Butterworth Outer Ring Road ( BORR ) ( Malay : Lebuhraya Lingkaran Luar Butterworth ) is a coastal expressway located in Butterworth, Penang , Malaysia . This 14 km (8.7 mi) expressway connects Sungai Dua in the north until Perai in the south.

#780219

6-437: The zeroeth kilometre of the expressway is located at Sungai Dua Interchange. Ships can be seen near Bagan Ajam Rest Area. The Penang Megamall is located at the end of the highway. It is a six-lane line and it is also the connecting highway to Federal Route 1, from which north bound traffic will bring travelers to Alor Setar and beyond while motorists travelling south can head to Ipoh and beyond. Construction began in 2003 and work

12-682: Is a dual-three lane cable stayed bridge that straddles the Perai River in Seberang Perai , Penang , Malaysia . It is part of the Butterworth Outer Ring Road (BORR). Designed by Dar Al-Handasah Consultants, it won the IStructE Award for Transportation Structures and the prestigious Supreme Award in 2006. Constructed by Lingkaran Luar Butterworth (Penang) Sdn. Bhd. on a turnkey contract. The project

18-666: The Raja Uda area to head to Perai and the Megamall Pinang. The people of Raja Uda area can also travel on the highway to head to the Sunway Carnival Mall. With just one toll payment, this highway will bring motorists from both the south and the north to the ferry terminal for onward faster and cheaper ferry-crossing to Penang since the Penang Bridge faces heavy traffic congestion. Notable features of

24-634: The expressway include Sungai Prai Bridge over the Perai River and Sungai Maklom Bridge over the Maklom River. The Butterworth Outer Ring Road uses open toll systems. As part of an initiative to facilitate faster transactions at the Perai, Bagan Ajam and Sungai Nyior Toll Plazas, all toll transactions at the two toll plazas are conducted electronically using Touch 'n Go cards or SmartTAGs since 1 June 2016. (Since 15 October 2015) Legend: Sungai Prai Bridge Perai River Bridge

30-602: Was carried out by Turnkey contractor, Lingkaran Luar Butterworth (Penang) Sdn. Bhd. The main sub-contractors to the Turnkey contractor are Ballast Needam International (left halfway through the project), IJM Construction Sdn. Bhd. in joint venture with Zublin International (Malaysia) Sdn. Bhd. and consists of the following works: 5°23′22″N 100°22′34″E  /  5.3893906°N 100.3760397°E  / 5.3893906; 100.3760397 This article about

36-689: Was completed in 2006. The expressway was open to motorists in January 2007. As Sungai Nyior residents protested against high toll rate in February 2007, the Sungai Nyior toll booth collection was postponed by the Ministry of Works. This highway is built to reduce the heavy traffic on the Sungai Dua–Juru NSE in the rushing hours and the holiday seasons. Nowadays, it is also used by residents in