The Danbury Railway Museum ( reporting mark DRMX ) is a railway museum housed in the former Union Station on the east end of downtown Danbury , Connecticut , United States . It was established in the mid-1990s following the closure of the station by the Metro-North Railroad in favor of a new station nearby, and primarily focuses on the history of railroading in southern New England and neighboring New York . In addition to the former station building, the museum has a collection of heritage railcars in the neighboring rail yard it shares with Metro-North.

#450549

93-522: The Danbury Branch is a diesel branch of the Metro-North Railroad 's New Haven Line in the U.S. state of Connecticut , running from downtown Norwalk north to Danbury . It opened in 1852 as the Danbury and Norwalk Railroad . Until the early 1970s, passenger service continued north from Danbury to Canaan, Connecticut , and Pittsfield, Massachusetts . Metro-North took over operation of

186-559: A Georgetown station between the Cannondale and Branchville stations has been approved, though not yet scheduled or funded. The previous station was abandoned in the 1970s due to low ridership. Over $ 60 million was allocated to the Danbury Branch, approximately half from the economic stimulus package of 2009 , to improve current stations, build siding tracks, and install a new signal system. Connecticut Gov. M. Jodi Rell held

279-548: A Train on its distinctive curved platform. In 1986, prior to the museum's use of the building, it was listed on the National Register of Historic Places . It was joined on the Register in 2005 by the former turntable , the only intact one in the state. The museum itself is located on a 1.3-acre (0.53 ha) lot at the southeast corner of White Street and Patriot Drive, just across from Meeker's Hardware , which

372-569: A complete overhaul as part of the Enhanced Station Initiative and would be entirely closed for up to 6 months. Updates would include cellular service, Wi-Fi, USB charging stations, interactive service advisories, and maps. The Harlem and Hudson lines and the Park Avenue mainline to Grand Central were previously owned by Midtown TDR Ventures LLC, who bought them from the corporate successors to Penn Central. The MTA had

465-622: A diesel train powered by Brookville BL20-GH locomotives. Electric service on the Hudson and Harlem lines uses M3 and M7 MU cars. The New Haven Line is unique in that trains use both third rail and 12.5 kV AC from overhead catenary . The line from Grand Central Terminal to Mount Vernon East uses third rail, while the section from Pelham east to New Haven State Street, which is 58 miles (93 km), uses overhead catenary. These electrification systems overlap between Mount Vernon East and Pelham stations and trains change power systems from one to

558-666: A joint agreement between MTA and CTDOT, with the agencies paying for 33.3% and 66.7% of costs respectively. CTDOT pays more because most of the line is in Connecticut. The New Haven Line has three branches in Connecticut: the New Canaan Branch , Danbury Branch and Waterbury Branch . At New Haven, CTDOT runs two connecting services, the Shore Line East connecting service continues east to New London , and

651-775: A lease extending to the year 2274 and an option to buy starting in 2017. The MTA exercised their option to buy what was now Argent Ventures' rail assets on November 13, 2018. Under the terms of the deal, the MTA purchased Grand Central Terminal, as well as the Hudson Line from Grand Central to a point 2 miles (3.2 km) north of Poughkeepsie, and the Harlem Line from Grand Central to Dover Plains. Most services running into Grand Central Terminal are electrically powered. Diesel trains into Grand Central use General Electric P32AC-DM electro-diesel locomotives capable of switching to

744-663: A neon sign on a nearby coal shed showing a derby hat coming down on a crown and saying "Danbury Crowns Them All". The hat-related traffic grew around the industry's two big seasons, the Christmas and Easter holidays. Other passengers were commuters going to jobs in Bridgeport or New York City, summer travelers headed for country retreats and hotels in the area, or visitors to the Danbury Fair , held every October. After World War II , train ridership began to decline with

837-462: A press conference with local politicians at the Cannondale station on July 28, 2009, to announce that construction was scheduled to start in late 2009 and finish in 2011. The new signal system finally began operation in 2013, but extensive work was still ongoing in 2014 because of unresolved problems with the drop gates at grade crossings. In fall 2012, the focus of the plan was only on improving

930-639: A pure electric mode. These locomotives have contact shoes compatible with Metro-North's under-running 750 V DC third rail power distribution system. Shoreliner series coaches are used in push-pull operation. On the Hudson Line, local trains between Grand Central and Croton–Harmon are powered by third rail. Through trains to Poughkeepsie are diesel powered and do not require a change of locomotive at Croton-Harmon. The Harlem Line has third rail from Grand Central Terminal to Southeast and trains are powered by diesel north to Wassaic . At most times, passengers between Southeast and Wassaic must change at Southeast to

1023-482: Is decorated in molded brick in floral patterns. The facility comprises a railroad yard full of restored and unrestored railroad equipment, and the restored station house containing exhibits of photographs and railroad paraphernalia, model train layouts, an extensive reference library, and a gift shop. The station is "significant in the history of Danbury" and also as a "good example" of a turn-of-the-twentieth-century railway station building. Its architectural style of

SECTION 10

#1732776763451

1116-435: Is also on the Register. To its west is a parking lot with room for 25 cars. Immediately behind it, to the south, are the railroad tracks and a 6-acre (2.4 ha) rail yard. The current Danbury station is a short distance away, and sometimes Metro-North stores its trains on the tracks behind the station between runs. The museum's collection of older cars is on the tracks in the yard's interior. A grade crossing on White marks

1209-781: Is diesel only. Power is collected from the bottom of the third rail as opposed to the top, used by other third rail systems, including the Long Island Rail Road and New York City Subway. This system is known as the Wilgus-Sprague third rail, and the SEPTA Market–Frankford Line in Philadelphia and Metro-North are the only two systems in North America that use it. It allows the third rail to be completely insulated from above, thus decreasing

1302-875: Is operated under contract with the Connecticut Department of Transportation . Metro-North works under contract with New Jersey Transit for the west-of-hudson lines located in New Jersey and New York in Metro-North also provides local rail service within the New York City boroughs of Manhattan and the Bronx . Metro-North is the descendant of commuter rail services dating back as early as 1832. By 1969, they had all been acquired by Penn Central . MTA acquired all three lines by 1972, but Penn Central continued to operate them under contract. Service

1395-423: The Connecticut Department of Transportation , which by then owned the neglected building, closed it in favor of a newer station on the other side of the block. Within two years the museum was formed and restored the station to its former appearance. It is architecturally distinctive, with Colonial Revival touches on a Richardsonian Romanesque structure. Alfred Hitchcock filmed station scenes for Strangers on

1488-682: The Consolidated Rail Corporation (Conrail) under a contract with Connecticut. In 1983 the newly formed Metro-North Commuter Railroad took over operation of passenger service along the line. Conrail continued to provide freight service on the line until 1993. The Providence and Worcester Railroad now provides freight service along the Danbury Branch. Upon renovation of the Merritt 7 station , Metro-North ceased stops at Kent Road on January 16, 1994, and instead provided service via shuttle bus to Merritt 7 for local employers. By

1581-611: The Hartford Line service continues north to Hartford , and Springfield, Massachusetts . Amtrak operates inter-city rail service along the New Haven and Hudson Lines. The New Haven Line is part of Amtrak's Northeast Corridor . Amtrak's Northeast Regional runs from New Rochelle to New Haven, while Stamford and New Haven are also served by the high-speed Acela . At New Haven, the New Haven Line connects to

1674-614: The Hartford and New Haven Railroad , which provided routes to Hartford , Springfield, Massachusetts, and eventually Boston . The two roads merged in 1872 to become the NYNH&;H, growing into the largest passenger and commuter carrier in New England. In the early 20th century, the NYNH&H came under the control of J.P. Morgan . Morgan's bankroll allowed the NYNH&H to modernize by upgrading steam power with both electric (along

1767-540: The New Haven Line continues southwest to Grand Central Terminal and northeast to Union Station in New Haven . All trains stop at all seven stations on the branch. The trip from Danbury to South Norwalk currently (2018) takes about 54 minutes. All peak trains and some off-peak run to Stamford on weekdays, and limited service runs to Grand Central Terminal as well. Limited through service from Danbury to Grand Central takes about 2 hours. Two weekday trains serve

1860-542: The New York Metropolitan Area , running service between New York City and its northern suburbs in New York and Connecticut , including Port Jervis , Spring Valley , Poughkeepsie , Yonkers , New Rochelle , Mount Vernon , White Plains , Southeast and Wassaic in New York and Stamford , New Canaan , Danbury , Bridgeport , Waterbury , and New Haven in Connecticut. Service in Connecticut

1953-1042: The Pascack Valley Line . The Port Jervis Line is accessed from two NJ Transit lines, the Main Line and the Bergen County Line . The Port Jervis Line terminates in Port Jervis, New York, and the Pascack Valley line in Spring Valley, New York, in Orange and Rockland Counties, respectively. Trackage on the Port Jervis Line north of the Suffern Yard is leased from the Norfolk Southern Railway by

SECTION 20

#1732776763451

2046-630: The Shepaug Railroad to Litchfield were possible. Starting on May 1, 1874, that connection was supplemented by the New York, Housatonic and Northern Railroad, running from Danbury northeast to the Housatonic. In 1881 the New York and New England Railroad was completed, giving another connection at Danbury and at Hawleyville. A short branch from Branchville on the mainline west to Ridgefield opened July 1, 1870. In July 1882 an extension

2139-474: The 1850s and 1860s, was originally part of the Erie's mainline from Jersey City to Buffalo, New York. The Pascack Valley Line was built by the New Jersey and New York Railroad , which became a subsidiary of the Erie. Trains that service Port Jervis formerly continued to Binghamton and Buffalo, New York (today used only by freight trains), while Pascack Valley service continued to Haverstraw, New York . In 1956,

2232-482: The 1880s, the three railroads that served the city — the Danbury and Norwalk , Housatonic and New York and New England — had built small, separate stations for their lines in the vicinity of the current building. Later in that decade, economic difficulties led to them all becoming part of the New York, New Haven and Hartford , leading it to be known locally as the Consolidated Road. Citizens began asking

2325-503: The 1955 Norwalk river flood. The NYNH&H merged into Penn Central in 1969. On January 1, 1971, the State of Connecticut leased the Danbury Branch from Penn Central. The last passenger train from Danbury north to Pittsfield, Massachusetts ran in April 1971, the day before Amtrak assumed passenger operations. From 1976 until 1983, freight and passenger service on the line was provided by

2418-664: The Amtrak New Haven–Springfield Line . The Hudson Line is part of the Empire Corridor , and the Yonkers, Croton-Harmon, and Poughkeepsie stations are all served by Amtrak as well as Metro-North. Freight trains operate over Metro-North lines, though the company itself does not operate freight services. The Hudson Line connects with the Oak Point Link and is the main route for freight to and from

2511-586: The Boston and Albany to Albany , Boston , Vermont , and Canada . On April 1, 1873, the New York and Harlem Railroad was leased by Cornelius Vanderbilt , who added the railroad to his complex empire of railroads , which were run by the NYC. Grand Central Depot, built in 1871, served as the southern terminus of NYC's Harlem and Hudson Divisions; it would be replaced by Grand Central Station in 1900, and by Grand Central Terminal in 1913. The Boston and Albany came under

2604-544: The Bronx and Long Island. Freight railroads CSX , CP Rail , P&W , and Housatonic Railroad have trackage rights on sections of the system. See Rail freight transportation in New York City and Long Island . Metro-North provides service west of the Hudson River on trains from Hoboken Terminal , New Jersey, jointly run with NJ Transit under contract. There are two branches: the Port Jervis Line and

2697-643: The Connecticut State Bond Commission authorized $ 21 million in borrowing for upgrades at the Merritt 7 station as well as for the addition of a station on the New Haven Line. The Merritt 7 station would have a footbridge added, a raised platform, and an expanded shelter. Plans to reopen the long-closed Wall Street station are under consideration in wake of new housing developments in Norwalk Center . West of South Norwalk ,

2790-491: The Danbury Railway Museum was formed the next year by a group of National Railway Historical Society and local railfans . The museum soon grew to a hundred members, and the first excursion train was run later that year. A temporary museum was established in an Ives Street storefront while the old station itself was restored with a $ 1.5 million grant. In late 1995 the restored station was rededicated at

2883-741: The Erie Railroad began coordinated service with rival Delaware, Lackawanna, and Western Railroad , and in 1960 they formed the Erie Lackawanna . Trains were rerouted to the Lackawanna's Hoboken Terminal in 1956–1958. Passenger rail in the United States began to falter after World War II. Commuter services historically had always been unprofitable, and were usually subsidized by long-distance passenger and freight services. As these profits disappeared, commuter services usually were

Danbury Branch - Misplaced Pages Continue

2976-617: The Harlem, Hudson and New Haven Lines on January 1, 1983 and merged them into the Metro-North Commuter Railroad. Metro-North took over the former Erie Lackawanna services west of the Hudson and north of the New Jersey state line. Since those lines are physically connected to NJ Transit, operations were contracted to NJ Transit with Metro-North subsidizing the service and supplying equipment. In preparation for

3069-553: The Hudson River in New York are owned and operated by Metro-North, except Suffern , which is owned and operated by NJ Transit. In partnership with NY Waterway, Metro-North also provides ferry service across the Hudson River to Ossining station and Beacon station , with the Haverstraw–Ossining Ferry and Newburgh–Beacon Ferry respectively. Most of the trackage east of the Hudson River and in New York State

3162-637: The LIRR. The New Haven Railroad's trustees initially opposed New York Central's takeover of the New Haven Line, as they felt that the $ 140 million offer for the New Haven Line was too low. After some discussion, the trustees decided to continue operating the New Haven Line, but only until June 1967. In 1968, following the Erie Lackawanna's example, the NYC and its rival the Pennsylvania Railroad formed Penn Central Transportation with

3255-420: The MTA also entered into a long-term lease of Penn Central's Hudson, Harlem, and New Haven Lines. Penn Central continued to operate the now-subsidized lines under contract to the MTA. In April 1970, Rockefeller proposed that the state take over the Hudson and Harlem Lines, and the next month, he signed a bond issue that provided $ 44.4 million in funding to these lines. The MTA and ConnDOT took over ownership of

3348-506: The MTA and the United Transportation Union (UTU) broke off, Metro-North employees went on strike. Commuters were left to carpool or use shuttle buses running to subway stations in the Bronx. Metro-North wanted to eliminate minimum staffing requirements and wanted the complete freedom to assign crews–a demand that the employees would not agree to. This was the first strike to shut down the New Haven, Harlem, and Hudson at

3441-470: The MTA's "Mail&Ride" program where monthly passes are delivered by mail. There is a discount for buying tickets online and through Mail&Ride. A surcharge is added if a ticket is purchased on a train. Ticket types available include One-way, Round-trip (two One-way tickets), 10-trip, Weekly (unlimited travel for one calendar week), Monthly (unlimited travel for one calendar month), and special student and disabled fare tickets. MetroCards are available on

3534-598: The MTA, but NJ Transit owns all of the Pascack Valley Line, including the portion in Rockland County, New York . Most stops for the Port Jervis and Pascack Valley Lines are in New Jersey, so NJ Transit provides most of the rolling stock and all the staff; Metro-North supplies some equipment. Metro-North equipment has been used on other NJ Transit lines on the Hoboken division. All stations west of

3627-602: The MTA. Three lines provide passenger service on the east side of the Hudson River to Grand Central Terminal in Manhattan : the Hudson , Harlem , and New Haven Lines . The Beacon Line is a freight line owned by Metro-North but is not in service. The Hudson and Harlem Lines terminate in Poughkeepsie and Wassaic , New York, respectively. The New Haven Line is operated through a partnership between Metro-North and

3720-528: The NYC, the NYNH&H, and the Erie Lackawanna had to maintain service on these lines. Mergers between railroads were seen as a way to curtail these issues by combining capital and services and creating efficiencies. In February 1965, New York Governor Nelson Rockefeller and Connecticut Governor John N. Dempsey jointly suggested that operations of the New Haven Line, the New Haven Railroad 's struggling commuter rail operation, be transferred to

3813-573: The New Haven Line in January 1971. In May 1972, the MTA also gained ownership of the Hudson and Harlem Lines. Penn Central continued to operate all three routes under contract. As part of its plan to modernize the commuter lines, the MTA ordered high-speed "Cosmopolitan" railcars for the New Haven Line as well as for the Hudson and Harlem Lines. After a series of delays and derailments in mid-1972, which involved Penn Central trains near Grand Central Terminal, Chairman Ronan expressed his disapproval of

Danbury Branch - Misplaced Pages Continue

3906-592: The New Haven Line) and diesel power (branches and lines to eastern and northern New England). The NYNH&H saw much profitability throughout the 1910s and 1920s until the Great Depression of the 1930s forced it into bankruptcy. Commuter services west of the Hudson River, today's Port Jervis and Pascack Valley lines, were initially part of the Erie Railroad . The Port Jervis Line, built in

3999-464: The New Haven Line, including the New Canaan, Danbury, and Waterbury branches, was owned by the New York, New Haven and Hartford Railroad (NYNH&H). These branches were started in the 1830s with horse-drawn cars, later replaced by steam engines, on a route that connected Lower Manhattan to Harlem . Additional lines started in the mid-19th century included the New York and New Haven Railroad and

4092-584: The New York Central Railroad as part of a plan to prevent the New Haven Railroad from going bankrupt. If the operational merger occurred, the proposed Metropolitan Commuter Transit Authority (MCTA; now Metropolitan Transportation Authority, or MTA) and the existing Connecticut Department of Transportation (ConnDOT) would contract with New York Central to operate the New Haven Line to Grand Central Terminal. Due to growing debts,

4185-707: The New York State Department of Transportation announced that the Newburgh–Beacon Shuttle would be developed in conjunction with Metro-North, running from the Beacon station on the Hudson Line to the Newburgh park-and-ride on Route 17K . Metro-North spent the better part of its early days updating and repairing its infrastructure. Stations, track, and rolling stock all needed to be repaired, renovated, or replaced. The railroad succeeded and by

4278-428: The State of Connecticut. The Connecticut Department of Transportation (CTDOT) owns the tracks and stations within Connecticut, and finances and performs capital improvements. MTA owns the tracks and stations and handles capital improvements within New York State. MTA performs routine maintenance and provides police services for the entire line, its branches and stations. New cars and locomotives are typically purchased in

4371-405: The Walk Bridge. However, at the same time a 30-year plan was published that does envision electrification of the Danbury Branch, extending service to New Milford and electrifying that extension. Electrification of the portion to Danbury would cost $ 400 million; the extension to New Milford would cost $ 450 million, and the electrification of the extension would cost $ 540 million. On February 1, 2017,

4464-410: The chances of a person being electrocuted by coming in contact with the rail. It also reduces the impact of icing in winter. The Hudson, Harlem and New Haven lines and the New Canaan branch and all passenger rolling stock is equipped with cab signalling , which displays the appropriate block signal in the engineer's cab. All rolling stock is equipped with Automatic Train Control (ATC), which enforces

4557-417: The corridor as far as Danbury, with no extension. In May 2015, Governor Dannel Malloy 's five-year plan for transportation improvements called "Let's Go CT" only mentioned one point for the Danbury Branch. This is a new small rail yard called the Danbury Line Dock Yard Improvements. This area in South Norwalk will include electrification of the southern end of the branch. This was to enable work to commence on

4650-419: The current Danbury Metro-North station . At the museum are examples of rolling stock retired from service as well as an indoor display of model trains . There have been proposals to re-electrify the Danbury Branch, along with a plan to extend service north from Danbury to New Milford . In connection with the planned redevelopment of the Gilbert & Bennett Wire Mill as a residential neighborhood, reopening

4743-432: The eastern terminus of the Beacon Line kept in reserve by Metro-North for possible future use. The station building is a one-story L-shaped structure of buff and brown brick with sandstone trim, 99 by 123 feet (30 by 37 m), both wings topped with gabled roofs covered in asphalt. Hipped-roof dormer windows pierce the north and west elevations, and similar canopies run along the tracks on either side, continuing

SECTION 50

#1732776763451

4836-408: The entire Metro-North Railroad system. This schematic is not to scale. The Metro-North Commuter Railroad Company ( reporting mark MNCW ), also branded as MTA Metro-North Railroad and commonly called simply Metro-North , is a suburban commuter rail service operated by the Metropolitan Transportation Authority (MTA), a public authority of the U.S. state of New York . Metro-North serves

4929-427: The federal government, the same year. Many of the other Northeastern railroads, including the Erie Lackawanna, followed Penn Central into bankruptcy, and so they had been merged into Conrail. However, the handover to private owners did not happen. In March 1981, the administration of President Ronald Reagan suggested that struggling Conrail commuter operations across five states be transferred to state agencies. At

5022-438: The first to be affected. Many railroads began to gradually discontinue their commuter lines after the war. By 1958, the NYC had already suspended service on its Putnam Division, while the newly formed Erie Lackawanna, in an effort to make a successful merger, began to prune some of its commuter services. Most New Yorkers still chose the train as their primary means of commuting, making many of the other lines heavily patronized. Thus

5115-423: The hip-roofed station is eclectic, with exterior Richardsonian and Colonial Revival elements. Its interior workmanship is more impressive. Visitors can ride the "Rail Yard Local" on weekends in the summer season. The ride takes about 30–35 minutes and includes a unique ride by the passengers on the museum's operating turntable , and a tour of the recently restored Danbury fairground's pumphouse. The turntable

5208-416: The hope of revitalizing their fortunes. In 1969 the bankrupt NYNH&H was also combined into Penn Central by the Interstate Commerce Commission . However, this merger eventually failed, due to large financial costs, government regulations, corporate rivalries, and lack of a formal merger plan. In 1970 Penn Central declared bankruptcy, at the time the largest corporate bankruptcy ever declared. The same year,

5301-484: The intermediate stations ( Rowayton , Darien , and Noroton Heights ) in peak direction. The following services that connect to the Danbury Branch are Amtrak , Metro-North Railroad , Norwalk Transit District , and HARTransit . Unlike the New Haven main line or the New Canaan Branch , the Danbury Branch is not electrified, and uses diesel locomotives in push-pull operation. Usually, the diesels push trains toward Grand Central Terminal , and pull toward Danbury. All of

5394-431: The line from Conrail in 1983, and the modern-day branch is mostly single-tracked. The Danbury and Norwalk Railroad began operating its line from Norwalk north to Danbury on February 22, 1852. In July 1872 a branch from the mainline at Bethel northeast to Hawleyville opened. At Hawleyville, the branch connected to the Housatonic Railroad , continuing north into Massachusetts . Also at Hawleyville, connections with

5487-426: The mid 90s gained both respect and monetary success, according to the MTA's website. 2006 was the best year for the division, with a 97.8% rate of on-time trains, record ridership (76.9 million people), and a passenger satisfaction rating of 92%. In December 2017, the MTA announced that the Metro-North Railroad stations at White Plains , Harlem–125th Street , Crestwood , Port Chester , and Riverdale , would receive

5580-399: The new owner to consolidate its three stations into one as early as 1894, two years after the last merger. In 1901, the Consolidated realigned the tracks and built the new station where the New York & New England's passenger depot had been. A. Malkin's design combined a basic Richardsonian Romanesque structure with some Colonial Revival details, like the small panes in the windows. It

5673-470: The next few years commuter lines under the control of Conrail were gradually taken over by state agencies such as the newly formed NJ Transit in New Jersey, the established SEPTA in southeastern Pennsylvania, and Massachusetts Bay Transportation Authority in Boston. In March 1982, the MTA announced it would take over the Harlem, Hudson, and New Haven Lines as long as there was no extra operating cost involved. The MTA and ConnDOT officially took control of

SECTION 60

#1732776763451

5766-401: The north of Peekskill, such as Poughkeepsie, were considered to be long-distance services. The other major commuter line was the Putnam Division running from 155th Street in upper Manhattan (later from Sedgwick Avenue in the Bronx ) to Brewster, New York . Passengers would transfer to the IRT Ninth Avenue Line for midtown and lower Manhattan . From the mid-19th century until 1969,

5859-401: The only official reporting marks registered and recognized on AEI scanner tags is 'MNCW'. Rolling stock owned by the Connecticut Department of Transportation bears the CTDOT seal and either the New Haven ("NH") logo or the MTA logo and is identified using the reporting mark 'CNDX'. Metro-North offers many different ticket types and prices depending on the frequency of travel and distance of

5952-401: The other while running between the stations. Multi-system M8 railcars equipped with third rail shoes and pantographs are used for electric service on the line. The New Canaan Branch also uses overhead catenary. The Danbury Branch was electrified, but became a diesel line in 1961. The Waterbury Branch, the only east-of-Hudson Metro-North service which has no direct service to Grand Central,

6045-410: The overhanging bracketed eaves that shelter the platform on the building itself. A single chimney rises from the south end of the station, near where the sets of tracks meet. Windows vary in size and shape. Those on the east are high and small, whereas tall windows that give the impression of sidelights are along the southwest, next to the tracks. These are hints of the Colonial Revival style that

6138-463: The ownership of NYC in 1914. NYC's four-track Water Level Route paralleled the Hudson River, Erie Canal, and Great Lakes on a route from New York to Chicago via Albany. It was fast and popular due to the lack of any significant grades. The section between Grand Central and Peekskill, New York , the northernmost station in Westchester County , became known as the NYC's Hudson Division, with frequent commuter service in and out of Manhattan. Stations to

6231-494: The passenger cars used are Shoreliner series cars, powered by GE P32AC-DM Genesis , Brookville BL20GH , or EMD GP40-3H locomotives. In August 2023, CTDOT approved a contract with Alstom for 60 single-level passenger cars. The cars will replace the existing Shoreliner coach fleet on the Waterbury Branch and the Danbury Branch, as well as Mafersa coaches on the Hartford Line . Deliveries are expected to begin in 2026. Metro-North Railroad [REDACTED] Map of

6324-420: The passenger railroad system totaling 385 miles (620 km) of route . It is the second busiest commuter railroad in North America in terms of annual ridership, behind the Long Island Rail Road and ahead of NJ Transit (both of which also serve New York City). As of 2018 , Metro-North's budgetary burden for expenditures was $ 1.3 billion, which it supports through the collection of taxes and fees. In 2023,

6417-428: The railroad $ 1.3 million. Richard Ravitch, the MTA Chairman, asked President Reagan to seek legislation to place the dispute under the law of New York State. Even though Metro-North was a state agency, the workers remained under federal law because Conrail was a federal agency. Reagan had turned down a request by Governor Mario Cuomo to intervene, but indicated that he would listen if a congressionally approved proposal

6510-421: The railroad would have to cease operating passenger trains on the New Haven Line if nothing was done. A joint report from both agencies, released in September of that year, recommended that the line be leased to New York Central for 99 years, with the MCTA and CTA acting as agents for both states. In October, the MCTA found that the New Haven Line's stations and infrastructure were even more decrepit than those of

6603-425: The reverse side of the Round-trip, Weekly, and Monthly tickets. Union Station (Danbury, Connecticut) The station was built in 1903 by the New York, New Haven and Hartford Railroad in response to local pressure for a new station after the three railroads that served the city were merged into the New Haven. At its peak, 125 trains stopped there each day. By 1993, that had dwindled to a few commuter trains, and

6696-424: The ride. While the fare policies of the east of Hudson and west of Hudson divisions are essentially the same, west of Hudson trains are operated by NJ Transit using its ticketing system. Tickets may be bought from a ticket office at stations, ticket vending machines (TVMs), online through the "WebTicket" program or through apps for iOS and Android devices, or on the train. Monthly tickets may be bought through

6789-553: The rise of passenger air travel and the Interstate Highway System . The decline of hatmaking, as many Americans started going around bareheaded, also contributed. Many of the station's original decorative features were removed. The New Haven's passenger train services to northwestern Connecticut, the Berkshires and to Pittsfield, Massachusetts were cut to weekend-only service by 1961. The last named train on

6882-611: The route, the Berkshire , was discontinued in 1968. In the late 1960s the Consolidated was itself absorbed into the short-lived Penn Central conglomerate. The last intercity passenger train left for Pittsfield in 1972, and the next year the Penn Central's final failure put its trains in the hands of Conrail and the station itself became property of the state Department of Transportation (ConnDOT). Metro-North closed

6975-488: The same time since January 1961. The UTU also went on strike against NJ Transit, which took over Conrail lines in New Jersey, and against SEPTA in Philadelphia. Two weeks into the strike, Metro-North President Peter Stangl estimated that it lost $ 80,000 a week due to the strike. The chairman of the MTA's finance committee, Stephen Berger, feared that Metro-North would lose 5% of its pre-strike ridership of 90,000–costing

7068-614: The speed dictated by the cab signal by a penalty brake application should the engineer fail to obey it. There are no intermediate wayside signals between interlockings: operation is solely by cab signal. Wayside signals remain at interlockings. These are a special type of signal, a go, a slow or a stop signal. They do not convey information about traffic in the blocks ahead – the cab signal conveys block information. Metro-North began upgrading its Operations Control Center in Grand Central Terminal in 2008. All control hardware

7161-404: The station, the northern terminus of the New Haven Line 's Danbury Branch , in 1993. The city's mayor, Gene Eriquez, who had seen downtown wither as retail business and customers went to the mall built on the former fairgrounds, did not want to see another old building lost to urban blight . The station seemed to him and others the ideal place for a rail museum that could attract visitors, and

7254-494: The system had a ridership of 60,569,700, or about 235,300 per weekday as of the third quarter of 2024. The MTA has jurisdiction, through Metro-North, over railroad lines on the western and eastern portions of the Hudson River in New York. Service on the western side of the Hudson is operated by NJ Transit under contract with the MTA. Additionally, connecting ferry service is operated by NY Waterway , also under contract with

7347-446: The takeover, Metro-North was created as a division of the MTA, with Peter Stangl as president. Once under the MTA's control, the agency planned to phase in capital improvements over the following five years. As part of the transition, the MTA needed to negotiate new labor contracts with the 17 unions representing 5,000 Conrail employees who would become MTA employees and had to negotiate the transfer of most of Conrail's assets. Much work

7440-477: The time of its closing, fewer than 15 passengers used the station daily. The Danbury Line operated electric-powered trains beginning in 1925. The catenary system on the Danbury Line was removed in 1961 when diesel-powered locomotives resumed service on the line. Steel posts that once carried the overhead catenary system can still be seen along the line. As of 2022, the Connecticut Department of Transportation

7533-495: The time, Conrail was being floated by the federal government as a private for-profit freight-only carrier. Even with state subsidies, the federal government did not want Conrail to take on the operating costs of the commuter lines, which it was relieved from by the Northeast Rail Service Act of 1981 . Thus, it became essential that state-owned agencies both operate and subsidize their commuter services. Over

7626-448: The way Penn Central was running its railroads. He said that the proportion of trains running on schedule had declined after Penn Central had inherited the Hudson, Harlem, and New Haven Lines in 1968. In 1976, Congress awarded the MTA "temporary" funding so the LIRR and Penn Central commuter routes could be handed over to local private operators. The bankrupt Penn Central's commuter routes were taken over by Conrail , an entity created by

7719-410: The yard, including its 1907-built 2-6-0 steam locomotive ( B&M #1455 ), two cabooses, a Budd Company self-propelled rail diesel car , and a Sperry track inspection car, are open to the visitors. The museum is an all-volunteer operation and welcomes anyone who would like to participate in any of the many facets of its operations – including operating its locomotives and self-propelled cars. By

7812-482: Was added to the National Register of Historic Places on September 15, 2005. The turntable, built around 1914 was originally part of a roundhouse and machine shop complex. A fire destroyed the buildings in the 1980s, leaving "the only intact surviving [railroad] turntable in Connecticut". It is essentially a swing bridge, and is located several hundred yards east of the station. Some of the rolling stock in

7905-536: Was built in Norwalk to docks at Wilson Point . The Housatonic Railroad leased the D&;N on July 21, 1887; and soon after, the New York, New Haven and Hartford Railroad leased the Housatonic. Long-distance passenger service operated on the line. The Berkshire ran on the line from Grand Central to Danbury, to Pittsfield, Massachusetts . Many railroad bridges along the Danbury Branch were damaged or destroyed in

7998-405: Was emerging at the time of the station's construction. Inside, the museum's exhibits and displays occupy the 74-by-40-foot (23 by 12 m) southern half of the building, its former waiting room. In the northern half, is the museum's gift shop and restrooms. The original ticket window and the varnished pine door and window architraves . Immediately east of the entry is a fireplace whose mantel

8091-558: Was issued. The strike lasted six weeks, and ended on April 18 when the two sides agreed to binding arbitration. The first major project undertaken by Metro-North was the extension of the third-rail electrification on the Harlem line from North White Plains to a new station at Brewster North (since renamed Southeast ). This was completed in 1984. During the late 1980s and early 1990s, all wayside signals that did not protect switches and interlockings north of Grand Central were removed and replaced by modern cab signaling . In October 1998,

8184-617: Was needed in reorganization, as significant business success would not appear for at least two decades, following the faltering railroad industry in the 1970s. Conrail and later Metro-North had decided to trim whatever services they felt were unnecessary. A significant portion of the old New York Central Central Harlem line between Millerton and Chatham , New York was abandoned by Conrail, leaving northeastern Dutchess and Columbia counties with no rail transportation. Most commuter lines were kept in service although they were in much need of repair. On March 7, 1983, after labor negotiations between

8277-872: Was replaced and software upgrades were performed. The new OCC at Grand Central opened over the weekend of July 18, 2010. Most of the rolling stock on west-of-Hudson lines consists of Metro-North owned and marked Comet V cars, although occasionally other NJ Transit (NJT) cars are used as the two railroads pool equipment. The trains are also usually handled by EMD GP40FH-2 , GP40PH-2 , F40PH-3C , Alstom PL42AC , or Bombardier ALP-45DP locomotives, although any Metro-North or NJ Transit diesel can show up. Metro-North owned and marked equipment operated by NJ Transit can also be seen on other NJ Transit lines. The Metro-North Railroad uses an electric fleet of M3A , M7A , and M8 electric multiple units . Multiple diesel locomotives and push-pull coaches are in use as well. Although Metro-North uses many abbreviations (MNCR, MNR, MN, etc.)

8370-405: Was said to be the largest station on the New Haven's New York Division. In its peak years, early in the 20th century, extant timetables suggest the station saw as many as 125 trains a day. Much of that passenger traffic was related to the city's large hatmaking industry, with workers migrating to and from jobs, and business travelers selling to or buying from the hatmakers. It was acknowledged with

8463-631: Was studying the feasibility of installing catenary wire on the Danbury Branch. The Switchtower Museum in South Norwalk describes to visitors how railroad employees would switch the tracks for trains continuing on the Danbury branch line, then switch them back for trains travelling along the New Haven main line . The Danbury Railway Museum is located in the former Union Station of the D&N and NY&NE in Danbury. It lies just north of

8556-528: Was transferred to Conrail in 1976, when it absorbed most of Penn Central's railroad functions after Penn Central's bankruptcy. The system took its current form in 1983, when the MTA took over direct operation of Conrail's commuter services in the northern portion of the Tri-State Area and formed Metro-North to run them. There are 124 stations on Metro-North Railroad's five active lines, which operate on more than 787 miles (1,267 km) of track, with

8649-659: Was under the control of the New York Central Railroad (NYC). The NYC initially operated three commuter lines, two of which ran into Grand Central Depot (now Grand Central Terminal ). Metro-North's Harlem Line was initially a combination of trackage from the New York and Harlem Railroad and the Boston and Albany Railroad , running from Manhattan to Chatham, New York in Columbia County . At Chatham, passengers could transfer to long-distance trains on