Rapid transit or mass rapid transit ( MRT ) or heavy rail , commonly referred to as metro , is a type of high-capacity public transport that is generally built in urban areas . A grade separated rapid transit line below ground surface through a tunnel can be regionally called a subway , tube , metro or underground . They are sometimes grade-separated on elevated railways , in which case some are referred to as el trains – short for "elevated" – or skytrains . Rapid transit systems are railways , usually electric , that unlike buses or trams operate on an exclusive right-of-way , which cannot be accessed by pedestrians or other vehicles.
159-576: The Blue Line is a rapid transit line in the Greater Boston metropolitan area, one of four rapid transit lines operated by the Massachusetts Bay Transportation Authority (MBTA). It runs from Bowdoin station in downtown Boston under Boston Harbor to East Boston and Revere on the inner North Shore, where it terminates at Wonderland . The stop at Airport Station , by way of a free shuttle bus,
318-698: A $ 566.6 million contract to a China based manufacturer CNR (which became part of CRRC the following year) to build 152 replacement railcars for the Orange Line, as well as additional cars for the Red Line. The other bidders were Bombardier Transportation , Kawasaki Heavy Industries and Hyundai Rotem . CNR began building the cars at a new manufacturing plant in Springfield, Massachusetts , with initial deliveries expected in 2018 and all cars in service by 2023. The Board forwent federal funding to allow
477-637: A TBM, albeit with more surface disruption. Cut-and-cover was estimated to cost $ 200–250 million for the tunnel costs alone, compared to $ 300–350 million for TBM and the $ 413 million estimated in the DEIR. In 2019 and 2023, the MBTA indicated plans to spend $ 15 million to design the connector in a five-year spending plan. A conceptual design completed in 2020 called for cut-and-cover construction, with Bowdoin station still planned for closure. The new Blue Line level at Charles/MGH would have entrances from
636-425: A body of water), which are potential congestion sites but also offer an opportunity for transfers between lines. Ring lines provide good coverage, connect between the radial lines and serve tangential trips that would otherwise need to cross the typically congested core of the network. A rough grid pattern can offer a wide variety of routes while still maintaining reasonable speed and frequency of service. A study of
795-454: A code for its stations. Unlike that of Singapore's MRT, it is mostly numbers. Based on the line number, for example Sinyongsan station, is coded as station 429. Being on Line 4, the first number of the station code is 4. The last two numbers are the station number on that line. Interchange stations can have multiple codes. Like City Hall station in Seoul which is served by Line 1 and Line 2. It has
954-651: A code of 132 and 201 respectively. The Line 2 is a circle line and the first stop is City Hall, therefore, City Hall has the station code of 201. For lines without a number like Bundang line it will have an alphanumeric code. Lines without a number that are operated by KORAIL will start with the letter 'K'. With widespread use of the Internet and cell phones globally, transit operators now use these technologies to present information to their users. In addition to online maps and timetables, some transit operators now offer real-time information which allows passengers to know when
1113-587: A connection to the Blue Line at Airport station, providing transfer service to Chelsea, the Seaport District and South Station. Unlike the Red Line and Orange Line, which had substantial new sections and station renovations in the 1970s and 1980s, most of the Blue Line had not been substantially modified since 1954. By the 1990 passage of the Americans with Disabilities Act , only Suffolk Downs and
1272-583: A conventional track is often provided in case of flat tires and for switching . There are also some rubber-tired systems that use a central guide rail , such as the Sapporo Municipal Subway and the NeoVal system in Rennes , France. Advocates of this system note that it is much quieter than conventional steel-wheeled trains, and allows for greater inclines given the increased traction of
1431-405: A dedicated right-of-way are typically used only outside dense areas, since they create a physical barrier in the urban fabric that hinders the flow of people and vehicles across their path and have a larger physical footprint. This method of construction is the cheapest as long as land values are low. It is often used for new systems in areas that are planned to fill up with buildings after the line
1590-654: A fine of $ 500 per day per car for late deliveries. Delays began to accumulate in 2019, and then facilities in China and Springfield had to shut down and operate at reduced capacity for parts of 2020 due to the COVID-19 pandemic . As of September 2022, 78 of 152 new cars had been put in service on the Orange Line. This was enough for service almost all the time because of the rush hour service cap introduced after an FTA safety audit identified insufficient staffing of subway dispatchers. The MBTA indicated it would assess which delays were
1749-418: A large number of factors, including geographical barriers, existing or expected travel patterns, construction costs, politics, and historical constraints. A transit system is expected to serve an area of land with a set of lines , which consist of shapes summarized as "I", "L", "U", "S", and "O" shapes or loops. Geographical barriers may cause chokepoints where transit lines must converge (for example, to cross
SECTION 10
#17327721373181908-652: A large part of the network, for example, in outer suburbs, runs at ground level. In most of Britain , a subway is a pedestrian underpass . The terms Underground and Tube are used for the London Underground . The North East England Tyne and Wear Metro , mostly overground, is known as the Metro . In Scotland , the Glasgow Subway underground rapid transit system is known as the Subway . In Ireland ,
2067-452: A line is obtained by multiplying the car capacity, the train length, and the service frequency . Heavy rapid transit trains might have six to twelve cars, while lighter systems may use four or fewer. Cars have a capacity of 100 to 150 passengers, varying with the seated to standing ratio – more standing gives higher capacity. The minimum time interval between trains is shorter for rapid transit than for mainline railways owing to
2226-615: A metro. In Spain, such systems are present in Madrid , Barcelona , Bilbao and Valencia . In Portugal, Lisbon has a metro. The Italian cities of Catania , Genoa , Milan , Naples , Rome and Turin also have metro lines. In Germany and Austria they rapid transit is known as U-Bahn , which are often supported by S-Bahn systems. In Germany, U-Bahn systems exist in Berlin , Hamburg , Munich and Nuremberg , while in Austria such
2385-553: A new platform, Scollay Under, was constructed to replace Court Street station) to a new station and loop at Bowdoin Square. Tracks continued west under Cambridge Street to an incline at Joy Street, where streetcars could continue on surface tracks to Charles Street and the Longfellow Bridge to Cambridge. Court Street station was abandoned on November 15, 1914, with service cut back to Devonshire. On March 13, 1916, service
2544-707: A newly-constructed plant in Springfield, Massachusetts , with 152 cars on order, along with additional cars for the Red Line. All in-service Orange Line trains run in six-car consists. Cars of the fleet are 65 feet (20 m) long and 9 ft 3 in (2.8 m) wide, with three pairs of doors on each side. As of February 2022 , weekday peak and afternoon service was scheduled to operate on 8-minute headways, with headways ranging from 8 to 12 minutes at other times. Vehicle utilization ranged between 8 trains (48 cars) and 13 trains (78 cars). However, rolling stock availability and longer trip times due to slow zones reduced service. By July 2023, headways were 10–12 minutes on weekdays. This
2703-692: A number of the modifications - the Blue Line Modernization Project - began in 1990–92. The first main construction phase of the project began on June 25, 1994, the line was cut back to Orient Heights at all times to permit reconstruction of the outer stations. Beachmont and Wood Island were completely rebuilt, while Suffolk Downs , Revere Beach and Wonderland were renovated. A simultaneous $ 8 million noise reduction program added sound walls at Beachmont and Orient Heights, rubber mats under tracks, and soundproofing of nearby homes. The stations reopened on June 26, 1995. Unlike
2862-499: A one-third decrease in dwell times. The new cars have faced several issues since their August entry into service. In November 2019, a car derailed while undergoing initial testing at the Wellington yard. The last car of a six car trainset had jumped the rails while going over a switch , however no major damage had been reported. Several months earlier, the first two trainsets were taken out of service due to safety issues following
3021-408: A pair of deeper tunnels bored by a tunnel boring machine (TBM), starting east of Bowdoin station and passing underneath the existing platform. Keeping the existing station and loop was judged infeasible because evacuation from a disabled train would not be possible in the confined loop, and the eastbound platform is not long enough for six-car trains. Use of a TBM rather than cut-and-cover construction
3180-691: A rapid transit setting. Orange Line (MBTA)#History The Orange Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south on the surface from Oak Grove station in Malden, Massachusetts through Malden and Medford , paralleling the Haverhill Line , then crosses the Mystic River on a bridge into Somerville , then into Charlestown . It passes under
3339-543: A short connector. The Blue Line extension has been proposed in various forms for over 80 years. The 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended that the East Boston Tunnel line, which had been converted to rapid transit from streetcars in 1924, be extended to Lynn via the Boston, Revere Beach & Lynn right-of-way. Ever since the 1954 Revere extension
SECTION 20
#17327721373183498-565: A specialized transit police may be established. These security measures are normally integrated with measures to protect revenue by checking that passengers are not travelling without paying. Some subway systems, such as the Beijing Subway , which is ranked by Worldwide Rapid Transit Data as the "World's Safest Rapid Transit Network" in 2015, incorporates airport-style security checkpoints at every station. Rapid transit systems have been subject to terrorism with many casualties, such as
3657-608: A system exists in Vienna . In addition, the small, car-free town of Serfaus in the Austrian state of Tyrol also features a short U-Bahn line. There are no U-Bahn systems in the German-speaking part of Switzerland, but the city of Lausanne has its own, small metro system. In Zurich, Switzerland's largest city, a project for a U-Bahn network was stopped by a referendum in the 1970s and instead its S-Bahn system
3816-611: A tight curve on Beach Street, the southern portion of the Atlantic Avenue Elevated , between South Station and Tower D on Washington Street, was closed (except for rush-hour trips from Dudley to North Station via the Elevated), breaking the loop; non-rush-hour Atlantic Avenue service was reduced to a shuttle between North and South Stations. In 1938, the remainder of the Atlantic Avenue Elevated
3975-801: Is a shortened reference to a metropolitan area . Rapid transit systems such as the Washington Metrorail , Los Angeles Metro Rail , the Miami Metrorail , and the Montreal Metro are generally called the Metro . In Philadelphia , the term "El" is used for the Market–Frankford Line which runs mostly on an elevated track, while the term "subway" applies to the Broad Street Line which is almost entirely underground. Chicago 's commuter rail system that serves
4134-608: Is a single corporate image for the entire transit authority, but the rapid transit uses its own logo that fits into the profile. A transit map is a topological map or schematic diagram used to show the routes and stations in a public transport system. The main components are color-coded lines to indicate each line or service, with named icons to indicate stations. Maps may show only rapid transit or also include other modes of public transport. Transit maps can be found in transit vehicles, on platforms , elsewhere in stations, and in printed timetables . Maps help users understand
4293-506: Is built. Most rapid transit trains are electric multiple units with lengths from three to over ten cars. Crew sizes have decreased throughout history, with some modern systems now running completely unstaffed trains. Other trains continue to have drivers, even if their only role in normal operation is to open and close the doors of the trains at stations. Power is commonly delivered by a third rail or by overhead wires . The whole London Underground network uses fourth rail and others use
4452-491: Is fully grade-separated and trains are driven by operators with automatic train control for safety. Wellington Carhouse in Medford is used for heavy maintenance and storage; a small yard at Forest Hills is also used for storage. All 20 Orange Line stations are fully accessible . Averaging 105,000 weekday passengers in 2023, the Orange Line has the second-highest ridership of the MBTA subway lines. The Orange Line originated as
4611-713: Is most of what is now Phase 1 of the Silver Line ). Also in 1901, the Atlantic Avenue Elevated opened, branching at Causeway Street to provide an alternate route through downtown Boston (along the shoreline, where today there is no rail transit) to the Washington Street Elevated. In 1908, a new Washington Street Tunnel opened, allowing Main Line service to travel from the Charlestown Elevated , underground via an additional new portal at
4770-416: Is necessary, rolling stock with a smaller loading gauge from one sub network may be transported along other lines that use larger trains. On some networks such operations are part of normal services. Most rapid transit systems use conventional standard gauge railway track . Since tracks in subway tunnels are not exposed to rain , snow , or other forms of precipitation , they are often fixed directly to
4929-410: Is now part of Washington Street. In January and February 1967, the four original Washington Street Tunnel stations were renamed. Transfer stations were given the same name for all lines: Winter and Summer stations plus Washington on the Red Line became Washington, Milk and State plus Devonshire on the Blue Line became State Street after the cross street, and Union and Friend plus Haymarket Square on
Blue Line (MBTA) - Misplaced Pages Continue
5088-476: Is one of two rapid transit connections to Logan International Airport . In 1967, during a systemwide rebranding, the line was assigned the blue color because it passes under the Boston Harbor . With an end-to-end travel time of less than twenty minutes, the Blue Line is the shortest of Boston's heavy-rail lines and the only line to have both third rail and overhead catenary sections. The East Boston Tunnel
5247-420: Is protected from the worst weather, but the 1970s-built Haymarket North Extension had older infrastructure and was in worse shape. From Sullivan Square north, it is exposed to the weather and largely built on an embankment, rendering it more vulnerable. That section is receiving new heated third rail, switch heaters, and snow fences to reduce the impacts of inclement weather. The work requires bustitution of
5406-555: Is referred to simply as "the subway", despite 40% of the system running above ground. The term "L" or "El" is not used for elevated lines in general as the lines in the system are already designated with letters and numbers. The "L" train or L (New York City Subway service) refers specifically to the 14th Street–Canarsie Local line, and not other elevated trains. Similarly, the Toronto Subway is referred to as "the subway", with some of its system also running above ground. These are
5565-412: Is serviced by at least one specific route with trains stopping at all or some of the line's stations. Most systems operate several routes, and distinguish them by colors, names, numbering, or a combination thereof. Some lines may share track with each other for a portion of their route or operate solely on their own right-of-way. Often a line running through the city center forks into two or more branches in
5724-748: Is the most commonly used term for underground rapid transit systems used by non-native English speakers. Rapid transit systems may be named after the medium by which passengers travel in busy central business districts ; the use of tunnels inspires names such as subway , underground , Untergrundbahn ( U-Bahn ) in German, or the Tunnelbana (T-bana) in Swedish. The use of viaducts inspires names such as elevated ( L or el ), skytrain , overhead , overground or Hochbahn in German. One of these terms may apply to an entire system, even if
5883-588: The Blue Line 's 0600 cars manufactured at the same time, were based on the designs of the PATH PA3. After 41 years of service, the last 01200s ran on August 19, 2022 before the shutdown, and began to be sent to scrap on September 22, 2022. All were processed by the contractor Costello to remove hazardous materials and be recycled; two were offered to the Seashore Trolley Museum , but the offer
6042-511: The Canal Street incline , under downtown Boston and back up again to meet the Washington Street Elevated and Atlantic Avenue Elevated near Chinatown . The stations were richly decorated with tile work, mosaics, and copper; after criticism of the large Tremont Street subway headhouses, most entrances were comparatively modest and set into buildings. Use of the parallel Tremont Street subway was returned exclusively to streetcars . By 1909,
6201-703: The Charles River and runs through Downtown Boston in the Washington Street Tunnel. The line returns to the surface in the South End , then follows the Southwest Corridor southwest in a cut through Roxbury and Jamaica Plain to Forest Hills station . The Orange Line operates during normal MBTA service hours (all times except late nights) with six-car trains. It uses a 152-car CRRC fleet built in 2018–2024. The Orange Line
6360-699: The Charlestown Elevated to the Canal Street incline near North Station . It was carried underground by the Tremont Street subway (now part of the Green Line ), returning above ground at the Pleasant Street incline (now closed, located just south of Boylston station ). A temporary link connected from there to the Washington Street Elevated , which in 1901 ran from this point via Washington Street to Dudley Square (which
6519-587: The Chinatown station was closed to allow the Orange Line to be tied into the new Southwest Corridor. On May 4, 1987, the Orange Line was rerouted from the southern end of the Washington Street Tunnel onto the new Southwest Corridor. Instead of rising up to elevated tracks, it now veered west at the Massachusetts Turnpike and followed the Pike and the old Boston and Albany Railroad right-of-way to
Blue Line (MBTA) - Misplaced Pages Continue
6678-627: The Dublin Area Rapid Transit is despite the name considered a commuter rail due to usage of mainline railways. In France, large cities, such as Paris , Marseille and Lyon , feature a Métro . Also the smaller cities of Lille Rennes have a light metro. Furthermore, Brussels in Belgium, and Amsterdam and Rotterdam in the Netherlands have metro systems in place. Several Southern European contries also have
6837-646: The Forest Hills–Everett Elevated (Route 2 on maps ) under the Metropolitan Transportation Authority . After taking over operations in August 1964, the MBTA began rebranding many elements of Boston's public transportation network. Colors were assigned to the rail lines on August 26, 1965, as part of a wider modernization developed by Cambridge Seven Associates . Peter Chermayeff assigned red , green , and blue to
6996-752: The Hudson and Manhattan Railroad K-series cars from 1958, the New York City Subway R38 and R42 cars from the late-1960s, and the Nagoya Municipal Subway 3000 series , Osaka Municipal Subway 10 series and MTR M-Train EMUs from the 1970s, were generally only made possible largely due to the relatively generous loading gauges of these systems and also adequate open-air sections to dissipate hot air from these air conditioning units. Especially in some rapid transit systems such as
7155-429: The London Underground . In 1868, New York opened the elevated West Side and Yonkers Patent Railway , initially a cable-hauled line using stationary steam engines . As of 2021 , China has the largest number of rapid transit systems in the world – 40 in number, running on over 4,500 km (2,800 mi) of track – and was responsible for most of the world's rapid-transit expansion in
7314-632: The Massachusetts Executive Office of Energy and Environmental Affairs required the MBTA to prepare a Supplemental Draft Environmental Impact Report. A 2018 MBTA long-range planning document considered a pedestrian tunnel between the Orange Line platforms at State and Downtown Crossing , which would allow transfers between the Red and Blue lines similar to (though longer than) the Winter Street Concourse between
7473-740: The Metropolitan Railway opened publicly in London in 1863. High capacity monorails with larger and longer trains can be classified as rapid transit systems. Such monorail systems recently started operating in Chongqing and São Paulo . Light metro is a subclass of rapid transit that has the speed and grade separation of a "full metro" but is designed for smaller passenger numbers. It often has smaller loading gauges, lighter train cars and smaller consists of typically two to four cars. Light metros are typically used as feeder lines into
7632-578: The Montreal Metro (opened 1966) and Sapporo Municipal Subway (opened 1971), their entirely enclosed nature due to their use of rubber-tyred technology to cope with heavy snowfall experienced by both cities in winter precludes any air-conditioning retrofits of rolling stock due to the risk of heating the tunnels to temperatures that would be too hot for passengers and for train operations. In many cities, metro networks consist of lines operating different sizes and types of vehicles. Although these sub-networks may not often be connected by track, in cases when it
7791-589: The Prague Metro . The London Underground and Paris Métro are densely built systems with a matrix of crisscrossing lines throughout the cities. The Chicago 'L' has most of its lines converging on The Loop , the main business, financial, and cultural area. Some systems have a circular line around the city center connecting to radially arranged outward lines, such as the Moscow Metro 's Koltsevaya Line and Beijing Subway 's Line 10 . The capacity of
7950-487: The Seashore Trolley Museum in Kennebunkport, Maine . From 1981 to 2022, the Orange Line used a fleet of Hawker-Siddeley heavy rail cars. These cars, nicknamed Orange Blossoms, featured reinforced roofs for pantographs. It was thought that if the Orange Line was extended, they would opt to use overhead collection. But since these extensions were never built, pantographs were never installed. The 01200s, along with
8109-416: The Silver Line bus rapid transit was added to connect Washington Street to the downtown subways, attempting to address this service need. This replacement service was controversial, as many residents preferred the return of rail transportation. In the mid-1980s, the MBTA spent $ 80 million to extend the platforms of seven Red Line and three Orange Line stations ( Essex , Washington , and State ) to allow
SECTION 50
#17327721373188268-685: The Singapore MRT , Changi Airport MRT station has the alphanumeric code CG2, indicating its position as the 2nd station on the Changi Airport branch of the East West Line. Interchange stations have at least two codes, for example, Raffles Place MRT station has two codes, NS26 and EW14, the 26th station on the North South Line and the 14th station on the East West Line. The Seoul Metro is another example that utilizes
8427-450: The deep tube lines . Historically, rapid transit trains used ceiling fans and openable windows to provide fresh air and piston-effect wind cooling to riders. From the 1950s to the 1990s (and in most of Europe until the 2000s), many rapid transit trains from that era were also fitted with forced-air ventilation systems in carriage ceiling units for passenger comfort. Early rapid transit rolling stock fitted with air conditioning , such as
8586-409: The linear motor for propulsion. Some urban rail lines are built to a loading gauge as large as that of main-line railways ; others are built to a smaller one and have tunnels that restrict the size and sometimes the shape of the train compartments. One example is most of the London Underground , which has acquired the informal term "tube train" due to the cylindrical shape of the trains used on
8745-538: The $ 174 million construction contract for the 94 cars in November 2001, with a total program cost of $ 200 million. The first deliveries were scheduled for January 2004, but ultimately delayed to 2007 due to manufacturing issues. The first set entered revenue service on February 20, 2008. The first three six-car trains began operating on September 15, 2008; by February 2009, eight of thirteen trainsets used at rush hour were six-car sets. By November 2009, all service
8904-519: The 0600 series (No. 4 cars), built 1978-1980 by Hawker Siddeley Canada Car and Foundry of Thunder Bay, Ontario , Canada . They were 48 feet 10 inches (14.88 m) long and 9 feet 3 inches (2.82 m) wide, with two pairs of doors on each side. The design was based on the PA3 model used by PATH in New Jersey . They were narrower and shorter than otherwise similar ones running on
9063-432: The 15 world largest subway systems suggested a universal shape composed of a dense core with branches radiating from it. Rapid transit operators have often built up strong brands , often focused on easy recognition – to allow quick identification even in the vast array of signage found in large cities – combined with the desire to communicate speed, safety, and authority. In many cities, there
9222-467: The 1970s for a direct connection between the Red and Blue lines. A 1974 state plan again proposed an extension to Park Street, while the 1978 and 1983 Program for Mass Transportation updates called for an extension to Charles/MGH instead. A 1986 MBTA feasibility study for a Charles/MGH extension called for a cut-and-cover tunnel beginning west of Bowdoin Street with no changes to Bowdoin station. The project
9381-591: The 1974 Transportation Plan revived the project with possible termini of Lynn, Salem, or even Route 128 in Peabody. The 1978 Program for Mass Transportation report and 1983 Transportation Plan both continued support for an extension to Lynn. Despite the continued recommendations, however, other projects like extensions of the Red and Orange lines were given funding instead of the Blue Line. In 2005, Lieutenant Governor Kerry Healey estimated construction would begin in 2017. Authorization to bond for planning money for
9540-488: The 1990 passage of the Americans with Disabilities Act . Construction at Sullivan Square and Wellington began in 1991. Haymarket was retrofitted with elevators in 2000. The 1975-built North Station was expanded into a "superstation" with a cross-platform transfer to the Green Line; elevators were in installed in 2001, though the Green Line did not use the station until 2004. The southbound platform at Chinatown
9699-419: The 1995 Tokyo subway sarin gas attack and the 2005 " 7/7 " terrorist bombings on the London Underground. Some rapid transport trains have extra features such as wall sockets, cellular reception, typically using a leaky feeder in tunnels and DAS antennas in stations, as well as Wi-Fi connectivity. The first metro system in the world to enable full mobile phone reception in underground stations and tunnels
SECTION 60
#17327721373189858-428: The 2010s and into the 2020s. Several prominent incidents occurred in 2022 alone, despite the then-underway fleet replacement. Accelerated repairs took place across the entire Orange Line from August 19 to September 18, 2022, and again across different segments of the line throughout 2024. The Main Line of the electric Boston Elevated Railway opened in segments, starting in 1901. It proceeded from Sullivan Square along
10017-423: The 2010s. The world's longest single-operator rapid transit system by route length is the Shanghai Metro . The world's largest single rapid transit service provider by number of stations (472 stations in total) is the New York City Subway . The busiest rapid transit systems in the world by annual ridership are the Shanghai Metro, Tokyo subway system , Seoul Metro and the Moscow Metro . The term Metro
10176-481: The 21st century, most new expansions and systems are located in Asia, with China becoming the world's leader in metro expansion, operating some of the largest and busiest systems while possessing almost 60 cities that are operating, constructing or planning a rapid transit system . Rapid transit is used for local transport in cities , agglomerations , and metropolitan areas to transport large numbers of people often short distances at high frequency . The extent of
10335-438: The 65-foot (20 m) Orange Line cars and the 69.5-foot (21.2 m) Red Line cars. From 1952 to 1954, a surface-level extension was constructed along the recently-defunct Boston, Revere Beach and Lynn Railroad , from Maverick to the current terminus at Wonderland. The original trackage had been narrow gauge , but was converted to standard gauge for this Revere Extension of the subway. The first above-ground station on
10494-627: The Blue Line eventually got its own maintenance shops, the connection was removed and the ramp portal was permanently covered in 1952. Like the Orange Line and Red Line , the Blue Line tracks are standard-gauge heavy rail . The Blue Line fleet comprises 94 700-series cars (47 pairs) with stainless steel bodies from Siemens , with each car 48 feet (15 m) long and 9 feet 3 inches (2.82 m) wide, with two pairs of doors per side. Uniquely among MBTA rolling stock, Blue Line cars use both third rail power and pantograph current pickup from overhead catenary wires. The overhead pantograph
10653-466: The Blue Line from July 5 to August 31, 2023, during a closure of the Sumner Tunnel . There is a proposal to extend the Blue Line northward to Lynn, Massachusetts . The land to extend the line was purchased for the initial construction of the Revere Extension, but due to budgetary constraints Wonderland station was designated the northern terminus. Two potential extension routes have been identified. One proposed path would run through marshland alongside
10812-401: The Blue Line was built with overhead lines on its surface section due to its proximity to corrosive salt air, it was not subject to icing issues.) Starting in 2015, the MBTA began implementing its $ 83.7 million Winter Resiliency Program, much of which focused on preventing similar issues with the Orange and Red lines. The Southwest Corridor section of the Orange Line is located in a trench and
10971-470: The Commonwealth Avenue line . (Three potential alignment were considered: one running south from Bowdoin, and two running southwest from a relocated Scollay Under.) Regional transportation plans from the 1940s to the early 1970s focused on suburban extensions, with no downtown extension past Bowdoin. The rise of Kendall Square as a major employment center, the coming of the Red Line Northwest Extension , and increased traffic to Logan Airport created demand in
11130-457: The East Boston Tunnel required an additional fare of 1 cent. In 1906, Atlantic Station (now Aquarium) was opened, with a connection to the Atlantic Avenue Elevated . Court Street proved to be a problematic terminus as its single-track design limited frequent service. The Boston Transit Commission (BTC) began construction of a 0.5-mile (0.8 km) extension of the East Boston Tunnel on November 29, 1912. The extension ran from Scollay Square (where
11289-442: The Green Line became Haymarket after Haymarket Square . Boylston Street was renamed Essex to avoid confusion with nearby Boylston station on the Green Line. In May 1987, Essex was renamed Chinatown after the adjacent Chinatown neighborhood , and Washington renamed Downtown Crossing after the adjacent shopping district . In March 2010, New England Medical Center station was renamed as Tufts Medical Center two years after
11448-503: The Green and Orange lines. A physical rail connection between the Red and Blue Lines existed in the early part of the 20th century (prior to the MBTA assigning the color designations of the subway lines ). Railcars from what is today the Blue Line could emerge from a ramp portal surfacing between Joy Street and Russell Street, just beyond Bowdoin station. The railcars would run on former streetcar track down Cambridge Street and then most of
11607-456: The MBTA did not complete design of the extension. The possibility of a public-private partnership (P3) to advance the project was studied in 2013. In 2015, the EPA removed the requirement for the MBTA to complete design. In 2018, the state commissioned a $ 50,000 study to reevaluate tunneling costs; it found that contrary to the 2010 DEIR, cut-and-cover tunneling could be considerably less costly than
11766-401: The MBTA made most Blue Line stations fully accessible as part of a larger effort to accommodate 6-car trains on the line. As of 2018, the only station in service on the Blue Line which is not fully accessible is the downtown Boston terminus Bowdoin. The East Boston Tunnel under Boston Harbor was the first North American subway tunnel to run beneath a body of water when it opened in 1904, and
11925-455: The MBTA subway system by the end of 2024. Under this plan, the first of several intermittent shutdowns of different segments of the Orange Line began on March 18, 2024, with more shutdowns taking place that June and October. All slow zones on the Orange Line were finally removed by early November 2024. Orange Line The Orange Line is standard-gauge heavy rail and uses a third rail for power. The newer cars are being built by CRRC in
12084-534: The MBTA's Safety Department and the Department of Public Utilities. The new cars were again removed from service on May 19–23, 2022, after a braking issue on one car due to an incorrectly installed bolt, and again between June and July 2022 due to a battery failure. In December 2022, some new cars were removed from service due to failed power cables causing electric arcing on axles. The CRRC contract requires delivery of all Orange Line cars by January 2022, with
12243-679: The MTA began operating " modified express service " on the line during the morning rush hour. Every other train bypassed Green Street, Egleston (southbound) or Northampton (northbound), Dover, and Thompson Square stations. This was discontinued in September 1961 to reduce wait times at the skipped stations, all of which were outdoors. The line was known as the Main Line Elevated under the Boston Elevated Railway , and
12402-544: The Main Line Elevated of the Boston Elevated Railway , which was built in 1901. It consisted of the Charlestown Elevated , Atlantic Avenue Elevated , Washington Street Elevated , and a portion of the previously-built Tremont Street subway . All of the original route has been replaced, beginning with the Washington Street Tunnel replacing the Tremont Street subway in 1908. The Washington Street Elevated
12561-510: The Orange Line, due to the stations and tunnels on the Blue Line having been originally designed to accommodate streetcars. In late 2009, the Seashore Trolley Museum received retired Hawker set 622-623 for their collection. By 2011, most of the 600-series cars were retired because of severe corrosion from the salty ocean air. Several 600-series cars were retained on MBTA property but no longer usable. Parts of scrapped cars are used to maintain Orange Line 1200 series rolling stock, which were built at
12720-404: The Red Line. An extension of the East Boston Tunnel to Charles Street was considered in a 1924 study of Charles station . A 1926 proposal to convert the Tremont Street subway and connecting streetcar lines into a pair of rapid transit trunk lines called for the East Boston Tunnel to be extended south to Park Street station, with through service running between Maverick Square and Brighton using
12879-471: The Washington Street Elevated had been extended south to Forest Hills . Trains from Washington Street were routed through the new subway, either all the way to Sullivan Square, or back around in a loop via the subway and then the Atlantic Avenue Elevated. In 1919, the same year that the Atlantic Avenue Elevated was partially damaged in Boston's Great Molasses Flood , the Charlestown Elevated
13038-478: The beginning of rapid transit. Initial experiences with steam engines, despite ventilation, were unpleasant. Experiments with pneumatic railways failed in their extended adoption by cities. In 1890, the City & South London Railway was the first electric-traction rapid transit railway, which was also fully underground. Prior to opening, the line was to be called the "City and South London Subway", thus introducing
13197-564: The contract to specify the cars be built in Massachusetts, to create a local railcar manufacturing industry. In conjunction with the new rolling stock, the remainder of the $ 1.3 billion allocated for the project would pay for testing, signal improvements and expanded maintenance facilities, as well as other related expenses. Sixty percent of the car's components are sourced from the United States. After delays due to issues with
13356-466: The contractual requirement of 90,000 miles by over a quarter. The Orange Line has two tracks for most of its length; a third track is present between Wellington station and the Charles River portal. This track is used to bypass construction on the other two tracks and for testing newly delivered cars for the Orange Line. The primary maintenance and storage facility is at Wellington station. Had
13515-518: The current Orange Line cars and the old Blue Line cars, ordered at the same time and largely identical except for size and color. In October 2013, MassDOT announced plans for a $ 1.3 billion subway car order for the Orange and Red Lines, which would provide 152 new Orange Line cars to replace the existing 120-car fleet and add more frequent service. On October 22, 2014, the MassDOT Board awarded
13674-414: The display of the transit network. Often this has the effect of compressing the distance between stations in the outer area of the system, and expanding distances between those close to the center. Some systems assign unique alphanumeric codes to each of their stations to help commuters identify them, which briefly encodes information about the line it is on, and its position on the line. For example, on
13833-530: The distance to the western end of the Longfellow Bridge , connecting to what is now the Red Line just east of its Cambridge subway portal, near what is now Kendall/MIT station. Because the tracks were unpowered, individual cars had to be towed along the street at night. This connection was never used in passenger service, but was used to transport Blue Line cars to the Eliot Street Yard maintenance shops then located near Harvard Square station. When
13992-496: The eastbound platform at State were accessible , with Wonderland then under construction. In 1988, the MBTA began planning for accessibility modifications as well as platform extensions to accommodate 6-car trains - similar to what had been done on the Orange and Red lines. The project was then expected to be complete in 1994. In 1989, the MBTA awarded design contracts for modernization and platform lengthening (to accommodate six-car trains) at nine Blue Line stations. Final design on
14151-526: The end of 2011. The 2003–07 reconstruction of Charles/MGH station was designed to accommodate a future Blue Line platform. In 2005, the state replaced the connector with other projects providing equivalent air quality improvements. After a second lawsuit from the CLF, the state agreed in 2006 to complete design of the connector. An Expanded Environmental Notification Form was released in September 2007 The 2010 Draft Environmental Impact Report (DEIR) instead called for
14310-417: The entire MBTA system was shut down on several occasions by heavy snowfalls. The aboveground sections of the Orange and Red lines were particularly vulnerable due to their exposed third rail, which iced over during storms. When a single train stopped due to power loss, other trains soon stopped as well; without continually running trains pushing snow off the rails, the lines were quickly covered in snow. (Because
14469-611: The entire metropolitan area is called Metra (short for Met ropolitan Ra il), while its rapid transit system that serves the city is called the "L" . Boston's subway system is known locally as "The T". In Atlanta , the Metropolitan Atlanta Rapid Transit Authority goes by the acronym "MARTA." In the San Francisco Bay Area , residents refer to Bay Area Rapid Transit by its acronym "BART". The New York City Subway
14628-518: The eponymous hospital changed its name. The Boston Transportation Planning Review looked at the line in the 1970s, considering extensions to reach the Route 128 beltway , with termini at Reading in the north and Dedham in the south. As a result of this review, the Charlestown Elevated – which served the Charlestown neighborhood north of downtown Boston and the inner suburb of Everett –
14787-731: The existing MBTA Commuter Rail stop at Back Bay . It then continued along new tracks, partially covered and partially open but depressed, to Forest Hills . This MBTA right-of-way is also shared by Amtrak as part of the national Northeast Corridor intercity passenger rail service. While ending more or less at the same terminus (Forest Hills), the new routing passes significantly to the west of its previous route on Washington Street; local residents were promised "equal or better" replacement service. Originally, plans provided for light rail vehicles street running in mixed traffic, from Washington Street to Dudley Square, then diverting southeastward on Warren Street towards Dorchester. In 2002, Phase 1 of
14946-595: The existing Newburyport/Rockport commuter rail line , on rail lines formerly operated by the Boston and Maine Railroad . An alternative route would extend the line alongside Revere Beach Boulevard through Point of Pines and the Lynnway , along the remainder of the BRB&L right of way. Other alternatives include increased commuter rail or bus service, or connecting the Blue Line to a commuter rail stop near Wonderland via
15105-433: The existing lobby and a new headhouse in an MGH development on the north side of Charles Street. Total project cost was estimated as $ 850 million ($ 740 million for construction including 30% contingency, $ 50 million for design, $ 30 million in administration costs, and $ 30 million for additional rolling stock), with construction lasting from 2025 to 2030. A Notice of Project Change was issued on October 2, 2023. In November 2023,
15264-454: The fault of the contractor at the end of the contract. In 2023, cars were being delivered incomplete with incomplete paint repairs, connectors seen hanging on underframes, and parts sanded down to bare metal. The MBTA and CRRC have collaborated to resolve quality issues. In August 2023, MBTA General Manager has reported that the new Orange Line cars are exhibiting an average of approximately 114,000 miles traveled between failures, which surpasses
15423-516: The floor rather than resting on ballast , such as normal railway tracks. An alternate technology, using rubber tires on narrow concrete or steel roll ways , was pioneered on certain lines of the Paris Métro and Mexico City Metro , and the first completely new system to use it was in Montreal , Canada. On most of these networks, additional horizontal wheels are required for guidance, and
15582-494: The following months. The edges of the original low platforms can still be seen under the high platforms at State and Aquarium. Rather than modify the narrow tunnel, the BERy elected to replace the streetcars with brand-new smaller-than-usual high-platform rapid transit cars which could operate in tight clearances—particularly around the tight loop at Bowdoin. Blue Line cars are thus 48.5 feet (14.8 m) long, substantially shorter than
15741-498: The full line was 13 minutes slower than before the shutdown, and 20 minutes slower than it would be without any slow zones. On October 25, the MBTA sent a letter to Senator Ed Markey , who had been investigating the project, detailing work needed during November and December to lift remaining slow zones, ranging from always-planned to unexpectedly necessary tasks. In early November 2023, MBTA General Manager Phillip Eng announced an ambitious plan to eliminate all 191 slow zones across
15900-457: The inadvertent opening of a passenger door while the train was in motion. Cars were also rechecked in early December 2019, after issues with sounds combined with passenger overload necessitated removal from service. The first train was restored to service in January 2020. The trains were pulled again on March 16, 2021, after a derailment involving one of the cars. Buses replaced trains around
16059-439: The interconnections between different parts of the system; for example, they show the interchange stations where passengers can transfer between lines. Unlike conventional maps, transit maps are usually not geographically accurate, but emphasize the topological connections among the different stations. The graphic presentation may use straight lines and fixed angles, and often a fixed minimum distance between stations, to simplify
16218-614: The large center-entrance cars introduced in 1917 (which were designed for multiple unit operation) could fully handle the crowds. In 1921, the Boston Transit Department (BTD)—the successor to the BTC—began work at Maverick Square to convert the East Boston Tunnel to high-floor metro trains. The next year, the BTD board approved the construction of high-level platforms at the four downtown stations. The Maverick Square incline
16377-450: The legal deadline for the Green Line extension to Somerville and Medford. The Blue Line and Red Line are currently the only MBTA subway rail lines without a direct transfer to each other; passengers must ride one stop on the Green or Orange lines to transfer. The proposed Red–Blue connector would extend the Blue Line 0.4 miles (0.64 km) west from Bowdoin to an underground platform at Charles/MGH station , allowing direct transfers to
16536-436: The line from Sullivan Square to Oak Grove on certain weeknights and weekends. In October 2018, the MBTA awarded a $ 218 million signal contract for the Red and Orange Lines, which was planned to allow 4.5-minute headways on the Orange Line beginning in 2022. On July 22, 2022, an Orange Line train caught fire while crossing the Mystic River . A metal sill along the underside of the train came loose and came into contact with
16695-547: The line were the No. 1 and No. 2 East Boston Rapid Transit cars, which were built by Pullman-Standard in 1923–1924 when the line was converted from streetcar operation to rapid transit. These were supplemented by the No. 3 fleet, built in 1951 by St. Louis Car Company , which was acquired for the Revere Extension. Cars in these earlier fleets were numbered in the 0500 series. The Nos. 1–3 fleets were replaced by 70 cars in
16854-602: The lines of the Lyon Metro includes a section of rack (cog) railway , while the Carmelit , in Haifa, is an underground funicular . For elevated lines, another alternative is the monorail , which can be built either as straddle-beam monorails or as a suspended monorail . While monorails have never gained wide acceptance outside Japan, there are some such as Chongqing Rail Transit 's monorail lines which are widely used in
17013-557: The main rapid transit system. For instance, the Wenhu Line of the Taipei Metro serves many relatively sparse neighbourhoods and feeds into and complements the high capacity metro lines. Some systems have been built from scratch, others are reclaimed from former commuter rail or suburban tramway systems that have been upgraded, and often supplemented with an underground or elevated downtown section. Ground-level alignments with
17172-512: The necessary demolition. However, land for I-95's Southwest Corridor through Roxbury had already been cleared of buildings; moreover, the state had already committed to using this vacant land for transportation purposes. As a result, instead of an 8-lane Interstate highway with a relocated Orange Line running in its median (in a manner similar to the Chicago Transit Authority 's Dan Ryan , Congress, and O'Hare branches ),
17331-418: The network map "readable" by illiterate people, this system has since become an "icon" of the system. Compared to other modes of transport, rapid transit has a good safety record, with few accidents. Rail transport is subject to strict safety regulations , with requirements for procedure and maintenance to minimize risk. Head-on collisions are rare due to use of double track, and low operating speeds reduce
17490-571: The new extension served Boston's Logan Airport , and was the first American urban transit connection to a commercial airfield. Beyond Maverick, the power feed was changed from third rail to overhead catenary (both at 600 V DC) to reduce the risk of winter ice buildup due to proximity to the ocean. The line was officially renamed the East Boston Tunnel & Revere Extension by the MTA in 1952, and designated as "Route 3" on system maps. It
17649-402: The next vehicle will arrive, and expected travel times. The standardized GTFS data format for transit information allows many third-party software developers to produce web and smartphone app programs which give passengers customized updates regarding specific transit lines and stations of interest. Mexico City Metro uses a unique pictogram for each station. Originally intended to help make
17808-902: The occurrence and severity of rear-end collisions and derailments . Fire is more of a danger underground, such as the King's Cross fire in London in November 1987, which killed 31 people. Systems are generally built to allow evacuation of trains at many places throughout the system. High platforms , usually over 1 meter / 3 feet, are a safety risk, as people falling onto the tracks have trouble climbing back. Platform screen doors are used on some systems to eliminate this danger. Rapid transit facilities are public spaces and may suffer from security problems: petty crimes , such as pickpocketing and baggage theft, and more serious violent crimes , as well as sexual assaults on tightly packed trains and platforms. Security measures include video surveillance , security guards , and conductors . In some countries
17967-603: The only two North American systems that are primarily called "subways". In most of Southeast Asia and in Taiwan , rapid transit systems are primarily known by the acronym MRT . The meaning varies from one country to another. In Indonesia , the acronym stands for Moda Raya Terpadu or Integrated Mass [Transit] Mode in English. In the Philippines , it stands for Metro Rail Transit . Two underground lines use
18126-672: The other stations, Wood Island was not accessible after the 1994-95 renovation; elevators were not added until 2000. Aquarium was closed from October 14, 2000, until October 29, 2001, for renovations, which were completed in 2003. A relocated Airport station opened on June 3, 2004. An extensive renovation of State , during which the station remained open, lasted from November 2004 to May 2011. Sequential closures of Wonderland, Wood Island, Revere Beach, and Beachmont stations took place in June through November 2008 for platform repairs. Reconstruction of Maverick began on October 4, 2005. The project
18285-551: The other three lines based on geographic features; however, according to Chermayeff, the Main Line El "ended up being orange for no particular reason beyond color balance." The firm originally planned for yellow instead of orange, but yellow was rejected after testing because yellow text was difficult to read on a white background. (Yellow was later used for MBTA bus service). The MBTA and transit historians later claimed that orange came from Orange Street, an early name for what
18444-587: The outset. Budapest , Chicago , Glasgow , Boston and New York City all converted or purpose-designed and built electric rail services. Advancements in technology have allowed new automated services. Hybrid solutions have also evolved, such as tram-train and premetro , which incorporate some of the features of rapid transit systems. In response to cost, engineering considerations and topological challenges some cities have opted to construct tram systems, particularly those in Australia, where density in cities
18603-422: The project was included in an April 2008 state bond bill, and $ 25 million in federal earmarks have been obtained. A 2004 state bond bill authorized $ 246.5 million on the condition of finding 50% non-state matching funds (which presumably would come from the federal government). The Draft Environmental Impact Report was expected to be complete by the end of 2008, but was delayed as planners focused on meeting
18762-908: The rapid transit system varies greatly between cities, with several transport strategies. Some systems may extend only to the limits of the inner city, or to its inner ring of suburbs with trains making frequent station stops. The outer suburbs may then be reached by a separate commuter rail network where more widely spaced stations allow higher speeds. In some cases the differences between urban rapid transit and suburban systems are not clear. Rapid transit systems may be supplemented by other systems such as trolleybuses , regular buses , trams , or commuter rail. This combination of transit modes serves to offset certain limitations of rapid transit such as limited stops and long walking distances between outside access points. Bus or tram feeder systems transport people to rapid transit stops. Each rapid transit system consists of one or more lines , or circuits. Each line
18921-542: The rubber tires. However, they have higher maintenance costs and are less energy efficient. They also lose traction when weather conditions are wet or icy, preventing above-ground use of the Montréal Metro and limiting it on the Sapporo Municipal Subway, but not rubber-tired systems in other cities. Some cities with steep hills incorporate mountain railway technologies in their metros. One of
19080-511: The same time by Hawker Siddeley and used many of the same components. In 2012, set 616-617 was placed in the former Broadway streetcar tunnel for use in emergency training. Rapid transit Modern services on rapid transit systems are provided on designated lines between stations typically using electric multiple units on railway tracks . Some systems use guided rubber tires , magnetic levitation ( maglev ), or monorail . The stations typically have high platforms, without steps inside
19239-503: The same year, daily ridership surpassed 200,000. Increased running times – largely due to longer dwell times from increased ridership – resulted in headways being lengthened from 5 minutes before 2011 to 6 minutes in 2016. The increased fleet size with the new trains will allow headways to be reduced to between 4 and 5 minutes at peak. In the interim, a 2016 test of platform markings at North Station which show boarding passengers where to stand to avoid blocking alighting passengers resulted in
19398-758: The second underwater vehicular tunnel of significant length built in the United States. The tunnel was constructed using a modified version of the Greathead Shield ; 2,700 feet (820 m) of the 1 mile (1.6 km) tunnel is actually under water. The excavation took two-and-a-half years, and cost $ 3 million and the lives of four workmen. Initially used as a streetcar tunnel, it ran from Maverick Square in East Boston to downtown Boston's Court Street station, with an intermediate stop at Devonshire (now State). Court Street had pedestrian access to Scollay Square station (now Government Center) but transfers to
19557-510: The site of the derailment until April 12. The CRRC cars remained out of service as of July 2021; defective side bearer pads were identified as a contributing factor. These dampen the movements of the trucks (which include the wheels) with respect to the car bodies, but were found to be wearing in such a way as to produce too much friction. The first of the CRRC trainsets was returned to revenue service on August 20, after modifications were approved by
19716-428: The space would be occupied by the realigned Orange Line, a reconstructed three-track mainline for Amtrak 's Northeast Corridor and MBTA Commuter Rail trains, and a linear park . After this re-routing was accomplished in 1987, the Washington Street Elevated was torn down, the last major segment of the original elevated line to be demolished. Between April 30 and May 3, 1987, the Washington Street Elevated south of
19875-414: The state's Executive Office of Housing and Economic Development, FTA Section 5309 New Starts program, and Federal Realty Investment Trust (the developer of Assembly Square). Construction began in late 2011 and finished in mid 2014. The new station, Assembly , opened on September 2, 2014. It was the first new station on the MBTA subway system since 1987. During the unusually brutal winter of 2014–2015 ,
20034-734: The suburbs, allowing a higher service frequency in the center. This arrangement is used by many systems, such as the Copenhagen Metro , the Milan Metro , the Oslo Metro , the Istanbul Metro and the New York City Subway . Alternatively, there may be a single central terminal (often shared with the central railway station), or multiple interchange stations between lines in the city center, for instance in
20193-714: The term subway . In Thailand , it stands for Metropolitan Rapid Transit , previously using the Mass Rapid Transit name. Outside of Southeast Asia, Kaohsiung and Taoyuan, Taiwan , have their own MRT systems which stands for Mass Rapid Transit , as with Singapore and Malaysia . In general rapid transit is a synonym for "metro" type transit, though sometimes rapid transit is defined to include "metro", commuter trains and grade separated light rail . Also high-capacity bus-based transit systems can have features similar to "metro" systems. The opening of London's steam-hauled Metropolitan Railway in 1863 marked
20352-467: The term Subway into railway terminology. Both railways, alongside others, were eventually merged into London Underground . The 1893 Liverpool Overhead Railway was designed to use electric traction from the outset. The technology quickly spread to other cities in Europe , the United States, Argentina, and Canada, with some railways being converted from steam and others being designed to be electric from
20511-496: The then-planned Cambridge Elevated line. When that plan was dropped in 1903 due to a disagreement between the Boston Transit Commission and the BERy, the stations were built with low platforms. Large bi-loading streetcars (with high floors but capable of loading from low platforms), which incorporated many attributes from metro cars used on the Main Line Elevated , began use in 1905. However, neither these nor
20670-505: The third rail, igniting sparks. Passengers had to jump out of the train onto the tracks, and one woman jumped into the river below and swam to shore. There were no injuries or casualties. Following various reliability issues on the Orange Line, the MBTA announced that it would close the entire line for renovations from August 19 to September 18, 2022. During the closure, the MBTA conducted accelerated repairs to track, ties, signals, and concrete walls, as well as replacing two crossovers. This
20829-443: The train's control system, the first new train entered revenue service on August 14, 2019; Replacement of the signal system is expected to be complete by 2022 on the Orange Line; the total cost is $ 218 million for both the Red and Orange Lines. While waiting for new cars, service has deteriorated due to maintenance problems with the old cars. The number of trains at rush hour was reduced from 17 (102 cars) to 16 (96 cars) in 2011; in
20988-511: The trains, requiring custom-made trains in order to minimize gaps between train and platform. They are typically integrated with other public transport and often operated by the same public transport authorities . Some rapid transit systems have at-grade intersections between a rapid transit line and a road or between two rapid transit lines. The world's first rapid transit system was the partially underground Metropolitan Railway which opened in 1863 using steam locomotives , and now forms part of
21147-601: The use of communications-based train control : the minimum headway can reach 90 seconds, but many systems typically use 120 seconds to allow for recovery from delays. Typical capacity lines allow 1,200 people per train, giving 36,000 passengers per hour per direction . However, much higher capacities are attained in East Asia with ranges of 75,000 to 85,000 people per hour achieved by MTR Corporation 's urban lines in Hong Kong. Rapid transit topologies are determined by
21306-503: The use of six-car trains. Washington and State were made fully accessible, as was the northbound platform at Essex. The Southwest Corridor station opened in 1987 were all fully accessible . Six-car trains entered service on August 18, 1987. Oak Grove was also renovated around 1987. This left only Haymarket , five stations on the Haymarket North Extension, and the southbound platform at Chinatown inaccessible by
21465-559: Was Singapore's Mass Rapid Transit (MRT) system, which launched its first underground mobile phone network using AMPS in 1989. Many metro systems, such as the Hong Kong Mass Transit Railway (MTR) and the Berlin U-Bahn, provide mobile data connections in their tunnels for various network operators. The technology used for public, mass rapid transit has undergone significant changes in the years since
21624-491: Was built as a streetcar tunnel in 1904 with Howard A. Carson as chief engineer; after an extension to Bowdoin in 1916, it was converted to heavy rail metro rolling stock in 1924. In 1952 and 1954 the line was extended along the former route of the Boston, Revere Beach and Lynn Railroad , in a project intended to reach Lynn but ultimately cut short to Wonderland. Further extensions to Lynn and Charles/MGH downtown are long-planned but not yet funded. From approximately 1998–2011,
21783-416: Was closed, leaving the subway as the only route through downtown – what is now the Orange Line between Haymarket and Chinatown stations. Ownership of the railway was transferred from the private Boston Elevated Railway to the public Metropolitan Transit Authority (MTA) in 1947; the MTA was itself reconstituted as the modern Massachusetts Bay Transportation Authority (MBTA) in 1964. On December 5, 1960,
21942-518: Was cut short to Wonderland, a further extension to Lynn has been planned. Following on the 1926 and 1945-47 studies, the 1966 Program for Mass Transportation recommended that the Blue Line be extended to Lynn, while the 1969 Recommended Highway and Transit Plan proposed that the extension run as far as Salem . An extension was not present in the 1972 Final Report of the Boston Transportation Planning Review , but
22101-481: Was demolished and replaced in 1975. The Haymarket North Extension rerouted the Orange Line through an underwater crossing of the Charles River . Service in Charlestown was replaced with service along Boston and Maine tracks routed partially beneath an elevated section of Interstate 93 , ultimately to Wellington and then to Oak Grove in Malden, Massachusetts , instead of Everett. Rail service to Everett
22260-899: Was developed further. Other Central European countries also have metro lines, for example in the cities of Budapest (Hungary), Prague (Czech Republic) and Warsaw (Poland). In Eastern Europe , metro systems are in operation in Minsk (Belarus), Kyiv (Ukraine), Riga (Latvia), Vilnius (Lithuania) and Moscow (Russia). In Southeastern European countries, there are metro systems in Athens and Thessaloniki (Greece), Belgrade (Serbia), Sofia (Bulgaria) and Istanbul (Turkey). In Northern Europe , rapid transit systems exist in Copenhagen (Denmark), Oslo (Norway), Stockholm (Sweden) and Helsinki (Finland). Various terms are used for rapid transit systems around North America . The term metro
22419-461: Was extended from Dudley Square to Forest Hills in 1909, with an infill station at Green Street in 1912; the Charlestown Elevated was extended from Sullivan Square to Everett in 1919. The Atlantic Avenue Elevated was closed in 1938. The newly formed MBTA assigned colors to its subway lines in 1965, with the Main Line becoming the Orange Line. The Charlestown Elevated was closed in 1975; it
22578-458: Was extended north from Sullivan Square to Everett station , over surface right-of-way parallel to Alford Street/Broadway , with a drawbridge over the Mystic River . The Boston Elevated had long-term plans to continue this extension further north to Malden , a goal which would only be achieved decades later, under public ownership and not via the Everett route. Following a 1928 accident at
22737-592: Was extended to the new Scollay Under, with streetcars looping empty around the Bowdoin loop. Bowdoin station opened on March 18 along with the Joy Street Portal, which was used by a Central Square –Orient Heights through line as well as several Cambridge lines that terminated at Scollay Under. The total cost of the extension was $ 2.4 million. The East Boston Tunnel was originally planned to be operated with high-floor metro rolling stock and connected to
22896-418: Was implemented to avoid third rail icing that frequently occurs in winter. Third rail power is used in the original Blue Line tunnels, which are smaller than most modern subway tunnels. Trains switch between the two modes at Airport station , near where the line transitions between running in a tunnel and running above ground. Previously, the switchover was made underground at Maverick station. The MBTA awarded
23055-441: Was improved to nine-minute headways on August 27, 2023. The "T" previously had a fleet of Pullman-Standard heavy rail cars for the Orange Line. These cars, known as 01100s, had been in service since the 1950s, and saw service on both the elevated and the northern extension before they were retired in 1981. Several remained on the property as Red Line work cars for some time before being scrapped. Units 01178-01179 are preserved at
23214-487: Was intended to reduce construction cost and limit disruption on Cambridge Street. Alternatives with a replacement Bowdoin station west of Bowdoin Street, and without a replacement station, were considered; the latter was recommended due to lower cost and reduced travel time. The preferred alternative was estimated to cost $ 748 million and take six years to construct. Daily ridership was estimated to be 18,940 one-way trips in 2030. Lacking available funding for construction,
23373-410: Was intended to remove speed restrictions and improve safety and reliability. The shutdown also gave time for more new CRRC cars to be delivered and put into service; after the closure, service on the line resumed with new trains almost all the time. However, the work was not enough to eliminate all slow zones, and temporary slow zones were added where work was performed. By early October, a round trip on
23532-702: Was low and suburbs tended to spread out . Since the 1970s, the viability of underground train systems in Australian cities, particularly Sydney and Melbourne , has been reconsidered and proposed as a solution to over-capacity. Melbourne had tunnels and stations developed in the 1970s and opened in 1980. The first line of the Sydney Metro was opened in 2019. Since the 1960s, many new systems have been introduced in Europe , Asia and Latin America . In
23691-404: Was made accessible in 2002. Renovations to Community College and Malden Center were completed in 2005, making the Orange Line the first of the four original MBTA subway lines to become fully accessible. In the early 2000s, Somerville began planning an infill station between Sullivan and Wellington to serve the new Assembly Square development. The $ 57 million station was funded by
23850-405: Was not accepted. The last pair, units 01280-01281, were hauled away on July 17, 2024. In late 2008, the MBTA began the planning process for new Orange and Red Line vehicles. The agency originally planned for a simultaneous order for 146 Orange Line cars (to replace the whole fleet) and 74 Red Line cars (to replace the older 1500 and 1600 series cars). A similar order was used in the late 1970s for
24009-425: Was planned to have longer headways to account for the lower projected ridership. This extension was opposed by residents of Melrose who preferred restored commuter rail service. Because of this, the express track ends at Wellington and a single commuter rail track continues parallel to the Orange Line north to Reading. Construction of Interstate 95 into downtown Boston was cancelled in 1972 after local protest over
24168-486: Was renamed as the Blue Line on August 26, 1965, as part of the new MBTA's color-based rebranding. The color blue represented water, as the line passes under Boston Harbor and travels near the coast for much of its length. Until the Silver Line was extended to Logan in 2004–05, the Blue Line was the only rapid transit connection to the airport. On April 21, 2018, the SL3 Silver Line service to Chelsea opened with
24327-476: Was replaced by buses from May 18–31, 2020, and April 25 to May 17, 2022, for track replacement and waterproofing work in the East Boston Tunnel. During the 2022 closure, temporary ferry service between Long Wharf and East Boston was also offered. An additional closure of the outer portion of the line from May 22 to June 8, 2022, allowed for repairs to the Suffolk Downs footbridge. No fares were charged on
24486-666: Was replaced by the Haymarket North Extension , which opened in phases from 1975 to 1977. The Southwest Corridor replaced the Washington Street Elevated in 1987, using an alignment originally intended for Interstate 95 , completing the modern Orange Line alignment. The downtown stations were lengthened in the 1980s to allow six-car trains. Accessibility modifications began with some of those stations and were completed in 2005. Assembly opened as an infill station in 2014. The Orange Line struggled with reliability issues, including aging infrastructure and trains, throughout
24645-440: Was replaced with Maverick station , which provided cross-platform transfers between tunnel trains and surface streetcars. Over the weekend of April 18–21, 1924, the East Boston Tunnel was converted to use the new high-floor trains. The tightly staged changeover required 1500 men to complete. Temporary wooden platform sections were put in place to allow service to begin on April 21, with the permanent concrete sections completed over
24804-566: Was replaced with buses. The extension was unique among Boston transit lines as it contained a third express track between Wellington and Community College stations. These stations, along with Sullivan Sq, have two island platform stations as opposed to the more normal single island stations found on the southern side of the Orange Line. This express track was designed for the never-built extension north of Oak Grove to Reading. The third track would have allowed peak-direction express service as well as places to terminate trains. Service north of Oak Grove
24963-539: Was sufficiently progressed for six-car trains to enter service on September 15, 2008, though the station was not completed until 2009. Orient Heights was closed from March 23 to November 26, 2013, for a complete reconstruction. Government Center closed from March 22, 2014, to March 21, 2016, for a complete renovation and accessibility modifications. This left all Blue Line stations accessible except for Bowdoin , which also has an eastbound platform that cannot be modified for six-car trains. Service between Bowdoin and Airport
25122-578: Was then estimated to cost $ 79–95 million (equivalent to $ 186–224 million in 2023). A 1987 cost-effectiveness study estimated 9,030 daily one-way trips over the extension. In 1991, the state agreed to build a set of transit projects as part of the settlement of a lawsuit by the Conservation Law Foundation (CLF) over auto emissions from the Big Dig project. Among these projects was a Red Line–Blue Line connector, to be complete by
25281-476: Was with six-car trains. By February 2023, service was scheduled to operate at 5 to 5.5-minute headways at weekday peak hours and 9 to 11 minutes at other times. Peak service used 10–12 trains (60–72 cars), while other service used 5–6 trains (30–36 cars). The MBTA expects to replace the current fleet in the mid-2030s after a 25-year operating lifespan. A 130-car fleet is planned to replace the existing 94-car fleet. The first generation of high-floor rolling stock on