Misplaced Pages

Wolverine (train)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#954045

77-566: The Wolverine is a higher-speed passenger train service operated by Amtrak as part of its Michigan Services . The 304-mile (489 km) line provides three daily round-trips between Chicago and Pontiac, Michigan , via Ann Arbor and Detroit . It carries a heritage train name descended from the New York Central Railroad ( Michigan Central ). During fiscal year 2023, the Wolverine carried 420,569 passengers,

154-468: A 14.5% increase from FY2022's total of 367,254 passengers. Before Amtrak's takeover of most private-sector passenger service in 1971 the Wolverine was one of three trains which operated over the Michigan Central route between Chicago and Detroit. Under Penn Central operation it continued through South-Western Ontario (Canada) to Buffalo, New York . Amtrak retained two trains (the other was

231-558: A Semi-High Speed Train. In 2021, Indian Railways started to upgrade Rajdhani Coaches to Tejas coaches. This replaced its traditional LHB Rajdhani coaches On 15 February 2021, the Agartala Rajdhani Express was upgraded with Tejas livery Sleeper Coaches. On 19 July 2021, the Mumbai Rajdhani Express was upgraded to Tejas class smart coaches. LHB Rajdhani coaches. On 1 September 2021

308-410: A change to the signalling system to account for increased braking distance. Prior to the project, the system comprised a mixture of equipment from pre- WWI mechanical signalling to the remote control systems of the 1980s. In some cases, operators needed to telephone the local operators to manually control the signal boxes. With the new speeds, the signalling needed to be computerized. The project employed

385-708: A class of railcars built by United Goninan , Broadmeadow for Transwa in 2004–05 to replace the WAGR WCA/WCE class railcars on the AvonLink and Prospector services in Australia . They are capable of high-speed operation. In China, higher-speed railways are railways that are not officially categorized as high-speed rail but allow CRH EMUs run on it with speeds up to 200 km/h. Typically these lines are classified as Grade I conventional railways and are used by both passenger and freight services. Note that

462-424: A legacy railway line to high speed railway standards (speeds in excess of 250 km/h or 155 mph), but usually falling short on the intended speeds. The faster speeds are achieved through various means including new rolling stock such as tilting trains, upgrades to tracks including shallower curves, electrification, in-cab signalling, and less frequent halts/stops. As with the definitions of high-speed rail ,

539-507: A male householder with no wife present, and 28.5% were non-families. 21.5% of all households were made up of individuals, and 6.1% had someone living alone who was 65 years of age or older. The average household size was 2.65 and the average family size was 3.12. The median age in the town was 39.1 years. 25.6% of residents were under the age of 18; 7.6% were between the ages of 18 and 24; 27% were from 25 to 44; 29.2% were from 45 to 64; and 10.7% were 65 years of age or older. The gender makeup of

616-581: A smoother ride at higher speeds, the lengths of rail may be welded together to form continuous welded rail (CWR). However, the continuous welded rails are vulnerable to stress due to changes in temperature. In Australia, the track condition before the Regional Fast Rail project could only support trains up to speeds of 130 km/h (80 mph). The tracks are with mixture of wooden and concrete ties. The rail weight varies but with majority being 47 kg/m (95 lb/yd). The track upgrade in

693-440: A temporary platform just east of the old station. Besides Pontiac, new stations were opened at Royal Oak and Troy . The Lake Cities also began serving Pontiac after the end of Toledo service in 1995. Amtrak dropped individual names again in 2004 and named all three trains Wolverine . Due to the increased ridership on these trains, Amtrak tested an additional Chicago-Kalamazoo Wolverine frequency September 2 to 7, 2010. This

770-611: A top speed of 110 mph (175 km/h). In 1999, the concept of Regional Fast Rail project was initiated by the Government of Victoria with a goal to provide express higher-speed rail services between four main regional centres of Victoria ( Geelong , Ballarat , Bendigo and the Latrobe Valley ) and Melbourne . The initiative included a key component to upgrade rail infrastructure to have top speeds up to 160 km/h (100 mph). The development phase of initiative

847-475: A total area of 6.48 square miles (16.78 km ), of which 6.2 square miles (16.06 km ) (or 95.68%) is land and 0.28 square miles (0.73 km ) (or 4.32%) is water. As of the census of 2010, there were 4,858 people, 1,832 households, and 1,310 families living in the town. The population density was 783.5 inhabitants per square mile (302.5/km ). There were 1,978 housing units at an average density of 319.0 per square mile (123.2/km ). The racial makeup of

SECTION 10

#1732786748955

924-696: A victim of their own success. Although fast (and flashy), they were unable to reach their design speed of 125 miles per hour (201 km/h) because of the poor quality of the Penn Central track in Michigan. The five-car fixed consists had a maximum capacity of 292 passengers, which was often not enough. Starting in March 1976 Amtrak began replacing some of the Turboliners with conventional equipment, including new Amfleet coaches. Individual names returned to

1001-462: Is median separators which are installed along the center line of roadways, extending approximately 70 to 100 feet from the crossing, to discourage drivers from running around the crossing gates. More active devices include the four-quadrant gate , which blocks both sides of each traffic lane. Longer gate arms can cover 3/4 of the roadway. Video cameras can also be installed to catch the violators. A signal monitoring system can also be installed to alert

1078-486: Is India's first train operated by private operators, IRCTC , a subsidiary of Indian Railways . The Ahmedabad – Mumbai Tejas express, also operated by IRCTC was inaugurated on the 17 January 2020. From 1 September 2021, the train LHB Rajdhani Rakes are replaced with LHB Tejas Sleeper Rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h making it

1155-601: Is a semi high-speed rail project inaugurated in 2023. Trains, called Namo Bharat trains , can reach speeds of up to 180 kilometers per hour. Porter, Indiana Porter is a town in Westchester Township , Porter County , in the U.S. state of Indiana . The population was 5,210 as of the 2020 census . Porter is in the Indiana Dunes ecosystem, which played a role in the creation of The Nature Conservancy, and inspired conservation efforts. It

1232-443: Is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks. Though the definition of higher-speed rail varies from country to country, most countries refer to rail services operating at speeds up to 200 km/h (125 mph). The concept is usually viewed as stemming from efforts to upgrade

1309-438: Is an example of deliberately reduced speeds). Identifiers starting with S indicates metropolitan services using CRH rolling stock and have a different fare system to the national one. Their maximum speed is 160 km/h. Note: The start and end station in the following lists accounts only CRH services. * denotes some section of this line doesn't have 160 km/h CRH services. (including Second track ) This section lists

1386-860: Is based on the British Rail designed High Speed Train and entered service in April 1982. It came to fruition in January 1978 when the Public Transport Commission invited tenders for 25 high-speed railcars similar to the Prospector railcars delivered by Comeng to the Western Australian Government Railways in 1971. Comeng's proposal for a train based on the InterCity 125 was announced as

1463-566: Is compatible with higher-speed rail operation. They are both transponder -based and GPS -based PTC systems currently in use in the United States. By a mandate, a significant portion of the railroads in the United States will be covered by PTC by the end of 2015. To support trains that run regularly at higher speeds, the rails need to be reliable. Most freight tracks have wooden ties which cause rails to become slightly misaligned over time due to wood rot, splitting and spike -pull (where

1540-586: Is home to Porter Beach, also known as Johnson's Beach, on Lake Michigan. Porter is noted for its proximity to Indiana Dunes State Park and for its railroad heritage. Porter was the southern terminus for the Chicago and West Michigan Railway . Porter had its start in the 1850s when the railroad was extended to that point. The Joseph Bailly Homestead is located in Indiana Dunes National Park on Howe Road, just north of U.S. 20. It

1617-651: Is the residence of three generations of the Bailly family. Joseph and Marie Bailly arrived here in 1822 from the St. Joseph River in Michigan. He had been a fur trader on Lake Michigan for nearly 30 years when he set up his family home along the Little Calumet River . The Chellberg Farm is also a three generation home, but of the family of Anders Kjellburg (Chellberg). He brought his family to this Swedish community in 1869, purchasing 80 acres (32 ha) from

SECTION 20

#1732786748955

1694-400: Is the safety of grade crossings (also known as level crossings , flat level crossings , non- grade-separated crossings) which limits how fast trains can go. FRA regulations set speed limits for tracks with grade crossings as follows: Level crossings are generally the most dangerous part of the railway network with a large number of fatal incidents occurring at a grade crossing. In Europe,

1771-938: The Blue Water and International , or the local Michigan Executive commuter service. Shortly after Amtrak began operating the ex- Penn Central services, trains regained names, train #14/17 reclaimed Wolverine and train #355/356, formerly the Twilight Limited , became the Saint Clair . Turboliner Service was used in conjunction with conventional named Amfleet -equipped service. The Wolverine operates over Norfolk Southern Railway , Amtrak, Conrail, and Canadian National Railway trackage: As of 2024, each Wolverine operates with two state-owned Siemens Charger locomotives, 3-5 Siemens Venture coaches, one Venture business class car, and one Venture cafe car. Amfleet and Horizon cars are still sometimes used as

1848-524: The Rajendra Nagar Patna Rajdhani Express was upgraded to Tejas rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h. In 2019, Vande Bharat Express , also known as Train 18 , was inaugurated. This is an Indian higher-speed rail intercity electric multiple unit . It was designed and built by Integral Coach Factory (ICF) at Perambur , Chennai under

1925-573: The Solid State Interlocking with the newly laid fiber-optic communication between the components to use three computer systems to control the signals. When the output of one computer differs from the other two, the system will fail that computer and continue the signal operations as long as the outputs from the other two computers are consistent. The project deployed the Train Protection & Warning System which allows

2002-595: The Windsor–Quebec City Corridor . The service would require track upgrades and the construction of a border processing facility. An intermediate Amtrak Thruway bus connection to Toronto was also raised. The extension is planned to begin service in 2027, pending customs approvals and track upgrades. This table shows the names given to trains which operated over the Chicago-Detroit corridor under Amtrak. It excludes trains that diverge at Battle Creek,

2079-886: The Amtrak-owned railcars used on the route. Despite this proposal, the Talgo railcars remained at the Amtrak facility in Beech Grove until 2019 when they were moved back to Milwaukee. In 2019, the trains were being considered for use for the Amtrak Cascades route in the Pacific Northwest instead of in Michigan, but the trains were ultimately sold to Nigeria for use on the Lagos Rail Mass Transit . The bilevel car order never materialized due to

2156-648: The Bailly descendants. The farm is located on Mineral Springs Road, north of U.S. 20 . The Augsburg Swedish Lutheran Church and Cemetery are located on Beam Street, west of town. The cemetery was founded in 1878. In addition to the Joseph Bailly Homestead, the Good Fellow Club Youth Camp and Porter Town Hall are listed on the National Register of Historic Places . According to the 2010 census, Porter has

2233-877: The Detroit–Chicago corridor was designated by the Federal Railroad Administration as a high-speed rail corridor and in October 2010, the State of Michigan received US$ 150 million from the federal government to increase track speeds to 110 mph (177 km/h) between Kalamazoo and Dearborn. In 2016, work to allow higher-speed operation on 41 miles (66 km) of track between Battle Creek and Jackson, including "...replacing 26,000 railroad ties, repairing or installing 15 track switches, realigning or modifying 29 railroad curves, repairing 23 railroad grade crossings and improving road profiles at crossings",

2310-678: The FRA establishes classification of track quality which regulates the speed limits of trains with Class 5, Class 6, Class 7 and Class 8 for top speeds of 90 mph (145 km/h), 110 mph (175 km/h), 125 mph (200 km/h) and 160 mph (255 km/h), respectively. The FRA also regulates passenger train design and safety standards to ensure trains that operate at speeds of 80 mph (130 km/h) up to 125 mph (200 km/h) comply with its Tier I standard and trains that operate at speeds up to 150 mph (240 km/h) comply with its Tier II standard. Another limitation

2387-540: The FRA limits train speeds to 110 mph (175 km/h) without an "impenetrable barrier" at each crossing. Even with that top speed, the grade crossings must have adequate means to prevent collisions. Another option is grade separation , but it could be cost-prohibitive and the planners may opt for at-grade crossing improvements instead. The safety improvements at crossings can be done using combination of techniques. This includes passive devices such as upgraded signage and pavement markings. Another low-cost passive device

Wolverine (train) - Misplaced Pages Continue

2464-525: The Indian government's Make in India initiative over a span of 18 months. The unit cost of the first rake was given as ₹ 1 billion (US$ 12 million), though the unit cost is expected to go down with subsequent production. At the original price, it is estimated to be 40% cheaper than a similar train imported from Europe. The train was launched on 15 February 2019, from Delhi to Varanasi . The service

2541-558: The US, see High-speed rail in the United States Higher-speed rail Higher-speed rail ( HrSR ), also known as high-performance rail , higher-performance rail , semi-high-speed rail or almost-high-speed rail , is the jargon used to describe inter-city passenger rail services that have top speeds of more than conventional rail but are not high enough to be called high-speed rail services. The term

2618-538: The United States, railroad tracks are largely used for freight with at-grade crossings . Passenger trains in many corridors run on shared tracks with freight trains . Most trains are limited to top speeds of 79 mph (127 km/h) unless they are equipped with an automatic cab signal , automatic train stop , automatic train control or positive train control system approved by the Federal Railroad Administration (FRA). In developing higher-speed rail services, one of those safety systems must be used. Additionally,

2695-580: The Venture cars are being gradually phased into service. The locomotives operate in push-pull configuration, with one locomotive on each end of the consist. Due to the FRA requirement of positive train control for operations above 79 mph, locomotives on the Wolverine are required to have Positive Train Control, supplied by Amtrak's Incremental Train Control System. Because of this modification

2772-780: The above limitations, many regional transportation planners focus on rail improvements to have the top speeds up to 110 mph (175 km/h) when proposing a new higher-speed rail service. In countries where there had been rail improvement projects in the later part of the 20th century and into the 2000s, there are inter-city rail services with comparable speed ranges of higher-speed rail, but they are not specifically called "higher-speed rail". Below are some examples of such services that are still in operation. Some commuter rail services that cover shorter distances may achieve similar speeds but they are not typically called as higher-speed rail. Some examples are: There are many types of trains that can support higher-speed rail operation. Usually,

2849-402: The average family size was 3.12. In the town, the population was spread out, with 28.3% under the age of 18, 9.9% from 18 to 24, 32.6% from 25 to 44, 21.5% from 45 to 64, and 7.8% who were 65 years of age or older. The median age was 33 years. For every 100 females, there were 95.4 males. For every 100 females age 18 and over, there were 92.7 males. The median income for a household in the town

2926-583: The construction of a train platform in the Depot Town area of the city along the Wolverine route. MDOT estimated that the stop would attract 9,000 annual riders. In June 2020 the city rescinded the $ 2 million after failing to receive a federal grant to move the project forward. The last train to serve Ypsilanti was the Twilight Limited in 1985. In August 2019, Amtrak proposed extending at least one round trip from Detroit to Toronto via

3003-469: The construction work that could potentially disrupt the train services. The followings are some strategies used by regional transportation planners and rail track owners for their rail improvement projects in order to start the higher-speed rail services. In Victoria , Australia, the increased top speeds from 130 to 160 km/h (80 to 100 mph) in the Regional Fast Rail project required

3080-608: The corridor, with the heretofore unnamed third train becoming the Twilight Limited . The last Turboliners left the corridor in 1981. Amtrak extended the Wolverine and Twilight Limited to Pontiac on May 5, 1994. With this change service began at a new station in Detroit's New Center . Although the Michigan Central Station in Corktown, Detroit , had closed on January 6, 1988, trains continued to stop at

3157-484: The crews when the crossing equipment has malfunctioned. In Norway, grade crossing speed are not permitted to exceed 160 km/h (100 mph). In areas where there is frequent interference between freight and passenger trains due to congestion which causes the passenger trains to slow down, more extensive improvements may be needed. Certain segments of the line in congested areas may need to be rerouted. New track may need to be laid to avoid many curves which slow down

Wolverine (train) - Misplaced Pages Continue

3234-526: The definition varies by country. The term has been used by government agencies, government officials, transportation planners, academia, the rail industry, and the media, but sometimes with overlaps in the speed definitions. Some countries with an established definition of higher-speed rail include: In Canada, the assumption about grade crossing is that operating higher-speed rail services between 160 and 200 km/h (99 and 124 mph) would require "improved levels of protection in acceptable areas". In

3311-493: The deliberately reduced scenarios mentioned in "train identifiers" section above. Since 1997, ongoing construction to upgrade and built higher-speed lines capable of speeds of up to 200 km/h (120 mph) is conducted. The P.A.Th.E. Plan ( Patras - Athens - Thessaloniki - Evzonoi ), as it is called aims at reduced journey times between Greece's main cities (Athens, Thessaloniki and Patra) as well as an improved rail connection between Greece and North Macedonia . Currently, only

3388-549: The diesel-electric counterpart. The fuel consumption, locomotive maintenance costs and track wear of all all-electric locomotives are also lower. Furthermore, electric traction makes the operator more independent of oil price fluctuations and imports, as electricity can be generated from domestic resources or renewable energy. This was a major consideration in the electrification of the German Democratic Republic network , as lignite (and therefore electricity)

3465-544: The failure of a critical crash test by the manufacturer. In the end, the order was switched to new single-level Siemens Venture cars that are similar to the Brightline fleet. By January 2021, some Venture cars had been delivered to Amtrak for testing and were being deployed on the Wolverine route for test runs. Michigan was also involved in a joint purchase with other states to purchase the new Siemens Charger locomotives. For 150 mph (241 km/h) or more in

3542-423: The higher speed limit in fiscal year 2024. In a June 2014 report prepared for MDOT, the number of round trips on the Wolverine line was projected to increase from 3 to 10 by the year 2035. By that time, the line was planned to have double-tracking for about 75% of the route. As of 2015, about 160 mi (260 km) of the line was not double-tracked. In March 2016, Ypsilanti approved $ 2 million toward

3619-454: The higher superelevation, will require track modification to have transition spirals to and from those curves to be longer. Old turnouts may need replacement to allow trains to run through the turnouts at higher speeds. In the United States, some old turnouts have speed limit of 20 mph (30 km/h). Even with newer turnouts (rated #20), the diverging speed limit is still at 45 mph (70 km/h) which would significantly slow down

3696-425: The higher-speed train passing through those sections. High-speed turnouts (rated #32.7) are capable of handling maximum diverging speeds of 80 mph (130 km/h). In order to minimize the downtime to upgrade tracks, a track renewal train (TRT) can automate much of the process, replacing rails, ties, and ballast at the rate of 2 miles per day. In the United States, a TRT is used by Union Pacific Railroad on

3773-435: The length of track. When straight routes are not possible, reducing the number of curves and lowering the degree of curvature would result in higher achievable speeds on those curves. An example is the elimination of three consecutive reverse curves in favor of one larger curve. Raising superelevation may be considered for sharp curves which significantly limit speed. The higher speeds on those modified curves, together with

3850-417: The limit is often 160 km/h (100 mph) over grade crossings. In Sweden there is a special rule permitting 200 km/h (125 mph) if there are barriers and automatic detection of road vehicles standing on the track. In Russia 250 km/h (155 mph) is permitted over grade crossings. The United Kingdom has railway lines of 200 km/h (125 mph) which still use grade crossings. With

3927-500: The majority of high-speed lines are also called "passenger-only"( Chinese : 客运专线 ) lines. Inside mainland China this word invokes a sense of higher-speed rail but the wording usage is inconsistent. Identifiers starting with G indicates at least part of the train's route operates at a maximum 300 km/h or above (this is a characteristic of the line rather than the precise maximum speed of this exact train) and not running at deliberately reduced speed on any section. Other sections of

SECTION 50

#1732786748955

4004-424: The modernized lines of Domokos – Thessaloniki , Athens Airport – Kiato , and Thessaloniki – Strymonas are in operation at maximum speeds of 160 km/h (99 mph). The Gatimaan Express was India's first semi-high speed train. In October 2014, the railways applied for safety certificate from Commission of Railway Safety to start the service. In June 2015, the train was officially announced. The train

4081-408: The population. There were 1,844 households, out of which 38.4% had children under the age of 18 living with them, 55.8% were married couples living together, 10.8% had a female householder with no husband present, and 29.5% were non-families. 23.3% of all households were made up of individuals, and 5.9% had someone living alone who was 65 years of age or older. The average household size was 2.62 and

4158-596: The power plants. Substations are required for each of the 40-mile (64 km) lengths to reduce severe voltage losses. There is also a need to consider the required amount of power supply and new power plants may be required. For locomotives, new electric locomotives are needed or existing diesel-electric locomotives can be retrofitted into all-electric locomotives, but it is a complicated task. These factors cause electrification to have high initial investment costs. The advantages of all-electric locomotives are that they provide quieter, cleaner and more reliable operations than

4235-434: The project included changing to use concrete ties and to use new standard of rail weight at 60 kg/m (121 lb/yd) in order to support the new top speeds of 160 km/h (100 mph). There may be restriction in maximum operating speeds due to track geometry of existing line, especially on curves. Straightening the route, where possible, will reduce the travel time by increasing the allowable speeds and by reducing

4312-564: The purchase agreement, MDOT also agreed to double-track the line east of Ypsilanti . On May 25, 2021, the maximum speed on the 45-mile (72 km) section between Kalamazoo and Albion was increased to 110 mph (177 km/h). The section between Albion and Jackson was expected to be upgraded to the higher speed limit during fiscal year 2022, followed by the Ypsilanti to Dearborn section in fiscal year 2023. The final MDOT-owned section between Jackson and Ypsilanti would be targeted for

4389-432: The rail infrastructure needs to be upgraded prior to such operation. However, the requirements to the infrastructure (signalling systems, curve radii, etc.) greatly increase with higher speeds, so an upgrade to a higher-speed standard is often simpler and less expensive than building new high-speed lines. But an upgrade to existing track currently in use, with busy traffic in some segments, introduces challenges associated with

4466-657: The renamed St. Clair ) and truncated the operation to Detroit but otherwise changed little. In April 1975, Amtrak introduced French-built Turboliner equipment to the Michigan route and added a third round-trip. A pool of three Turboliner trainsets served the route, and the three round-trip pairs were numbered 350—355, train numbers which are still in use today. Amtrak dropped the individual train names and rebranded all three Turboliner , in common with similar services to St. Louis, Missouri and Milwaukee, Wisconsin . The new equipment led to massive gains in ridership, topping 340,000 in 1975 and 370,000 in 1976. The Turboliners became

4543-557: The route may have lower speeds as low as 160 km/h. Identifiers starting with C indicates short-distance travel using CRH trains, the maximum speed is irrelevant (ranging from 160 km/h Ürümqi-Korla service to 350 km/h Beijing-Tianjin (via intercity) service). Identifiers starting with D indicates CRH services with maximum speed 265 km/h or less, including overnight sleepers on 310 km/h Beijing-Guangzhou line (running them 310 km/h overnight not only causes noises but also disturbs sleeping patterns of passengers. This

4620-406: The route, safety at all at-grade crossings needs to be considered. In Australia, the levels of upgrade of the crossing in the rail improvements project were based on the risk analysis. The improvements included flashing light protection, automatic full barriers protection, and pedestrian gates crossings. The project also introduced the use of rubber panels at the crossings. In the United States,

4697-407: The spike is gradually loosened from the tie). The concrete ties used to replace them are intended to make the track more stable, particularly with changes in temperature. Rail joints are also an issue, since most conventional rail lines use bolts and fishplates to join two sections of the rail together. This causes the joint to become slightly misaligned over time due to loosening bolts. To make for

SECTION 60

#1732786748955

4774-423: The state of Michigan reached an agreement with Talgo , a Spanish railcar manufacturer, to buy two trainsets for the Wolverine , at a cost of $ 58 million. The trains had been previously built for the state of Wisconsin, before plans for expanded passenger rail service in that state were canceled and the trainsets placed in storage. The new equipment would have provided a substantial upgrade in passenger amenities over

4851-577: The successful bidder in October 1976. The Tilt Train is the name for two similar tilting train services, one electric and the other diesel , operated by Queensland Rail on the North Coast line from Brisbane to Rockhampton and Cairns . In May 1999 the Electric Tilt Train set an Australian train speed record of 210 km/h (130 mph) north of Bundaberg , a record that still stands. The Transwa WDA/WDB/WDC class are

4928-468: The system to automatically applies the brakes at a sufficient distance to stop the train if the driver does not control the speeds adequately. The project also incorporated Train Control and Monitoring System to allow real-time monitoring of the position of trains. In the United States, the first step to increase top speeds from 79 mph (127 km/h) is to install a new signal system that incorporates FRA-approved positive train control (PTC) system that

5005-914: The third rail system is not generally used for higher-speed rail. One example in the United States that does involve electrification is the Keystone Improvement Project to provide higher-speed rail service along the Harrisburg - Pittsburgh segment of the Keystone Corridor in Pennsylvania . The plan includes additional track, a new signal system and electrification. If completed as planned, this would allow Amtrak to utilize electric power continuously on service from Philadelphia to Pittsburgh. The first segment ("Main Line") has already been using electric locomotives with

5082-544: The town was 49.5% male and 50.5% female. As of the census of 2000, there were 4,972 people, 1,844 households, and 1,300 families living in the town. The population density was 788.8 inhabitants per square mile (304.6/km ). There were 1,966 housing units at an average density of 311.9 per square mile (120.4/km ). The racial makeup of the town was 96.14% White , 0.82% African American , 0.22% Native American , 0.58% Asian , 0.62% from other races , and 1.61% from two or more races. Hispanic or Latino of any race were 4.69% of

5159-419: The town was 94.3% White , 1.1% African American , 0.3% Native American , 0.9% Asian , 1.6% from other races , and 1.7% from two or more races. Hispanic or Latino of any race were 6.6% of the population. There were 1,832 households, of which 35.6% had children under the age of 18 living with them, 56.3% were married couples living together, 9.7% had a female householder with no husband present, 5.5% had

5236-504: The track shared with future higher-speed rail service in Illinois area. For electrified track, the old catenary may need to be replaced. The fixed-tension catenary which is acceptable for low speeds may not be suitable for regular higher-speed rail services, where a constant tension is automatically maintained when temperature changes cause the length of the wire to expand or contract. With trains running at higher speeds throughout

5313-455: The trains. In stretches of heavy freight train traffic, adding passing sidings along the segment should be considered. Sometimes certain stations may need to be bypassed. Another consideration is electrification . Electrifying a railway line entails a major upgrade to the rail infrastructure and equipment. On the infrastructure side, it requires catenary lines to be built above the tracks. New transmission lines are needed to carry power from

5390-544: The units equipped with PTC are usually captive to the Michigan services. Between 2016-2018 Michigan expected to take delivery of new bilevel cars which would displace the Horizons and Amfleets in regular service. In addition, in early 2014 the Michigan Department of Transportation issued a request for proposal aimed at acquiring additional passenger equipment for use between 2014-2017. In September 2014,

5467-684: Was between 2000 and 2002. Finally, the services on four lines began between 2005 and 2006 with top speeds of 160 km/h using VLocity trains. Additionally, Queensland Rail 's Tilt Train , the Prospector and NSW TrainLink's XPT all have a top service speed of 160 km/h (99–100 mph). The New South Wales XPT (short for Express Passenger Train) is the main long-distance passenger train operated by NSW TrainLink on regional railway services in New South Wales , Australia from Sydney to Dubbo , Grafton , and Casino as well as interstate destinations, Brisbane and Melbourne . The XPT

5544-457: Was cheap and plentiful domestically whereas oil had to be imported at world market prices. An alternative to catenary lines is to use a third rail system which has a semi-continuous rigid conductor placed alongside or between the rails of a railway track. However the operating speeds of this type of systems cannot be greater than 100 mph (160 km/h) due to its limitation of the power supply gaps at turnouts and grade crossings. Therefore,

5621-783: Was completed. Amtrak owns the 97-mile (156 km) stretch of the Wolverine's route from Porter, Indiana to Kalamazoo, Michigan and it is the longest segment of track owned by Amtrak outside of the Northeast Corridor . Starting in January 2002 Amtrak began track improvements to increase the allowed speed along this section of track. Amtrak trains currently travel at top speeds of 110 mph (177 km/h) along this section of track. In December 2012, MDOT completed its purchase from Norfolk Southern of 135 miles (217 km) of track between Kalamazoo and Dearborn. This will make it easier to maintain track and eventually upgrade it to 110-mile-per-hour (180 km/h) running. As part of

5698-418: Was done to determine all that would be involved in operations should Amtrak decide to initiate such service in the future. Michigan City station closed on April 4, 2022. At that time, it was served by just 1 + 1 ⁄ 2 round trips. The federal government considers high-speed rail service to be rail service which at any time reaches the speed of 110 miles per hour (177 km/h) or higher. In 2006

5775-525: Was launched on 5 April 2016 and completed its maiden journey between Nizamuddin and Agra Cantt within 100 minutes. But due to low occupancy, Indian Railways first extended this train from Agra to Gwalior on 19 February 2018 and then to Jhansi on 1 April 2018. The Tejas Express was Introduced by Indian Railways in 2017. It features modern onboard facilities with doors which are operated automatically. Tejas means "sharp", "lustre" and "brilliance" in many Indian languages. The inaugural run of Tejas Express

5852-534: Was named 'Vande Bharat Express' on 27 January 2019. On 5 October 2019, a second Vande Bharat Express was opened from Delhi to Katra On 30 September 2022, Prime Minister Narendra Modi inaugurated a 3rd Vande Bharat Express rake connecting Mumbai and Ahmedabad passing through Surat . This rake was an upgraded second generation version. an other second generation rake was inaugurated from Delhi to Una passing through Chandigarh . The Delhi Meerut Regional Rapid Transit System (RRTS), also known as RapidX ,

5929-422: Was on 24 May 2017 from Mumbai Chhatrapati Shivaji Maharaj Terminus to Karmali , Goa . It covered 552 km in 8 hours and 30 minutes. On 1 March 2019, second Tejas Express of the country was flagged off between Chennai Egmore and Madurai Junction by Prime Minister Narendra Modi . It covered 497 km in 6 hours and 30 minutes. Lucknow – New Delhi Tejas Express , which was inaugurated on 4 October 2019,

#954045