224. The river then passes Lockaby Campground and Carter Bridge Campground, where it passes under Route 224 again for
5530-633: The plant site. Generation of hydroelectric power changes the downstream river environment. Water exiting a turbine usually contains very little suspended sediment, which can lead to scouring of river beds and loss of riverbanks. The turbines also will kill large portions of the fauna passing through, for instance 70% of the eel passing a turbine will perish immediately. Since turbine gates are often opened intermittently, rapid or even daily fluctuations in river flow are observed. Drought and seasonal changes in rainfall can severely limit hydropower. Water may also be lost by evaporation. When water flows it has
5609-450: The rainfall regime, could reduce total energy production by 7% annually by the end of the century. Lower positive impacts are found in the tropical regions. In lowland rainforest areas, where inundation of a part of the forest is necessary, it has been noted that the reservoirs of power plants produce substantial amounts of methane . This is due to plant material in flooded areas decaying in an anaerobic environment and forming methane,
5688-428: The right about 17 miles (27 km) from the mouth. It receives Goose Creek from the right before passing Barton County Park, which lies north of the river about 3 miles (5 km) downstream of Bonnie Lure. Deep Creek then enters from the right, Foster Creek from the left, and Richardson Creek from the right before the Clackamas River reaches Carver 8 miles (13 km) from the mouth. Here it receives Clear Creek from
5767-409: The right. From its confluence with Oak Grove Fork, the river runs close to Oregon Route 224 for most of the rest of its course. The highway is initially north and east of the river; that is, to its right. Over the next few miles, the river receives Big Creek, Sandstone Creek, and Whale Creek, all from the left, passes under Route 224, receives Cripple Creek, and passes under Route 224 again at
5846-469: The southeast, tributaries of the Molalla River to the southwest, Clear Creek to the northwest, and the Clackamas River to the northeast. A hiking guide calls the river "one of the most remote large streams in the state of Oregon". The Hillockburn Trail, which provides the only access to the lower river corridor, is 3.2 miles (5.1 km) round trip. It is usually open from mid-March to December,
5925-470: The unincorporated community of Three Lynx. It receives Three Lynx Creek and Deer Creek from the right, Cat Creek from the left, and then Dinner Creek from the right as it enters a chute known as The Narrows about 46 miles (74 km) from the mouth. Soon Pup Creek enters from the left opposite the Sunstrip Campground before Roaring River enters from the right at about 44 miles (71 km) from
6004-546: The watershed, and its streams supported big populations of salmon , steelhead , and other fish. Native Americans hunted, fished and gathered food and materials in the Clackamas River drainage as early as 10,000 years ago. By 2,000 to 3,000 years ago, they had established permanent settlements along the river's lower floodplain. This was home to the Clackamas tribe , a subgroup of the Chinookan speakers who lived in
6083-524: The world are hydroelectric power stations, with some hydroelectric facilities capable of generating more than double the installed capacities of the current largest nuclear power stations . Although no official definition exists for the capacity range of large hydroelectric power stations, facilities from over a few hundred megawatts are generally considered large hydroelectric facilities. Currently, only seven facilities over 10 GW ( 10,000 MW ) are in operation worldwide, see table below. Small hydro
6162-539: The world. The classification of hydropower plants starts with two top-level categories: The classification of a plant as an SHP or LHP is primarily based on its nameplate capacity , the threshold varies by the country, but in any case a plant with the capacity of 50 MW or more is considered an LHP. As an example, for China, SHP power is below 25 MW, for India - below 15 MW, most of Europe - below 10 MW. The SHP and LHP categories are further subdivided into many subcategories that are not mutually exclusive. For example,
6241-586: Was allowed to provide irrigation and power to citizens (in addition to aluminium power) after the war. In Suriname , the Brokopondo Reservoir was constructed to provide electricity for the Alcoa aluminium industry. New Zealand 's Manapouri Power Station was constructed to supply electricity to the aluminium smelter at Tiwai Point . Since hydroelectric dams do not use fuel, power generation does not produce carbon dioxide . While carbon dioxide