Misplaced Pages

ETOPS

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Extended-range Twin-engine Operations Performance Standards (ETOPS) ( / iː ˈ t ɒ p s / ) are safety standards set by the International Civil Aviation Organization (ICAO) for twin-engine commercial passenger aircraft operations. They are a safety measure intended to ensure that in the event of a single engine failure, an aircraft will still be able to reach a diversion airport using the remaining operational engine. This may be at a reduced speed and/or height, and usually applies to flights over water or remote lands, typically routes previously restricted to three- and four-engine aircraft.

#611388

176-571: In 1936, the predecessor to the Federal Aviation Administration (FAA), the U.S. Bureau of Air Commerce , restricted commercial operations within United States airspace to within 100 miles (160 km) of an adequate airport. For many aircraft of that era this meant about 60 minutes with one engine inoperative. In 1953, with piston engine reliability and aircraft performance improved, U.S. authorities introduced

352-532: A Lockheed L-1011 TriStar on the route between Boston and Paris, a huge savings. The Airbus A310 secured approval for 120-minute ETOPS flights one month later in June. The larger safety margins were permitted because of the improved reliability demonstrated by twinjets and their turbofan engines. The FAA lengthened the ETOPS time to 180 minutes for CF6-powered 767s in 1989, making the type the first to be certified under

528-466: A Lockheed L-1011 TriStar on the same route, prompting TWA to spend $ 2.6 million on each 767 they owned to retrofit them to ETOPS-120 specs. It was followed by Singapore Airlines in June with an Airbus A310 . In April 1986, Pan Am inaugurated transatlantic revenue service using A310s, and within five years Airbus ETOPS operators numbered more than 20. In 1988, the FAA amended the ETOPS regulation to allow

704-489: A T-tail . By 1976, a twinjet layout, similar to the one which had debuted on the Airbus A300 , became the baseline configuration. The decision to use two engines reflected increased industry confidence in the reliability and economics of new-generation jet powerplants. While airline requirements for new wide-body aircraft remained ambiguous, the 7X7 was generally focused on mid-size, high-density markets. As such, it

880-551: A "60-minute rule", restricting twin-engine aircraft to a 60-minute diversion area (at single-engine cruise speed). There was some additional flexibility beyond this limit with special approval. Meanwhile, the International Civil Aviation Organization (ICAO) recommended a 90-minute diversion time for all aircraft, which was adopted by many regulatory authorities and airlines outside the US. During

1056-417: A "prior experience" bid, where anyone with an FAA Control Tower Operator certificate (CTO) and 52 weeks of experience could apply. This was a revolving bid, every month the applicants on this bid were sorted out, and eligible applicants were hired and sent directly to facilities, bypassing the FAA academy entirely. In the process of promoting diversity, the FAA revised its hiring process. The FAA later issued

1232-402: A 767-200 with 210 seats, and a trijet 767MR/LR version with 200 seats intended for intercontinental routes. The 767MR/LR was subsequently renamed 777 for differentiation purposes. The 767 was officially launched on July 14, 1978, when United Airlines ordered 30 of the 767-200 variant, followed by 50 more 767-200 orders from American Airlines and Delta Air Lines later that year. The 767-100

1408-559: A 767-300F order for 27 aircraft to replace its DC-10 freighters, citing the USAF tanker order and Boeing's decision to continue production as contributing factors. FedEx Express agreed to buy 19 more of the −300F variant in June 2012. In June 2015, FedEx said it was accelerating retirements of planes both to reflect demand and to modernize its fleet, recording charges of $ 276 million (~$ 347 million in 2023). On July 21, 2015, FedEx announced an order for 50 767-300F with options on another 50,

1584-576: A 777-200ER. On May 28, 2014, the Boeing 787 received its ETOPS-330 certificate from the FAA, enabling LAN Airlines (now known as LATAM Airlines) to switch to the 787 from the A340 on their Santiago–Auckland–Sydney service a year later. Until the rule change in North America and Oceania, several commercial airline routes were still economically off-limits to twinjets because of ETOPS regulations, unless

1760-536: A CTI certificate allowed a prospective controller to skip the Air Traffic Basics part of the academy, about a 30- to 45-day course, and go right into Initial Qualification Training (IQT). All prospective controllers, CTI or not, have had to pass the FAA Academy in order to be hired as a controller. Failure at the academy means FAA employment is terminated. In January 2015 they launched another pipeline,

1936-636: A Special Agent with the Office of Inspector General for the Department of Transportation and with FAA Security, is one of the most outspoken critics of FAA. Rather than commend the agency for proposing a $ 10.2 million fine against Southwest Airlines for its failure to conduct mandatory inspections in 2008, he was quoted as saying the following in an Associated Press story: "Penalties against airlines that violate FAA directives should be stiffer. At $ 25,000 per violation, Gutheinz said, airlines can justify rolling

SECTION 10

#1732771771612

2112-441: A certain amount of single-engine flying time away from the nearest suitable airport. For example, if an aircraft is certified for 180 minutes, it is permitted to fly any route not more than 180 minutes' single-engine flying time to the nearest suitable airport. The following ratings are awarded under current regulations according to the capability of the airliner: However, ratings for ETOPS type approval are fewer. They are: Until

2288-519: A college that offered a CTI program. Before the change, candidates who had completed coursework at participating colleges and universities could be "fast-tracked" for consideration. However, the CTI program had no guarantee of a job offer, nor was the goal of the program to teach people to work actual traffic. The goal of the program was to prepare people for the FAA Academy in Oklahoma City, OK. Having

2464-452: A commercial twinjet of 12,082 km (6,524 nmi; 7,507 mi) from Washington, D.C. to Addis Ababa . In the mid-1980s, the 767 and its European rivals, the Airbus A300 and A310 , spearheaded the growth of twinjet flights across the northern Atlantic under extended-range twin-engine operational performance standards ( ETOPS ) regulations, the FAA's safety rules governing transoceanic flights by aircraft with two engines. In 1976,

2640-515: A common pilot type rating . Studies for a higher-capacity 767 in 1986 led Boeing to develop the larger 777 twinjet, introduced in June 1995. The 159-foot-long (48.5 m) 767-200 typically seats 216 passengers over 3,900  nautical miles  [nmi] (7,200 km; 4,500 mi), while the 767-200ER seats 181 over a 6,590 nmi (12,200 km; 7,580 mi) range . The 180-foot-long (54.9 m) 767-300 typically seats 269 passengers over 3,900 nmi (7,200 km; 4,500 mi), while

2816-484: A crew of two was safe for operating wide-body jets. A three-crew cockpit remained as an option and was fitted to the first production models. Ansett Australia ordered 767s with three-crew cockpits due to union demands; it was the only airline to operate 767s so configured. The 767's two-crew cockpit was also applied to the 757, allowing pilots to operate both aircraft after a short conversion course, and adding incentive for airlines to purchase both types. To produce

2992-421: A few government facilities", and that humanity would never get to Mars under those rules. A Designated Engineering Representative (DER) is an engineer who is appointed under 14 CFR section 183.29 to act on behalf of a company or as an independent consultant (IC). The DER system enables the FAA to delegate certain involvement in airworthiness exams, tests, and inspections to qualified technical people outside of

3168-483: A flight instructor (Gold Seal certification), a 50-year aviator (Wright Brothers Master Pilot Award), a 50-year mechanic (Charles Taylor Master Mechanic Award) or as a proficient pilot. The latter, the FAA " WINGS Program ", provides a lifetime series of grouped proficiency activities at three levels (Basic, Advanced, and Master) for pilots who have undergone several hours of ground and flight training since their last WINGS award, or "Phase". The FAA encourages volunteerism in

3344-429: A four-year degree or five years of full-time work experience to apply, rather than the closed college program or Veterans Recruitment Appointment bids, something that had last been done in 2008. Thousands were hired, including veterans, Collegiate Training Initiative graduates, and people who are true "off the street" hires. The move was made to open the job up to more people who might make good controllers but did not go to

3520-419: A further 787-based cockpit upgrade for the 767, featuring three landscape-format LCD screens that can display two windows each. The 767 is equipped with three redundant hydraulic systems for operation of control surfaces, landing gear, and utility actuation systems. Each engine powers a separate hydraulic system, and the third system uses electric pumps. A ram air turbine provides power for basic controls in

3696-508: A loosening of ETOPS rules starting in 1985 allowed the aircraft to operate transatlantic flights . A total of 742 of these aircraft were in service in July 2018, with Delta Air Lines being the largest operator with 77 aircraft in its fleet. As of October 2024 , Boeing has received 1,407 orders from 74 customers, of which 1,319 airplanes have been delivered, while the remaining orders are for cargo or tanker variants. Competitors have included

SECTION 20

#1732771771612

3872-425: A new airport aid program and certain added responsibilities for airport safety. During the 1960s and 1970s, the FAA also started to regulate high altitude (over 500 feet) kite and balloon flying. By the mid-1970s, the agency had achieved a semi-automated air traffic control system using both radar and computer technology. This system required enhancement to keep pace with air traffic growth, however, especially after

4048-432: A new design available, asked for and received another time-limited exemption for just the 767-300 and 767-300ER until 2019 when commercial production was expected to cease. But in 2017, with continual demand for the 767-300F, Boeing asked for another exemption up to the end of 2027, well past the revised production end date. It is noted that while Boeing requested extension of the original exemption from 2016 to 2019 based upon

4224-706: A new independent agency, the Civil Aeronautics Authority . The legislation also expanded the government's role by giving the CAA the authority and the power to regulate airline fares and to determine the routes that air carriers would serve. President Franklin D. Roosevelt split the authority into two agencies in 1940: the Civil Aeronautics Administration (CAA) and the Civil Aeronautics Board (CAB). CAA

4400-401: A passenger 767-300ER production to bridge the gap. A demand for 50 to 60 aircraft could have to be satisfied. Having to replace its 40 767s, United Airlines requested a price quote for other widebodies. In November 2017, Boeing CEO Dennis Muilenburg cited interest beyond military and freighter uses. However, in early 2018 Boeing Commercial Airplanes VP of marketing Randy Tinseth stated that

4576-431: A recovering global economy and ETOPS approval, 767 sales accelerated in the mid-to-late 1980s; 1989 was the most prolific year with 132 firm orders. By the early 1990s, the wide-body twinjet had become its manufacturer's annual best-selling aircraft, despite a slight decrease due to economic recession. During this period, the 767 became the most common airliner for transatlantic flights between North America and Europe. By

4752-562: A refuelling stop at Gander, Newfoundland , in order to safely complete their journey. Aloha Airlines operated 180-minute ETOPS–approved Boeing 737-700 aircraft on nonstop routes between the Hawaiian Islands and the western U.S. and also Vancouver, Canada. The use of the smaller 737-700 enabled Aloha to serve routes that could not support larger jet aircraft with an example being the Honolulu – Burbank nonstop route. Prior to

4928-425: A report that the "bio-data" was not a reliable test for future performance. However, the "Bio-Q" was not the determining factor for hiring, it was merely a screening tool to determine who would take a revised Air Traffic Standardized Aptitude Test (ATSAT). Due to cost and time, it was not practical to give all 30,000 some applicants the revised ATSAT, which has since been validated. In 2015 Fox News levied criticism that

5104-427: A retractable tailskid . All passenger 767 models have exit doors near the front and rear of the aircraft. Most 767-200 and -200ER models have one overwing exit door for emergency use; an optional second overwing exit increases maximum allowable capacity from 255 to 290. The 767-300 and -300ER typically feature two overwing exit doors or, in a configuration with no overwing exits, three exit doors on each side and

5280-407: A routing of Havana – Port au Prince – Ciudad Trujillo – San Juan, Puerto Rico . In 1948–52 New Zealand National Airways Corporation scheduled a DC-3 to fly from Apia (Western Samoa) to Aitutaki, a 5 + 1 ⁄ 2 -hour flight covering 685 airportless nautical miles between Tafuna (Pago Pago) and Aitutaki. In 1963 Polynesian Airlines started flying a Percival Prince Apia to Aitutaki; in 1964

5456-727: A second military derivative of the 767-200ER. Launched with an order in October 2002 from the Italian Air Force , the KC-767 was intended for the dual role of refueling other aircraft and carrying cargo. The Japanese government became the second customer for the type in March 2003. In May 2003, the United States Air Force (USAF) announced its intent to lease KC-767s to replace its aging KC-135 tankers. The plan

ETOPS - Misplaced Pages Continue

5632-670: A series of midair collisions—most notably the 1956 Grand Canyon mid-air collision ) prompted passage of the Federal Aviation Act of 1958 . This legislation passed the CAA's functions to a new independent body, the Federal Aviation Agency. The act also transferred air safety regulation from the CAB to the FAA, and gave it sole responsibility for a joint civil-military system of air navigation and air traffic control. The FAA's first administrator, Elwood R. Quesada ,

5808-463: A similar numbering scheme, but adds a preceding manufacturer letter; all variants based on the 767-200 and 767-300 are classified under the codes "B762" and "B763"; the 767-400ER receives the designation of "B764". The 767-200 was the original model and entered service with United Airlines in 1982. The type has been used primarily by mainline U.S. carriers for domestic routes between major hub centers such as Los Angeles to Washington. The 767-200

5984-427: A smaller exit door aft of the wing. A further configuration featuring three exit doors on each side plus one overwing exit allows an increase in maximum capacity from 290 to 351. All 767-400ERs are configured with three exit doors on each side and a smaller exit door aft of the wing. The 767-300F has one exit door at the forward left-hand side of the aircraft. In addition to shared avionics and computer technology,

6160-522: A smaller fuselage than the existing 747, McDonnell Douglas DC-10 , and Lockheed L-1011 TriStar wide-bodies. To defray the high cost of development, Boeing signed risk-sharing agreements with Italian corporation Aeritalia and the Civil Transport Development Corporation (CTDC), a consortium of Japanese aerospace companies. This marked the manufacturer's first major international joint venture, and both Aeritalia and

6336-440: A smaller version of the 777, Boeing announced that it was revisiting studies for a larger 767. The proposed 767-400X, a second stretch of the aircraft, offered a 12 percent capacity increase versus the 767-300, and featured an upgraded flight deck, enhanced interior, and greater wingspan. The variant was specifically aimed at Delta Air Lines' pending replacement of its aging Lockheed L-1011 TriStars, and faced competition from

6512-486: A third of the 767's design drawings, and performed 26,000 hours of wind tunnel tests. Design work occurred concurrently with the 757 twinjet, leading Boeing to treat both as almost one program to reduce risk and cost. Both aircraft would ultimately receive shared design features, including avionics , flight management systems , instruments, and handling characteristics. Combined development costs were estimated at $ 3.5 to $ 4 billion. Early 767 customers were given

6688-545: A window or aisle. As a result, the aircraft can be largely occupied before center seats need to be filled, and each passenger is no more than one seat from the aisle. It is possible to configure the aircraft with extra seats for up to an eight abreast configuration, but this is less common. The 767 interior introduced larger overhead bins and more lavatories per passenger than previous aircraft. The bins are wider to accommodate garment bags without folding, and strengthened for heavier carry-on items. A single, large galley

6864-426: Is Boeing's first wide-body twinjet , powered by General Electric CF6 , Rolls-Royce RB211 , or Pratt & Whitney JT9D turbofans. JT9D engines were eventually replaced by PW4000 engines. The aircraft has a conventional tail and a supercritical wing for reduced aerodynamic drag . Its two-crew glass cockpit , a first for a Boeing airliner, was developed jointly for the 757 − a narrow-body aircraft , allowing

7040-456: Is a U.S. federal government agency within the U.S. Department of Transportation which regulates civil aviation in the United States and surrounding international waters . Its powers include air traffic control , certification of personnel and aircraft , setting standards for airports, and protection of U.S. assets during the launch or re-entry of commercial space vehicles. Powers over neighboring international waters were delegated to

7216-630: Is a set of programs to implement a suite of incremental changes to the National Airspace System (NAS). More precise Performance Based Navigation can reduce fuel burn, emissions, and noise exposure for a majority of communities, but the concentration of flight tracks also can increase noise exposure for people who live directly under those flight paths. A feature of the NextGen program is GPS-based waypoints, which result in consolidated flight paths for planes. The result of this change

ETOPS - Misplaced Pages Continue

7392-637: Is appointed for a five-year term. On March 19, 2019, President Donald Trump announced he would nominate Stephen Dickson, a former executive and pilot at Delta Air Lines , to be the next FAA Administrator. On July 24, 2019, the Senate confirmed Dickson by a vote of 52–40. He was sworn in as Administrator by Transportation Secretary Elaine Chao on August 12, 2019. On February 16, 2022, Dickson announced his resignation as FAA Administrator, effective March 31, 2022. In September 2023, President Joe Biden announced that he would be nominating Mike Whitaker to lead

7568-428: Is equipped with six-panel leading edge slats , single- and double-slotted flaps , inboard and outboard ailerons , and six spoilers . The airframe further incorporates Carbon-fiber-reinforced polymer composite material wing surfaces, Kevlar fairings and access panels, plus improved aluminum alloys , which together reduce overall weight by 1,900 pounds (860 kg) versus preceding aircraft. To distribute

7744-711: Is headquartered in Washington, D.C. , and also operates the William J. Hughes Technical Center near Atlantic City, New Jersey , for support and research, and the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma , for training. The FAA has nine regional administrative offices: The Air Commerce Act of May 20, 1926, is the cornerstone of the U.S. federal government 's regulation of civil aviation. This landmark legislation

7920-484: Is installed near the aft doors, allowing for more efficient meal service and simpler ground resupply. Passenger and service doors are an overhead plug type, which retract upwards, and commonly used doors can be equipped with an electric-assist system. In 2000, a 777-style interior, known as the Boeing Signature Interior, debuted on the 767-400ER. Subsequently, adopted for all new-build 767s,

8096-511: Is that many localities experience huge increases in air traffic over previously quiet areas. Complaints have risen with the added traffic and multiple municipalities have filed suit. As a result of the March 10, 2019 Ethiopian Airlines Flight 302 crash and the Lion Air Flight 610 crash five months earlier, most airlines and countries began grounding the Boeing 737 MAX 8 (and in many cases all MAX variants) due to safety concerns, but

8272-409: Is the main target, but a passenger version could be a cheaper alternative to the proposed New Midsize Airplane . The 767 is a low-wing cantilever monoplane with a conventional tail unit featuring a single fin and rudder. The wings are swept at 31.5 degrees and optimized for a cruising speed of Mach 0.8 (533 mph or 858 km/h). Each wing features a supercritical airfoil cross-section and

8448-481: The Airbus A300 , A310 , and A330-200 . Its successor, the 787 Dreamliner , entered service in 2011. In 1970, the 747 entered service as the first wide-body jetliner with a fuselage wide enough to feature a twin-aisle cabin. Two years later, the manufacturer began a development study, code-named 7X7, for a new wide-body jetliner intended to replace the 707 and other early generation narrow-body airliners. The aircraft would also provide twin-aisle seating, but in

8624-511: The Airbus A340 and A380. The North Atlantic Tracks are the most heavily used oceanic routes in the world, and are largely covered by ETOPS 120-minute rules, thereby removing the necessity of using 180-minute rules. However, North Atlantic diversion airports are subject to adverse weather conditions that affect their availability for use. As a result, the JAA and FAA have given 15% extension to

8800-482: The Airline Deregulation Act of 1978 phased out the CAB's economic regulation of the airlines. A nationwide strike by the air traffic controllers union in 1981 forced temporary flight restrictions but failed to shut down the airspace system. During the following year, the agency unveiled a new plan for further automating its air traffic control facilities, but progress proved disappointing. In 1994,

8976-472: The Boeing 737 MAX , following the crash of Ethiopian Airlines Flight 302 . Boeing 767-200ER The Boeing 767 is an American wide-body airliner developed and manufactured by Boeing Commercial Airplanes . The aircraft was launched as the 7X7 program on July 14, 1978, the prototype first flew on September 26, 1981, and it was certified on July 30, 1982. The initial 767-200 variant entered service on September 8, 1982, with United Airlines , and

SECTION 50

#1732771771612

9152-579: The Boeing 747-8 and the terminology updated to EDTO (Extended Diversion Time Operations). While the earliest jet engines were sometimes unreliable, widespread use of later engines such as the Pratt & Whitney JT8D (e.g. McDonnell Douglas DC-9 and Boeing 737 ) led to major advances in reliability and safety. As jet engines started to deliver more power than piston engines while increasing reliability, aircraft whose size previously required four piston engines could now be built using only two jet engines. By

9328-461: The Boeing 777 was rated ETOPS-120. European airlines operating the 777 had to demonstrate one year of trouble-free 120-minute ETOPS experience before obtaining 180-minute ETOPS for the 777. Effective February 15, 2007, the FAA ruled that US-registered twin-engine airplane operators can fly more than 180-minute ETOPS to the design limit of the aircraft. In November 2009, the Airbus A330 became

9504-543: The COVID-19 pandemic in the early 2020s, Boeing and Airbus have since ended all production of the 747 and A380 , respectively (and both being the two largest commercial aircraft in the world). At the same time, the increasing prominence of new-generation ultra-long-range wide-body twinjets like the Boeing 777 and 787 , and Airbus A330 and A350 over the last decade has shifted the favor from quadjets to twinjets for international long-haul travel. The cornerstone of

9680-621: The Department of Commerce assumed primary responsibility for aviation oversight. In fulfilling its civil aviation responsibilities, the U.S. Department of Commerce initially concentrated on such functions as safety regulations and the certification of pilots and aircraft. It took over the building and operation of the nation's system of lighted airways, a task initiated by the Post Office Department . The Department of Commerce improved aeronautical radio communications—before

9856-650: The E-767 , an Airborne Early Warning and Control (AWACS) variant based on the 767-200ER. The first two E-767s , featuring extensive modifications to accommodate surveillance radar and other monitoring equipment, were delivered in 1998 to the Japan Self-Defense Forces . The longest flight for the -400ER variant was completed by OMD275 of Nomadic Aviation from Bogota to Abu Dubai in the UAE on May 31, 2024. In November 1995, after abandoning development of

10032-470: The Federal Register in 2007: This final rule applies to air carrier (part 121), commuter, and on-demand (part 135) turbine powered multi-engine airplanes used in extended-range operations. However, all-cargo operations in airplanes with more than two engines of both part 121 and part 135 are exempted from the majority of this rule. Today's rule [January 16, 2007] establishes regulations governing

10208-490: The engine pylons of several aircraft. The cracks were related to the extra weight of the RB211 engines, which are 2,205 pounds (1,000 kg) heavier than other 767 engines. During the grounding, interim repairs were conducted to alleviate stress on engine pylon components, and a parts redesign in 1991 prevented further cracks. Boeing also performed a structural reassessment, resulting in production changes and modifications to

10384-648: The fuselage of an aircraft , but was prevented by supervisors he said were friendly with the airline. This was validated by a report by the Department of Transportation which found FAA managers had allowed Southwest Airlines to fly 46 airplanes in 2006 and 2007 that were overdue for safety inspections, ignoring concerns raised by inspectors. Audits of other airlines resulted in two airlines grounding hundreds of planes, causing thousands of flight cancellations. The House Transportation and Infrastructure Committee held hearings in April 2008. Jim Oberstar , former chairman of

10560-475: The 1,000th 767 rolled out, destined for All Nippon Airways. The aircraft was the 91st 767-300ER ordered by the Japanese carrier, and with its completion the 767 became the second wide-body airliner to reach the thousand-unit milestone after the 747. The 1,000th aircraft also marked the last model produced on the original 767 assembly line. Beginning with the 1,001st aircraft, production moved to another area in

10736-547: The 120-minute rules to deal with such contingencies, resulting to ETOPS-138 (i.e. 138 minutes) to allow ETOPS flights with such airports closed. By the mid-2010s, virtually all North Atlantic plane routes were dominated by twin-engine aircraft. During the Cold War , routes between Europe and East Asia were prohibited from flying over Soviet Union or China since both airspaces were previously heavily military-controlled. Virtually all flights between Europe and East Asia flew over

SECTION 60

#1732771771612

10912-529: The 1950s, Pan Am twin-engine Convair 240s flew across the Caribbean from Barranquilla, Colombia to Kingston, Jamaica , Avensa Convair 340s flew from Maracaibo, Venezuela to Montego Bay, Jamaica , KLM Douglas DC-3s flew Curacao to Ciudad Trujillo while KLM Convairs flew Aruba to Kingston with Delta Air Lines operating Convair 340 flights nonstop between New Orleans and Havana as well as nonstop between Havana and Montego Bay and also on

11088-411: The 1960s had already brought the agency into the field of civil aviation security. In response to the hijackings on September 11, 2001, this responsibility is now primarily taken by the Department of Homeland Security . The FAA became more involved with the environmental aspects of aviation in 1968 when it received the power to set aircraft noise standards. Legislation in 1970 gave the agency management of

11264-634: The 60-minute rule. Trijets and quadjets dominated international long-haul flights until the late 1980s. Airbus A300 twinjets, the first twin-engine wide-body aircraft, had been flying across the North Atlantic, the Bay of Bengal, and the Indian Ocean under a 90-minute ICAO rule since 1976. When the FAA director J. Lynn Helms in 1980 was approached about the possibility of an exemption, his response

11440-578: The 737-700 operation, Aloha Airlines had operated 737-200 aircraft to various Pacific islands utilizing 120 minute ETOPS. Other new-generation ETOPS aircraft include the Airbus A220 series, the Embraer E-Jets series and the ATR 72 . By the mid-2010s, the widespread successes of ETOPS-reliant narrow-body aircraft have diminished the global market share of double-deck wide-body jets. At the onset of

11616-401: The 757. Work on both proposals proceeded through the airline industry upturn in the late 1970s. In January 1978, Boeing announced a major extension of its Everett factory —which was then dedicated to manufacturing the 747—to accommodate its new wide-body family. In February 1978, the new jetliner received the 767 model designation, and three variants were planned: a 767-100 with 190 seats,

11792-462: The 767 from new wiring separation rules that would prevent ignition sources, because design improvements it introduced fell short of meeting such rules. One of the justification by Boeing: changes to the fuel quantity indication system would require a halt of delivery by three years as production of the 767 model was expected to end shortly. FAA gave the manufacturer three years to have a compliant system while deliveries continued. In 2014, Boeing, without

11968-642: The 767 uses the same auxiliary power unit , electric power systems, and hydraulic parts as the 757. A raised cockpit floor and the same forward cockpit windows result in similar pilot viewing angles. Related design and functionality allows 767 pilots to obtain a common type rating to operate the 757 and share the same seniority roster with pilots of either aircraft. The original 767 flight deck uses six Rockwell Collins CRT screens to display electronic flight instrument system (EFIS) and engine indication and crew alerting system (EICAS) information, allowing pilots to handle monitoring tasks previously performed by

12144-665: The 767, Boeing formed a network of subcontractors which included domestic suppliers and international contributions from Italy's Aeritalia and Japan's CTDC. The wings and cabin floor were produced in-house, while Aeritalia provided control surfaces, Boeing Vertol made the leading edge for the wings, and Boeing Wichita produced the forward fuselage. The CTDC provided multiple assemblies through its constituent companies, namely Fuji Heavy Industries ( wing fairings and gear doors), Kawasaki Heavy Industries (center fuselage), and Mitsubishi Heavy Industries (rear fuselage, doors, and tail). Components were integrated during final assembly at

12320-442: The 767-200 in late 1982, while Air Canada, China Airlines , El Al , and Pacific Western began operating the aircraft in 1983. The aircraft's introduction was relatively smooth, with few operational glitches and greater dispatch reliability than prior jetliners. Following the 1996 in-flight explosion of TWA Flight 800 , the FAA introduced new rules about flammability reduction in 2008. In 2012, Boeing requested an exemption for

12496-524: The 767-300ER seats 218 over 5,980 nmi (11,070 km; 6,880 mi). The 767-300F can haul 116,000 lb (52.7 t) over 3,225 nmi (6,025 km; 3,711 mi), and the 201.3-foot-long (61.37 m) 767-400ER typically seats 245 passengers over 5,625 nmi (10,415 km; 6,473 mi). Military derivatives include the E-767 for surveillance and the KC-767 and KC-46 aerial tankers . Initially marketed for transcontinental routes ,

12672-552: The 767-300F, a production freighter, and conversions of passenger 767-200 and 767-300 models. When referring to different variants, Boeing and airlines often collapse the model number (767) and the variant designator, e.g. –200 or –300, into a truncated form, e.g. "762" or "763". Subsequent to the capacity number, designations may append the range identifier, though -200ER and -300ER are company marketing designations and not certificated as such. The International Civil Aviation Organization (ICAO) aircraft type designator system uses

12848-717: The 767-300F. Renewed freighter interest led Boeing to consider enhanced versions of the 767-200 and 767-300F with increased gross weights, 767-400ER wing extensions, and 777 avionics. Net orders for the 767 declined from 24 in 2008 to just three in 2010. During the same period, operators upgraded aircraft already in service; in 2008, the first 767-300ER retrofitted with blended winglets from Aviation Partners Incorporated debuted with American Airlines. The manufacturer-sanctioned winglets, at 11 feet (3.35 m) in height, improved fuel efficiency by an estimated 6.5 percent. Other carriers including All Nippon Airways and Delta Air Lines also ordered winglet kits. On February 2, 2011,

13024-424: The 767. Using a conventional tail design also allowed the rear fuselage to be tapered over a shorter section, providing for parallel aisles along the full length of the passenger cabin, and eliminating irregular seat rows toward the rear of the aircraft. The 767 was the first Boeing wide-body to be designed with a two-crew digital glass cockpit. Cathode-ray tube (CRT) color displays and new electronics replaced

13200-540: The A300 and A310 , and Boeing 767 . The success of ETOPS aircraft like A300 and Boeing 767 made the intercontinental trijets obsolete for passenger use, production of which was largely ended by the late 2000s with Boeing cancelling the McDonnell Douglas MD-11 program in the same period. The rules have also allowed American legacy carriers ( United Airlines and Delta Air Lines in particular) to use

13376-473: The A300 was the first twinjet to secure permission to fly 90 minutes away from diversion airports , up from 60 minutes. In May 1985, the FAA granted its first approval for 120-minute ETOPS flights to the 767, on an individual airline basis starting with TWA, provided that the operator met flight safety criteria. This allowed the aircraft to fly overseas routes at up to two hours' distance from land. The 767 burned 7,000 lb (3.2 t) less fuel per hour than

13552-529: The A330-200, a shortened derivative of the Airbus A330. In March 1997, Delta Air Lines launched the 767-400ER when it ordered the type to replace its L-1011 fleet. In October 1997, Continental Airlines also ordered the 767-400ER to replace its McDonnell Douglas DC-10 fleet. The type completed its first flight on October 9, 1999, and entered service with Continental Airlines on September 14, 2000. In

13728-570: The Boeing 757 on "long and thin" transatlantic routes between their major hubs and secondary European cities that cannot generate the passenger demand to justify the use of a widebody airliner. The practice has been controversial, because although the 757 has adequate range to cross the Atlantic Ocean comfortably, strong headwinds caused by the jetstream over the winter months can result in westbound flights being declared "minimum fuel", forcing

13904-495: The CTDC received supply contracts in return for their early participation. The initial 7X7 was conceived as a short take-off and landing airliner intended for short-distance flights, but customers were unenthusiastic about the concept, leading to its redefinition as a mid-size, transcontinental-range airliner. At this stage the proposed aircraft featured two or three engines, with possible configurations including over-wing engines and

14080-438: The ETOPS approach is the statistics showing that the turbine assembly of a modern jet engine is an inherently reliable component. Engine ancillaries, by contrast, have a lower reliability rating. Therefore, an ETOPS-certified engine may be built with duplicate sets of certain ancillaries in order to receive the required reliability rating. ETOPS approval is a two-step process. First, the airframe and engine combination must satisfy

14256-565: The Earth's entire surface, allowing point-to-point travel anywhere in the world except directly over the South Pole . Meanwhile, the first time that ETOPS-330 approval was given to a four-engine aircraft was in February 2015, to the Boeing 747-8 Intercontinental . It is the only ETOPS-compliant aircraft allowed to run non-stop overflights over Antarctica with proper alternates , alongside

14432-530: The Everett factory which occupied about half of the previous floor space. The new assembly line made room for 787 production and aimed to boost manufacturing efficiency by over twenty percent. At the inauguration of its new assembly line, the 767's order backlog numbered approximately 50, only enough for production to last until 2013. Despite the reduced backlog, Boeing officials expressed optimism that additional orders would be forthcoming. On February 24, 2011,

14608-451: The Everett factory. For expedited production of wing spars , the main structural member of aircraft wings, the Everett factory received robotic machinery to automate the process of drilling holes and inserting fasteners . This method of wing construction expanded on techniques developed for the 747. Final assembly of the first aircraft began in July 1979. The prototype aircraft, registered as N767BA and equipped with JT9D turbofans,

14784-419: The FAA and Boeing had colluded on recertification test flights, attempted to cover up important information and that the FAA had retaliated against whistleblowers. SpaceX CEO Elon Musk criticized the FAA as moving too slowly, after a 2020 launch of a Starship prototype rocket violated the company's license. Musk said the agency's regulations are tailored for "a handful of expendable launches per year from

14960-474: The FAA announced it will allow airlines to expand the passengers use of portable electronic devices during all phases of flight, but mobile phone calls would still be prohibited (and use of cellular networks during any point when aircraft doors are closed remains prohibited to-date). Implementation initially varied among airlines. The FAA expected many carriers to show that their planes allow passengers to safely use their devices in airplane mode , gate-to-gate, by

15136-697: The FAA by authority of the International Civil Aviation Organization . The FAA was created in August ;1958  ( 1958-08 ) as the Federal Aviation Agency, replacing the Civil Aeronautics Administration (CAA). In 1967, the FAA became part of the newly formed U.S. Department of Transportation and was renamed the Federal Aviation Administration. The FAA's roles include: The FAA operates five "lines of business". Their functions are: The FAA

15312-771: The FAA called the Air Traffic Organization , (ATO) was set up by presidential executive order. This became the air navigation service provider for the airspace of the United States and for the New York (Atlantic) and Oakland (Pacific) oceanic areas. It is a full member of the Civil Air Navigation Services Organisation . The FAA issues a number of awards to holders of its certificates. Among these are demonstrated proficiencies as an aviation mechanic (the AMT Awards),

15488-483: The FAA declined to ground MAX 8 aircraft operating in the U.S. On March 12, the FAA said that its ongoing review showed "no systemic performance issues and provides no basis to order grounding the aircraft." Some U.S. Senators called for the FAA to ground the aircraft until an investigation into the cause of the Ethiopian Airlines crash was complete. U.S. Transportation Secretary Elaine Chao said that "If

15664-441: The FAA discriminated against qualified candidates. In December 2015, a reverse discrimination lawsuit was filed against the FAA seeking class-action status for the thousands of men and women who spent up to $ 40,000 getting trained under FAA rules before they were abruptly changed. The prospects of the lawsuit are unknown, as the FAA is a self-governing entity and therefore can alter and experiment with its hiring practices, and there

15840-567: The FAA for landings with 980 feet (300 m) minimum visibility in 1984. On the 767-400ER, the cockpit layout is simplified further with six Rockwell Collins liquid crystal display (LCD) screens, and adapted for similarities with the 777 and the Next Generation 737 . To retain operational commonality , the LCD screens can be programmed to display information in the same manner as earlier 767s. In 2012, Boeing and Rockwell Collins launched

16016-514: The FAA identifies an issue that affects safety, the department will take immediate and appropriate action." The FAA resisted grounding the aircraft until March 13, 2019, when it received evidence of similarities in the two accidents. By then, 51 other regulators had already grounded the plane, and by March 18, 2019, all 387 aircraft in service were grounded. Three major U.S. airlines-- Southwest , United , and American Airlines —were affected by this decision. Further investigations also revealed that

16192-432: The FAA proposed to fine Southwest $ 10.2 million for failing to inspect older planes for cracks, and in 2009 Southwest and the FAA agreed that Southwest would pay a $ 7.5 million penalty and would adopt new safety procedures, with the fine doubling if Southwest failed to follow through. In 2014, the FAA modified its approach to air traffic control hiring. It launched more "off the street bids", allowing anyone with either

16368-431: The FAA shifted to a more step-by-step approach that has provided controllers with advanced equipment. In 1979, Congress authorized the FAA to work with major commercial airports to define noise pollution contours and investigate the feasibility of noise mitigation by residential retrofit programs. Throughout the 1980s, these charters were implemented. In the 1990s, satellite technology received increased emphasis in

16544-450: The FAA when acting under the authority of a DER appointment; a DER has no federal protection for work done or the decisions made as a DER. Neither does the FAA provide any indemnification for a DER from general tort law . "The FAA cannot shelter or protect DERs from the consequences of their findings." A DAR is an individual appointed in accordance with 14 CFR 183.33 who may perform examination, inspection, and testing services necessary to

16720-532: The FAA's development programs as a means to improvements in communications, navigation, and airspace management. In 1995, the agency assumed responsibility for safety oversight of commercial space transportation, a function begun eleven years before by an office within DOT headquarters. The agency was responsible for the decision to ground flights after the September 11 attacks . In December 2000, an organization within

16896-458: The FAA. Qualifications and policies for appointment of Designated Airworthiness Representatives are established in FAA Order 8100.8 , Designee Management Handbook . Working procedures for DERs are prescribed in FAA Order 8110.37 , Designated Engineering Representative (DER) Handbook . Neither type of DER is an employee of either the FAA or the United States government. While a DER represents

17072-446: The FAA. Whitaker previously served as deputy administrator of the FAA under President Barack Obama . The FAA has been cited as an example of regulatory capture , "in which the airline industry openly dictates to its regulators its governing rules, arranging for not only beneficial regulation, but placing key people to head these regulators." Retired NASA Office of Inspector General Senior Special Agent Joseph Gutheinz , who used to be

17248-646: The Federal Aviation Administration as it became one of several agencies (e.g., Federal Highway Administration, Federal Railroad Administration, the Coast Guard, and the Saint Lawrence Seaway Commission) within DOT. The FAA administrator no longer reported directly to the president, but instead to the Secretary of Transportation. New programs and budget requests would have to be approved by DOT, which would then include these requests in

17424-475: The International Community (commonly abbreviated as CANIC) is a notification from the FAA to civil airworthiness authorities of foreign countries of pending significant safety actions. The FAA Airworthiness Directives Manual, states the following: 8. Continued Airworthiness Notification to the International Community (CANIC). The FAA issued a CANIC to state the continued airworthiness of

17600-456: The NuLook 767 package by Heath Tecna. In its first year, the 767 logged a 96.1 percent dispatch rate, which exceeded the industry average for all-new aircraft. Operators reported generally favorable ratings for the twinjet's sound levels, interior comfort, and economic performance. Resolved issues were minor and included the recalibration of a leading edge sensor to prevent false readings,

17776-602: The Signature Interior features even larger overhead bins, indirect lighting, and sculpted, curved panels. The 767-400ER also received larger windows derived from the 777. Older 767s can be retrofitted with the Signature Interior. Some operators have adopted a simpler modification known as the Enhanced Interior, featuring curved ceiling panels and indirect lighting with minimal modification of cabin architecture, as well as aftermarket modifications such as

17952-542: The Sonic Cruiser. The following year, the manufacturer announced the 7E7, a mid-size 767 successor made from composite materials which promised to be 20 percent more fuel efficient. The new jetliner was the first stage of a replacement aircraft initiative called the Boeing Yellowstone Project . Customers embraced the 7E7, later renamed 787 Dreamliner, and within two years it had become

18128-612: The U.S.) given the current aircraft range restrictions and, in the case of the early and mid-2020s, the reinstatement of selected routes by airlines between the Western Hemisphere and Eastern Hemisphere bypassing Russia due to its ongoing war with Ukraine . For decades, narrow-body aircraft like the Airbus A320 series, and the Boeing 737 series and 757 have continuously operated flights as approved for ETOPS operation, alongside earlier wide-body aircraft such as

18304-410: The US only. Boeing is widely expected to begin production of 787 Freighter during that extension period. After the debut of the first stretched 767s, Boeing sought to address airline requests for greater capacity by proposing larger models, including a partial double-deck version informally named the "Hunchback of Mukilteo" (from a town near Boeing's Everett factory) with a 757 body section mounted over

18480-551: The USAF announced its selection of the KC-767 Advanced Tanker, an upgraded variant of the KC-767, for its KC-X fleet renewal program. The selection followed two rounds of tanker competition between Boeing and Airbus parent EADS , and came eight years after the USAF's original 2003 announcement of its plan to lease KC-767s. The tanker order encompassed 179 aircraft and was expected to sustain 767 production past 2013. In December 2011, FedEx Express announced

18656-727: The United States, often with a tank stop in Anchorage , Alaska . They flew near the North Pole with a very large distance to usable airports, for which only three- and four-engine wide-body aircraft were permitted for safety reasons by international aviation authorities. Some flights between Europe and Oceania still largely pass through stopovers in Asia (either in the Middle East or Southeast Asia ) or North America (either in Canada or

18832-429: The aft main fuselage. In 1986, Boeing proposed the 767-X, a revised model with extended wings and a wider cabin, but received little interest. The 767-X did not get enough interest from airlines to launch and the model was shelved in 1988 in favor of the Boeing 777 . In March 2000, Boeing was to launch the 259-seat 767-400ERX with an initial order for three from Kenya Airways with deliveries planned for 2004, as it

19008-579: The aftermath of the Southwest Airlines inspection scandal, a bill was unanimously approved in the House to tighten regulations concerning airplane maintenance procedures, including the establishment of a whistleblower office and a two-year "cooling off" period that FAA inspectors or supervisors of inspectors must wait before they can work for those they regulated. The bill also required rotation of principal maintenance inspectors and stipulated that

19184-468: The aircraft's weight on the ground, the 767 has a retractable tricycle landing gear with four wheels on each main gear and two for the nose gear. The original wing and gear design accommodated the stretched 767-300 without major changes. The 767-400ER features a larger, more widely spaced main gear with 777 wheels, tires, and brakes. To prevent damage if the tail section contacts the runway surface during takeoff, 767-300 and 767-400ER models are fitted with

19360-560: The airline. Engines must have an in-flight shutdown (IFSD) rate better than 1 per 20,000 hours for ETOPS-120, 1 per 50,000 hours for ETOPS-180, and 1 per 100,000 hours for beyond ETOPS-180. Private jets are exempted from ETOPS by the FAA, but are subject to the ETOPS 120-minute rule in EASA's jurisdiction. Government-owned aircraft (including military) do not have to adhere to ETOPS regulations. There are different levels of ETOPS certification, each allowing aircraft to fly on routes that are

19536-429: The airplane-engine combination in the application. On December 12, 2011, Boeing received type-design approval from the FAA for up to 330-minute extended operations for its Boeing 777 series, all equipped with GE engines, and with Rolls-Royce and Pratt & Whitney engines expected to follow. The first ETOPS-330 flight took place on December 1, 2015, with Air New Zealand connecting Auckland to Buenos Aires on

19712-645: The airways. In 1936, the Bureau itself took over the centers and began to expand the ATC system. The pioneer air traffic controllers used maps, blackboards, and mental calculations to ensure the safe separation of aircraft traveling along designated routes between cities. In 1938, the Civil Aeronautics Act transferred the federal civil aviation responsibilities from the Commerce Department to

19888-421: The basic ETOPS requirements during its type certification . This is called "ETOPS type approval". Such tests may include shutting down an engine and flying the remaining engine during the complete diversion time. Often such tests are performed in the middle of the ocean. It must be demonstrated that, during the diversion flight, the flight crew is not unduly burdened by extra workload due to the lost engine and that

20064-575: The choice of Pratt & Whitney JT9D or General Electric CF6 turbofans, marking the first time that Boeing had offered more than one engine option at the launch of a new airliner. Both jet engine models had a maximum output of 48,000 pounds-force (210 kN) of thrust . The engines were mounted approximately one-third the length of the wing from the fuselage, similar to previous wide-body trijets. The larger wings were designed using an aft-loaded shape which reduced aerodynamic drag and distributed lift more evenly across their surface span than any of

20240-426: The committee, said its investigation uncovered a pattern of regulatory abuse and widespread regulatory lapses, allowing 117 aircraft to be operated commercially although not in compliance with FAA safety rules . Oberstar said there was a "culture of coziness" between senior FAA officials and the airlines and "a systematic breakdown" in the FAA's culture that resulted in "malfeasance, bordering on corruption". In 2008

20416-592: The company did not intend to resume production of the passenger variant. In its first quarter of 2018 earnings report, Boeing plans to increase its production from 2.5 to 3 monthly beginning in January 2020 due to increased demand in the cargo market, as FedEx had 56 on order, UPS has four, and an unidentified customer has three on order. This rate could rise to 3.5 per month in July 2020 and 4 per month in January 2021, before decreasing to 3 per month in January 2025 and then 2 per month in July 2025. In 2019, unit cost

20592-487: The cost of upgrading the design and their low production rate and ending production in 2019, Boeing developed the KC-46 tanker (based on the 767) which fully compliant with the new rulings and is assembled on the same production line as the 767. Since the 2019 exemption went into effect, Boeing has increased production of the freighter to satisfy demand. Forecasting airline interest in larger-capacity models, Boeing announced

20768-404: The data collected, the reliability of the particular airframe-engine combination is measured and statistics published. The figures must be within limits of type certifications. Of course, the figures required for ETOPS-180 will always be more stringent than ETOPS-120. Unsatisfactory figures would lead to a downgrade or, worse, suspension of ETOPS capabilities either for the type certificate holder or

20944-416: The delays. To extend the operational lives of older aircraft, airlines increased heavy maintenance procedures, including D-check teardowns and inspections for corrosion , a recurring issue on aging 767s. The first 787s entered service with All Nippon Airways in October 2011, 42 months behind schedule. In 2007, the 767 received a production boost when UPS and DHL Aviation placed a combined 33 orders for

21120-576: The design, operation and maintenance of certain airplanes operated on flights that fly long distances from an adequate airport. This final rule codifies current FAA policy, industry best practices and recommendations, as well as international standards designed to ensure long-range flights will continue to operate safely." and Several commenters … recommended use of the acronym "LROPS"—meaning 'Long Range Operations'—for three- and four-engine ETOPS, to avoid confusion, particularly for those operations beyond 180 minutes' diversion time. The FAA has decided to use

21296-564: The dice and taking the chance on getting caught. He also said the FAA is often too quick to bend to pressure from airlines and pilots." Other experts have been critical of the constraints and expectations under which the FAA is expected to operate. The dual role of encouraging aerospace travel and regulating aerospace travel are contradictory. For example, to levy a heavy penalty upon an airline for violating an FAA regulation which would impact their ability to continue operating would not be considered encouraging aerospace travel. On July 22, 2008, in

21472-571: The downing of Malaysia Airlines Flight 17 , the FAA suspended flights by U.S. airlines to Ben Gurion Airport during the 2014 Israel–Gaza conflict for 24 hours. The ban was extended for a further 24 hours but was lifted about six hours later. The FAA Reauthorization Act of 2018 gives the FAA one year to establish minimum pitch, width and length for airplane seats, to ensure they are safe for passengers. The first FAA licensed orbital human space flight took place on November 15, 2020 , carried out by SpaceX on behalf of NASA. The administrator

21648-482: The early 2000s, cumulative 767 deliveries approached 900, but new sales declined during an airline industry downturn. In 2001, Boeing dropped plans for a longer-range model, the 767-400ERX, in favor of the proposed Sonic Cruiser , a new jetliner which aimed to fly 15 percent faster while having comparable fuel costs to the 767. The following year, Boeing announced the KC-767 Tanker Transport ,

21824-449: The end of 2013. Devices must be held or put in the seat-back pocket during the actual takeoff and landing. Mobile phones must be in airplane mode or with mobile service disabled, with no signal bars displayed, and cannot be used for voice communications due to Federal Communications Commission regulations that prohibit any airborne calls using mobile phones. From a technological standpoint, cellular service would not work in-flight because of

22000-455: The end of the decade, 767s crossed the Atlantic more frequently than all other aircraft types combined. The 767 also propelled the growth of point-to-point flights which bypassed major airline hubs in favor of direct routes . Taking advantage of the aircraft's lower operating costs and smaller capacity, operators added non-stop flights to secondary population centers, thereby eliminating

22176-420: The engine pylons of all 767s in service. In January 1993, following an order from UPS Airlines , Boeing launched a freighter variant, the 767-300F, which entered service with UPS on October 16, 1995. The 767-300F featured a main deck cargo hold, upgraded landing gear, and strengthened wing structure. In November 1993, the Japanese government launched the first 767 military derivative when it placed orders for

22352-500: The event of an emergency. An early form of fly-by-wire is employed for spoiler operation, utilizing electric signaling instead of traditional control cables. The fly-by-wire system reduces weight and allows independent operation of individual spoilers. The 767 features a twin-aisle cabin with a typical configuration of six abreast in business class and seven across in economy . The standard seven abreast, 2–3–2 economy class layout places approximately 87 percent of all seats at

22528-438: The extended-range 767-200ER in 1984. It was stretched into the 767-300 in October 1986, followed by the extended-range 767-300ER in 1988, the most popular variant. The 767-300F, a production freighter version, debuted in October 1995. It was stretched again into the 767-400ER from September 2000. Designed to complement the larger 747 , it has a seven-abreast cross-section accommodating smaller LD2 ULD cargo containers. The 767

22704-416: The extended-range model could carry heavier payloads at distances up to 6,385 nautical miles (11,825 km; 7,348 mi), and was targeted at overseas customers. The 767-200ER entered service with El Al Airline on March 27, 1984. The type was mainly ordered by international airlines operating medium-traffic, long-distance flights. In May 1984, an Ethiopian Airlines 767-200ER set a non-stop record for

22880-415: The extension to a 180-minute diversion period, subject to stringent technical and operational qualifications. ETOPS-180 and ETOPS-207 cover about 95% of the Earth. The first such flight was conducted in 1989. This set of regulations was subsequently adopted by the JAA, ICAO, and other regulatory bodies. The original 1985 regulations allowed an airliner to have ETOPS-120 rating on entry into service. ETOPS-180

23056-465: The fastest-selling airliner in the company's history. In 2005, Boeing opted to continue 767 production despite record Dreamliner sales, citing a need to provide customers waiting for the 787 with a more readily available option. Subsequently, the 767-300ER was offered to customers affected by 787 delays, including All Nippon Airways and Japan Airlines. Some aging 767s, exceeding 20 years in age, were also kept in service past planned retirement dates due to

23232-576: The first aircraft to receive ETOPS-240 approval, which has since been offered by Airbus as an option. ETOPS-240 and beyond are now permitted on a case-by-case basis, with regulatory bodies in the United States, Australia, and New Zealand adopting said regulatory extension. Authority is only granted to operators of two-engine airplanes between specific city pairs. The certificate holder must have been operating at 180-minute or greater ETOPS authority for at least 24 consecutive months, of which at least 12 consecutive months must be at 240-minute ETOPS authority with

23408-528: The first delivery to Delta Air Lines on October 25, 1982. The 767 entered service with United Airlines on September 8, 1982. The aircraft's first commercial flight used a JT9D-powered 767-200 on the Chicago-to-Denver route. The CF6-powered 767-200 commenced service three months later with Delta Air Lines. Upon delivery, early 767s were mainly deployed on domestic routes, including US transcontinental services. American Airlines and TWA began flying

23584-420: The flight engineer. The CRTs replace conventional electromechanical instruments found on earlier aircraft. An enhanced flight management system, improved over versions used on early 747s, automates navigation and other functions, while an automatic landing system facilitates CAT IIIb instrument landings in low visibility situations. The 767 became the first aircraft to receive CAT IIIb certification from

23760-413: The flight was a DC-3 from Faleolo (Upolu) to Aitutaki, a distance of 768 nautical miles (1,422 km; 884 mi). More recently, the January 1979 OAG showed a weekly Polynesian Airlines HS748 from Niue to Rarotonga, 585 nmi (1,083 km; 673 mi) with no airport. In 2017 ICAO issued Standards and Recommended Practices (SARPS) for ETOPS, and ETOPS were extended to four-engine aircraft like

23936-543: The founding of the Federal Communications Commission in 1934, which handles most such matters today—and introduced radio beacons as an effective aid to air navigation. The Aeronautics Branch was renamed the Bureau of Air Commerce in 1934 to reflect its enhanced status within the Department. As commercial flying increased, the Bureau encouraged a group of airlines to establish the first three centers for providing air traffic control (ATC) along

24112-533: The horizontal tail. The 767-400ERX would offer the capacity of the Airbus A330-200 with 3% lower fuel burn and costs. Boeing cancelled the variant development in 2001. Kenya Airways then switched its order to the 777-200ER. In October 2019, Boeing was reportedly studying a re-engined 767-XF for entry into service around 2025, based on the 767-400ER with an extended landing gear to accommodate larger General Electric GEnx turbofan engines. The cargo market

24288-433: The inability to retract the landing gear because of a hydraulic fluid leak. The prototype was used for subsequent flight tests. The 10-month 767 flight test program utilized the first six aircraft built. The first four aircraft were equipped with JT9D engines, while the fifth and sixth were fitted with CF6 engines. The test fleet was largely used to evaluate avionics, flight systems, handling, and performance, while

24464-538: The issuance of certificates. There are two types of DARs: manufacturing, and maintenance. Specialized Experience – Amateur-Built and Light-Sport Aircraft DARs Both Manufacturing DARs and Maintenance DARs may be authorized to perform airworthiness certification of light-sport aircraft. DAR qualification criteria and selection procedures for amateur-built and light-sport aircraft airworthiness functions are provided in Order 8100.8. A Continued Airworthiness Notification to

24640-499: The largest order for the type. With the announcement FedEx confirmed that it has firm orders for 106 of the freighters for delivery between 2018 and 2023. In February 2018, UPS announced an order for 4 more 767-300Fs to increase the total on order to 63. With its successor, the Boeing New Midsize Airplane , that was planned for introduction in 2025 or later, and the 787 being much larger, Boeing could restart

24816-586: The late 1960s, most large civil airliners were jet-powered, relegating the piston engine to roles such as cargo flights. With the JT8D reliably powering the three-engine Boeing 727 , the 60-minute rule was waived in 1964 for three-engine aircraft, which in turn opened the way for the development of wide-body , intercontinental trijets such as the Lockheed L-1011 TriStar and McDonnell Douglas DC-10 . By then, only twin-engine jets were restricted by

24992-447: The longer duration, and all available engines received approval by 1993. Regulatory approval spurred the expansion of transoceanic flights with twinjet aircraft and boosted the sales of both the 767 and its rivals. The 767 has been produced in three fuselage lengths. These debuted in progressively larger form as the 767-200, 767-300, and 767-400ER. Longer-range variants include the 767-200ER and 767-300ER, while cargo models include

25168-685: The longer-range -400ERX would have a strengthened wing, fuselage and landing gear for a 15,000 lb (6.8 t) higher MTOW , up to 465,000 lb (210.92 t). Thrust would rise to 72,000 lbf (320 kN) for better takeoff performance, with the Trent 600 or the General Electric/Pratt & Whitney Engine Alliance GP7172, also offered on the 747X. Range would increase by 525 nmi (950 km; 604 mi) to 6,150 nmi (11,390 km; 7,080 mi), with an additional fuel tank of 2,145 U.S. gallons (8,120 L) in

25344-412: The manufacturer's previous aircraft. The wings provided higher-altitude cruise performance, added fuel capacity, and expansion room for future stretched variants. The initial 767-200 was designed for sufficient range to fly across North America or across the northern Atlantic, and would be capable of operating routes up to 3,850 nautical miles (7,130 km; 4,430 mi). The 767's fuselage width

25520-460: The mid-1980s, the term EROPS (extended range operations) was used before being superseded by ETOPS usage. In 1997, when Boeing proposed to extend ETOPS authority for twins to beyond 180 minutes, Airbus proposed to replace ETOPS by a newer system, referred to as Long Range Operational Performance Standards (LROPS), which would affect all civil airliners, not just those with a twin-engine configuration with more than 180 minutes ETOPS. The FAA stated in

25696-469: The need for connecting flights. The increased number of cities receiving non-stop services caused a paradigm shift in the airline industry as point-to-point travel gained prominence at the expense of the traditional hub-and-spoke model. In February 1990, the first 767 equipped with Rolls-Royce RB211 turbofans, a 767-300, was delivered to British Airways . Six months later, the carrier temporarily grounded its entire 767 fleet after discovering cracks in

25872-510: The normal engineering and flight procedures. Pilots and engineering staff must be qualified and trained for ETOPS. An airline with extensive experience operating long-distance flights may be awarded ETOPS operational approval immediately, while others may need to demonstrate ability through a series of ETOPS proving flights. Regulators closely watch the ETOPS performance of both type certificate holders and their affiliated airlines. Any technical incidents during an ETOPS flight must be recorded. From

26048-569: The overall budget and submit it to the president. At the same time, a new National Transportation Safety Board took over the Civil Aeronautics Board's (CAB) role of investigating and determining the causes of transportation accidents and making recommendations to the secretary of transportation. CAB was merged into DOT with its responsibilities limited to the regulation of commercial airline routes and fares. The FAA gradually assumed additional functions. The hijacking epidemic of

26224-503: The probability of the remaining engine failing is extremely remote. For example, if an aircraft is rated for ETOPS-180, it means that it is able to fly with full load and just one engine for three hours. Second, an operator who conducts ETOPS flights must satisfy their own country's aviation regulators about their ability to conduct ETOPS flights. This is called "ETOPS operational certification" and involves compliance with additional special engineering and flight crew procedures in addition to

26400-588: The promotion of aviation safety. The FAA Safety Team, or FAASTeam, works with Volunteers at several levels and promotes safety education and outreach nationwide. On March 18, 2008, the FAA ordered its inspectors to reconfirm that airlines are complying with federal rules after revelations that Southwest Airlines flew dozens of aircraft without certain mandatory inspections. The FAA exercises surprise Red Team drills on national airports annually. On October 31, 2013, after outcry from media outlets, including heavy criticism from Nick Bilton of The New York Times ,

26576-409: The rapid speed of the airborne aircraft: mobile phones cannot switch fast enough between cellular towers at an aircraft's high speed. However, the ban is due to potential radio interference with aircraft avionics. If an air carrier provides Wi-Fi service during flight, passengers may use it. Short-range Bluetooth accessories, like wireless keyboards , can also be used. In July 2014, in the wake of

26752-472: The replacement of an evacuation slide latch, and the repair of a tailplane pivot to match production specifications. Seeking to capitalize on its new wide-body's potential for growth, Boeing offered an extended-range model, the 767-200ER, in its first year of service. Ethiopian Airlines placed the first order for the type in December 1982. Featuring increased gross weight and greater fuel capacity,

26928-403: The role of the flight engineer by enabling the pilot and co-pilot to monitor aircraft systems directly. Despite the promise of reduced crew costs, United Airlines initially demanded a conventional three-person cockpit, citing concerns about the risks associated with introducing a new aircraft. The carrier maintained this position until July 1981, when a US presidential task force determined that

27104-627: The route was specifically conducted as indivertible. There were routes traversing the Southern hemisphere, e.g., South Pacific (e.g., Sydney – Santiago , one of the longest over-the-sea distances flown by a commercial airline), South Atlantic (e.g., Johannesburg – São Paulo ), Southern Indian Ocean (e.g., Perth – Johannesburg ), and Antarctica . Before the introduction of the Airbus A350XWB in 2014, regulations in North America and Europe permitted up to 180-minute ETOPS at entry. The A350 XWB

27280-515: The same committee sent before a meeting to discuss air traffic control privatization noted a 35-year legacy of failed air traffic control modernization management, including NextGen. The letter said the FAA initially described NextGen as fundamentally transforming how air traffic would be managed. In 2015, however, the National Research Council noted that NextGen, as currently executed, was not broadly transformational and that it

27456-489: The single term, 'extended operations,' or ETOPS, for all affected operations regardless of the number of engines on the airplane." Prior to 2007, the FAA used the term for Extended Range Operation with Two-Engine Airplanes but the meaning was changed when regulations were broadened to include aircraft with more than two engines. In 2017 ICAO amendment 36 to Part I of Annex 6 of the Chicago Convention replaced

27632-853: The sixth aircraft was used for route-proving flights. During testing, pilots described the 767 as generally easy to fly, with its maneuverability unencumbered by the bulkiness associated with larger wide-body jets. Following 1,600 hours of flight tests, the JT9D-powered 767-200 received certification from the US Federal Aviation Administration (FAA) and the UK Civil Aviation Authority (CAA) in July 1982. The first delivery occurred on August 19, 1982, to United Airlines. The CF6-powered 767-200 received certification in September 1982, followed by

27808-527: The stretched 767-300 in 1983 and the extended-range 767-300ER in 1984. Both models offered a 20 percent passenger capacity increase, while the extended-range version was capable of operating flights up to 5,990 nautical miles (11,090 km; 6,890 mi). Japan Airlines placed the first order for the -300 in September 1983. Following its first flight on January 30, 1986, the type entered service with Japan Airlines on October 20, 1986. The 767-300ER completed its first flight on December 9, 1986, but it

27984-520: The term ETOPS with the new term EDTO (Extended Diversion Time Operations). The main reason of this change in the terminology was to better reflect the scope and applicability of these new standards. A colloquial aviation backronym is "Engines Turn Or Passengers Swim", referring to the inevitable emergency water landing of a twin engine aircraft after a double engine failure over water outside gliding range of land. Federal Aviation Administration The Federal Aviation Administration ( FAA )

28160-409: The war. The application of radar to ATC helped controllers in their drive to keep abreast of the postwar boom in commercial air transportation. In 1946, meanwhile, Congress gave CAA the added task of administering the federal-aid airport program, the first peacetime program of financial assistance aimed exclusively at development of the nation's civil airports. The approaching era of jet travel (and

28336-479: The word "customer" properly applies to the flying public, not those entities regulated by the FAA. The bill died in a Senate committee that year. In September 2009, the FAA administrator issued a directive mandating that the agency use the term "customers" to refer to only the flying public. In 2007, two FAA whistleblowers , inspectors Charalambe "Bobby" Boutris and Douglas E. Peters, alleged that Boutris said he attempted to ground Southwest after finding cracks in

28512-434: Was "It'll be a cold day in hell before I let twins fly long haul, overwater routes." The Boeing 767-200ER entered service in 1984. In 1985, the FAA increased the ETOPS to 120 minutes at the single-engine cruise speed. Trans World Airlines operated the first 120-minute ETOPS (ETOPS-120) service on February 1, 1985, with a Boeing 767 -200 from Boston to Paris. The 767 burned 7,000 lb (3.2 t) less fuel per hour than

28688-504: Was US$ 217.9 million for a -300ER, and US$ 220.3 million for a -300F. Production of the 767 was expected to cease by the end of 2027 due to more stringent emissions and noise limits that will go into effect in 2028. However, as of May 2024 , the US Congress is considering giving Boeing a waiver to continue to produce the 767 freighter for an additional five years. If granted, these aircraft would be restricted to domestic use within

28864-624: Was a former Air Force general and adviser to President Eisenhower . The same year witnessed the birth of the National Aeronautics and Space Administration (NASA), which was created in response to the Soviet Union (USSR) launch of the first manmade satellite. NASA assumed NACA's aeronautical research role. In 1967, a new U.S. Department of Transportation (DOT) combined major federal responsibilities for air and surface transport. The Federal Aviation Agency's name changed to

29040-435: Was first to receive an ETOPS-370 prior to entry into service by European authorities, enabling economical nonstop routes between Europe and Oceania (and thereby bypassing historical stopovers across Asia and North America ) by the late 2010s and early 2020s. This includes the high-demand London–Sydney route , in the latest development for ultra long-haul flights. The A350 XWB's current ETOPS certification covers 99.7% of

29216-444: Was intended to transport large numbers of passengers between major cities. Advancements in civil aerospace technology, including high-bypass-ratio turbofan engines, new flight deck systems, aerodynamic improvements, and more efficient lightweight designs were to be applied to the 7X7. Many of these features were also included in a parallel development effort for a new mid-size narrow-body airliner, code-named 7N7, which would become

29392-438: Was never any guarantee of a job in the CTI program. In August 2023 The New York Times published an investigative report that showed overworked air traffic controllers at understaffed facilities making errors that resulted in 46 near collisions in the air and on the ground in the month of July alone. A May 2017 letter from staff of the U.S. House of Representatives Committee on Transportation and Infrastructure to members of

29568-419: Was not until March 1987 that the first firm order, from American Airlines, was placed. The type entered service with American Airlines on March 3, 1988. The 767-300 and 767-300ER gained popularity after entering service, and came to account for approximately two-thirds of all 767s sold. Until the 777's 1995 debut, the 767-300 and 767-300ER remained Boeing's second-largest wide-bodies behind the 747. Buoyed by

29744-549: Was only possible after one year of trouble-free 120-minute ETOPS experience. In 1990 Boeing convinced the FAA that it could deliver an airliner with ETOPS-180 on its entry into service. This process was called Early ETOPS. The Boeing 777 was the first aircraft to be introduced with an ETOPS rating of 180 minutes. In the 1990s, the Joint Aviation Authorities (JAA) demurred; on its entry into service in Europe,

29920-538: Was passed at the urging of the aviation industry, whose leaders believed the airplane could not reach its full commercial potential without federal action to improve and maintain safety standards. The Act charged the Secretary of Commerce with fostering air commerce, issuing and enforcing air traffic rules, licensing pilots , certifying aircraft, establishing airways, and operating and maintaining aids to air navigation. The newly created Aeronautics Branch, operating under

30096-409: Was proposed to Lauda Air . Increased gross weight and a tailplane fuel tank would have boosted its range by 11,100 to 12,025 km (5,990 to 6,490 nmi; 6,900 to 7,470 mi), and GE could offer its 65,000–68,000 lbf (290–300 kN) CF6 -80C2/G2. Rolls-Royce offered its 68,000–72,000 lbf (300–320 kN) Trent 600 for the 767-400ERX and the Boeing 747X . Offered in July,

30272-499: Was responsible for ATC, airman and aircraft certification, safety enforcement, and airway development. CAB was entrusted with safety regulation, accident investigation, and economic regulation of the airlines. The CAA was part of the Department of Commerce. The CAB was an independent federal agency. On the eve of America's entry into World War II , CAA began to extend its ATC responsibilities to takeoff and landing operations at airports. This expanded role eventually became permanent after

30448-430: Was rolled out on August 4, 1981. By this time, the 767 program had accumulated 173 firm orders from 17 customers, including Air Canada , All Nippon Airways , Britannia Airways , Transbrasil , and Trans World Airlines (TWA). On September 26, 1981, the prototype took its maiden flight under the command of company test pilots Tommy Edmonds, Lew Wallick, and John Brit. The maiden flight was largely uneventful, save for

30624-468: Was set midway between that of the 707 and the 747 at 16.5 feet (5.03 m). While it was narrower than previous wide-body designs, seven abreast seating with two aisles could be fitted, and the reduced width produced less aerodynamic drag. The fuselage was not wide enough to accommodate two standard LD3 wide-body unit load devices side-by-side, so a smaller container, the LD2, was created specifically for

30800-569: Was suspended in March 2004 amid a conflict of interest scandal , resulting in multiple US government investigations and the departure of several Boeing officials, including Philip Condit , the company's chief executive officer , and chief financial officer Michael Sears. The first KC-767s were delivered in 2008 to the Japan Self-Defense Forces. In late 2002, after airlines expressed reservations about its emphasis on speed over cost reduction, Boeing halted development of

30976-572: Was ultimately not offered for sale, as its capacity was too close to the 757's seating, while the 777 trijet was eventually dropped in favor of standardizing the twinjet configuration. In the late 1970s, operating cost replaced capacity as the primary factor in airliner purchases. As a result, the 767's design process emphasized fuel efficiency from the outset. Boeing targeted a 20 to 30 percent cost saving over earlier aircraft, mainly through new engine and wing technology. As development progressed, engineers used computer-aided design for over

#611388