Rapid transit or mass rapid transit ( MRT ) or heavy rail , commonly referred to as metro , is a type of high-capacity public transport that is generally built in urban areas . A grade separated rapid transit line below ground surface through a tunnel can be regionally called a subway , tube , metro or underground . They are sometimes grade-separated on elevated railways , in which case some are referred to as el trains – short for "elevated" – or skytrains . Rapid transit systems are railways , usually electric , that unlike buses or trams operate on an exclusive right-of-way , which cannot be accessed by pedestrians or other vehicles.
97-404: Cross River Rail ( CRR ) is an underground heavy rail project currently under construction in Brisbane , Queensland, Australia. The project will see the development of a new rail line underneath the Brisbane River , together with the redevelopment of a number of stations in the Brisbane central business district as well as the Beenleigh railway line . The business case for the project
194-425: A body of water), which are potential congestion sites but also offer an opportunity for transfers between lines. Ring lines provide good coverage, connect between the radial lines and serve tangential trips that would otherwise need to cross the typically congested core of the network. A rough grid pattern can offer a wide variety of routes while still maintaining reasonable speed and frequency of service. A study of
291-454: A code for its stations. Unlike that of Singapore's MRT, it is mostly numbers. Based on the line number, for example Sinyongsan station, is coded as station 429. Being on Line 4, the first number of the station code is 4. The last two numbers are the station number on that line. Interchange stations can have multiple codes. Like City Hall station in Seoul which is served by Line 1 and Line 2. It has
388-651: A code of 132 and 201 respectively. The Line 2 is a circle line and the first stop is City Hall, therefore, City Hall has the station code of 201. For lines without a number like Bundang line it will have an alphanumeric code. Lines without a number that are operated by KORAIL will start with the letter 'K'. With widespread use of the Internet and cell phones globally, transit operators now use these technologies to present information to their users. In addition to online maps and timetables, some transit operators now offer real-time information which allows passengers to know when
485-631: A combination of construction methods, including cut-and-cover station box construction for some stations, mined station caverns for the CBD stations, and both Tunnel Boring Machines and Road-headers for tunnelling. In December 2019, work commenced on the demolition of the Brisbane Transit Centre . With an estimated capital cost of $ 5.4 billion it is expected to be the largest transport project ever built in Queensland. In addition,
582-583: A conventional track is often provided in case of flat tires and for switching . There are also some rubber-tired systems that use a central guide rail , such as the Sapporo Municipal Subway and the NeoVal system in Rennes , France. Advocates of this system note that it is much quieter than conventional steel-wheeled trains, and allows for greater inclines given the increased traction of
679-405: A dedicated right-of-way are typically used only outside dense areas, since they create a physical barrier in the urban fabric that hinders the flow of people and vehicles across their path and have a larger physical footprint. This method of construction is the cheapest as long as land values are low. It is often used for new systems in areas that are planned to fill up with buildings after the line
776-404: A high level conceptual plan for integrating tunnel operations into the existing network with an emphasis on high service levels and network reliability. Sectorisation was chosen over grade separation to reduce construction and maintenance costs while allowing for high frequencies. The sectorised network will also reduce the propagation of service perturbation, ensuring any delays are contained within
873-418: A large number of factors, including geographical barriers, existing or expected travel patterns, construction costs, politics, and historical constraints. A transit system is expected to serve an area of land with a set of lines , which consist of shapes summarized as "I", "L", "U", "S", and "O" shapes or loops. Geographical barriers may cause chokepoints where transit lines must converge (for example, to cross
970-652: A large part of the network, for example, in outer suburbs, runs at ground level. In most of Britain , a subway is a pedestrian underpass . The terms Underground and Tube are used for the London Underground . The North East England Tyne and Wear Metro , mostly overground, is known as the Metro . In Scotland , the Glasgow Subway underground rapid transit system is known as the Subway . In Ireland ,
1067-452: A line is obtained by multiplying the car capacity, the train length, and the service frequency . Heavy rapid transit trains might have six to twelve cars, while lighter systems may use four or fewer. Cars have a capacity of 100 to 150 passengers, varying with the seated to standing ratio – more standing gives higher capacity. The minimum time interval between trains is shorter for rapid transit than for mainline railways owing to
SECTION 10
#17327731551451164-615: A metro. In Spain, such systems are present in Madrid , Barcelona , Bilbao and Valencia . In Portugal, Lisbon has a metro. The Italian cities of Catania , Genoa , Milan , Naples , Rome and Turin also have metro lines. In Germany and Austria they rapid transit is known as U-Bahn , which are often supported by S-Bahn systems. In Germany, U-Bahn systems exist in Berlin , Hamburg , Munich and Nuremberg , while in Austria such
1261-424: A number of new stations on the branch line and trains running through Cross River Rail. Rapid transit Modern services on rapid transit systems are provided on designated lines between stations typically using electric multiple units on railway tracks . Some systems use guided rubber tires , magnetic levitation ( maglev ), or monorail . The stations typically have high platforms, without steps inside
1358-540: A process of building a new fleet of 65 EMUs capable of operating on the new corridor, with the government committing $ 600 million to the first 20 trains in 2020. In 2021 three manufacturers were shortlisted for the project and the Queensland Government committed $ 7.1 billion to build all 65 trains, with construction to take place at a purpose-built facility in Maryborough . The design of the trains, and
1455-614: A rapid transit setting. Albert Street, Brisbane Albert Street is a street in the Brisbane central business district , Queensland, Australia. It was named after Prince Albert , the Prince Consort of Queen Victoria of the United Kingdom. Albert Street railway station is being built directly beneath the street and is expected to open in 2026. The station precinct includes partial road closures as planned in
1552-604: A second rail crossing of the Brisbane river due to concerns that the only inner-city rail river crossing, the Merivale Bridge , would reach capacity. According to the project's business case, without the new tunnel overcrowding on most lines would be expected by 2026. Cross River Rail is considered to be the highest infrastructure priority by the Queensland Government . Infrastructure Australia evaluated
1649-672: A single sector. According to SEQ Rail Connect the three sectors will consist of the following line pairs: Sector 1 will operate north-south via the rebuilt Exhibition station and the Cross River Rail tunnel. Northern Lines include the Sunshine Coast line, Caboolture line and the Redcliffe Peninsula line. Southern Lines include the Gold Coast line and Beenleigh line. Sector 2 will operate east-west via
1746-565: A specialized transit police may be established. These security measures are normally integrated with measures to protect revenue by checking that passengers are not travelling without paying. Some subway systems, such as the Beijing Subway , which is ranked by Worldwide Rapid Transit Data as the "World's Safest Rapid Transit Network" in 2015, incorporates airport-style security checkpoints at every station. Rapid transit systems have been subject to terrorism with many casualties, such as
1843-608: A system exists in Vienna . In addition, the small, car-free town of Serfaus in the Austrian state of Tyrol also features a short U-Bahn line. There are no U-Bahn systems in the German-speaking part of Switzerland, but the city of Lausanne has its own, small metro system. In Zurich, Switzerland's largest city, a project for a U-Bahn network was stopped by a referendum in the 1970s and instead its S-Bahn system
1940-801: Is a shortened reference to a metropolitan area . Rapid transit systems such as the Washington Metrorail , Los Angeles Metro Rail , the Miami Metrorail , and the Montreal Metro are generally called the Metro . In Philadelphia , the term "El" is used for the Market–Frankford Line which runs mostly on an elevated track, while the term "subway" applies to the Broad Street Line which is almost entirely underground. Chicago 's commuter rail system that serves
2037-608: Is a single corporate image for the entire transit authority, but the rapid transit uses its own logo that fits into the profile. A transit map is a topological map or schematic diagram used to show the routes and stations in a public transport system. The main components are color-coded lines to indicate each line or service, with named icons to indicate stations. Maps may show only rapid transit or also include other modes of public transport. Transit maps can be found in transit vehicles, on platforms , elsewhere in stations, and in printed timetables . Maps help users understand
SECTION 20
#17327731551452134-407: Is being relocated and rebuilt to the south of Annerley Road . Boggo Road in the inner-city suburb of Dutton Park will be a busy transport hub with a direct interchange available with the proposed Brisbane Metro . The station will provide direct pedestrian access to Princess Alexandra Hospital and is proposed that 134 trains will pass through the station during the morning peak. Easy access to
2231-506: Is built. Most rapid transit trains are electric multiple units with lengths from three to over ten cars. Crew sizes have decreased throughout history, with some modern systems now running completely unstaffed trains. Other trains continue to have drivers, even if their only role in normal operation is to open and close the doors of the trains at stations. Power is commonly delivered by a third rail or by overhead wires . The whole London Underground network uses fourth rail and others use
2328-416: Is necessary, rolling stock with a smaller loading gauge from one sub network may be transported along other lines that use larger trains. On some networks such operations are part of normal services. Most rapid transit systems use conventional standard gauge railway track . Since tracks in subway tunnels are not exposed to rain , snow , or other forms of precipitation , they are often fixed directly to
2425-555: Is referred to simply as "the subway", despite 40% of the system running above ground. The term "L" or "El" is not used for elevated lines in general as the lines in the system are already designated with letters and numbers. The "L" train or L (New York City Subway service) refers specifically to the 14th Street–Canarsie Local line, and not other elevated trains. Similarly, the Toronto Subway is referred to as "the subway", with some of its system also running above ground. These are
2522-412: Is serviced by at least one specific route with trains stopping at all or some of the line's stations. Most systems operate several routes, and distinguish them by colors, names, numbering, or a combination thereof. Some lines may share track with each other for a portion of their route or operate solely on their own right-of-way. Often a line running through the city center forks into two or more branches in
2619-748: Is the most commonly used term for underground rapid transit systems used by non-native English speakers. Rapid transit systems may be named after the medium by which passengers travel in busy central business districts ; the use of tunnels inspires names such as subway , underground , Untergrundbahn ( U-Bahn ) in German, or the Tunnelbana (T-bana) in Swedish. The use of viaducts inspires names such as elevated ( L or el ), skytrain , overhead , overground or Hochbahn in German. One of these terms may apply to an entire system, even if
2716-475: The Boggo Road busway station ), Woolloongabba , Albert Street and Roma Street , towards upgraded stations at Exhibition and Bowen Hills . A new line through the city centre was needed because of the centralised nature of the existing inner-city network of stations. If any inner-city services were interrupted it led to traffic bottlenecks that rippled across city-wide services. The tunnel will utilise
2813-627: The Dublin Area Rapid Transit is despite the name considered a commuter rail due to usage of mainline railways. In France, large cities, such as Paris , Marseille and Lyon , feature a Métro . Also the smaller cities of Lille Rennes have a light metro. Furthermore, Brussels in Belgium, and Amsterdam and Rotterdam in the Netherlands have metro systems in place. Several Southern European contries also have
2910-602: The European Train Control System , and Automatic Train Operation . The maximum capacity is 24 trains per hour in each direction. According to the project's business case the desired design speed is 80 km/h (50 mph). The four new underground stations will have platform screen doors, a first for Brisbane. Platforms will be 220m long to accommodate future nine-car trains, though the tunnel will initially run six-car trains. The project will utilise
3007-752: The Hudson and Manhattan Railroad K-series cars from 1958, the New York City Subway R38 and R42 cars from the late-1960s, and the Nagoya Municipal Subway 3000 series , Osaka Municipal Subway 10 series and MTR M-Train EMUs from the 1970s, were generally only made possible largely due to the relatively generous loading gauges of these systems and also adequate open-air sections to dissipate hot air from these air conditioning units. Especially in some rapid transit systems such as
Cross River Rail - Misplaced Pages Continue
3104-592: The Ipswich railway line to use the tunnel via the Tennyson railway line . It also allowed the existing rail yards at Clapham to be used as stabling yards, negating the need to build a new storage depot for trains elsewhere. In June 2012, the newly elected Newman Government announced plans for a scaled down version of the project estimated to cost $ 4.5 billion. The revised plan excluded upgrades to existing stations and extra above-ground train lines south or north of
3201-429: The London Underground . In 1868, New York opened the elevated West Side and Yonkers Patent Railway , initially a cable-hauled line using stationary steam engines . As of 2021 , China has the largest number of rapid transit systems in the world – 40 in number, running on over 4,500 km (2,800 mi) of track – and was responsible for most of the world's rapid-transit expansion in
3298-740: The Metropolitan Railway opened publicly in London in 1863. High capacity monorails with larger and longer trains can be classified as rapid transit systems. Such monorail systems recently started operating in Chongqing and São Paulo . Light metro is a subclass of rapid transit that has the speed and grade separation of a "full metro" but is designed for smaller passenger numbers. It often has smaller loading gauges, lighter train cars and smaller consists of typically two to four cars. Light metros are typically used as feeder lines into
3395-578: The Montreal Metro (opened 1966) and Sapporo Municipal Subway (opened 1971), their entirely enclosed nature due to their use of rubber-tyred technology to cope with heavy snowfall experienced by both cities in winter precludes any air-conditioning retrofits of rolling stock due to the risk of heating the tunnels to temperatures that would be too hot for passengers and for train operations. In many cities, metro networks consist of lines operating different sizes and types of vehicles. Although these sub-networks may not often be connected by track, in cases when it
3492-589: The Prague Metro . The London Underground and Paris Métro are densely built systems with a matrix of crisscrossing lines throughout the cities. The Chicago 'L' has most of its lines converging on The Loop , the main business, financial, and cultural area. Some systems have a circular line around the city center connecting to radially arranged outward lines, such as the Moscow Metro 's Koltsevaya Line and Beijing Subway 's Line 10 . The capacity of
3589-685: The Singapore MRT , Changi Airport MRT station has the alphanumeric code CG2, indicating its position as the 2nd station on the Changi Airport branch of the East West Line. Interchange stations have at least two codes, for example, Raffles Place MRT station has two codes, NS26 and EW14, the 26th station on the North South Line and the 14th station on the East West Line. The Seoul Metro is another example that utilizes
3686-585: The University of Queensland will be available by transfer at the nearby Boggo Road busway station . Woolloongabba will provide direct access to the Gabba Stadium and to the Mater health precinct . It has nearby access to the high capacity South East Busway to the west. The Gabba is planned to be rebuilt for the 2032 Brisbane Olympics , for which it will serve as the main stadium. As part of this,
3783-450: The deep tube lines . Historically, rapid transit trains used ceiling fans and openable windows to provide fresh air and piston-effect wind cooling to riders. From the 1950s to the 1990s (and in most of Europe until the 2000s), many rapid transit trains from that era were also fitted with forced-air ventilation systems in carriage ceiling units for passenger comfort. Early rapid transit rolling stock fitted with air conditioning , such as
3880-409: The linear motor for propulsion. Some urban rail lines are built to a loading gauge as large as that of main-line railways ; others are built to a smaller one and have tunnels that restrict the size and sometimes the shape of the train compartments. One example is most of the London Underground , which has acquired the informal term "tube train" due to the cylindrical shape of the trains used on
3977-432: The 15 world largest subway systems suggested a universal shape composed of a dense core with branches radiating from it. Rapid transit operators have often built up strong brands , often focused on easy recognition – to allow quick identification even in the vast array of signage found in large cities – combined with the desire to communicate speed, safety, and authority. In many cities, there
Cross River Rail - Misplaced Pages Continue
4074-488: The 1995 Tokyo subway sarin gas attack and the 2005 " 7/7 " terrorist bombings on the London Underground. Some rapid transport trains have extra features such as wall sockets, cellular reception, typically using a leaky feeder in tunnels and DAS antennas in stations, as well as Wi-Fi connectivity. The first metro system in the world to enable full mobile phone reception in underground stations and tunnels
4171-621: The 2010s. The world's longest single-operator rapid transit system by route length is the Shanghai Metro . The world's largest single rapid transit service provider by number of stations (472 stations in total) is the New York City Subway . The busiest rapid transit systems in the world by annual ridership are the Shanghai Metro, Tokyo subway system , Seoul Metro and the Moscow Metro . The term Metro
4268-517: The 2014 City Centre Master Plan, Albert Street is marked as a park to park link. In the plan the street aims to cater for casual outdoor dining as well as pedestrian access to large scale events at the King George Square and Riverstage . Albert Street is one of the earliest streets in Brisbane . Albert Hall was an entertainment venue from 1901 to 1969 on the north side of Albert Street between Ann Street and Turbot Street , to
4365-565: The 2014 City Centre Master Plan, for the creation of a new public space. The street forms a key city axis. The southern part of Albert Street is low-lying and prone to flooding; it was part of the historic Frog's Hollow district. The Brisbane City Council has a vision to turn Albert Street into a subtropical boulevard linking the Roma Street Parklands and Wickham Park with the City Botanic Gardens . In
4462-532: The 21st century, most new expansions and systems are located in Asia, with China becoming the world's leader in metro expansion, operating some of the largest and busiest systems while possessing almost 60 cities that are operating, constructing or planning a rapid transit system . Rapid transit is used for local transport in cities , agglomerations , and metropolitan areas to transport large numbers of people often short distances at high frequency . The extent of
4559-642: The Cross River Rail Delivery Authority to deliver the new project and any related public transport projects. After finalisation of a business case in August 2017, construction officially started in September 2017, when work began on demolishing the defunct GoPrint building at Woolloongabba, to make way for Cross River Rail. In April 2019, the Queensland Government appointed a CIMIC Group led consortium to deliver various aspects of
4656-520: The Gold and Sunshine Coasts directly, operating trains from Varsity Lakes and Beenleigh through to Redcliffe Peninsula, Nambour and Gympie. Sector Two will link the Rosewood and Springfield lines through Central to the domestic airport and Shorncliffe. Sector Three will run Ferny Grove trains through Central and Southbank to Cleveland. A report titled the 2008 Inner City Rail Capacity Study predicted that
4753-674: The Mall, in connection with the busway tunnel from the Queen Street bus station to the King George Square busway station . An underground railway station is expected to open in Albert Street in 2024 as part of the Cross River Rail project. In the 1940s, an American soldier batooned and injured his Australian counterpart here. Albert Street has a number of heritage-listed sites, including: At 102 Albert Street,
4850-468: The Queensland Government announced a revised plan for the BaT (Bus and Train) project as an alternative to the previous Cross River Rail proposal. The revised plan involved a 14.8 m (48 ft 7 in) external diameter (13.5 m (44 ft 3 in) internal diameter) 5.4 kilometres (3.4 mi) tunnel to accommodate both a dual track rail line on the lower level and a two lane busway above. The cost
4947-474: The State Government. As part of the project 4 new underground stations will be built in Brisbane, 8 stations will be rebuilt including Exhibition station and stations between Dutton Park and Salisbury, and 3 new stations will be built on the Gold Coast line. Four new underground rail stations will be built in central Brisbane, while Exhibition station will be expanded. Dutton Park railway station
SECTION 50
#17327731551455044-435: The basis of the project cost estimates and are prone to design maturity risks. Construction started in September 2017, with completion scheduled by 2024. The Labor Government has stated the project will provide more than 1,500 jobs each year during construction, and boost the Queensland economy by $ 70 million. The New Generation Rollingstock fleet will operate in the tunnels. The Queensland Government has also initiated
5141-478: The beginning of rapid transit. Initial experiences with steam engines, despite ventilation, were unpleasant. Experiments with pneumatic railways failed in their extended adoption by cities. In 1890, the City & South London Railway was the first electric-traction rapid transit railway, which was also fully underground. Prior to opening, the line was to be called the "City and South London Subway", thus introducing
5238-426: The business case in 2017 and expressed concerns that the rail patronage projections may not be achieved and that the benefits in the business case may be overstated. However, Infrastructure Australia still listed Cross River Rail as a priority project. Under the plan, Queensland Rail Citytrain will operate in three sectors, all connecting at the existing or new underground Roma Street stations. Sector One will connect
5335-441: The city's north, connecting existing Brisbane rail lines . The project includes 5.9 km (3.7 mi) of twin tunnels and will deliver four new underground stations at Boggo Road , Woolloongabba , Albert Street and Roma Street , with Exhibition station upgraded. Tunnelling for the project was completed in 2021, with construction planned to be complete by 2025 and the new line operational by early 2026. The project provides
5432-499: The demand for Brisbane peak train services would double by 2016. The Infrastructure Australia review of the current project highlighted that the 2011 business case projected the 2016 rail patronage – without Cross River Rail – as 374,000 passengers per day. The Queensland Rail Annual Report for 2015–16 reports patronage of approximately 150,000 passengers per day for the Citytrain network in 2015–16. Between Salisbury and Dutton Park
5529-414: The display of the transit network. Often this has the effect of compressing the distance between stations in the outer area of the system, and expanding distances between those close to the center. Some systems assign unique alphanumeric codes to each of their stations to help commuters identify them, which briefly encodes information about the line it is on, and its position on the line. For example, on
5626-611: The entire metropolitan area is called Metra (short for Met ropolitan Ra il), while its rapid transit system that serves the city is called the "L" . Boston's subway system is known locally as "The T". In Atlanta , the Metropolitan Atlanta Rapid Transit Authority goes by the acronym "MARTA." In the San Francisco Bay Area , residents refer to Bay Area Rapid Transit by its acronym "BART". The New York City Subway
5723-520: The eventual service plan for Cross River Rail, have not been detailed by the government. The project is being delivered through public-private partnerships and contracts, and is arranged into three major infrastructure packages. The first is the Tunnel, Stations and Development public-private partnership to deliver the main underground and tunnelling works, the Rail, Integration and Systems alliance to deliver
5820-644: The existing inner-city core network. Eastern Lines are the Shorncliffe line, Airport line and Doomben line. Western Lines include the Ipswich and Rosewood line and Springfield Central line. Sector 3 will operate east-west via the existing inner-city core network and the Merivale bridge incorporating the Ferny Grove and Cleveland lines. Exact line pairings and operations have not been publicly revealed by
5917-489: The existing line is used by freight trains traveling to the Port of Brisbane and a terminal at Acacia Ridge , and the expected rise in the number of passengers services may interrupt freight services unless a new line is built. The Merivale Bridge is the only inner-city rail crossing in Brisbane, and by 2016 it was expected to be over capacity, leading the Queensland Government to plan for this project. The original plans for
SECTION 60
#17327731551456014-516: The floor rather than resting on ballast , such as normal railway tracks. An alternate technology, using rubber tires on narrow concrete or steel roll ways , was pioneered on certain lines of the Paris Métro and Mexico City Metro , and the first completely new system to use it was in Montreal , Canada. On most of these networks, additional horizontal wheels are required for guidance, and
6111-439: The interconnections between different parts of the system; for example, they show the interchange stations where passengers can transfer between lines. Unlike conventional maps, transit maps are usually not geographically accurate, but emphasize the topological connections among the different stations. The graphic presentation may use straight lines and fixed angles, and often a fixed minimum distance between stations, to simplify
6208-521: The left of Albert Street Methodist (now Uniting) Church . Albert Hall was replaced by the SGIO / Suncorp Building. Albert Street originally ran from Alice Street to Wickham Terrace . The section between Adelaide Street and Ann Street was closed to traffic in 1968 and now forms part of King George Square in front of Brisbane City Hall . The section of Albert Street between Queen Street Mall and Adelaide Street has now been converted into part of
6305-602: The lines of the Lyon Metro includes a section of rack (cog) railway , while the Carmelit , in Haifa, is an underground funicular . For elevated lines, another alternative is the monorail , which can be built either as straddle-beam monorails or as a suspended monorail . While monorails have never gained wide acceptance outside Japan, there are some such as Chongqing Rail Transit 's monorail lines which are widely used in
6402-439: The main rapid transit system. For instance, the Wenhu Line of the Taipei Metro serves many relatively sparse neighbourhoods and feeds into and complements the high capacity metro lines. Some systems have been built from scratch, others are reclaimed from former commuter rail or suburban tramway systems that have been upgraded, and often supplemented with an underground or elevated downtown section. Ground-level alignments with
6499-418: The network map "readable" by illiterate people, this system has since become an "icon" of the system. Compared to other modes of transport, rapid transit has a good safety record, with few accidents. Rail transport is subject to strict safety regulations , with requirements for procedure and maintenance to minimize risk. Head-on collisions are rare due to use of double track, and low operating speeds reduce
6596-423: The new stadium will be closely integrated with the new Woolloongabba Cross River Rail station. Albert Street will provide rail services to the southern part of the Brisbane CBD , providing direct access to the Parliament of Queensland and Queensland University of Technology, Gardens Point Campus . A station in the southern CBD was vital as both the existing Roma Street station and Central station are located in
6693-411: The new tunnel. The revised plan was expected to be completed by 2020. Thirty-nine commercial properties were to have been resumed for the project, including the Royal on the Park hotel and another nine properties in the central business district. One hundred and five residential properties at Yeerongpilly were to have been resumed for the expansion of the Yeerongpilly railway station . In November 2013,
6790-402: The next vehicle will arrive, and expected travel times. The standardized GTFS data format for transit information allows many third-party software developers to produce web and smartphone app programs which give passengers customized updates regarding specific transit lines and stations of interest. Mexico City Metro uses a unique pictogram for each station. Originally intended to help make
6887-487: The northern part of the city. A station in this area places it within walking distance of new growth areas such as Queen's Wharf and 1 William Street . The new underground Roma Street station will be an extension of the existing ground-level station that will provide direct access to the existing bus and train network as well the proposed Brisbane Metro. Demolition of the Brisbane Transit Centre commenced in December 2019, with it to be relocated partially underground near
6984-958: The occurrence and severity of rear-end collisions and derailments . Fire is more of a danger underground, such as the King's Cross fire in London in November 1987, which killed 31 people. Systems are generally built to allow evacuation of trains at many places throughout the system. High platforms , usually over 1 meter / 3 feet, are a safety risk, as people falling onto the tracks have trouble climbing back. Platform screen doors are used on some systems to eliminate this danger. Rapid transit facilities are public spaces and may suffer from security problems: petty crimes , such as pickpocketing and baggage theft, and more serious violent crimes , as well as sexual assaults on tightly packed trains and platforms. Security measures include video surveillance , security guards , and conductors . In some countries
7081-603: The only two North American systems that are primarily called "subways". In most of Southeast Asia and in Taiwan , rapid transit systems are primarily known by the acronym MRT . The meaning varies from one country to another. In Indonesia , the acronym stands for Moda Raya Terpadu or Integrated Mass [Transit] Mode in English. In the Philippines , it stands for Metro Rail Transit . Two underground lines use
7178-587: The outset. Budapest , Chicago , Glasgow , Boston and New York City all converted or purpose-designed and built electric rail services. Advancements in technology have allowed new automated services. Hybrid solutions have also evolved, such as tram-train and premetro , which incorporate some of the features of rapid transit systems. In response to cost, engineering considerations and topological challenges some cities have opted to construct tram systems, particularly those in Australia, where density in cities
7275-570: The pre-2009 figures supplied by Queensland Rail due to double counting of patronage figures. The current 2016 proposed 10.2-kilometre (6.3 mi) rail link involves building a new 5.9-kilometre (3.7 mi) tunnel under the Brisbane River and the Brisbane central business district , creating five new inner city station precincts, and increasing the core capacity of the rail network. The alignment will extend from Dutton Park , through four new underground stations at Boggo Road (adjacent to
7372-417: The project were released on 11 November 2010. The project included a 9.8-kilometre (6.1 mi) tunnel, two new surface stations as well as four new underground stations. Upgrades to Moorooka and Rocklea were also proposed. Underground stations were proposed to include retail facilities, and a maximum of 120,000 passengers were claimed to be able to be moved during the morning peak period. The city station
7469-517: The project's detailed business case identifies the project will result in costs of $ 4.9 billion for additional services and complementary growth projects, and $ 4.4 billion for operation and maintenance costs over a 30-year period. On 13 June 2017, the Queensland Government allocated $ 2.8 billion to start building the rail link. The remaining $ 2.6 billion of capital costs and other project costs is proposed to be allocated in future budgets. Infrastructure Australia has observed that early project designs formed
7566-559: The project. The consortium began work in late 2019, with a five year construction time frame. In June 2021, construction was halted over one weekend because of worker concerns about the potential release of dangerous silica dust from the conveyor belt carrying tunnel spoil to the surface. Spoil from the diggings is transported to Rochedale where it is made into bricks at a brickworks. The bricks will be used in housing construction in South East Queensland. One of
7663-644: The rail system upgrades, and the European Train Control System contract to deliver the new signalling system. These contracts were awarded in 2019. Cross River Rail will add an additional sector to the rail network, replacing the current main and suburban sectors. Exact operations of the network are yet to be publicly revealed, however in 2022 SEQ Rail Connect was published by the Department of Transport and Main Roads. The document serves as
7760-908: The rapid transit system varies greatly between cities, with several transport strategies. Some systems may extend only to the limits of the inner city, or to its inner ring of suburbs with trains making frequent station stops. The outer suburbs may then be reached by a separate commuter rail network where more widely spaced stations allow higher speeds. In some cases the differences between urban rapid transit and suburban systems are not clear. Rapid transit systems may be supplemented by other systems such as trolleybuses , regular buses , trams , or commuter rail. This combination of transit modes serves to offset certain limitations of rapid transit such as limited stops and long walking distances between outside access points. Bus or tram feeder systems transport people to rapid transit stops. Each rapid transit system consists of one or more lines , or circuits. Each line
7857-539: The river linking Albert Street and Woolloongabba stations. Jacobs Engineering Group is responsible for reconfiguring the existing network, supply and installation of supporting rail systems and seven station upgrades. The first test train went along the tunnel in October 2024. In March 2022, it was announced that the Maroochydore railway line would be planned and built ahead of the 2032 Brisbane Olympics, with
7954-542: The rubber tires. However, they have higher maintenance costs and are less energy efficient. They also lose traction when weather conditions are wet or icy, preventing above-ground use of the Montréal Metro and limiting it on the Sapporo Municipal Subway, but not rubber-tired systems in other cities. Some cities with steep hills incorporate mountain railway technologies in their metros. One of
8051-474: The south of Annerley Road . Yeerongpilly station's existing lifts and footbridge will be retained. In July 2021, the State Government announced that a further three stations would be built on the Gold Coast railway line as part of Cross River Rail. These will be located at Pimpama , Hope Island and Merrimac . In April 2016, the Queensland Government announced it would pass legislation to establish
8148-1046: The suburb of Bowen Hills will undergo an extensive upgrade. The station only opens a few times a year, servicing special events such as the Brisbane Ekka held at the Brisbane Showgrounds . After the station is upgraded, it will open year-round with high-frequency services connecting the surrounding residential community. Seven existing rail stations will be upgraded at Dutton Park station , Fairfield station , Yeronga station , Yeerongpilly station , Moorooka station , Rocklea station and Salisbury station . Stations will be rebuilt with additional accessibility features (such as braille maps and rubber platform gap fillers), high level platforms, new lifts, new enclosed stairs and overpasses for weather protection, and new drop-off and cycling facilities. Stations will also receive an additional third platform apart from Dutton Park station which will also be relocated and rebuilt to
8245-663: The suburbs, allowing a higher service frequency in the center. This arrangement is used by many systems, such as the Copenhagen Metro , the Milan Metro , the Oslo Metro , the Istanbul Metro and the New York City Subway . Alternatively, there may be a single central terminal (often shared with the central railway station), or multiple interchange stations between lines in the city center, for instance in
8342-714: The term subway . In Thailand , it stands for Metropolitan Rapid Transit , previously using the Mass Rapid Transit name. Outside of Southeast Asia, Kaohsiung and Taoyuan, Taiwan , have their own MRT systems which stands for Mass Rapid Transit , as with Singapore and Malaysia . In general rapid transit is a synonym for "metro" type transit, though sometimes rapid transit is defined to include "metro", commuter trains and grade separated light rail . Also high-capacity bus-based transit systems can have features similar to "metro" systems. The opening of London's steam-hauled Metropolitan Railway in 1863 marked
8439-530: The term Subway into railway terminology. Both railways, alongside others, were eventually merged into London Underground . The 1893 Liverpool Overhead Railway was designed to use electric traction from the outset. The technology quickly spread to other cities in Europe , the United States, Argentina, and Canada, with some railways being converted from steam and others being designed to be electric from
8536-511: The trains, requiring custom-made trains in order to minimize gaps between train and platform. They are typically integrated with other public transport and often operated by the same public transport authorities . Some rapid transit systems have at-grade intersections between a rapid transit line and a road or between two rapid transit lines. The world's first rapid transit system was the partially underground Metropolitan Railway which opened in 1863 using steam locomotives , and now forms part of
8633-428: The tunnel boring machines (TBM) was named after Professor Else Shephard, the other after Merle Thornton . Pre-cast concrete segments were manufactured at Wacol by Wagners, a Toowoomba-based construction company. TBM Else completed its tunnel boring when it broke through to the northern portal on 25 November 2021. The second machine completed its tunnelling on 17 December 2021. By September 2022, track had been laid under
8730-418: The underground platform entrances. A set of new high rise buildings will occupy the site. The subway and busway platforms at Roma Street station are also receiving a facelift as part of the project, to better integrate the new and existing station. Customers transferring from the above ground station to the underground or vice versa will benefit from a tap-less interchange. The existing Exhibition station in
8827-601: The use of communications-based train control : the minimum headway can reach 90 seconds, but many systems typically use 120 seconds to allow for recovery from delays. Typical capacity lines allow 1,200 people per train, giving 36,000 passengers per hour per direction . However, much higher capacities are attained in East Asia with ranges of 75,000 to 85,000 people per hour achieved by MTR Corporation 's urban lines in Hong Kong. Rapid transit topologies are determined by
8924-559: Was Singapore's Mass Rapid Transit (MRT) system, which launched its first underground mobile phone network using AMPS in 1989. Many metro systems, such as the Hong Kong Mass Transit Railway (MTR) and the Berlin U-Bahn, provide mobile data connections in their tunnels for various network operators. The technology used for public, mass rapid transit has undergone significant changes in the years since
9021-899: Was developed further. Other Central European countries also have metro lines, for example in the cities of Budapest (Hungary), Prague (Czech Republic) and Warsaw (Poland). In Eastern Europe , metro systems are in operation in Minsk (Belarus), Kyiv (Ukraine), Riga (Latvia), Vilnius (Lithuania) and Moscow (Russia). In Southeastern European countries, there are metro systems in Athens and Thessaloniki (Greece), Belgrade (Serbia), Sofia (Bulgaria) and Istanbul (Turkey). In Northern Europe , rapid transit systems exist in Copenhagen (Denmark), Oslo (Norway), Stockholm (Sweden) and Helsinki (Finland). Various terms are used for rapid transit systems around North America . The term metro
9118-466: Was expected to be $ 5 billion with construction proposed to start in 2015 and completion in 2021. Citytrain patronage is quoted as having increased at an annual average of 3.4% between 2006 and 2012, compared to an average annual population increase of 2.4% over the same period, confirming forecasts that the Merivale Bridge will reach capacity some time between 2016 and 2021. However, this capacity constraint may be over pessimistic as doubt has been cast on
9215-702: Was low and suburbs tended to spread out . Since the 1970s, the viability of underground train systems in Australian cities, particularly Sydney and Melbourne , has been reconsidered and proposed as a solution to over-capacity. Melbourne had tunnels and stations developed in the 1970s and opened in 1980. The first line of the Sydney Metro was opened in 2019. Since the 1960s, many new systems have been introduced in Europe , Asia and Latin America . In
9312-428: Was released in August 2017, with construction officially beginning in September 2017. The project replaced the planned 2013 BaT Tunnel , which in turn replaced the original 2010 Cross River Rail proposal. It is the largest infrastructure megaproject ever undertaken in Queensland. Cross River Rail consists of a new 10.2 km (6.3 mi) line through the CBD from Dutton Park in the city's south to Bowen Hills in
9409-409: Was to be built under Albert Street , with two entrances and allowing for trains up to 200 m (656 ft 2 in) in length. Proposed stations at Woolloongabba and Exhibition were to be named The Gabba and The Ekka respectively. Yeerongpilly was chosen as the southern portal because it had less impact on residents than a tunnel entrance at Fairfield . An entrance there would allow trains on
#144855