Misplaced Pages

First National Bank Tower, Dallas

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The National is a 52-story, 191 m (627 ft) skyscraper in the Main Street district of downtown Dallas , Texas , adjacent to the Dallas Area Rapid Transit (DART) Akard Station . It is the tenth tallest building in the city. In January 2010 the building was closed due to low occupancy rates. It was listed on the National Register of Historic Places in 2017.

#510489

51-610: In 2020, it reopened, after the most costly building conversion in Dallas' history, totaling $ 460 million. It contains The luxury Thompson Dallas Hotel, 324 apartments, 37,000 sq ft of office space and 43,000 sq ft of retail space. The $ 35 million skyscraper was designed for the First National Bank in Dallas by architects George Dahl and Thomas E. Stanley , built to replace First National's home on Main Street. It originally

102-795: A M.Arch. from Harvard University in 1923. He subsequently spent two years in Italy as a fellow at the American Academy in Rome . In 1926, he began work for the Herbert M. Greene Co. in Dallas , Texas. He became a partner in Greene's firm in 1928, and the name of the firm was changed to Herbert M. Greene, LaRoche, and Dahl (later LaRoche and Dahl). In 1943, Dahl founded his own firm, George Leighton Dahl, Architects and Engineers, Incorporated, with

153-485: A "walk-up" bank on Elm Street for pedestrians and a "drive-in" bank on Pacific Street. The second floor contained the "Money Tree", a 20-foot-wide (6.1 m) mural designed by Alma Shon made of 8,500 coins and carved wood. The ninth floor, the first floor of the tower, housed the bank's top executives, lounge areas and executive dining room. It was surrounded by an extensive rooftop garden, heavily landscaped and filled with sculptures and fountains. The 8th floor contained

204-422: A Registration Examination or a series of exams is required prior to licensure. Professionals who engaged in the design and supervision of construction projects before the late 19th century were not necessarily trained in a separate architecture program in an academic setting. Instead, they often trained under established architects. Prior to modern times, there was no distinction between architects and engineers and

255-403: A building or several buildings, structures, and the spaces among them. The architect participates in developing the requirements the client wants in the building. Throughout the project (planning to occupancy), the architect coordinates a design team. Structural , mechanical , and electrical engineers are hired by the client or architect, who must ensure that the work is coordinated to construct

306-600: A dark and light contrasting theme, was clad in more than 8 acres (3.2 ha) of dark gray glass and white marble imported from Greece. The building's construction began in 1961 and used more than 25,000 tons of steel. Construction was handled jointly by Robert E. McKee, Inc. and Henry C. Beck Co. At the time of opening in 1965, it was the tallest building west of the Mississippi River , until surpassed by 555 California Street in San Francisco in 1969. It

357-473: A nationwide practice. Dahl was also a pioneer in fast-track construction . Upon his retirement in 1973, he had produced some 3,000 projects throughout the country that are estimated to be worth $ 2 billion. Dahl was married twice: in 1921 to Lillie E. Olson, with whom he had one daughter, and in 1978 to Joan Renfro. Dahl died of dehydration at the age of ninety-three at his home in Dallas. Dallas Projects: Other projects: Architect An architect

408-493: A title attached to a person's name was regulated by law in some countries. Architects' fee structure was typically based on a percentage of construction value, as a rate per unit area of the proposed construction, hourly rates, or a fixed lump sum fee. Combination of these structures were also common. Fixed fees were usually based on a project's allocated construction cost and could range between 4 and 12% of new construction cost for commercial and institutional projects, depending on

459-421: A vital part of the current design, and in some jurisdictions, design reports and records are required to include ongoing considerations of materials and contaminants, waste management and recycling, traffic control, and fire safety. Previously, architects employed drawings to illustrate and generate design proposals. While conceptual sketches are still widely used by architects, computer technology has now become

510-564: A warranty which specifies the expected life and other aspects of the material, product, or work. In most jurisdictions prior notification to the relevant authority must be given before commencement of the project, giving the local authority notice to carry out independent inspections. The architect will then review and inspect the progress of the work in coordination with the local authority. The architect will typically review contractor shop drawings and other submittals , prepare and issue site instructions, and provide Certificates for Payment to

561-705: Is a person who plans, designs, and oversees the construction of buildings. To practice architecture means to provide services in connection with the design of buildings and the space within the site surrounding the buildings that have human occupancy or use as their principal purpose. Etymologically, the term architect derives from the Latin architectus , which derives from the Greek ( arkhi - , chief + tekton , builder), i.e., chief builder. The professional requirements for architects vary from location to location. An architect's decisions affect public safety, and thus

SECTION 10

#1732794464511

612-473: Is often between the client and the contractor. This contract is legally binding and covers a wide range of aspects, including the insurance and commitments of all stakeholders, the status of the design documents, provisions for the architect's access, and procedures for the control of the works as they proceed. Depending on the type of contract used, provisions for further sub-contract tenders may be required. The architect may require that some elements be covered by

663-496: Is suggested that various developments in technology and mathematics allowed the development of the professional 'gentleman' architect, separate from the hands-on craftsman. Paper was not used in Europe for drawing until the 15th century but became increasingly available after 1500. Pencils were used for drawing by 1600. The availability of both paper and pencils allowed pre-construction drawings to be made by professionals. Concurrently,

714-555: Is the Pritzker Prize , sometimes termed the "Nobel Prize for architecture". The inaugural Pritzker Prize winner was Philip Johnson who was cited as having "50 years of imagination and vitality embodied in a myriad of museums, theatres libraries, houses gardens and corporate structures". The Pritzker Prize has been awarded for forty-two straight editions without interruption, and there are now 22 countries with at least one winning architect. Other prestigious architectural awards are

765-781: The Royal Gold Medal , the AIA Gold Medal (US), AIA Gold Medal (Australia), and the Praemium Imperiale . Architects in the UK who have made contributions to the profession through design excellence or architectural education or have in some other way advanced the profession might, until 1971, be elected Fellows of the Royal Institute of British Architects and can write FRIBA after their name if they feel so inclined. Those elected to chartered membership of

816-591: The Dallas Room, a 300-seat auditorium, and the bank employees' cafeteria. George Dahl George Leighton Dahl (May 11, 1894 – July 18, 1987) was a prominent American architect based in Dallas , Texas during the 20th century. His most notable contributions include the Art Deco structures of Fair Park while he oversaw planning and construction of the 1936 Texas Centennial Exposition . In 1970, in anticipation of imminent commercial growth brought on by

867-753: The RIBA after 1971 may use the initials RIBA but cannot use the old ARIBA and FRIBA. An honorary fellow may use the initials Hon. FRIBA, and an international fellow may use the initials Int. FRIBA. Architects in the US who have made contributions to the profession through design excellence or architectural education or have in some other way advanced the profession are elected Fellows of the American Institute of Architects and can write FAIA after their name. Architects in Canada who have made outstanding contributions to

918-536: The ability to practice independently of supervision. The term building design professional (or design professional) , by contrast, is a much broader term that includes professionals who practice independently under an alternate profession, such as engineering professionals, or those who assist in the practice of architecture under the supervision of a licensed architect, such as intern architects . In many places, independent, non-licensed individuals may perform design services outside of professional restrictions, such as

969-412: The adjacent Renaissance Tower was opened in 1974. An 800-space garage was located on the lower two levels, and was the largest single parking facility in Dallas at the time. During following years the bank continued to grow and under InterFirst Corp. built Renaissance Tower and Bank of America Plaza . After a series of mergers it became part of Bank of America , and as most banking operations vacated

1020-564: The architect must report back to the client, who may have reservations or recommendations which might introduce further variables into the design. Architects also deal with local and federal jurisdictions regarding regulations and building codes . The architect might need to comply with local planning and zoning laws such as required setbacks, height limitations, parking requirements, transparency requirements (windows), and land use . Some jurisdictions require adherence to design and historic preservation guidelines. Health and safety risks form

1071-500: The architect must undergo specialised training consisting of advanced education and a practicum (or internship) for practical experience to earn a license to practice architecture. Practical, technical, and academic requirements for becoming an architect vary by jurisdiction though the formal study of architecture in academic institutions has played a pivotal role in the development of the profession . Throughout ancient and medieval history, most architectural design and construction

SECTION 20

#1732794464511

1122-426: The architect's services during each construction stage may be extensive (detailed document preparation and construction review) or less involved (such as allowing a contractor to exercise considerable design-build functions). Architects typically put projects to tender on behalf of their clients, advise them on the award of the project to a general contractor , facilitate and administer a contract of agreement, which

1173-494: The building's design, construction, and maintenance. Virtual reality (VR) presentations are becoming more common for visualizing structural designs and interior spaces from the point-of-view perspective. Since modern buildings are known to release carbon into the atmosphere, increasing controls are being placed on buildings and associated technology to reduce emissions, increase energy efficiency, and make use of renewable energy sources. Renewable energy sources may be designed into

1224-417: The building. The lower five floors of the base were recessed 10 feet (3.0 m) to provide large walkways around the building. The floors above the arches (6,7 and 8) do not have any windows and are covered in marble. The 13,860 sq ft (1,288 m) main banking floor, located on the 4th floor, was 2 stories in height and contained the vaults and 50 teller stations. Two motor banks served customers:

1275-411: The construction. In many jurisdictions mandatory certification or assurance of the completed work or part of the work is required. This demand for certification entails a high degree of risk; therefore, regular inspections of the work as it progresses on site is required to ensure that the design is in compliance itself as well as following all relevant statutes and permissions. Recent decades have seen

1326-463: The contractor (see also Design-bid-build ) which is based on the work done as well as any materials and other goods purchased or hired in the future. In the United Kingdom and other countries, a quantity surveyor is often part of the team to provide cost consulting. With large, complex projects, an independent construction manager is sometimes hired to assist in the design and management of

1377-401: The design becomes more advanced and detailed, specifications and detail designs are made of all the elements and components of the building. Techniques in the production of a building are continually advancing which places a demand on the architect to ensure that he or she remains up to date with these advances. Depending on the client's needs and the jurisdiction's requirements, the spectrum of

1428-429: The design of houses or other smaller structures. In the architectural profession, technical and environmental knowledge, design, and construction management require an understanding of business as well as design. However, design is the driving force throughout the project and beyond. An architect accepts a commission from a client. The commission might involve preparing feasibility reports , building audits, and designing

1479-494: The design takes place. The extent and nature of these expectations will vary. Foresight is a prerequisite when designing buildings as it is a very complex and demanding undertaking. Any design concept during the early stage of its generation must take into account a great number of issues and variables, including the qualities of the space(s), the end-use and life-cycle of these proposed spaces, connections, relations, and aspects between spaces, including how they are put together, and

1530-468: The design undertaking. The architect may make early proposals to the client which may rework the terms of the brief. The "program" (or brief) is essential to producing a project that meets all the needs of the owner. This becomes a guide for the architect in creating the design concept. Design proposal(s) are generally expected to be both imaginative and pragmatic. Much depends upon the time, place, finance, culture, and available crafts and technology in which

1581-452: The design, ensuring that aspects such as structural supports and air conditioning elements are coordinated. The control and planning of construction costs are also part of these consultations. Coordination of the different aspects involves a high degree of specialized communication, including advanced computer technology such as building information modeling (BIM), computer-aided design (CAD), and cloud-based technologies. Finally, at all times,

First National Bank Tower, Dallas - Misplaced Pages Continue

1632-416: The design. The architect, once hired by a client, is responsible for creating a design concept that meets the requirements of that client and provides a facility suitable to the required use. The architect must meet with and ask questions to the client, to ascertain all the requirements (and nuances) of the planned project. Often, the full brief is not clear in the beginning. It involves a degree of risk in

1683-401: The design. The design must also balance increasing concerns with environmental sustainability . The architect may introduce (intentionally or not), aspects of mathematics and architecture , new or current architectural theory , or references to architectural history . A key part of the design is that the architect often must consult with engineers, surveyors, and other specialists throughout

1734-593: The exception of high-status projects. In most developed countries only those qualified with an appropriate license, certification, or registration with a relevant body (often a government) may legally practice architecture. Such licensure usually requires a university degree, successful completion of exams, and a training period. Representation of oneself as an architect through the use of terms and titles were restricted to licensed individuals by law, although in general, derivatives such as architectural designer were not legally protected. To practice architecture implies

1785-458: The firm (i.e. staff architect, partner, or shareholder, etc.), and the size and location of the firm. A number of national professional organizations exist to promote career and business development in architecture. A wide variety of prizes is awarded by national professional associations and other bodies, recognizing accomplished architects, their buildings, structures, and professional careers. The most lucrative award an architect can receive

1836-409: The impact of proposals on the immediate and wider locality. The selection of appropriate materials and technology must be considered, tested, and reviewed at an early stage in the design to ensure there are no setbacks (such as higher-than-expected costs) which could occur later in the project. The site and its surrounding environment, as well as the culture and history of the place, will also influence

1887-641: The impending development of the Dallas/Fort Worth International Airport , he designed the First National Bank of Grapevine building at 1400 South Main Street. This iconic cubist structure served as a harbinger of the area's upcoming economic development. George Dahl was born in Minneapolis to Norwegian immigrant parents, Olaf G. and Laura (Olson) Dahl. He received a B.Arch. from the University of Minnesota and

1938-411: The industry standard. Furthermore, design may include the use of photos, collages, prints, linocuts, 3D scanning technology, and other media in design production. Increasingly, computer software is shaping how architects work. BIM technology allows for the creation of a virtual building that serves as an information database for the sharing of design and building information throughout the life-cycle of

1989-414: The introduction of linear perspective and innovations such as the use of different projections to describe a three-dimensional building in two dimensions, together with an increased understanding of dimensional accuracy, helped building designers communicate their ideas. However, development was gradual and slow-going. Until the 18th century, buildings continued to be designed and set out by craftsmen, with

2040-429: The most costly building conversion in Dallas' history, totaling $ 460 million. It contains The luxury Thompson Dallas Hotel, 324 apartments, 37,000 sq ft of office space and 43,000 sq ft of retail space. The building's eight story base, which contained the banking and operational function for First National Bank, covered the entire block and featured a continuous set of 48-foot-high (15 m) marble arches on all sides of

2091-511: The profession through contributions to research, scholarship, public service, or professional standing to the good of architecture in Canada or elsewhere may be recognized as Fellows of the Royal Architectural Institute of Canada and can write FRAIC after their name. In Hong Kong, those elected to chartered membership may use the initial HKIA, and those who have made a special contribution after nomination and election by

First National Bank Tower, Dallas - Misplaced Pages Continue

2142-497: The project's size and complexity. Residential projects ranged from 12 to 20%. Renovation projects typically commanded higher percentages such as 15–20%. Overall billings for architectural firms range widely, depending on their location and economic climate. Billings have traditionally been dependent on local economic conditions, but with rapid globalization, this is becoming less of a factor for large international firms. Salaries could also vary depending on experience, position within

2193-687: The proposed building by local or national renewable energy providers. As a result, the architect is required to remain abreast of current regulations that are continually being updated. Some new developments exhibit extremely low energy use or passive solar building design . However, the architect is also increasingly being required to provide initiatives in a wider environmental sense. Examples of this include making provisions for low-energy transport, natural daylighting instead of artificial lighting, natural ventilation instead of air conditioning, pollution, and waste management, use of recycled materials, and employment of materials which can be easily recycled. As

2244-742: The rise of specialisations within the profession. Many architects and architectural firms focus on certain project types (e.g. healthcare, retail, public housing, and event management), technological expertise, or project delivery methods. Some architects specialise in building code, building envelope , sustainable design , technical writing , historic preservation(US) or conservation (UK), and accessibility . Many architects elect to move into real-estate (property) development , corporate facilities planning, project management , construction management, chief sustainability officers interior design, city planning, user experience design , and design research. Although there are variations in each location, most of

2295-419: The structure the name was changed to Elm Place. Under a special agreement, the bank owned the bottom 10 floors, while the lobby and upper 42 floors had a separate owner. The lower floors of the building were foreclosed on in early 2009; the tower portion of the building closed in late January 2010 due to low occupancy rates. In May 2010 the building was put up for sale for $ 19 million. In 2020, it reopened, after

2346-469: The title used varied depending on geographical location. They often carried the title of master builder or surveyor after serving a number of years as an apprentice (such as Sir Christopher Wren ). The formal study of architecture in academic institutions played a pivotal role in the development of the profession as a whole, serving as a focal point for advances in architectural technology and theory. The use of "Architect" or abbreviations such as "Ar." as

2397-551: The tower contain Plexiglas mullions that house fluorescent lights, which were once turned on every night. The Observation Terrace on the 50th floor contained the world's highest escalator from the 49th floor. At ground level the building features a long pedestrian arcade flanked by retail space connected Elm Street and Pacific Street, and the building was later connected to the Dallas Pedestrian Network when

2448-412: The world's architects are required to register with the appropriate jurisdiction. Architects are typically required to meet three common requirements: education, experience, and examination. Basic educational requirement generally consist of a university in architecture. The experience requirement for degree candidates is usually satisfied by a practicum or internship (usually two to three years). Finally,

2499-456: Was carried out by artisans —such as stone masons and carpenters—who rose to the role of master builders. Until modern times, there was no clear distinction between architect and engineer. In Europe, the titles architect and engineer were primarily geographical variations that referred to the same person, often used interchangeably. "Architect" derives from Greek ἀρχιτέκτων ( arkhitéktōn , "master builder," "chief tektōn ). It

2550-438: Was proposed to be 96 feet (29 m) higher, but was scaled back after determining it would be a hazard to flights leaving Dallas Love Field . By choosing a site with lower elevation, the tower, even with a modified height, was still taller than rival bank's Republic Center . The 2-acre (0.81 ha) block of land previously contained First National's motor bank, which was demolished for the new structure. The exterior, featuring

2601-595: Was the tallest in Texas until 1971, when One Shell Plaza was built in Houston . In 1974, Renaissance Tower became the tallest in Dallas. The 225-foot-long (69 m) tower that rises out of this base was placed off center and is a modified hexagon, with four of the sides only slightly angled [end walls are 75 feet (23 m) wide with a midpoint width of 95 feet (29 m)]. Floors 11-49 were general lease space not used by First National Bank. The white columns running up

SECTION 50

#1732794464511
#510489