Auto-Train Corporation ( reporting mark AUCX ), stylized auto-train , was a privately owned passenger railroad that operated from 1971 to 1981. Its trains included autorack cars, enabling passengers to bring their own vehicles on their journey. The company used its own rolling stock , and traveled on rails leased from major railroads. It served central Florida from points in the Mid-Atlantic region near Washington, D.C. , and the Midwest near Louisville, Kentucky . The company failed after 10 years despite the popularity of the service on its primary route, which parallels busy Interstate 95 in five states along the eastern U.S. coast.
95-465: After a hiatus, a similarly named and operated service, Auto Train , began under the government-financed Amtrak in 1983, which became one of the railroad's most popular services. An idea of Auto-Train Corporation founder Eugene K. Garfield , a former employee of the U.S. Department of Transportation , the novel approach allowed families to relax en route and save the expense and unfamiliarity of
190-496: A caboose , then an unusual sight on most passenger trains. The engines were freight types, purchased at much lower cost than passenger types. But they lacked steam generators , so heat to the passenger cars was supplied by steam-generator cars. Passengers rode in wide coach seats or private first-class sleeping compartments , and meals were served in dining cars. Their vehicles were carried in enclosed autoracks . The company's first autoracks were acquired used, and started life in
285-567: A "quasi-public corporation" to take over the operation of intercity passenger trains. Matters were brought to a head on June 21, 1970, when the Penn Central , the largest railroad in the Northeastern United States and teetering on bankruptcy, filed to discontinue 34 of its passenger trains. In October 1970, Congress passed, and President Richard Nixon signed into law (against the objections of most of his advisors),
380-718: A "transitional CEO" who would reorganize Amtrak before turning it over to new leadership. On November 17, 2016, the Gateway Program Development Corporation (GDC) was formed for the purpose of overseeing and effectuating the rail infrastructure improvements known as the Gateway Program. GDC is a partnership of the States of New York and New Jersey and Amtrak. The Gateway Program includes the Hudson Tunnel Project, to build
475-438: A damage claim is later filed. The passengers leave their vehicles here and take their carry-on bags with them into the station to await boarding. The vehicles are then staged near the autorack ramps by size and length for optimal loading order and are then loaded onto the autoracks. Motorcycle owners help tie their bikes down to a motorcycle carrier that is then loaded into the autorack. Passengers cannot access their vehicles during
570-521: A day's pay for 100-to-150-mile (160 to 240 km) workdays. Streamliners covered that in two hours. Matters approached a crisis in the 1960s. Passenger service route-miles fell from 107,000 miles (172,000 km) in 1958 to 49,000 miles (79,000 km) in 1970, the last full year of private operation. The diversion of most United States Post Office Department mail from passenger trains to trucks, airplanes, and freight trains in late 1967 deprived those trains of badly needed revenue. In direct response,
665-489: A full train. The first 30 vehicles off belong to passengers who have paid an extra fee, a service Amtrak has offered by the name Priority Vehicle Offloading since April 2013. The fee has risen from $ 50 in 2016 to $ 60 in 2017 to $ 95 in 2023. Lorton, Virginia , is about a half-hour drive south of Washington, D.C., near Interstate 95 in Northern Virginia . Amtrak's new Lorton terminal opened in early 2000 as
760-577: A large overhang of debt from years of underfunding. In the mid-1990s, Amtrak suffered through a serious cash crunch. Under Downs, Congress included a provision in the Taxpayer Relief Act of 1997 that resulted in Amtrak receiving a $ 2.3 billion tax refund that resolved their cash crisis. However, Congress also instituted a "glide path" to financial self-sufficiency, excluding railroad retirement tax act payments. George Warrington became
855-472: A new engineer and conductors take over and the train takes on fuel and water. No passengers embark or disembark here. The schedule calls for the trains to arrive in Lorton and Sanford about 10 a.m. the next day. When the trains arrive on time, they have covered the 855-mile (1,376 km) journey in about 17 hours, at an average speed of about 50 miles per hour (80 km/h). Passengers cannot immediately leave
950-634: A new tunnel under the Hudson River and rehabilitate the existing century-old tunnel, and the Portal North Bridge, to replace a century-old moveable bridge with a modern structure that is less prone to failure. Later projects of the Gateway Program, including the expansion of track and platforms at Penn Station New York, construction of the Bergen Loop and other improvements will roughly double capacity for Amtrak and NJ Transit trains in
1045-453: A pair of derailments stretched the company's finances to the breaking point. Service ceased in April 1981. Amtrak planned to introduce a Midwest–Florida auto train service called " AutoTrak " in 1974. Running between Indianapolis and Poinciana , it would have competed with Auto-Train's Louisville–Sanford service. Amtrak built a terminal at Poinciana, acquired 20 auto-carrier cars, and ran
SECTION 10
#17327831899981140-526: A popular following, particularly among older travelers. No one else offered a similar service until, after a gap of almost two years, service was revived by Amtrak (the National Railroad Passenger Corporation), as their Auto Train service. Auto-Train used 13 GE U36B locomotives (4 additional units were ordered but were never delivered due to financial issues) as the primary motive power for its trains. Also included in
1235-440: A profit of $ 1.6 million on revenues of $ 20 million. In May 1974, service began over a second route between Florida and Louisville, Kentucky , and the company was mulling additional service between Chicago and Denver . The Louisville extension proved to be the company's undoing. The decaying Louisville and Nashville Railroad track between Louisville and Florida (which also hampered Amtrak's Floridian ) hindered operations, and
1330-454: A rental car on arrival. The Auto-Train consists included passenger cars , autoracks , and a caboose . Although the company had its own locomotives and rolling stock, Auto-Train Corporation trains initially operated on Seaboard Coast Line (SCL) and Richmond, Fredericksburg & Potomac (RF&P) tracks. Auto-Train Corporation's new service began operations on December 6, 1971, between Lorton, Virginia , and Sanford, Florida . The service
1425-443: A replacement for the original station built during the 1970s, and features a large, modern waiting area with high glass walls. The station was designed by architect Hanny Hassan. The suspended sculpture in the lobby was designed by Patrick Sheridan. The platform is 1,480 feet (451 m) long. Lorton was selected as site of the northern terminal because the 20-foot-2-inch (6.15 m) high autoracks were too tall to pass through
1520-651: A test train loaded with rented autos on April 30 – May 1, 1974. The test train damaged the autos; Amtrak delayed and eventually cancelled the AutoTrak service. Nearly two years after the Auto-Train Corporation folded, the Virginia–Florida service was revived by Amtrak . Amtrak acquired the terminals in Lorton and Sanford and some of the Auto-Train equipment. On October 30, 1983, it introduced
1615-462: A triweekly version of the service under the restyled name " Auto Train ". Daily service was introduced a year later. Amtrak used Auto-Train's bi-level and tri-level autoracks . For passenger equipment, it initially used a mixture of former Auto-Train railcars and mid-century long-distance railcars from Amtrak's general fleet, all rebuilt to Amtrak's "Heritage Fleet" standards. In the mid-1990s, Amtrak replaced all these passenger railcars, which were of
1710-606: A wide variety of food-service cars. These included ex-Seaboard kitchen-dormitory cars, ex-Seaboard dining cars rebuilt as buffet cars, and five Norfolk and Western and Western Pacific coaches which were also rebuilt as buffet cars. Sleeping cars acquired by Auto-Train included six ex-Santa Fe Regal series sleeping cars (four bedrooms, four compartments, two drawing rooms), five ex-Union Pacific Ocean series sleeping cars (five bedrooms, two compartment, two drawing rooms), and three ex- Seaboard sleepers (five bedrooms, one compartment, four sections, four roomettes). The centerpieces of
1805-567: A year, its highest number since its founding in 1970. Politico noted a key problem: "the rail system chronically operates in the red. A pattern has emerged: Congress overrides cutbacks demanded by the White House and appropriates enough funds to keep Amtrak from plunging into insolvency. But, Amtrak advocates say, that is not enough to fix the system's woes." Joseph H. Boardman replaced Kummant as president and CEO in late 2008. In 2011, Amtrak announced its intention to improve and expand
1900-467: Is aligned with a loading ramp (see picture). The doors between each are opened, and connecting ramps are lowered to allow vehicles to move between cars. At this point vehicles begin to roll off the autoracks and to the claim area, where they are identified and announced by the vehicle number that was attached to the vehicle at the origin station. Vehicles are not unloaded in the same order they were loaded. It normally takes one hour to unload all vehicles from
1995-856: Is an 855-mile (1,376 km) scheduled daily train service for passengers and their automobiles operated by Amtrak between Lorton, Virginia (near Washington, D.C. ), and Sanford, Florida (near Orlando ). Auto Train is the only motorail service in the United States. Passengers ride in coach seats or private sleeping car rooms while their vehicles are carried in enclosed automobile-carrying freight cars called autoracks . The train can carry up to 340 vehicles. The train also includes lounge cars and dining cars . Auto Train allows its passengers to avoid driving Interstate 95 in Virginia , North Carolina , South Carolina , Georgia , and Florida while bringing their own vehicles with them. It has
SECTION 20
#17327831899982090-648: Is managed as a for-profit organization . The company's headquarters is located one block west of Union Station in Washington, D.C. Amtrak is headed by a Board of Directors, two of whom are the Secretary of Transportation and CEO of Amtrak, while the other eight members are nominated to serve a term of five years. Amtrak's network includes over 500 stations along 21,400 miles (34,000 km) of track. It directly owns approximately 623 miles (1,003 km) of this track and operates an additional 132 miles of track;
2185-616: Is owned by New York's Metropolitan Transportation Authority and the Connecticut Department of Transportation as the New Haven Line .) This mainline became Amtrak's "jewel" asset, and helped the railroad generate revenue. While the NEC ridership and revenues were higher than any other segment of the system, the cost of operating and maintaining the corridor proved to be overwhelming. As a result, Amtrak's federal subsidy
2280-590: Is powered by overhead lines ; for the rest of the system, diesel-fueled locomotives are used. Routes vary widely in the frequency of service, from three-days-a-week trains on the Sunset Limited to several times per hour on the Northeast Corridor. For areas not served by trains, Amtrak Thruway routes provide guaranteed connections to trains via buses, vans, ferries and other modes. The most popular and heavily used services are those running on
2375-400: Is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. states and three Canadian provinces . Amtrak is a portmanteau of the words America and track. Founded in 1971 as a quasi-public corporation to operate many U.S. passenger rail routes, Amtrak receives a combination of state and federal subsidies but
2470-763: The California Zephyr between Oakland and Chicago via Denver and revived the Auto Train , a unique service that carries both passengers and their vehicles. Amtrak advertised it as a great way to avoid traffic along the I-95 running between Lorton, Virginia (near Washington, D.C.) and Sanford, Florida (near Orlando) on the Silver Star alignment. In 1980s and 1990s, stations in Baltimore, Chicago, and Washington, D.C. received major rehabilitation and
2565-442: The 10 largest metropolitan areas and 83% of passengers travel on routes shorter than 400 miles (645 km). In 1916, 98% of all commercial intercity travelers in the United States moved by rail, and the remaining 2% moved by inland waterways . Nearly 42 million passengers used railways as primary transportation. Passenger trains were owned and operated by the same privately owned companies that operated freight trains. As
2660-477: The Atchison, Topeka and Santa Fe Railway filed to discontinue 33 of its remaining 39 trains, ending almost all passenger service on one of the largest railroads in the country. The equipment the railroads had ordered after World War II was now 20 years old, worn out, and in need of replacement. As passenger service declined, various proposals were brought forward to rescue it. The 1961 Doyle Report proposed that
2755-1018: The COVID-19 pandemic , Amtrak continued operating as an essential service. It started requiring face coverings the week of May 17, and limited sales to 50% of capacity. Most long-distance routes were reduced to three weekly round trips in October 2020. In March 2021, following President Joe Biden's American Jobs Plan announcement, Amtrak CEO Bill Flynn outlined a proposal called Amtrak Connects US that would expand state-supported intercity corridors with an infusion of upfront capital assistance. This would expand service to cities including Las Vegas , Phoenix , Baton Rouge , Nashville , Chattanooga , Louisville , Columbus (Ohio) , Wilmington (North Carolina) , Cheyenne , Montgomery , Concord , and Scranton . Also in March 2021, Amtrak announced plans to return 12 of its long-distance routes to daily schedules later in
2850-553: The First Street Tunnel into Washington, D.C. Sanford, Florida , is the southern terminus and is about a half-hour drive north of Orlando . The original facility was older and smaller than the terminal at Lorton. At Sanford, the Auto Train loads passengers on two tracks, as no one track is long enough to accommodate all the passenger railcars. Sanford's operation is unique in that a railroad crossing runs through
2945-658: The Highway Trust Fund and Aviation Trust Fund paid for by user fees, highway fuel and road taxes, and, in the case of the General Fund, from general taxation. Gunn dropped most freight express business and worked to eliminate deferred maintenance. A plan by the Bush administration "to privatize parts of the national passenger rail system and spin off other parts to partial state ownership" provoked disagreement within Amtrak's board of directors. Late in 2005, Gunn
Auto-Train Corporation - Misplaced Pages Continue
3040-636: The Railroad Revitalization and Regulatory Reform Act of 1976. A large part of the legislation was directed to the creation of Conrail , but the law also enabled the transfer of the portions of the NEC not already owned by state authorities to Amtrak. Amtrak acquired the majority of the NEC on April 1, 1976. (The portion in Massachusetts is owned by the Commonwealth and managed by Amtrak. The route from New Haven to New Rochelle
3135-714: The Santa Fe's Big Domes (six dormitory-lounges and seven of eight full lounges) and the majority of the Union Pacific 's Astra Dome fleet: seven coaches, nine dining cars, and 14 lounge-observation cars. Two of the Big Dome lounges and two of the Astra Dome lounges were rebuilt as "Night Club" cars. The remainder of the Astra Domes were dubbed "Maxie-Domes", as opposed to the "Mini-Domes". Auto-Train acquired
3230-484: The 1950s as an innovation of the Canadian National (CN) Railroad. The CN cars were huge by the standards of the time: each 75-footer (23.86 m) could carry eight vehicles, which were loaded through doors at each end. The Auto-Train began running on December 6, 1971. It was immediately popular with the traveling public and at first enjoyed financial success as well. In fiscal year 1974 the company turned
3325-559: The 20th century progressed, patronage declined in the face of competition from buses , air travel , and the car . New streamlined diesel-powered trains such as the Pioneer Zephyr were popular with the traveling public but could not reverse the trend. By 1940, railroads held 67 percent of commercial passenger-miles in the United States. In real terms, passenger-miles had fallen by 40% since 1916, from 42 billion to 25 billion. Traffic surged during World War II , which
3420-485: The Auto-Train were the 62 ex- Canadian National bilevel autoracks , which were acquired between 1971 and 1973. The passenger equipment acquired by Auto-Train used steam heat, so the company also acquired steam generator cars . These were mostly former Great Northern cars, but the Auto-Train also rebuilt several former Western Pacific and Santa Fe baggage cars into steam generator cars. Auto Train Auto Train
3515-620: The California corridor trains accounted for a combined 2.35 million passengers in fiscal year 2021. Other popular routes include the Empire Service between New York City and Niagara Falls , via Albany and Buffalo , which carried 613.2 thousand passengers in fiscal year 2021, and the Keystone Service between New York City and Harrisburg via Philadelphia that carried 394.3 thousand passengers that same year. Four of
3610-451: The DOT's analysis was far too optimistic, with director George Shultz arguing to cut the number of routes by around half. Nixon agreed with Shultz, and the public draft presented by Volpe on November 30 consisted of only 16 routes. The initial reaction to this heavily-cut-back proposed system from the public, the press, and congressmen was strongly negative. It made front-page headlines across
3705-467: The Empire Connection tunnel opened in 1991, allowing Amtrak to consolidate all New York services at Penn Station. Despite the improvements, Amtrak's ridership stagnated at roughly 20 million passengers per year, amid uncertain government aid from 1981 to about 2000. In the early 1990s, Amtrak tested several different high-speed trains from Europe on the Northeast Corridor. An X 2000 train
3800-478: The NEC and rises in automobile fuel costs. The inauguration of the high-speed Acela in late 2000 generated considerable publicity and led to major ridership gains. However, through the late 1990s and very early 21st century, Amtrak could not add sufficient express freight revenue or cut sufficient other expenditures to break even. By 2002, it was clear that Amtrak could not achieve self-sufficiency, but Congress continued to authorize funding and released Amtrak from
3895-642: The NEC, including the Acela and Northeast Regional . The NEC runs between Boston and Washington, D.C. via New York City and Philadelphia. Some services continue into Virginia . The NEC services accounted for 4.4 million of Amtrak's 12.2 million passengers in fiscal year 2021. Outside the NEC the most popular services are the short-haul corridors in California, the Pacific Surfliner , Capitol Corridor , and San Joaquins , which are supplemented by an extensive network of connecting buses. Together
Auto-Train Corporation - Misplaced Pages Continue
3990-1003: The NRPC as a politically expedient way for the President and Congress to give passenger trains a "last hurrah" as demanded by the public. They expected the NRPC to quietly disappear as public interest waned. After Fortune magazine exposed the manufactured mismanagement in 1974, Louis W. Menk , chairman of the Burlington Northern Railroad , remarked that the story was undermining the scheme to dismantle Amtrak. Proponents also hoped that government intervention would be brief and that Amtrak would soon be able to support itself. Neither view had proved to be correct; popular support allowed Amtrak to continue in operation longer than critics imagined, while financial results made passenger train service returning to private railroad operations infeasible. The Rail Passenger Service Act gave
4085-421: The NRPC had hired Lippincott & Margulies to create a brand for it and replace its original working brand name of Railpax. On March 30, L&M's work was presented to the NRPC's board of incorporators, who unanimously agreed on the "headless arrow" logo and on the new brand name "Amtrak", a portmanteau of the words America and trak , the latter itself a sensational spelling of track . The name change
4180-601: The Navy and retired Southern Railway head William Graham Claytor Jr. came out of retirement to lead Amtrak. During his time at Southern, Claytor was a vocal critic of Amtrak's prior managers, who all came from non-railroading backgrounds. Transportation Secretary Drew Lewis cited this criticism as a reason why the Democrat Claytor was acceptable to the Reagan White House. Despite frequent clashes with
4275-697: The Northeast Corridor, some of which connect to it or are extensions from it. In addition to its inter-city services, Amtrak also operates commuter services under contract for three public agencies: the MARC Penn Line in Maryland, Shore Line East in Connecticut, and Metrolink in Southern California. Service on the Northeast Corridor (NEC), between Boston , and Washington, D.C. , as well as between Philadelphia and Harrisburg ,
4370-565: The Northeast Corridor, state-supported short-haul service outside the Northeast Corridor, and medium- and long-haul service known within Amtrak as the National Network. Amtrak receives federal funding for the vast majority of its operations including the central spine of the Northeast Corridor as well as for its National Network routes. In addition to the federally funded routes, Amtrak partners with transportation agencies in 18 states to operate other short and medium-haul routes outside of
4465-462: The November 30th draft. These required routes only had their endpoints specified; the selection of the actual routes to be taken between the endpoints was left to the NRPC, which had just three months to decide them before it was due to start service. Consultants from McKinsey & Company were hired to perform this task, and their results were publicly announced on March 22. At the same time,
4560-722: The Rail Passenger Service Act. Proponents of the bill, led by the National Association of Railroad Passengers (NARP), sought government funding to ensure the continuation of passenger trains. They conceived the National Railroad Passenger Corporation (NRPC), a quasi-public corporation that would be managed as a for-profit organization , but which would receive taxpayer funding and assume operation of intercity passenger trains – while many involved in drafting
4655-612: The Reagan administration over funding, Claytor enjoyed a good relationship with Lewis, John H. Riley , the head of the Federal Railroad Administration (FRA), and with members of Congress. Limited funding led Claytor to use short-term debt to fund operations. Building on mechanical developments in the 1970s, high-speed Washington–New York Metroliner Service was improved with new equipment and faster schedules. Travel time between New York and Washington, D.C.
4750-458: The Secretary of Transportation, at that time John A. Volpe , thirty days to produce an initial draft of the endpoints of the routes the NRPC would be required by law to serve for four years. On November 24 Volpe presented his initial draft consisting of 27 routes to Nixon, which he believed would make a $ 24 million profit by 1975. The Office of Management and Budget , however, believed Volpe and
4845-455: The bill did not believe the NRPC would actually be profitable, this was necessary in order for the White House and more conservative members of Congress to support the bill. There were several key provisions: Of the 26 railroads still offering intercity passenger service in 1970, only six declined to join the NRPC. Nearly everyone involved expected the experiment to be short-lived. The Nixon administration and many Washington insiders viewed
SECTION 50
#17327831899984940-433: The busiest, most complex section of the Northeast Corridor. In June 2017, it was announced that former Delta and Northwest Airlines CEO Richard Anderson would become Amtrak's next President & CEO. Anderson began the job on July 12, assuming the title of President immediately and serving alongside Moorman as "co-CEOs" until the end of the year. On April 15, 2020, Atlas Air Chairman, President and CEO William Flynn
5035-424: The conventional single-level type, with its newer, bi-level Superliner I and II equipment. In 2006, the aging bi-level, tri-level, and "van" autoracks were phased out and replaced with 80 new autoracks. Amtrak operates two Auto Trains simultaneously each day: southbound #53 from Lorton and northbound #52 from Sanford, departing at 5 p.m. for a scheduled arrival the following day at 10 a.m. In practice, however,
5130-434: The corridor to make it suitable for higher-speed electric trains. The Northend Electrification Project extended existing electrification from New Haven, Connecticut , to Boston to complete the overhead power supply along the 454-mile (731 km) route, and several grade crossings were improved or removed. Ridership increased during the first decade of the 21st century after the implementation of capital improvements in
5225-477: The country and it was quickly leaked that the DOT had wanted a far larger system than the White House would approve of. The ICC produced its own report on December 29, criticising the proposed draft and arguing for the inclusion of fifteen additional routes, giving further ammunition to the congressmen who wanted an expanded system. Further wrangling between the DOT and the White House produced the final list of routes on January 28, 1971, adding five additional routes to
5320-468: The entire route is owned by CSX Transportation except for the southern 16 miles (26 km), which are owned by SunRail . Ridership declined through 2019, then dropped 30.3% to 163,556 in 2020, the first year of the COVID-19 pandemic . It recovered somewhat in 2021 to 199,414 and then set a new ridership record in 2022 with 279,019 passengers. This figure rose slightly once more in 2023, with another new record set of 283,646 riders. The Auto Train has
5415-480: The ex- New York Central Railroad 's Water Level Route from New York to Ohio and Grand Trunk Western Railroad 's Chicago to Detroit route. The reduced passenger train schedules created confusion amongst staff. At some stations, Amtrak service was available only late at night or early in the morning, prompting complaints from passengers. Disputes with freight railroads over track usage caused some services to be rerouted, temporarily cancelled, or replaced with buses. On
5510-572: The fleet. The city of Sanford provides a shuttle bus to the historic district departing every 20 minutes between 1:00 pm and 3:00 pm free of charge on all days except Sundays and certain major holidays. The Auto Train uses Amtrak’s bi-level Superliner equipment, which is used for trains in the western United States and cannot pass through Baltimore Penn Station or the North River Tunnels for access to New York Penn Station . A typical consist includes two GE Genesis locomotives in
5605-493: The front or one GE Genesis and one ALC-42 , a transition sleeper car , three sleeping cars , a sightseer lounge car , a full-service dining car , five sleepers, a cafe dining car, four coaches , and up to 34 autoracks . Superliner sleeping cars have deluxe bedrooms on the upper level, roomettes on the upper and lower levels, one "family bedroom", and one "accessible bedroom". Coach cars have reclining seats on both levels. The Sightseer Lounge car has wrap-around windows on
5700-624: The high-speed rail corridor from Penn Station in NYC, under the Hudson River in new tunnels, and double-tracking the line to Newark, NJ , called the Gateway Program , initially estimated to cost $ 13.5 billion (equal to $ 18 billion in 2023). From May 2011 to May 2012, Amtrak celebrated its 40th anniversary with festivities across the country that started on National Train Day (May 7, 2011). A commemorative book entitled Amtrak: An American Story
5795-507: The highest revenue of any Amtrak long-distance train. The train had total revenue of US$ 75,169,554 in FY2016, down 7.9% from FY2015. The train operates every day. At 12:30 pm, the station gates are opened to allow the vehicles into the vehicle staging area. Here, each vehicle is assigned a unique number, which is affixed to the driver's door magnetically. The vehicle is typically videoed to document existing dents and other damage, in case
SECTION 60
#17327831899985890-496: The highest revenue of any train in Amtrak's Long Distance Service Line . The service operates as train number 52 northbound and number 53 southbound. The train operates non-stop between its Virginia and Florida terminals, except for a brief stop in Florence, South Carolina , for servicing and a crew change of the engineers and conductors . Amtrak's Auto Train is the successor to an earlier, similarly named service operated by
5985-701: The job, he is the second-longest serving head of Amtrak since it was formed more than 40 years ago. On December 9, 2015, Boardman announced in a letter to employees that he would be leaving Amtrak in September 2016. He had advised the Amtrak Board of Directors of his decision the previous week. On August 19, 2016, the Amtrak Board of Directors named former Norfolk Southern Railway President & CEO Charles "Wick" Moorman as Boardman's successor with an effective date of September 1, 2016. During his term, Moorman took no salary and said that he saw his role as one of
6080-414: The middle of the rail yard. This complicates some switching procedures and also requires a three-man yard conductor crew – conductor, assistant conductor, and a utility conductor – while operations at Lorton require only a conductor and assistant conductor. Both yards operate with one engineer. Sanford serves as the main mechanical and maintenance location for Auto Train , with diesel and car shops to service
6175-607: The other hand, the creation of the Los Angeles–Seattle Coast Starlight from three formerly separate train routes was an immediate success, resulting in an increase to daily service by 1973. Needing to operate only half the train routes that had operated previously, Amtrak would lease around 1,200 of the best passenger cars from the 3,000 that the private railroads owned. All were air-conditioned, and 90% were easy-to-maintain stainless steel. When Amtrak took over, passenger cars and locomotives initially retained
6270-479: The overall market share fell to 46% by 1950, and then 32% by 1957. The railroads had lost money on passenger service since the Great Depression , but deficits reached $ 723 million in 1957. For many railroads, these losses threatened financial viability. The causes of this decline were heavily debated. The National Highway System and airports , both funded by the government, competed directly with
6365-433: The paint schemes and logos of their former owners which resulted in Amtrak running trains with mismatched colors – the "Rainbow Era". In mid-1971, Amtrak began purchasing some of the equipment it had leased, including 286 EMD E and F unit diesel locomotives, 30 GG1 electric locomotives and 1,290 passenger cars. By 1975, the official Amtrak color scheme was painted on most Amtrak equipment and newly purchased locomotives and
6460-692: The private railroads pool their services into a single body. Similar proposals were made in 1965 and 1968 but failed to attract support. The federal government passed the High Speed Ground Transportation Act of 1965 to fund pilot programs in the Northeast Corridor , but this did nothing to address passenger deficits. In late 1969, multiple proposals emerged in the United States Congress , including equipment subsidies, route subsidies, and, lastly,
6555-468: The privately-owned Auto-Train Corporation in the 1970s. The original Auto-Train operated on Seaboard Coast Line Railroad and Richmond, Fredericksburg & Potomac tracks. It was operated by Auto-Train Corporation , a privately owned railroad carrier founded by Eugene K. Garfield . Garfield had worked at the U.S. Department of Transportation , which had funded a study of the practicality of an automobile-train service. He then resigned and later used
6650-407: The railroads, which, unlike the airline, bus, and trucking companies, paid for their own infrastructure. American car culture was also on the rise in the post-World War II years. Progressive Era rate regulation limited the railroad's ability to turn a profit. Railroads also faced antiquated work rules and inflexible relationships with trade unions. To take one example, workers continued to receive
6745-594: The remaining mileage is over rail lines owned by other railroad companies. While most track speeds are limited to 79 mph (127 km/h) or less, several lines have been upgraded to support top speeds of 110 mph (180 km/h), and parts of the Northeast Corridor support top speeds of 160 mph (260 km/h). In fiscal year 2022, Amtrak served 22.9 million passengers and had $ 2.1 billion in revenue, with more than 17,100 employees as of fiscal year 2021. Nearly 87,000 passengers ride more than 300 Amtrak trains daily. Nearly two-thirds of passengers come from
6840-443: The requirement. In early 2002, David L. Gunn replaced Warrington as seventh president. In a departure from his predecessors' promises to make Amtrak self-sufficient in the short term, Gunn argued that no form of passenger transportation in the United States is self-sufficient as the economy is currently structured. Highways, airports, and air traffic control all require large government expenditures to build and operate, coming from
6935-532: The rolling stock began appearing. Amtrak inherited problems with train stations (most notably deferred maintenance ) and redundant facilities from the competing railroads that once served the same communities. Chicago is a prime example; on the day prior to Amtrak's inception, intercity passenger trains used four different Chicago terminals: LaSalle , Dearborn , North Western Station , Central , and Union. The trains at LaSalle remained there, as their operator Rock Island could not afford to opt into Amtrak. Of all
7030-559: The roster were Baldwin S-12 , Baldwin VO-1000 , and ALCO S-2 locomotives that were used as switchers in the terminal stations. Auto-Train acquired a significant number of dome cars , so many that in 1974 it did not roster any conventional coaches. These included seven ex- Western Pacific dome coaches, each seating 36, which Auto-Train called "Mini-Domes". These had previously run on the California Zephyr . It also acquired all but one of
7125-406: The schedule. Amtrak uses a sliding scale, with trips under 250 miles (400 km) considered late if they are more than 10 minutes behind schedule, up to 30 minutes for trips over 551 miles (887 km) in length. Outside the Northeast Corridor and stretches of track in Southern California and Michigan, most Amtrak trains run on tracks owned and operated by privately owned freight railroads. BNSF
7220-519: The six busiest stations by boardings are on the NEC: New York Penn Station (first), Washington Union Station (second), Philadelphia 30th Street Station (third), and Boston South Station (fifth). The other two are Chicago Union Station (fourth) and Los Angeles Union Station (sixth). On-time performance is calculated differently for airlines than for Amtrak. A plane is considered on-time if it arrives within 15 minutes of
7315-505: The sixth president in 1998, with a mandate to make Amtrak financially self-sufficient. Under Warrington, the company tried to expand into express freight shipping, placing Amtrak in competition with the "host" freight railroads and the trucking industry . On March 9, 1999, Amtrak unveiled its plan for the Acela Express, a high-speed train on the Northeast Corridor between Washington, D.C. and Boston. Several changes were made to
7410-775: The spring. Most of these routes were restored to daily service in late-May 2021. However, a resurgence of the virus caused by the Omicron variant caused Amtrak to modify and/or suspend many of these routes again from January to March 2022. Amtrak is required by law to operate a national route system. Amtrak has presence in 46 of the 48 contiguous states, as well as the District of Columbia (with only thruway connecting services in Wyoming and no services in South Dakota ). Amtrak services fall into three groups: short-haul service on
7505-664: The study as the blueprint for his enterprise. The company provided a service unique in the country: scheduled rail transportation for passengers and their automobiles between Lorton, Virginia , near Washington, D.C., and Sanford, Florida , near Orlando, Florida . The Auto-Train Corporation used its own rolling stock , painted in red, white, and purple. The typical train was equipped with two or three General Electric U36B diesel-electric locomotives ; 75 ft (22.86 m) double-deck auto carriers; streamlined passenger cars , including coaches, dining cars , and sleeping cars ; and 85 ft (25.91 m) full- dome cars ; and
7600-431: The system with an aim to reduce costs, speed construction, and improve its corporate image. However, the cash-strapped railroad would ultimately build relatively few of these standard stations. Amtrak soon had the opportunity to acquire rights-of-way. Following the bankruptcy of several northeastern railroads in the early 1970s, including Penn Central, which owned and operated the Northeast Corridor (NEC), Congress passed
7695-618: The train, as the autoracks are first decoupled from the consist, and in the case of the Sanford station, the passenger cars are split into two sections to fit on Sanford's shorter platforms. At this point, the passengers are then allowed to disembark and move to the auto claim area. Cleaning crews move into the train after passengers leave, and the train is re-supplied with food and water. The passenger car seat backs are flipped to allow everyone in coach to ride facing forward. The autoracks are further split into three to six sections and each section
7790-636: The trains serving Dearborn Station, Amtrak retained only a pair of Santa Fe trains, which relocated to Union Station beginning with the first Amtrak departures on May 1, 1971. Dearborn Station closed after the last pre-Amtrak trains on the Santa Fe arrived in Chicago on May 2. None of the intercity trains that had served North Western Station became part of the Amtrak system, and that terminal became commuter-only after May 1. The trains serving Central Station continued to use that station until an alternate routing
7885-405: The trains usually run late. In May 2021, for example, only 31 percent of Auto Trains arrived on time, mostly because of interference by freight trains that have preference over much of the route. The Auto Train was the last Amtrak service to permit smoking on board. Amtrak discontinued the practice on June 1, 2013. Auto Train operates on the same route it and its predecessor have always used;
7980-421: The trip. Vehicles and passengers are accepted up until 3 p.m., after which the autoracks are closed and coupled together, the passenger cars are coupled together in the case of Sanford departures, and the autoracks are coupled to the rear of the consist . At 5 p.m., the train departs the station. About 1 a.m., the train makes its sole scheduled stop, at the Florence, South Carolina, station , where
8075-468: The upper level and an informal café on the lower. One dining and lounge car is reserved for sleeping car customers, while another also serves coach passengers. Amtrak calls the Auto Train, whose total length is roughly 3 ⁄ 4 -mile (1.2 km), the longest passenger train in the world. Amtrak The National Railroad Passenger Corporation , doing business as Amtrak ( / ˈ æ m t r æ k / ; reporting marks AMTK , AMTZ ),
8170-467: Was adopted in March 1972. In New York City , Amtrak had to maintain two stations ( Penn and Grand Central ) due to the lack of track connections to bring trains from upstate New York into Penn Station; a problem that was rectified once the Empire Connection was built in 1991. The Amtrak Standard Stations Program was launched in 1978 and proposed to build a standardized station design across
8265-414: Was aided by troop movement and gasoline rationing . The railroad's market share surged to 74% in 1945, with a massive 94 billion passenger-miles. After the war, railroads rejuvenated their overworked and neglected passenger fleets with fast and luxurious streamliners. These new trains brought only temporary relief to the overall decline. Even as postwar travel exploded, passenger travel percentages of
8360-609: Was fired. Gunn's replacement, Alexander Kummant (2006–08), was committed to operating a national rail network, and like Gunn, opposed the notion of putting the Northeast Corridor under separate ownership. He said that shedding the system's long-distance routes would amount to selling national assets that are on par with national parks, and that Amtrak's abandonment of these routes would be irreversible. In late 2006, Amtrak unsuccessfully sought annual congressional funding of $ 1 billion for ten years. In early 2007, Amtrak employed 20,000 people in 46 states and served 25 million passengers
8455-803: Was increased dramatically. In subsequent years, other short route segments not needed for freight operations were transferred to Amtrak. In its first decade, Amtrak fell far short of financial independence, which continues today, but it did find modest success rebuilding trade. Outside factors discouraged competing transport, such as fuel shortages which increased costs of automobile and airline travel, and strikes which disrupted airline operations. Investments in Amtrak's track, equipment and information also made Amtrak more relevant to America's transportation needs. Amtrak's ridership increased from 16.6 million in 1972 to 21 million in 1981. In February 1978, Amtrak moved its headquarters to 400 North Capitol Street NW, Washington D.C. In 1982, former Secretary of
8550-650: Was leased from Sweden for test runs from October 1992 to January 1993, followed by revenue service between Washington, D.C. and New York City from February to May and August to September 1993. Siemens showed the ICE 1 train from Germany, organizing the ICE Train North America Tour which started to operate on the Northeast Corridor on July 3, 1993. In 1993, Thomas Downs succeeded Claytor as Amtrak's fifth president. The stated goal remained "operational self-sufficiency". By this time, however, Amtrak had
8645-548: Was named Amtrak President and CEO. In addition to Atlas Air, Flynn has held senior roles at CSX Transportation , SeaLand Services and GeoLogistics Corp. Anderson would remain with Amtrak as a senior advisor until December 2020. As Amtrak approached profitability in 2020, the company undertook planning to expand and create new intermediate-distance corridors across the country. Included were several new services in Ohio, Tennessee, Colorado, and Minnesota, among other states. During
8740-640: Was popular with travelers. Soon, Auto-Train entrepreneurs sought to expand into other markets, and established a short-lived service between Louisville and Sanford, Florida. In 1978, the company announced plans for a service in Mexico between Nuevo Laredo and Querétaro City . Lack of success from the Louisville expansion, high crew costs, and several accidents put Garfield's company into bankruptcy. Auto-Train Corporation ended its services in late April 1981. Operating for almost 10 years, Auto-Train had developed
8835-445: Was publicly announced less than two weeks before operations began. Amtrak began operations on May 1, 1971. Amtrak received no rail tracks or rights-of-way at its inception. All of Amtrak's routes were continuations of prior service, although Amtrak pruned about half the passenger rail network. Of the 366 train routes that operated previously, Amtrak continued only 184. Several major corridors became freight-only, including
8930-508: Was published, a documentary was created, six locomotives were painted in Amtrak's four prior paint schemes , and an Exhibit Train toured the country visiting 45 communities and welcoming more than 85,000 visitors. After years of almost revolving-door CEOs at Amtrak, in December 2013, Boardman was named "Railroader of the Year" by Railway Age magazine, which noted that with over five years in
9025-462: Was reduced to under 3 hours due to system improvements and limited stop service. This improvement was cited as a reason why Amtrak grew its share of intercity trips between the cities along the corridor. Elsewhere in the country, demand for passenger rail service resulted in the creation of five new state-supported routes in California, Illinois, Missouri, Oregon and Pennsylvania, for a total of 15 state-supported routes. Amtrak added two trains in 1983,
#997002