Misplaced Pages

South Portland, Portland, Oregon

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Downtown Portland is the central business district of Portland , Oregon , United States . It is on the west bank of the Willamette River in the northeastern corner of the southwest section of the city and where most of the city's high-rise buildings are found.

#730269

92-649: South Portland is a long, narrow neighborhood just south of Downtown Portland, Oregon , hemmed in between the Willamette River and the West Hills . It stretches from I-405 and the Marquam Bridge on the north, to SW Canby St. and the Sellwood Bridge in the south. The Willamette forms the eastern boundary, and SW Barbur Blvd. most of the western boundary. In addition to Downtown to

184-596: A first-come, first-served basis. TriMet contracts some keycard access to BikeLink and uses its Hop Fastpass on others. Other lockers may be rented by users. Bicycle racks are the most common form of bicycle parking. As of 2020 , TriMet operates five models of light rail vehicles designated as "Type 1" through "Type 5", of which two are successive upgrades of the same model. The MAX system's 145 cars vary in length, from 88 feet (26.8 m) to 95 feet (29.0 m), and are used interchangeably on every line. Downtown Portland's 200-foot (61 m) downtown blocks allow

276-612: A TriMet study of European systems. The low-floor cars, which TriMet and Siemens jointly developed, entered service in August 1997. MAX achieved full accessibility in April 1999. Ticket vending machines provide information and instructions in audio, braille , and raised lettering. Station platforms also have signs with braille and raised lettering to indicate which lines provide service and where they go. The edge of platforms have tactile paving to warn riders from standing too close to

368-483: A federal grant in 2013 enabled TriMet to add more at other locations. Concessionaires sometimes open coffee shops at certain stations. A majority of MAX stations are at street level, correlating to the system's predominant alignment. Sunset Transit Center , Southeast Bybee Boulevard , and stations along the Banfield Freeway are below street level. One station, Lents Town Center/Southeast Foster Road ,

460-546: A financing plan suspended the project for several years but planning resumed in 1988 and studies were completed in 1991. Staunch lobbying by local and state officials led by Hillsboro Mayor Shirley Huffman forced an extension of the line further west to downtown Hillsboro in 1993. Construction of the 20-station, 18-mile (29 km) line began that August with the excavation of the Robertson Tunnel . The Westside MAX opened in two stages following delays in tunneling:

552-657: A locally preferred alternative in April 2019, and the FTA announced $ 99.99 million for the project through the Capital Investment Grants program in May 2020. Final design was completed by engineering firm Parametrix in early 2021. The design includes two new bridges north of Gateway Transit Center to accommodate the second track and a new MAX platform called " Gateway North ". TriMet broke ground on September 28, 2021. From April 2–9, 2022, Red Line service

644-623: A more streamlined design and more seating, and are lighter and more energy-efficient than the previous models. The Type 4 cars were the first in the MAX network to use LED-type destination signs . The second series of S70 cars, TriMet's Type 5 vehicles, were procured for the Portland–Milwaukie light rail project. TriMet placed an order for the Type 5 cars with Siemens in 2012 and delivery commenced in 2014. These vehicles include some improvements over

736-506: A one-seat option from 10 additional stations to Portland International Airport. Additionally, TriMet had announced it would procure up to eight new light rail vehicles to accommodate the improvements, but later purchased 30 new trains overall; four were part of A Better Red , while the remaining 26 were replacements for the original MAX fleet, which are gradually being retired. Preliminary design work began in February 2018. TriMet adopted

828-479: A plan to revitalize downtown Portland. Moses charted a highway loop around the city's central freeways, which would become Interstate 405 as it links with I-5 south of downtown. Additionally the creation of a downtown transit mall in 1977 , a new waterfront park in 1978 (later named after Governor Tom McCall ) in place of a freeway , the creation of the Pioneer Courthouse Square in 1984,

920-616: A portion of the nearby Lloyd District after 2001. However, in 2010, free rides became limited to MAX and streetcar service – no longer covering bus service – and the zone renamed the "Free Rail Zone", and in September 2012 the fareless zone was discontinued entirely, because of a $ 12 million shortfall in TriMet's annual budget. Several high-rise buildings are located in downtown Portland. The five tallest are: MAX Light Rail The Metropolitan Area Express ( MAX )

1012-495: A report published in 2019, TriMet provides a total of 12,614 park-and-ride spaces, of which 10,219 directly serve 25 MAX stations. The agency's parking facilities are either surface lots or multi-level garages , and they are free to use. TriMet allows vehicles to park at most stalls overnight as long as they do not exceed 24 hours. At some locations, TriMet negotiates with nearby establishments for additional parking spaces. Westside MAX stations contain 3,643 parking spaces,

SECTION 10

#1732797280731

1104-657: A result of Portland's short city blocks in downtown, which restrict trains to two-car consists. Like other North American light rail systems, MAX stations do not have faregates ; paid fare zones are delineated but remain accessible to anyone. In 2015, TriMet proposed installing turnstiles at some stations along the Portland–Milwaukie segment but never did so. Stations are typically equipped with trash cans, shelters, and ticket vending machines . Most stations have arrival information displays that show when trains arrive and other service information. These displays were first installed at I-205 and Portland Transit Mall stations, and

1196-674: A result, Portland businesses pushed for the construction of a new bridge further upstream that led to the southern end of the Portland Transit Mall. The locally preferred alignment was finalized in mid-2008; a new bridge would carry light rail across the Willamette River from the South Waterfront to just south of the Oregon Museum of Science and Industry (OMSI). TriMet designed this bridge, which

1288-440: A single contact wire to minimize the amount of overhead wiring. To further minimize visual impact, ornamental street light poles, buildings, and bridge structures are used to support the wiring. Substations , spaced approximately every one mile (1.6 km) apart, convert the high-voltage public supply to the voltage power used by trains. The power system can bridge any one substation so that trains can continue to operate should

1380-605: A stop at a MAX station attached to the main passenger terminal of Portland International Airport. TriMet has built a total of six infill stations . Four were built on the original Eastside MAX alignment— Mall/Southwest 4th Avenue (1990), Mall/Southwest 5th Avenue (1990), Convention Center (1990), and Civic Drive (2010) —while two were built on the Portland Transit Mall—PSU South/Southwest 6th and College (2012) and PSU South/Southwest 5th and Jackson (2012). On March 1, 2020, TriMet permanently closed

1472-517: A substation or its supply go down. Approximately 70 percent of the MAX system uses automatic block signaling (ABS), which allows for relatively fast operating speeds—up to 55 miles per hour (89 km/h)—and short headways . For example, between Lloyd Center/Northeast 11th Avenue station and Gateway Transit Center along the Banfield Freeway, ABS can accommodate an operating headway of two minutes. Within these sections, automatic train stops (ATS) enforce speed limits and automatically apply

1564-429: A suit filed by TriMet, a circuit court upheld the project's continuation. The 17-station, 7.3-mile (11.7 km) Portland–Milwaukie segment and Orange Line service opened on September 12, 2015. The Orange Line, operating along the Portland Transit Mall's southbound segment, became the third service to serve this corridor. In October 2017, TriMet, citing system-wide delays caused by two single-track segments along

1656-528: A task force that helped determine several alternative options, including a busway and light rail. Local jurisdictions originally favored the busway alternative but support for light rail prevailed following the mode's inclusion in a 1977 environmental impact statement . The proposal became known as the Banfield light rail project, named for the Banfield Freeway , a segment of I-84 that part of

1748-598: A train serves within its designated termini , i.e. a train "route" or "service". MAX operates five lines, each assigned a color. TriMet adopted the use of colors to distinguish separately operated routes in 2000 and brought them into use on September 10, 2001, when it opened the Airport MAX extension. On that day, the service running between Hillsboro and Gresham became designated the Blue Line, while that running between downtown Portland and Portland International Airport

1840-661: A transfer to the region's commuter rail line, WES Commuter Rail , which operates between Beaverton and Wilsonville in Washington County. Within the Portland Transit Mall, trains connect with buses serving downtown Portland; bus stops take up transit mall blocks unoccupied by light rail platforms. MAX riders can transfer to the Portland Streetcar at points where MAX and streetcar lines intersect and to Amtrak via two stations near Portland Union Station . The Red Line operates as an airport rail link with

1932-484: Is Metro's latest iteration, and it lists three funding scenarios that divide the region's proposals into three priority levels. The highest priority projects, which are referred to as "2027 Constrained", are proposals the region expects to have funding for by 2027. The "2040 Constrained" lists projects that fit within the region's planned budget through 2040, while the "2040 Strategic" are projects that may be built if additional funding becomes available. The 2018 RTP lists

SECTION 20

#1732797280731

2024-626: Is a light rail system serving the Portland metropolitan area in the U.S. state of Oregon . Owned and operated by TriMet , it consists of five lines connecting the six sections of Portland; the communities of Beaverton , Clackamas , Gresham , Hillsboro , Milwaukie , and Oak Grove ; and Portland International Airport to Portland City Center . Trains run seven days a week with headways of between 30 minutes off-peak and three minutes during rush hours . In 2019, MAX had an average daily ridership of 120,900, or 38.8 million annually. Due to

2116-422: Is elevated. Washington Park is the system's only underground station and holds the distinction as North America's deepest transit station at 260 feet (79 m) below ground. Many MAX stations facilitate transfers to other modes of public transit. 11 stations are transit centers with connections to multiple local and intercity bus routes. Beaverton Transit Center is the only MAX-served transit center with

2208-547: Is estimated at $ 18,000 per surface-lot space and $ 52,000 per structured space. TriMet additionally offers four different bicycle parking options at its MAX stations, although not all options are available at every station. Bike and rides are secure, enclosed spaces that are accessible by keycard and are monitored 24 hours per day by security cameras ; as of 2020 they are available at eight stations. Electronic bicycle lockers , or eLockers, are secure lockers that may also be accessed by keycard and are made available on

2300-699: Is the farthest east, while most of the high-rises end by I-405 to the west. Interstate 5 runs on the opposite bank of the river, crossing over on the Marquam Bridge. U.S. Route 26 connects downtown Portland to the Oregon Coast and the Cascade Range . Downtown is also served by several forms of public transportation. TriMet , the regional mass transit agency, operates MAX light rail on two alignments in downtown, one running east–west on Yamhill and Morrison streets and north–south on 1st Avenue,

2392-571: The COVID-19 pandemic , which impacted public transit use globally , annual ridership plummeted, with only 14.8 million riders recorded in 2021. MAX was among the first second-generation American light rail systems to be built, conceived from freeway revolts that took place in the 1970s. Planning for the network's inaugural eastside segment, then referred to as the Banfield Light Rail Project , started in 1973 ahead of

2484-567: The Hop Fastpass payment system. In the early 20th century, privately funded interurbans and streetcars gave Portland one of the largest urban rail systems in the American West , with lines that once extended as far as Vancouver, Washington to the north, Eugene to the south, Troutdale to the east, and Forest Grove to the west. Ben Holladay brought over Portland's first trolleys from San Francisco in 1872; operated by

2576-921: The Portland Street Railway Company , they were drawn by horses and mules . In 1890, the first electric streetcar opened in Albina while the first cable car began running along 5th Avenue; these marked the start of an era of major rail expansion. In 1892, the East Side Railway Company opened the first long-distance interurban service—a 16-mile (25.7 km) line running from Portland to Oregon City . The Portland Railway, Light and Power Company had taken over all local streetcars by 1906, and interurbans by 1908. In 1912, as Portland's population exceeded 250,000, transit ridership rose to 70 million passengers annually. Passenger rail services had started to decline by

2668-743: The Steel Bridge . On August 30, 2009, it was rerouted to terminate at the PSU Urban Center stations with the addition of light rail to the Portland Transit Mall . In September 2012, this was extended further south to the PSU South stations , which had not been built due to the construction of nearby transit-oriented development . The Yellow Line became interlined with the Orange Line in 2015; it now only operates

2760-799: The brakes should a train operator fail to do so. The remaining 30 percent of the system relies on traffic signals and line-of-sight operation. Speeds do not exceed 35 mph (56 km/h) in these sections. MAX consists of 94 stations, of which 48 are served by the Blue Line, 30 by the Green Line, 37 by the Red Line, 17 by the Orange Line, and 17 by the Yellow Line. Furthermore, 47 stations are served by at least two lines and eight stations are served by three lines. The system's central stations, where all MAX services interconnect, border

2852-425: The "Southwest Corridor" project which TriMet expects will be funded by 2027. TriMet has indicated that other extensions and improvements have been studied or discussed with Metro and cities in the region. These proposals include the following, with light rail and alternatives being considered: The MAX rail network is approximately 60 miles (97 km) long. It was built in a series of six projects starting with

South Portland, Portland, Oregon - Misplaced Pages Continue

2944-544: The 14-station, 1.8-mile (2.9 km) Portland Transit Mall on August 30, 2009, first served by the Yellow Line. The opening of the eight-station, 6.5-mile (10.5 km) I-205 MAX and Green Line service followed on September 12. The South Corridor project's second phase initially proposed the extension of MAX between downtown Portland and Milwaukie via the Hawthorne Bridge . Studies showed that this alignment would cause severe traffic bottlenecks in downtown. As

3036-417: The 15.1-mile (24.3 km) Banfield—now called Eastside—segment between downtown Portland and Gresham. Each successive project has either been an extension or a branch of an existing segment. TriMet has typically paired each project with the opening of a new line, often making the line and segment synonymous (e.g. "Airport MAX Red Line"). For MAX, a "line" refers to the physical railroad tracks and stations

3128-413: The 1920s with the rise of the automobile and suburban and freeway development. Portland's original streetcar lines had ceased operating by 1950, replaced by buses until 2001, when the modern Portland Streetcar opened in downtown Portland . Meanwhile, the region's last two interurban lines, which traveled to Oregon City and Bellrose (Southeast 136th Avenue), permanently closed in 1958. At

3220-514: The 1990s, the Port of Portland began exploring ways to alleviate worsening traffic congestion, including the possibility of introducing MAX service, which regional planners had not anticipated for at least another 20 years. In 1997, engineering firm Bechtel accelerated plans by submitting an unsolicited proposal to design and build an airport rail link in exchange for 120 acres (49 ha) of Port property. A public–private partnership between

3312-734: The Airport MAX and Portland Streetcar projects, since these projects were locally funded. The 10-station, 5.8-mile (9.3 km) extension from the Rose Quarter to the Expo Center opened on May 1, 2004, with its new service designated the Yellow Line . From 2004 to 2009, the Yellow Line ran from Expo Center station in North Portland to 11th Avenue in downtown Portland, following the Blue and Red lines' downtown alignment from

3404-575: The Airport MAX project. The system's 27 Type 3 vehicles, which the agency purchased as part of the Interstate MAX project and first brought into use in 2003, are the same model as the Type 2 vehicles but with technical upgrades and a new livery. Twenty-two Siemens S70 low-floor cars, which were designated Type 4, were purchased in conjunction with the I-205 MAX and Portland Transit Mall projects, and were first used in 2009. Type 4 cars have

3496-703: The Airport MAX, announced the MAX Red Line Improvements Project, later renamed "A Better Red". A Better Red sought double-tracking a 2,800-foot-long (850 m) section of track north of Gateway Transit Center and another 3,800-foot-long (1,200 m) section alongside Northeast Airport Way just before the airport terminal. To qualify the project for federal funding, TriMet included extending Red Line service farther west to Fair Complex/Hillsboro Airport station in Hillsboro; this extension would use existing Westside MAX tracks and create

3588-451: The Banfield light rail project by a joint venture between Bombardier and La Brugeoise et Nivelles beginning in 1983. TriMet announced it would purchase seven additional vehicles that August, but a budget shortfall forced the agency to withdraw this proposal the following November. The cars are similar in design to Bombardier vehicles that had been used in Rio de Janeiro . Bombardier built

3680-581: The Elmonica facility is adjacent to Elmonica/Southwest 170th Avenue station ; both are on the Blue Line. Ruby Junction began with one building that TriMet built as part of the original MAX project in the early 1980s; it had expanded to three multi-story buildings totaling 143,000 square feet (13,300 m ) occupying 17 acres (6.9 ha) by 2010, and to four buildings totalling 149,000 square feet (13,800 m ) occupying 23 acres (9.3 ha) by 2016. It contains 13 maintenance bays and its yard tracks have

3772-617: The I-205 corridor due to an existing right-of-way along the I-205 Transitway , an unfinished mass transit component of the freeway that had been built to accommodate a busway. TriMet, however, prioritized the Westside MAX during its bid for federal matching funds and the I-205 plans were put on hold. In 1989, studies for both I-205 and Milwaukie proposals received funding from the U.S. Senate Committee on Appropriations under

South Portland, Portland, Oregon - Misplaced Pages Continue

3864-751: The Mall infill stations in an effort to speed up travel times in downtown Portland. The agency also temporarily closed Kings Hill/Southwest Salmon Street station for a trial period ending on March 1, 2021. Stations built as part of the Banfield Light Rail Project were originally fitted with electric wayside lifts to accommodate riders with mobility devices on the system's high-floor , first-generation vehicles. Each station had two lifts, one for each direction of travel. The lifts were installed on platforms rather than on trains to prevent malfunctions from delaying service. Increased use of

3956-599: The Morrison and Yamhill couplet, MAX travels in the left lanes. On the Portland Transit Mall (5th and 6th couplet), MAX shares dedicated lanes with buses; both vehicle types travel in the center or right lanes and stop at their respective curbside platforms on the right lane. Lanes may be separated by turtleback delineators or double-solid white lines, and marked with white diamonds or white "T"s. Outside of downtown Portland, MAX runs on street medians and viaducts, alongside freeways and freight lines, and underground. Where

4048-597: The Pearl and Northwest Portland districts. The system currently has two routes, measuring 7.2 miles (11.6 km) end to end, and connects in South Waterfront with the Tram (aerial cableway) to Oregon Health & Science University (OHSU). Starting in 1975 and continuing for almost four decades, all transit service in downtown was free , as downtown was entirely within TriMet's Fareless Square , which also covered

4140-535: The Portland metropolitan area, the other two being the Portland Streetcar and WES Commuter Rail . MAX directly connects with them as well as with other transit services such as Amtrak , Frequent Express , and local and intercity buses . Trains operate with two-car consists due to downtown Portland's short city blocks . Vehicles and platforms are fully accessible , and fares are collected through

4232-462: The Portland–Milwaukie segment had a 100-percent usage rate of its available spaces while the Westside MAX segment had 85 percent. The corridor with the lowest use of available parking spaces was the I-205 MAX at 30 percent; TriMet attributes this to factors such as inconvenient lot access and the Green Line's indirect route to downtown Portland compared with the availability of more direct bus routes. The cost-per-space for building park and rides

4324-625: The Robertson Tunnel, the system's longest underground segment. MAX crosses the Willamette River using the Steel Bridge and Tilikum Crossing. In studies conducted for the Eastside MAX, planners recommended using the Steel Bridge due to its former role as a river crossing for the city's historic streetcars. When MAX commenced service in 1986, trains shared the bridge's center lanes with vehicular traffic. In 2008, workers closed

4416-403: The Type 4 cars, including less-cramped interior seating, and improvements to the air-conditioning system and wheelchair ramps. These introduced a new seating layout in the center section, among other changes, and Siemens later retroactively redesignated TriMet's Type 5 cars as model S700. In July 2019, TriMet placed an order for 26 Siemens S700 light rail vehicles that are intended to replace

4508-667: The Willamette to Interstate 405 and south from Burnside Street to just south of the Portland State University campus (also bounded by I-405), except for a part of northeastern portion north of SW Harvey Milk Street and east of SW 3rd Ave that belongs to the Old Town Chinatown neighborhood. High-density business and residential districts near downtown include the Lloyd District , across

4600-491: The aftermath of the September 11 attacks . Red Line service originally ran between the airport and downtown, turning around at the loop tracks on 11th Avenue. On September 1, 2003, it was extended west along existing tracks to Beaverton Transit Center to relieve overcrowding on the Blue Line and to create a one-seat airport connection for the west side. In 1999, Portland business leaders and residents who were opposed to

4692-529: The alignment followed. TriMet approved the project in September 1978. Construction of the 15.3-mile (24.6 km), 27-station line between 11th Avenue in downtown Portland and Cleveland Avenue in Gresham began in March 1982. Inaugural service commenced on September 5, 1986. Less than two months before opening, TriMet adopted the name "Metropolitan Area Express", or "MAX", following an employee contest. As

SECTION 50

#1732797280731

4784-430: The bridge's upper deck to construct a junction between the Eastside MAX tracks and the newer Portland Transit Mall tracks. Upon reopening, the two inner lanes became exclusive to MAX trains, while cars, buses, and other motorized traffic were restricted to the two outer lanes. TriMet designed and built the newer Tilikum Crossing to accommodate transit vehicles (MAX, streetcar, and buses), cyclists, and pedestrians only; with

4876-489: The cancelation of the Mount Hood Freeway . Construction began in 1982, and service commenced between downtown Portland and Gresham on September 5, 1986. The original 27-station, 15.1-mile (24 km) line has since been expanded to 94 stations and 59.7 miles (96.1 km) of track. The latest extension, from Portland to Milwaukie , opened in 2015. MAX is one of three urban rail transit services operating in

4968-470: The cancellation of the South–North Line urged TriMet to revive the project. TriMet responded with a new proposal that would expand MAX solely to North Portland via North Interstate Avenue. The agency moved forward with this plan and the Interstate MAX broke ground in February 2001. To minimize costs to taxpayers, the city created an urban renewal district and federal matching funds were allocated from

5060-525: The capacity to store 87 light rail cars. In 2016, around 200 employees worked at Ruby Junction and almost 200 MAX operators operated trains that were based there. In addition to vehicle maintenance, crews who maintain the MAX system's tracks and signals are also based at Ruby Junction. In 2015, some maintenance-of-way personnel moved into the Portland Vintage Trolley carbarn next to Rose Quarter Transit Center after Vintage Trolley service

5152-571: The city is attempting to reduce in order to promote higher density, create storefronts, and make downtown more vibrant. Some changes are being made slowly, such as the creation of the Smart Park garage system, and conversion of a surface-level parking lot into a park with underground parking at Park Block 5 between the Fox Tower and Park Avenue West Tower . In 2017, Human Access Project partnered with Portland Parks & Recreation to open

5244-501: The city's first officially recognized public swimming beach, Poet's Beach . In 2020 and 2021, during the COVID-19 pandemic , Downtown Portland faced an increase in homeless camps and a reduction in office workers due to remote work . During and after the Black Lives Matter protests, there was an increase in graffiti, property damage, and windows being boarded up. Portland is sometimes known as "Bridgetown", due to

5336-509: The company and local governments was negotiated and construction of the Airport MAX began in June 1999. With no federal assistance requested and right-of-way already secured, it was completed in just under two years. The four-station, 5.5-mile (8.9 km) line between Gateway/Northeast 99th Avenue Transit Center and Portland International Airport station opened on September 10, 2001. Celebrations scheduled for that weekend were canceled in

5428-487: The condition that they included potential route extensions to Clark County, Washington . Metro completed the studies in 1993, ultimately abandoning I-205 in favor of a route along the I-5 and Willamette River corridors. It finalized a single 25-mile (40 km) line from Hazel Dell, Washington south to Clackamas Town Center via Milwaukie, which Metro and TriMet formally named the South–North Line. Metro said it adopted

5520-546: The early 1970s, parts of Portland's central city had been in decay for some time. New suburban shopping malls in the neighboring cities of Beaverton , Tigard , and Gresham competed with downtown for people and money. Unlike many downtown revitalization efforts around the United States at this time, Portland's plan did not call for widespread demolition and reconstruction. Robert Moses , the designer of New York City 's gridded freeways, expressways, and bridges, designed

5612-586: The edge. Non-street-level platforms may be accessed with elevators . Most light rail cars, with the exception of Type 1, are low-floor and have ramps that extend onto platforms to allow mobility devices to board. High-floor Type 1 cars are paired with low-floor Type 2 or 3 cars to maintain accessibility. In each train, an audio system and LED signs announce the name of each upcoming station. All trains have spaces and priority seating areas reserved for seniors and people with disabilities, and service animals are permitted on board. In 2011, TriMet began upgrading

SECTION 60

#1732797280731

5704-427: The exception of emergency responders , private vehicles are prohibited. Tilikum Crossing is thus recognized as the first major "car-free" bridge in the United States. MAX is powered by a conventional 750-volt direct current (DC) overhead wire system. Most of the system uses a dual-wire catenary, with a contact wire supported by a messenger wire . In central city areas such as downtown Portland, however, it uses

5796-647: The frames in Quebec but its factory in Barre, Vermont , manufactured the majority of each car, the first of which arrived in Portland in 1984. Each 45-short-ton (41 t) car is single-articulated and contains six axles. The high floors connect with the low platforms through interior steps, which necessitated platform wheelchair lifts until the arrival of low-floor cars. A car sits 76 people and has an overall capacity of 166. In 1992, TriMet officials conducted an accessibility study and determined that low-floor cars were

5888-482: The height of local freeway revolts in the 1970s, studies for public transit began using funds made available by the Federal-Aid Highway Act of 1973 . These funds had been intended for the Mount Hood Freeway and Interstate 505 (I-505) projects, which were abandoned amid strong opposition from the Portland city government and neighborhood associations. In 1973, Governor Tom McCall assembled

5980-532: The last bidirectional single-track sections on the MAX system. The Red Line extension to Hillsboro began service on August 25, 2024 with a soft launch, with the full launch beginning on August 28. Fair Complex/Hillsboro Airport station was also renamed to Hillsboro Airport/Fairgrounds station . TriMet works with local jurisdictions and agencies to identify and recommend priority transit projects to include in Metro's Regional Transportation Plan (RTP). The 2018 RTP

6072-657: The lifts eventually became the cause of delays, and many users felt stigmatized by the lifts' "box" design and time-consuming operation. After the Americans with Disabilities Act (ADA) was signed into law, TriMet developed a paratransit plan in January 1992. Just before the start of the Westside MAX Project, MAX became the first light rail system in North America to procure low-floor vehicles after

6164-436: The most cost-effective alternative to providing universal access. MAX then became the first light rail system in North America to acquire low-floor train sets when TriMet procured 39 model SD660 cars from Siemens in 1993. These Type 2 cars were equipped with doorway wheelchair ramps. They entered service during the partial opening of the Westside MAX in 1997. By 2000, TriMet had ordered 17 more Type 2 cars including six for

6256-449: The most number of spaces in a corridor. Clackamas Town Center Transit Center on the I-205 MAX segment includes a 750-space parking garage, the largest capacity of any single MAX station. Southeast Holgate Boulevard station , also on the I-205 MAX, provides the fewest parking spaces with 125 stalls. In the 2019 report, passengers originating from TriMet park and rides accounted for five percent of TriMet's total weekday ridership. In 2017,

6348-452: The name "South/North" instead of the more conventional "North/South" word order, at the request of representatives in the southern part of the corridor after the southern leg, which had long been planned to be the next-priority MAX corridor after the Westside line, was merged with the northern leg as a single proposed project. In November 1994, 63% of Portland area voters passed a $ 475   million ballot measure to fund Oregon's portion of

6440-431: The north, other bordering neighborhoods are Southwest Hills , Homestead , Hillsdale , and South Burlingame to the west, and Hosford-Abernethy , Brooklyn , and Sellwood-Moreland across the river on the east. The neighborhood, formerly known as Corbett-Terwilliger-Lair Hill or CTLH , changed its name at a meeting of its neighborhood association on September 6, 2006, to be more concise and inclusive. South Portland

6532-499: The northbound segment of the transit mall. In 2001, Metro revisited its former light rail plans for Clackamas County and reconsidered proposals similar to those of the canceled South/North project, with two routes extending to Clackamas and Milwaukie. This resulted in a new study, which Metro referred to as the South Corridor transportation project, that evaluated light rail among other alternatives. The study's task force recommend both light rail options in 2003 and suggested splitting

6624-542: The number of bridges that cross its two rivers. There are nine bridges entering downtown and immediately adjacent areas. The bridges are (north to south): Outside the downtown area there are three other road bridges within Portland limits that cross the Willamette River : the St. Johns Bridge and Sauvie Island Bridge (to the north) and the Sellwood Bridge (to the south). Most streets in downtown Portland are one-way. Naito Parkway (two-way, formerly known as Front Avenue)

6716-483: The oldest sections of MAX to improve pedestrian safety and compliance with updated ADA standards. TriMet installed pipe barriers at Gateway Transit Center platform crossings to force pedestrians to slow down and face oncoming trains before crossing the tracks and realigned sidewalks and crosswalks at four at-grade crossings in Gresham. Other improvements made throughout the line include the installation of pedestrian warning signals and tactile paving upgrades. Based on

6808-520: The opening of the Portland–Gresham light rail line in 1986, and the opening of Pioneer Place mall in 1990 successfully drew or retained businesses and lured customers. After 1990, downtown Portland dominated the city's development, with 500,000 square feet (46,000 m ) more development there than on the east side ( Lloyd District , Central Eastside Industrial District, and Lower Albina ). Downtown Portland has many surface parking lots , which

6900-516: The operation of only one or two consists to prevent stopped trains from blocking intersections. Type 2 and 3 low-floor vehicles may run singularly or coupled to another Type 1, 2, or 3 vehicle. Type 1 high-floor vehicles are also capable of running singularly, but doing so would constrain accessibility due to a lack of wheelchair access. Thus, a high-floor car must be coupled with a low-floor car. Type 4 and 5 cars can only be coupled to one another. Twenty-six Type 1 high-floor vehicles were produced for

6992-527: The other running north–south on 5th and 6th avenues. On the latter two streets, an extensive transit mall —known as the Portland Mall —limits private vehicles and provides connections between more than fifty bus lines, MAX light rail, and the Portland Streetcar . The southern part of downtown and the West End are also served by the Portland Streetcar system, operating from South Waterfront north into

7084-668: The planning of a light rail line to the west side gained momentum in the mid-1980s, the original MAX line came to be referred to as the Eastside MAX to distinguish it from what would become the Westside MAX extension. Early proposals called for the extension to terminate just west of the Beaverton – Hillsboro boundary on 185th Avenue in Washington County . A dispute between TriMet and the Urban Mass Transportation Administration over

7176-456: The project into two phases. The first phase planned for the addition of light rail to I-205, between Gateway Transit Center and Clackamas Town Center. In October of that year, the first phase plans were amended to include adding light rail to the Portland Transit Mall following a petition from Portland business leaders. The combined project was approved for federal funding in 2006 and work began in January 2007. Light rail commenced service along

7268-490: The project without seeking contributions from either Clark County or the state, instead sourcing funds from Clackamas County and Portland. In 1998, TriMet placed a new ballot measure to reaffirm voter support for the $ 475   million originally approved in 1994. The measure failed by 52% in November of that year, effectively canceling the proposed line. Compelled by the rapid expansion of Portland International Airport in

7360-546: The project. The following February, however, Clark County residents defeated a tax measure that would have funded Washington's share. To move the project forward, TriMet downsized the plan and abandoned the line's Clark County and North Portland segments up to the Rose Quarter . That July, the Oregon House of Representatives approved a $ 750   million transportation package, which included $ 375 million for

7452-805: The river from the northern part of downtown, and the South Waterfront area, just south of downtown in the South Portland neighborhood. Portland's downtown features narrow streets—64 feet (20 m) wide—and square, compact blocks 200 feet (61 m) on a side, to create more corner lots that were expected to be more valuable. The small blocks also made downtown Portland pleasant to walk through. The 264-foot (80 m) long combined blocks divide one mile (1.6 km) of road into exactly 20 separate blocks. By comparison, Seattle 's blocks are 240 by 320 feet (73 m × 98 m), and Manhattan 's east–west streets are divided into blocks that are from 600–800 feet (183–244 m) long. By

7544-429: The same route into downtown Portland as the Blue and Red lines. It was realigned to the transit mall in 2009 when light rail service was introduced to that corridor. MAX operates on a mixture of shared and exclusive transit right-of-way. Within downtown Portland, trains run on surface streets. They operate in dedicated lanes restricted to personal vehicles, and operators abide by the city's traffic control system. On

7636-559: The same time TriMet was planning the Westside MAX in the mid-1980s, Metro regional government announced new light rail proposals for Clackamas County . Its planning committee—the Joint Policy Advisory Committee on Transportation (JPACT)—proposed two separate routes that would have run between downtown Portland and Oregon City via Milwaukie and between Portland International Airport and Clackamas Town Center via I-205 . Further planning led JPACT to favor

7728-548: The scaled-back line. The funding was annulled by the Oregon Supreme Court due to the inclusion of unrelated measures that violated the state's constitution. The legislature met again in February 1996 and passed a revised $ 375   million package, but light rail opponents forced a statewide vote and defeated it the following November. A third proposal between Lombard Street in North Portland and Clackamas Town Center followed. This time, Metro and TriMet pursued

7820-486: The section from 11th Avenue to Kings Hill/Southwest Salmon Street was opened in 1997 and the section to Hatfield Government Center —the segment's current western terminus—was opened in 1998. The resulting 33-mile (53 km) MAX line began operating as a single, through service on September 12, 1998. This service was renamed the Blue Line in 2001 after TriMet adopted color designations for its light rail routes. At

7912-586: The system's Type 1 vehicles. The order was expanded to 30 cars in June 2021. The first car was delivered in December 2022, and the type will be designated Type 6. TriMet's vehicle-maintenance complexes for the MAX system are the Ruby Junction facility in Gresham and the smaller Elmonica facility in Beaverton. The Ruby Junction facility is located near Ruby Junction/East 197th Avenue station while

8004-467: The tracks run within a street median, intersections are controlled by traffic signals that give trains preemption . Where tracks run on a separate right-of-way, trains are protected by automated grade crossing gates when traversing level crossings . Some segments of MAX are elevated to carry trains over busy thoroughfares and difficult terrain. A three-mile (4.8 km) section of tracks runs beneath Washington Park in Portland's West Hills through

8096-586: The two city blocks in downtown Portland occupied by the Pioneer Courthouse and Pioneer Courthouse Square ; they are the Pioneer Courthouse and Pioneer Place stations —served by the Green, Orange, and Yellow lines—and the Pioneer Square stations —served by the Blue and Red lines. MAX stations vary in size but are generally simple and austere. Platforms are about 200 feet (61 m) long as

8188-443: Was designated the Red Line. Every MAX line interlines with at least one other service, particularly as it approaches the system's central area. The Steel Bridge accommodates the most interline routes with four lines (Blue, Green, Red, and Yellow) utilizing the same tracks. TriMet has modified train routes over time, often as part of system expansions. For example, the Yellow Line, which began service in 2004, originally followed

8280-399: Was eventually inaugurated as Tilikum Crossing , to be "car-free" and to accommodate only transit vehicles, bicycles, and pedestrians. Construction of the line began in June 2011. In September 2012, opponents passed a ballot initiative—with 60% of the vote—requiring all Clackamas County spending on light rail to be approved by voters. Following the county's attempt to end its involvement and

8372-627: Was suspended to make way for construction, and shuttle buses operated between Gateway Transit Center and Portland International Airport. The project was completed in March 2024. From June 18 to October 21, 2023, TriMet suspended MAX service between Gateway Transit Center and the airport to allow for construction of the second track between the airport and Mount Hood Avenue. From January 14 to March 3, 2024, TriMet suspended MAX Red, Blue and Green Line service between NE 7th and Gateway Transit Center. Inbound Red Line trains from PDX began serving Gateway North on March 4, 2024. These projects eliminated

8464-656: Was the name of a 19th-century community that overlapped the present day neighborhood. The neighborhood is a collection of very different areas. Parts of the Lair Hill and Corbett areas are regulated to protect the historic significance of South Portland Historic District. Bounded roughly by SW Arthur, Front, Grover, Hood, and Curry Streets and SW Barbur Boulevard, it was listed on the National Register of Historic Places on July 31, 1998. Downtown, Portland, Oregon The downtown neighborhood extends west from

#730269