Gilgel Gibe III Dam

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Gilgel Gibe III Dam is a 250m high roller-compacted concrete dam with an associated hydroelectric power plant on the Omo River in Ethiopia . It is located about 62 km (39 mi) west of Sodo in the Southern Nations, Nationalities, and Peoples' Region . Once fully commissioned, it will be the third largest hydroelectric plant in Africa with a power output of about 1,870 Megawatt (MW), thus more than doubling Ethiopia's total installed capacity from its 2007 level of 814 MW. The Gibe III dam is part of the Gibe cascade, a series of dams including the existing Gibe I dam (184 MW) and Gibe II power station (420 MW) as well as the planned Gibe IV (1,472 MW) and Gibe V (560 MW) dams. The existing dams are owned and operated by the state-owned Ethiopian Electric Power , which is also the client for the Gibe III Dam.

#365634

79-550: The US$ 1.8 billion project began in 2006 and electricity generation started in October 2015. The remaining generators were operational by 2016. The project has experienced serious delays; in May 2012, full commissioning had been scheduled for June 2013. The dam was inaugurated by Prime Minister Hailemariam Desalegn on 17 December 2016. Local and international environmental groups forecast major negative environmental and social impacts of

158-480: A World Heritage Site . According to the Ethiopian authorities, once the dam has been built the total amount of water flowing into the lake will not change. The only difference would be a more stable flow over the year - more during the dry season, and less during the wet. Ethiopian Prime Minister Meles Zenawi said in a BBC interview: "The overall environmental impact of the project is highly beneficial. It increases

237-439: A reservoir with a capacity of 14.7 km (3.5 cu mi) and a surface area of 210 km (81 sq mi), collecting with a catchment area of 34,150 km (13,190 sq mi). The reservoir's live (active or "useful") storage is 11.75 km (2.82 cu mi) and dead storage 2.95 km (0.71 cu mi). The normal operating level of the reservoir is 892 m (2,927 ft) above sea level with

316-551: A B1 from Moody's and B ratings from both Fitch and Standard & Poor's, which opened the door to international capital markets and foreign direct investment. However, the foreign investment capital comes from China, which has committed hundreds of millions of dollars in loans and grants to assist the government-owned corporations’ ambitious initiatives, as well as other capital intensive projects like roads, bridges and railways. On 14 February 2018, Hailemariam Desalegn announced his resignation as prime minister and chairman of EPRDF in

395-415: A Chinese state-owned company, who completed the work. The financial costs of the dam and hydroelectric power plant were estimated to be 1.55 billion Euro. The cost of a transmission line from the power plant to the nearby Wolayta Sodo Substation was estimated at 35 Million Euro. These costs do not include the costs of constructing or upgrading power transmission lines to Addis Abeba and onwards to Djibouti to

474-420: A call from NGOs for such a review. In August 2010 Ethiopian Prime Minister Meles Zenawi vowed to complete the dam "at any cost", saying the dam's critics "don’t want to see developed Africa; they want us to remain undeveloped and backward to serve their tourists as a museum." The Gilgel Gibe III Dam is 610 m-long (2,000 ft) and 243 m (797 ft) high roller-compacted concrete dam. It withholds

553-481: A collaborative of eight consultants from around the world, conducted an independent environmental impact statement of their own for the Gibe III dam. The alternative impact statement was performed because of the alleged corruption and inaccuracy of the official impact assessment. The ARWG criticizes many of the statements made in the official Gibe III ESIA. Regarding the flow of water into Lake Turkana, they state that

632-556: A combined capacity of over 2,000 megawatts. Hailemariam Desalegn Hailemariam Desalegn Boshe ( Amharic : ኀይለማሪያም ደሳለኝ ቦሼ ; born 19 July 1965) is an Ethiopian politician who served as prime minister of Ethiopia from 2012 to 2018. He also previously served as deputy prime minister and Minister of Foreign Affairs under Prime Minister Meles Zenawi from 2010 to 2012. After Meles' death in August 2012, Hailemariam succeeded him as prime minister, initially in an acting capacity . He

711-480: A devastating look a deeply flawed development process fueled by the special interests of global finance and African governments. In the process, it identifies major overlooked or otherwise minimized risks, not the least of which is a U.S. Geological Survey estimation of a high risk for a magnitude 7 or 8 earthquake in the Gibe III dam region. Professor Carr in her new book further examines how development processes driven by international finance, African governments and

790-532: A flood claimed the lives of at least 360 people and thousands of livestock in the lower Omo River basin. A further benefit is the reduction in the impact of droughts, including through large state-owned irrigated sugar plantations. The project is controversial because of its environmental and social impact, the magnitude of which in itself is a subject of controversy; because of the award of the construction contract without competitive bidding; and because of an alleged lack of transparency in project affairs. For example,

869-690: A freer civil society, to uphold the freedoms enshrined in the Ethiopian Constitution" was clear. In February 2014, Hailemariam met in Addis Ababa with a visiting delegation from Somalia led by Somali Prime Minister Abdiweli Sheikh Ahmed to discuss strengthening bilateral relations between the two countries. Hailemariam pledged his administration's continued support for the peace and stabilization efforts in Somalia, as well as its preparedness to assist in initiatives aiming to build up

SECTION 10

#1732779823366

948-866: A graduate assistant in the Arba Minch Water Technology Institute (now Arba Minch University ). After two years of working in this capacity, he won a scholarship to Tampere University of Technology in Finland , where he earned a master's degree in sanitation engineering . Upon his return to Ethiopia, he served in different academic and administrative capacities, including the dean of the Water Technology Institute, for 13 years. In 2006, he also received an MA in Organizational Leadership at Azusa Pacific University , California , US . In

1027-550: A maximum of 893 m (2,930 ft) and minimum of 800 m (2,600 ft). The dam's spillway is 108 m (354 ft) long and floodgate -controlled with a maximum discharge capacity of 18,000 m/s (640,000 cu ft/s). Water above 873 m (2,864 ft) above sea level can be discharged through its gates. Feeding the dam's power house are two penstocks that each branch into five separate tunnels for each individual turbine. The power house contains ten 187 MW generators supported by Francis turbines for

1106-524: A new export pathway and reduce Kenya's dependence on the heavily congested port of Mombasa. Moreover, Hailemariam has partnered Ethiopia with Djibouti to sign an agreement for a $ 1.55 billion fuel pipeline with developers Mining, Oil & Gas Services and Blackstone Group LP-backed Black Rhino Group. Both countries which are in the Horn of Africa signed framework agreements in September 2015 for construction of

1185-429: A peak around 1980, and subsequently decreased again. The Environmental and Social Impact Assessment (ESIA) summary of the project did not assess the impact of the dam on the water level and water quality of Lake Turkana. The director of Kenya's Water Services Regulatory Board, John Nyaoro, argued that the dam would have no negative impact on Lake Turkana. It was predicted that there is about 50-75% leakage of waters from

1264-400: A political crisis and lingering unrest in the Horn of Africa country, which had been releasing thousands of political prisoners to ease tensions. "Unrest and a political crisis have led to the loss of lives and displacement of many," he added, however, that he would stay on as prime minister in a caretaker capacity, until the ruling Ethiopian People's Revolutionary Democratic Front (EPRDF) and

1343-457: A sense of fear regarding any opposition to sugar plantation plans." The decreased water flow of the Omo River resulting from the Gibe III dam will have significant impacts on the ecosystems surrounding the river. The Omo River Basin is home to the only pristine riparian forest remaining in the drylands of sub-Saharan Africa. The survival of this forest is dependent upon the seasonal flooding of

1422-567: A serious reduction of inflow to Kenya's Lake Turkana, which receives 90 per cent of its waters from the river. According to the ARWG report, these changes will destroy the survival means of at least 200,000 pastoralists, flood-dependent agriculturalists and fishers along the Omo River 300,000 pastoralists and fishers around the shores of Lake Turkana - plunging the region's ethnic groups into cross-border violent conflict reaching well into South Sudan, as starvation confronts all of them. The report offers

1501-412: A surplus installed capacity of 400 megawatts. Under Ethiopia's current development plans it is said that the country will be more than 95% dependent on hydroelectric power. Ethiopia has predicted that electricity exports will generate around $ 407 million revenue per year, exceeding the value of the country's next most valuable export, coffee. A secondary benefit of the project is flood protection. In 2006,

1580-678: A televised address and submitted letter to the SEPDM and EPRDF, who finally accept the letter. His resignation made him the first leader to do so in the country's recent history. He stated that the resignation is "vital in the bid to carry out reforms that would lead to sustainable peace and democracy", linked to the 2014–2016 unrest in Oromia Region , in which hundreds were killed by government crackdown in Oromia and Amhara Region in between 2015 and 2016. Hailemariam's announcement came amid

1659-438: A total installed capacity of 1,870 MW. The initial design of the dam foresaw a rock-fill dam. However, due to difficulties with obtaining proper and sufficient insurance coverage for the rock-fill dam, the design was changed to roller-compacted concrete. The main benefit of the dam is electricity generation that is both renewable and dispatchable . It was forecast to supply about half of its power to Ethiopia and export

SECTION 20

#1732779823366

1738-409: Is estimated that more than 200,000 people rely on the Omo River below the dam for some form of subsistence such as flood recession agriculture, and many of these ethnic groups live in chronic hunger. Critics state that the Gibe III dam may worsen their situation. Indigenous people rely on recessional cultivation of food along the riverbanks, as well as livestock herding, for survival. The Gibe III dam and

1817-478: Is fatally flawed in terms of its logic, in terms of its thoroughness, in terms of its conclusions". In June 2011 UNESCO 's World Heritage Committee , in its 35th session held in Paris, France, called for the construction of the dam to be halted, to submit all assessments of the dam and requested Ethiopia and Kenya to invite a World Heritage Centre/ IUCN monitoring mission to review the dam's impact on Lake Turkana ,

1896-554: The International Rivers Network the power cuts were caused by drought, since almost all electricity generation in Ethiopia is hydroelectric. According to the same source, despite an increase in access to the electric grid, electricity consumption is likely to remain low for the foreseeable future due to the prevailing level of poverty. Even without the Gibe III hydro plant, according to one source Ethiopia had

1975-495: The Somali security forces through experience-sharing and training. He also suggested that Ethiopia and Somalia should increase bilateral trade and investment. Additionally, Hailemariam described the growing ties between both nations as a break from the counter-productive policies of past administrations, marking instead of the opening of a new chapter where mutual stability is beneficial. For his part, Ahmed commended Ethiopia's role in

2054-601: The Southern Nations, Nationalities, and People's Region (SNNPR). His family belongs to the Apostolic Church of Ethiopia, a Oneness Pentecostal denomination that is not part of mainstream Trinitarian Ethiopian Protestant Christianity ( Pentay ). Married to Roman Tesfaye, he is well known to be both a religious and family man. In 1988, Hailemariam received a bachelor's degree in civil engineering from Addis Ababa University . He subsequently worked as

2133-558: The caretaker government until 2 April 2018. Hailemariam is the first ruler in modern Ethiopian history to step down; previous leaders have died in office or been overthrown. He said he wanted to clear the way for reforms. Hailemariam was born in 1965 in the Boloso Sore District Hombba of the Wolayita Zone in southern Ethiopia. Hailemariam is from Wolayta ethnic group of Ethiopia, the first largest in

2212-753: The 550-kilometer (340-mile) line to transport diesel, gasoline and jet fuel from port access in Djibouti to central Ethiopia. The joint project construction is scheduled for completion in two years. Hailemariam continued with the ambitious projects like the Ethiopian Electric Power Corporation construction of the Grand Ethiopian Renaissance Dam , which was launched by his predecessor, Meles Zenawi. Financially, Hailemariam's government welcomed its first sovereign credit ratings from global agencies in 2014 –

2291-450: The Dam would be built. With no outlet, Lake Turkana loses 2.3 meters of water every year to evaporation, and its level is sensitive to climatic and seasonal fluctuations. For purposes of comparison, the historic level of Lake Turkana declined from a high of 20m above today's level in the 1890s to the same level as today in the 1940s and 1950s. Then it increased again gradually by 7 meters to reach

2370-514: The EIB stopped financing environmental and social studies for the dam, stating that "alternative financing" had been found. The African Development Bank had also been considering a US$ 250 million loan for the electro-mechanical equipment of the plant. The World Bank also had considered funding the project. In 2008 the World Bank decided not to pursue a full feasibility study for the dam, because of

2449-446: The Ethiopian government to get a loan from them. The bypassing of the standard process was defended by general manager of the Ethiopian Electric Power Corporation, Mihert Debeba, as skipping a set of "luxurious preconditions" that Ethiopia could not meet, one which would completely halt any development of hydroelectric power.In 2010, a construction contract was signed with a Chinese hydropower company Dongfang Electric Machinery Corporation,

Gilgel Gibe III Dam - Misplaced Pages Continue

2528-467: The Gibe III dam into the Omo River will not be sufficient to meet the needs of these biota. Additionally, the ARWG states that there is "no precedent of successful and sustained implementation" of an artificial flood simulation program in sub-Saharan Africa, so it is not guaranteed that such a program will be maintained at the Gibe III dam. The contract for the construction of the dam was awarded in 2006 to Salini Costruttori of Italy. The engineering design

2607-417: The Gibe III dam will result in a 57-60% decrease of river flow volume. The ARWG also notes that it is not necessarily the volume of water that is important to the Omo River and Turkana ecosystems, but that the seasonality and timing of the water flow is crucial, because certain biota are adapted to feeding, reproducing, growing, etc. in response to seasonal changes in water flow. Artificially releasing water from

2686-551: The Gibe III dam, and many of them did not even know what a dam was. This is an indication of the failure of consultations and informed consent for the indigenous populations. Survival, together with the Campaign for the Reform of the World Bank, Counter Balance coalition, Friends of Lake Turkana and International Rivers have launched a petition to stop the dam. Dam proponents argue that artificial floods are planned to be released from

2765-559: The Italian government for civil works. In 2008, JPMorgan Chase and the Italian export credit agency SACE refused to provide financing. In May 2010 EEPCo and Dongfang Electric Machinery Corporation, a Chinese state-owned company, signed a memorandum of understanding to provide electrical and mechanical equipment for the project. The agreement is backed by a loan from the Industrial and Commercial Bank of China reportedly covering 85% of

2844-683: The Northeast of the dam, to Sudan in the West and to Kenya in the South, all located at a distance between 500 and 1000 km from the dam. The cost estimate does not include the costs of extending the electricity distribution network to effectively increase access to electricity. As of 2009, electricity access in the prospective beneficiary countries was still low at 16% in Kenya and 36% in Sudan. According to

2923-460: The Omo River, which will cease with construction of the dam. This may cause 290 km of forest to "dry out" from lack of water. The decreased water flow will also negatively impact, if not eliminate, all economic activities associated with the Omo River such as farming, fishing, and tourism. The water level of the Omo River is crucial for recharging groundwater supplies in the Omo basin. If the water level of

3002-692: The SEPDM (2002–present); Deputy Chairman of the EPRDF (since Sept 2010). After his tenure as President of the SNNPR, Hailemariam worked in the Prime Minister's Office as the advisor on Social Affairs and Civic Organizations and Partnerships for two years. He led the team that drafted the Charities and Societies Proclamation law (CSO law) that limits the interference of international non-governmental organizations (NGOs) in local political activities. The law

3081-598: The SNNPR (2000–2002); President of the SNNPR (2002–2005); Member of the House of People's Representatives (2005–present); Social Affairs Special Advisor to the PM, then Public Mobilization & Participation Special Advisor to the Prime Minister (2005–2008); Government Chief Whip, with a Ministerial portfolio (2008–2010). Party Posts: Member of the Executive Committee of the EPRDF and the SEPDM (2000–present); Chairman of

3160-504: The Transborder Region of Ethiopia, Kenya, and South Sudan: The Proposed Gibe III Dam in Ethiopia" analyzes the full scale of impacts of the dam and charges that no environmental or social review of the full cross-border impact area has been carried out by the Ethiopian government or international development banks involved in the project, including the World Bank. It is authored by a member of the ARWG and long-term researcher in

3239-543: The US$ 495 million cost. International environmental groups have criticized the loan as "hypocritical" and a violation of ICBC's commitment to China's Green Credit Policy. Previously the European Investment Bank (EIB) had been considering financing of the dam's electrical and mechanical equipment with a loan of US$ 341 million. It has financed economic, financial and technical studies for the dam. In July 2010

Gilgel Gibe III Dam - Misplaced Pages Continue

3318-810: The Wolayta/Sodo substation in Ethiopia and the Suswa substation in Kenya. Environmental groups have criticized the loan as funding for the Gilgel Gibe III Dam through the backdoor. A $ 1.9 billion deal between China's Sino Hydro Corporation and the Ethiopian Electric Power Authority to construct the Gibe IV and Halele Werabesa hydroelectric dams was reported by The Shanghai Daily on 15 July 2009. Both dams are "expected to be completed in five years", and would have

3397-621: The absence of competitive bidding for the prime contractor. The Exim Bank of China financed the transmission line to the Addis Ababa. The contract was awarded to the Chinese Company Tebian Electric Apparatus Stock Co., Ltd. (TBEA) on July 24, 2009. In July 2012 the World Bank approved a US$ 684 million loan for an Eastern Electricity Highway Project that will finance a 500 Kilovolt High Voltage Direct Current transmission line between

3476-461: The amount of water in the river system, it completely regulates flooding, which was a major problem, it improves the livelihood of people downstream because they will have irrigation projects, and it does not in any way negatively affect the Turkana Lake. This is what our studies show." According to critics, the dam will be potentially devastating to the indigenous population. The dam will stop

3555-452: The assessment was only completed in July 2008, nearly two years after construction began, in violation of Ethiopian law and in contrast to global good practice of environmental assessments. Also, an independent environmental advisory panel has been established only as late as July 2009, apparently in a belated effort to appease criticism of the project. The Africa Resources Working Group (ARWG),

3634-586: The associated decrease in water levels and seasonality of flows in the Omo River threaten the continuation of the only two options for survival in this arid environment—there are no alternatives. The people living in the project area are part of the Southern Nations of Ethiopia , a highly diverse group of people. Ethnic groups affected by the dam include eight distinct indigenous communities: the Mursi , Bodi ( Mekan ), Muguji (Kwegu), Kara (Karo), Hamer , Bashada, Nyangatom and Daasanach . Stephen Corry , Director of

3713-402: The brackish water to increase in salinity to where it may no longer be drinkable by the indigenous groups around the lake. Currently, the salinity of the water is about 2332 mg/L, and it is estimated that a 10-meter decrease in the water level of Lake Turkana could cause the salinity to rise to 3397 mg/L. Raising salinity could also drastically reduce the number of fish in the lake, which

3792-783: The country's parliament accepted his resignation and elected Abiy Ahmed as the new Prime Minister on 2 April. Hailemariam is a member of the board of numerous international organizations such as International Crisis Group , Alliance for a Green Revolution in Africa , Tana High Level Forum on Security in Africa , Brenthurst Foundation , IBA Ethiopia Center for Innovation , and the Ethiopian Reconciliation Commission . Prime Minister of Ethiopia (2012–18); Chair, Ethiopian People's Revolutionary Democratic Front (2012–18); Deputy Prime Minister and Minister of Foreign Affairs (2010–12); Advisor to Prime Minister with

3871-536: The dam and criticized the project's environmental and social impact assessment as insufficient. Because of this and accusations that the entire approval process for the project was suspect, funding for the full construction cost was not secured, as the African Development Bank delayed a decision about a loan pending a review of the dam's environmental impact by its compliance review and mediation unit. This dates back to August 2009 when they accepted

3950-428: The dam and are susceptible to more water leakage as well as decreasing the economic inputs. Moreover, the landslides would fill up the reservoir and less water capacity can be stored. This would also mean that less hydro power can be produced. Controversy arose also as the environmental and social impact assessment and preceding environmental impact study (EIS) were not done until two years after beginning construction on

4029-597: The dam to the African Development Bank, CESI's owners include vendors who can benefit from the project and this conflict of interest is not disclosed in the impact statement. As part of the assessment, according to the Project Company, public consultations were carried out with "officials and institutions, people affected by the project and non-governmental organizations". According to critics, these consultations have been minimal. Most importantly,

SECTION 50

#1732779823366

4108-665: The dam. The Ethiopian Environmental Protection Authority requires that an environmental impact assessment be done for any project "likely to entail significant adverse environmental impacts" and that "the EIS must submitted before commencing any construction or any other implementation of the project." An Environmental and Social Impact Assessment (ESIA) has been carried out by Centro Elettrotecnico Sperimentale Italiano (CESI) and Agriconsulting of Italy, in association with MDI Consulting Engineers from Ethiopia. According to Anthony Mitchell, an engineer who submitted an independent feasibility study of

4187-452: The death of Ethiopia's longtime Prime Minister Meles Zenawi on 20 August 2012, Deputy Prime Minister Hailemariam was appointed as the acting Premier. Hailemariam became the permanent Prime Minister on 21 September 2012. European Parliament President Martin Schulz , after meeting with Hailemariam, said that his desire "to strengthen democracy in the country, allowing for greater pluralism and

4266-563: The environmental and social impact assessment was not published until two years after construction began. The assessment suggested that the project would cause minimal problems environmentally and socially. However, critics consider it to be flawed both in terms of thoroughness and objectivity. Among these critics is the African Resources Working Group who released statements saying that "The quantitative [and qualitative] data included in virtually all major sections of

4345-472: The global consulting industry can lead to such disastrous outcomes for the vast number of people affected by such development. The magnitude of the impact that the dam and possible irrigation projects induced by the dam will have on the water level of Lake Turkana is controversial. A hydrological study conducted for the African Development Bank in November 2010 concluded that the filling of the dam will reduce

4424-513: The indigenous rights organization Survival International said, "The Gibe III dam will be a disaster of cataclysmic proportions for the tribes of the Omo valley. Their land and livelihoods will be destroyed, yet few have any idea what lies ahead. The government has violated Ethiopia’s constitution and international law in the procurement process. No respectable outside body should be funding this atrocious project." Other sources note that, when interviewed, people in many villages have never even heard of

4503-496: The information field, and a third cooperative agreement on the aviation sector. Hailemariam Desalegn sustained economic progress in Ethiopia after the sudden death of his predecessor in 2012. He played role to complete the implementation of the Growth and Transformation Plan (GTP I) and to start with GTP II. Between 2012 and 2018, major projects like Hawassa and Mekelle industrial park, Addis Ababa Light Rail , Gilgel Gibe III Dam ,

4582-425: The lake's water level by two metres, if no irrigation will be undertaken. Irrigation would cause a further drop in the lake level. Friends of Lake Turkana, a Kenyan organization representing indigenous groups in northwestern Kenya whose livelihoods are linked to Lake Turkana, had previously estimated that the dam could reduce the level of Lake Turkana by up to 10 meter affecting up to 300,000 people. This could cause

4661-575: The late 1990s and early 2000s, he became seriously involved in politics as a member of the EPRDF (Ethiopia's ruling party) and became the deputy president of the SNNPR. He replaced Abate Kisho who was removed from power on corruption charges, but it is believed that Abate was demoted for supporting the anti-Meles Zenawi faction when the Tigrayan People's Liberation Front (the core of the EPRDF) split in 2000. Another widely accepted belief about Abate

4740-536: The new Addis Ababa–Djibouti Railway , as well as Bahir Dar Stadium and other stadiums in Mekelle and Hawassa are completed. Hailemariam is accredited for the country's continued rapid and double-digit economic growth, and Hailemariam led Ethiopia to partner Kenya in the ambitious US$ 24.5bn Lamu Port Southern Sudan-Ethiopia Transport (LAPSSET) Corridor – which includes a railway, highways, and an oil pipeline – which will provide his landlocked country and South Sudan with

4819-408: The official website of Gibe III, most of the construction cost of the dam itself was financed by the Ethiopian government with its own funds. However, part of the project is financed through a corporate bond called "Millennium Bond" issued by the Ethiopian Electric Power Corporation (EEPCO) and marketed with the Ethiopian diaspora. The Ethiopian government also requested financing of US$ 250 million from

SECTION 60

#1732779823366

4898-579: The ongoing peace and stabilization process in Somalia as well as its support against the Al-Shabaab militant group. He likewise welcomed the Ethiopian military 's decision to join AMISOM . The meeting concluded with a tripartite Memorandum of Understanding agreeing to promote partnership and cooperation, including a cooperative agreement to develop the police force, a second cooperative agreement covering

4977-461: The other half to Kenya (500 MW), Sudan (200 MW) and Djibouti (200 MW). However, there were long delays in making Power Purchase Agreements . Only Kenya signed a Memorandum of Understanding to purchase electricity from the dam. Financing for a transmission line to Kenya was approved by the World Bank in July 2012. Access to the electricity grid in Ethiopia currently is very low. Less than 2% of Ethiopia's rural population, which accounts for 85% of

5056-413: The people around Lake Turkana depend on for sustenance and their livelihoods. According to critics, this "will condemn the lake to a not-so-slow death." According to dam proponents, the impact on Lake Turkana will be limited to the temporary reduction in flows during the filling of the reservoir. Various sources state that the filling could take between one and three wet seasons. The total storage volume of

5135-458: The plantations are mostly Ethiopian state-owned companies. There are also reports about human rights violations by the Ethiopian army against locals who oppose the sugar plantations in the lower Omo Valley that would be irrigated with water from the dam's reservoir. According to the reports, "villagers are expected to voice immediate support, otherwise beatings (including the use of tasers ), abuse, and general intimidation occurs", (...) "instilling

5214-740: The rank of Minister (2007-2010); Chair, African Union (2013–14); University lecturer and Dean, Arba Minch University for 12 years; Vice President and President of the Southern Nations Nationalities and Peoples’ Regional State (2001–06). Currently : Board Chair, Alliance for a Green Revolution in Africa; Founder and Board Chair, Hailemariam and Roman Foundation ; Board Chair, Tourism Ethiopia; Board of Trustees, International Crisis Group; Advisory Board Member, The Brenthurst Foundation; Member of Parliament for 21 years; Member of different professional Associations. Paleoanthropologist Too Many Requests If you report this error to

5293-482: The region, Claudia J. Carr, an associate professor at the University of California, Berkeley. The 250-page report is based on substantial field-based research involving the participation of local residents throughout much of the cross-border region. The Gibe III dam is already under construction by Ethiopia along its Omo River, with general recognition that it will cause a major decrease in river flow downstream and

5372-472: The report were clearly selected for their consistence with the predetermined objective of validating the completion of the Gibe III hydro-dam" and that despite claims made by the government to the contrary, the dam would "produce a broad range of negative effects, some of which would be catastrophic." Another prominent critic of the dam is the Kenyan paleoanthropologist Richard Leakey who said that "the project

5451-452: The reservoir due to multiple fractures in the basalts at the planned reservoir site. Due to the loss of the waters in reservoir, the dam would not be able to produce as much electricity and less hydro power would be available to export to other nearby countries. Also, the dam and reservoir are vulnerable to seismic activity such as earthquakes and massive landslides in the Gibe III project region. The earthquakes can cause even larger fractures to

5530-510: The reservoir of Gibe III dam will be between 11.75 and 14 billion cubic meter, depending on sources. According to the firm that builds the dam this would reduce the water level in the lake by "less than 50 cm per year for three years" and that salinity "will not change in any way". According to the International Lake Environment Committee, 90% of Lake Turkana's water is delivered by the Omo River on which

5609-539: The reservoir. Furthermore, irrigation projects are envisaged to improve the livelihoods of the downstream population. As it became known to a wider public in November 2011 through a report by the Oakland Institute, there are indeed massive plans for cotton and sugarcane plantations on 445,000 ha in the lower Omo Valley. The sugarcane plantations could be financed with aid from India, which is heavily engaged in developing Ethiopian sugar production. The investors in

5688-591: The river drops once the Gibe III dam is built, then it will no longer be able to refill underground water supplies, leaving much of the basin bereft of groundwater, which negatively impacts people and ecosystems. As the water level of the Omo River drops, the erosion of its riverbanks will increase, causing increased sediment flows in the river, loss of soil for crop cultivation along the riverbanks, and loss of riparian habitats. A December 2012 study stated Ethiopia's Gibe III dam would cause humanitarian catastrophe and major cross-border armed conflict. Construction of one of

5767-424: The seasonal flood, which will impact the lower reach of the Omo River and Lake Turkana as well as the people who rely on these ecosystems for their livelihoods. According to Terri Hathaway, director of International Rivers ' Africa programme, Gibe III is "the most destructive dam under construction in Africa." The project would condemn "half a million of the region's most vulnerable people to hunger and conflict." It

5846-509: The total population, have access to the grid. With the support of the World Bank the government is carrying out an ambitious project to expand rural electricity access. In 2003, low generation capacity combined with a severe drought caused power cuts lasting 15 hours twice a week for a period of six months, costing an estimated $ 200 million in economic output. In 2008 and 2009, Ethiopia again experienced power cuts and brownouts . According to

5925-412: The world's tallest dams on the Omo River in southern Ethiopia will lead to mass starvation among a half million indigenous people in an already famine-prone region, sparking major armed conflict in the three-nation border region over its disappearing natural resources, according to a new report from the African Resources Working Group (ARWG). "Humanitarian Catastrophe and Regional Armed Conflict Brewing in

6004-533: Was adopted by the Ethiopian Parliament in 2009. He is also credited with pushing EPRDF to re-organize its structure after the contentious 2005 elections via the '1-to-5' model (one member recruits five new people - አንድ ለአምስት አደረጃጀት) that boosted the number of party members from 400,000 to five million by the 2010 elections. In 2010, Hailemariam was sworn into dual ministerial positions as Deputy Prime Minister and Minister of Foreign Affairs. Following

6083-455: Was awarded to Studio Pietrangeli and supervision of ELC-COB ( ELC Electroconsult , Italy - Coyne et Bellier , France) as representative of the Ethiopian Electric Power Corporation. The contract to Salini Construttori was awarded after direct negotiation rather than allowing bidding on the contract from other qualified companies. Public international financial institutions require competitive bidding of construction contracts, making it difficult for

6162-401: Was that he was less educated and exercised poor leadership while he was in power. Hailemariam was President of the SNNPR from November 2001 to March 2006 and was promoted to Deputy Prime Minister and Minister of Foreign Affairs in October 2010. He has been Deputy Chairman of EPRDF, Chairman of SEPDM , Deputy Prime Minister and Minister of Foreign Affairs. He has served as Vice President of

6241-530: Was then elected as the chair of the EPRDF , the ruling party, on 15 September 2012. Hailemariam also served as the chairperson of the African Union from 2013 to 2014. He submitted his resignation as prime minister and chair of the EPRDF on 15 February 2018 in response to the fallout from mass protests and unrest in 2016. His resignation was accepted on 11 March 2018, but he stayed in office as head of