A passenger information system , or passenger information display system , is an automated system for supplying users of public transport with information about the nature and the state of a public transport service through visual, voice or other media. It is also known as a customer information system or an operational information system. Among the information provided by such systems, a distinction can be drawn between:

#637362

93-724: The Bombardier M5000 , is a model of light rail passenger vehicle. It is part of the Flexity Swift range of vehicles, built specifically as a high-floor , articulated bi-directional tram to operate solely on the Manchester Metrolink system in England. The Metrolink system is the only tram network in the United Kingdom capable of running vehicles in multiple and consequently the M5000s can operate as either

186-724: A "light rail" vehicle (it is a heavy rail vehicle), and is only included for comparison purposes. Low-floor LRVs have the advantage of a low-floor design, allowing them to load passengers directly from low-rise platforms that can be little more than raised curbs. High-floor light rail systems also exist, featuring larger stations. Historically, the track gauge has had considerable variations, with narrow gauge common in many early systems. However, most light rail systems are now standard gauge . Older standard-gauge vehicles could not negotiate sharp turns as easily as narrow-gauge ones, but modern light rail systems achieve tighter turning radii by using articulated cars . An important advantage of

279-529: A Lawo Lumintator Europa 'IBIS' (Integrated Board Information System). This is a relatively primitive system that works on wheel rotations, and relies on the driver inputting the relevant 'IBIS code' to display the correct destination. The M5000s operate all Metrolink services. They operate both singularly and as a double, denoted by dbl for a double on passenger information displays . Multiple M5000s are able to be coupled and operate as triple and quadruple units however this only happens in case of emergency such as

372-458: A bus, there will be even more capacity when there is a combination of cars and light rail. Table 3 shows an example of peak passenger capacity. The cost of light rail construction varies widely, largely depending on the amount of tunneling and elevated structures required. A survey of North American light rail projects shows that costs of most LRT systems range from $ 15 million to over $ 100 million per mile. Seattle's new light rail system

465-403: A chaotic breakdown inflow and a dramatic drop in speed (a traffic jam ) if they exceed about 2,000 vehicles per hour per lane (each car roughly two seconds behind another). Since most people who drive to work or on business trips do so alone, studies show that the average car occupancy on many roads carrying commuters is only about 1.5 people per car during the high-demand rush hour periods of

558-1142: A common right-of-way (however, Link converted to full separation in 2019). Some systems, such as the AirTrain JFK in New York City, the DLR in London, and Kelana Jaya Line in Kuala Lumpur , have dispensed with the need for an operator. The Vancouver SkyTrain was an early adopter of driverless vehicles, while the Toronto Scarborough rapid transit operated the same trains as Vancouver, but used drivers. In most discussions and comparisons, these specialized systems are generally not considered light rail but as light metro systems. Around Karlsruhe , Kassel , and Saarbrücken in Germany, dual-voltage light rail trains partly use mainline railroad tracks, sharing these tracks with heavy rail trains. In

651-416: A light rail train may have three to four cars of much larger capacity in one train under the control of one driver, or no driver at all in fully automated systems, increasing the labor costs of BRT systems compared to LRT systems. BRT systems are also usually less fuel-efficient as they use non-electrified vehicles. The peak passenger capacity per lane per hour depends on which types of vehicles are allowed on

744-435: A live rail. In outer areas, the trams switch to conventional overhead wires . The Bordeaux power system costs about three times as much as a conventional overhead wire system and took 24 months to achieve acceptable levels of reliability, requiring the replacement of all the main cables and power supplies. Operating and maintenance costs of the innovative power system still remain high. However, despite numerous service outages,

837-543: A longer distance. Light rail cars are often coupled into multiple units of two to four cars. Light rail systems may also exhibit attributes of heavy rail systems, including having downtown subways, as in San Francisco and Seattle . Light rail is designed to address a gap in interurban transportation between heavy rail and bus services, carrying high passenger numbers more quickly than local buses and more cheaply than heavy rail. It serves corridors in which heavy rail

930-642: A more diverse range of design characteristics than LRT, depending on the demand and constraints that exist, and BRT using dedicated lanes can have a theoretical capacity of over 30,000 passengers per hour per direction (for example, the Guangzhou Bus Rapid Transit system operates up to 350 buses per hour per direction). For the effective operation of a bus or BRT system, buses must have priority at traffic lights and have their dedicated lanes, especially as bus frequencies exceed 30 buses per hour per direction. The higher theoretical of BRT relates to

1023-407: A result, has many of the operating characteristics of a metro system rather than a light rail system. A capacity of 1,350 passengers per train is more similar to the heavy rail than light rail. Bus rapid transit (BRT) is an alternative to LRT and many planning studies undertake a comparison of each mode when considering appropriate investments in transit corridor development. BRT systems can exhibit

SECTION 10

#1732798581638

1116-471: A single row. In 2011, a federal funding was granted to equip 4500 additional stations with DSA signage, making for most of the 6500 DSAs by 2015. The federal grant came along with a Federal Railway Authority ( German : Eisenbahn-Bundesamt (EBA)) order in 2010 to have all stations connected to the travel information system to announce delays with electronic signage or loudspeakers. The Deutsche Bahn operator tried to block that order legally for stations with

1209-634: A single vehicle or coupled together to form a "double" unit. A total of 147 trams were ordered between 2007 and 2018, with the first M5000 entering service on 16 December 2009. Following the withdrawal of the last T-68 and T-68A trams in May 2014, the M5000s have operated all Metrolink services. In April 2007, eight Bombardier Flexity Swift trams were ordered by the Greater Manchester Passenger Transport Executive for Metrolink; these were intended to supplement

1302-401: A standard four persons per square metre there is space for 146 standing passengers , giving each vehicle a total peak capacity of 206 passengers. The M5000 can be operated as a single vehicle or as a double, the latter providing capacity for over 400 passengers at any one time. The trams are equipped with a passenger information system to deliver timely and relevant travelling information using

1395-534: A top speed of 55–71.5 miles per hour (88.51–115.1 km/h) depending on the system, while the trains on the all-underground Montreal Metro can only reach a top speed of 72 kilometres per hour (44.74 mph). LACMTA light rail vehicles have higher top and average speeds than Montreal Metro or New York City Subway trains. Many light rail systems—even fairly old ones—have a combination of both on- and off-road sections. In some countries (especially in Europe), only

1488-484: A tram unit breaking down. The first 60 units (3001–60) were either delivered with, or retrofitted from withdrawn T68s, automatic tram stop (ATS) and vehicle recognition system (VRS) equipment and can be used anywhere on the Metrolink network. Units 3061-3147 have never been fitted with this equipment and cannot be used in-between Timperley and Altrincham where the line is operated by Network Rail. During disruption,

1581-481: A tramway, a light metro, and, in a narrow sense, rapid transit. This is especially common in the United States, where there is not a popularly perceived distinction between these different types of urban rail systems. The development of technology for low-floor and catenary-free trams facilitates the construction of such mixed systems with only short and shallow underground sections below critical intersections as

1674-503: A very low frequency but lost all lawsuits in 2015. It was given 18 months to equip the remaining stations with DSAs. The DSA system has a GSM radio module to receive a text message to be displayed in a horizontally-moving news ticker style. A loudspeaker may optionally be mounted on top. When there is no delay, the current time is shown statically on its 96×8 LED dot-matrix display. National Rail stations are equipped with visual platform displays and audio announcements, which indicate

1767-460: Is 28.4 m (93 ft) long and has three bogies , the outer two of which are powered, while the unpowered central bogie supports the articulation gangway. Numbers 3001 to 3074 have 52 standard seats with a further eight "perch" seats, while numbers 3075 upwards have 60 standard seats and six perch seats. On numbers 3001 to 3074, there are two wheelchair spaces, one in each half of the tram; which increased to four spaces for numbers 3075 upwards. At

1860-470: Is a generic international English phrase for types of rail systems using modern streetcars/trams, which means more or less the same thing throughout the English-speaking world . Light rail systems can range from trams runnig in streets along with other traffic, to semi-metro systems having portions of grade separated track. People movers are even "lighter", in terms of capacity. Monorail

1953-500: Is a political goal. Real-time information is provided to passengers in a number of different ways, including mobile phone applications , platform-level signage, and automated public address systems . It may include both predictions about arrival and departure times, as well as information on the nature and the cause of disruptions. There are four principal considerations for the provision of passenger information (static or real time): Current operational information on service running

SECTION 20

#1732798581638

2046-575: Is a separate technology that has been more successful in specialized services than in a commuter transit role. The use of the generic term light rail avoids some serious incompatibilities between British and American English . The word tram , for instance, is generally used in the UK and many former British colonies to refer to what is known in North America as a streetcar , but in North America tram can instead refer to an aerial tramway , or, in

2139-602: Is a significant amount of overlap between the technologies; similar rolling stock may be used for either, and it is common to classify streetcars or trams as a subcategory of light rail rather than as a distinct type of transportation. However, some distinctions can be made, though systems may combine elements of both. Low-floor light rail lines tend to follow a reserved right-of-way and with trains receiving priority at intersections, and tend not to operate in mixed traffic, enabling higher operating speeds. Light rail lines tend to have less frequent stops than tramways, and operate over

2232-423: Is an advance on schedule-only information, which recognises the fact that public transport services do not always operate exactly according to the published timetable. By providing real-time information to travellers, they are better able to conduct their journey confidently, including taking any necessary steps in the event of delays. That helps to encourage greater use of public transport, which for many countries

2325-563: Is by far the most expensive in the US, at $ 179 million per mile, since it includes extensive tunneling in poor soil conditions, elevated sections, and stations as deep as 180 feet (55 m) below ground level. This results in costs more typical of subways or rapid transit systems than light rail. At the other end of the scale, four systems (Baltimore, Maryland; Camden, New Jersey; Sacramento, California; and Salt Lake City, Utah) incurred construction costs of less than $ 20 million per mile. Over

2418-601: Is collected from automatic vehicle location (AVL) systems and from control systems, including incident capture systems . The information can be compared algorithmically with the published service timetable to generate a prediction of how services will run in the next few minutes to hours. That may be informed by additional information. For instance, bus services are affected by congestion on the road network, and all services may be affected by adverse weather conditions. The capital and revenue costs for traveller information systems can be calculated with reasonable accuracy. However,

2511-426: Is especially important for wheelchair access, as narrower gauges (e.g. metre gauge) can make it challenging or impossible to pass the tram's wheels. Furthermore, standard-gauge rolling stock can be switched between networks either temporarily or permanently, and both newly built and used standard-gauge rolling stock tends to be cheaper to buy, as more companies offer such vehicles. Overhead lines supply electricity to

2604-502: Is expensive. Similarly, the most expensive US highway expansion project was the " Big Dig " in Boston, Massachusetts, which cost $ 200 million per lane mile for a total cost of $ 14.6 billion. A light rail track can carry up to 20,000 people per hour as compared with 2,000–2,200 vehicles per hour for one freeway lane. For example, in Boston and San Francisco, light rail lines carry 9,600 and 13,100 passengers per hour, respectively, in

2697-403: Is for each individual person and perhaps each individual piece of roadside hardware. Even less is known about the long-term effects of access to these types of services. The only long-term study is from 2012. Information may be delivered via any electronic media, including: Additional considerations include: The information provided by a passenger information system depends on its location and

2790-575: Is hard to distinguish between what is called light rail, and other forms of urban and commuter rail. A system described as a light rail in one city may be considered to be a streetcar or tram system in another. Conversely, some lines that are called "light rail" are very similar to rapid transit ; in recent years, new terms such as light metro have been used to describe these medium-capacity systems. Some "light rail" systems, such as Sprinter , bear little similarity to urban rail, and could alternatively be classified as commuter rail or even inter-city rail. In

2883-559: Is impractical. Light metro systems are essentially hybrids of light rail and rapid transit. Metro trains are larger and faster than light rail trains, with stops being further apart. Many systems have mixed characteristics. Indeed, with proper engineering, a rail line could run along a street, then go underground, and then run along an elevated viaduct. For example, the Los Angeles Metro Rail 's A Line "light rail" has sections that could alternatively be described as

Bombardier M5000 - Misplaced Pages Continue

2976-557: Is installed on all stations on line 14. The displays show the time needed for a train (and the subsequent train after it) to reach a particular station. On the bus network in Paris, monochrome LCDs have been used since 1996 to indicate the time needed for a bus on a bus route to arrive at a bus stop , after a two-year trial period on a few bus routes. Deutsche Bahn AG offers a Travel Information System ( German : Reiseinformationssystem (RIS)). It shows current train times compared to

3069-480: Is now completely line of sight . Like their predecessors the T-68s, the M5000s are fitted with two warning devices in the form of a street whistle and segregated horn. Unlike the T-68s however, these are electronic rather than the air-chime whistle and airhorn fitted to the T-68s. Both utilise a loudspeaker underneath the cab floor facing forwards, and are operated by foot pedals in the cab. The frequent 'toot' sounds of

3162-484: Is one of the highest capacity ones, having been upgraded in a series of expansions to handle 40,000 passengers per hour per direction, and having carried as many as 582,989 passengers in a single day on its Line 1 . It achieves this volume by running four-car trains with a capacity of up to 1,350 passengers each at a frequency of up to 30 trains per hour. However, the Manila light rail system has full grade separation and as

3255-407: Is similar to that of a traditional tram, while operating at a higher capacity and speed, often on an exclusive right-of-way. In broader use, it includes tram-like operations mostly on streets. A few light rail networks have characteristics closer to rapid transit or even commuter rail , yet only when these systems are fully grade-separated are they referred to as light metros . The term light rail

3348-542: The Cádiz TramBahia , where trams share track with commuter and long-distance trains from the main terminus in the city and curve off to serve cities without a railway connection. Some of the issues involved in such schemes are: There is a history of what would now be considered light rail vehicles operating on heavy rail rapid transit tracks in the US, especially in the case of interurban streetcars . Notable examples are Lehigh Valley Transit trains running on

3441-758: The London Underground and the New York City Subway . Conventional rail technologies including high-speed , freight, commuter , and rapid transit urban transit systems are considered "heavy rail". The main difference between light rail and heavy rail rapid transit is the ability for a light rail vehicle to operate in mixed traffic if the routing requires it. The world's first electric tram operated in Sestroretsk near Saint Petersburg , Russia , invented and operated on an experimental basis by Fyodor Pirotsky in 1880. The first tramway

3534-637: The Netherlands , this concept was first applied on the RijnGouweLijn . This allows commuters to ride directly into the city center, rather than taking a mainline train only as far as a central station and then having to change to a tram. In France, similar tram-trains are planned for Paris, Mulhouse , and Strasbourg ; further projects exist. In some cases, tram trains use previously abandoned or lightly used heavy rail lines in addition to or instead of still in use mainline tracks. In 2022, Spain opened

3627-874: The O-Train Trillium Line in Ottawa, Ontario , Canada, the River Line in New Jersey , United States, and the Sprinter in California , United States, which use diesel multiple unit (DMU) cars. Light rail is different from the British English term light railway , long-used to distinguish railway operations carried out under a less rigorous set of regulations using lighter equipment at lower speeds from mainline railways. Light rail

3720-703: The Philadelphia and Western Railroad high-speed third rail line (now the Norristown High-Speed Line ). Such arrangements are almost impossible now, due to the Federal Railroad Administration refusing (for crash safety reasons) to allow non-FRA compliant railcars (i.e., subway and light rail vehicles) to run on the same tracks at the same times as compliant railcars, which includes locomotives and standard railroad passenger and freight equipment. Notable exceptions in

3813-647: The RER , the Paris Métro and on 250 bus routes on the RATP bus system . On the RER, two types of indicators are used. The first-generation model indicates only the termini of trains stopping at a station through the use of square lights beside the words bearing the name of a terminus. The second-generation model includes an LED display above the square lights indicating the terminus and train service. The displays are used only on

Bombardier M5000 - Misplaced Pages Continue

3906-479: The RER line A , RER line B and at Gare de Châtelet – Les Halles station on RER line D . They can be inaccurate at times because of the lack of communication between SNCF and RATP , the two operators of the RER. On the Paris Métro, there are two types of information display systems. The LED numerical display installed in all Métro lines (except line 14 ) has been in use since 1997. The television display

3999-530: The medians of roads . If run in streets , trains are usually limited by city block lengths to about four 180-passenger vehicles (720 passengers). Operating on two-minute headways using traffic signal progression, a well-designed two-track system can handle up to 30 trains per hour per track, achieving peak rates of over 20,000 passengers per hour in each direction. More advanced systems with separate rights-of-way using moving block signaling can exceed 25,000 passengers per hour per track. Most light rail systems in

4092-624: The 1970s was proven to have been a technical failure by the following decade. After World War II, the Germans retained many of their streetcar networks and evolved them into model light rail systems ( Stadtbahnen ). With the exception of Hamburg , all large and most medium-sized German cities maintain light rail networks. The concept of a "limited tramway" was proposed by American transport planner H. Dean Quinby in 1962. Quinby distinguished this new concept in rail transportation from historic streetcar or tram systems as: The term light rail transit

4185-495: The French city of Bordeaux , the tramway network is powered by a third rail in the city center, where the tracks are not always segregated from pedestrians and cars. The third rail (actually two closely spaced rails) is placed in the middle of the track and divided into eight-metre sections, each of which is powered only while it is completely covered by a tram. This minimizes the risk of a person or animal coming into contact with

4278-662: The US are the NJ Transit River Line from Camden to Trenton and Austin's Capital MetroRail , which have received exemptions to the provision that light rail operations occur only during daytime hours and Conrail freight service only at night, with several hours separating one operation from the other. The O-Train Trillium Line in Ottawa also has freight service at certain hours. With its mix of right-of-way types and train control technologies, LRT offers

4371-455: The US as a whole, excluding Seattle, new light rail construction costs average about $ 35 million per mile. By comparison, a freeway lane expansion typically costs $ 1.0 million to $ 8.5 million per lane mile for two directions, with an average of $ 2.3 million. However, freeways are frequently built in suburbs or rural areas, whereas light rail tends to be concentrated in urban areas, where right of way and property acquisition

4464-595: The United States and in North America . In Britain, modern light rail systems began to appear in the 1980s, starting with the Tyne and Wear Metro from 1980 and followed by the Docklands Light Railway (DLR) in London in 1987, continuing into the 1990s including the establishment of the Manchester Metrolink in 1992 and the Sheffield Supertram from 1994. Due to varying definitions, it

4557-590: The United States are limited by demand rather than capacity (by and large, most American LRT systems carry fewer than 4,000 persons per hour per direction), but Boston's and San Francisco's light rail lines carry 9,600 and 13,100 passengers per hour per track during rush hour. Elsewhere in North America, the Calgary C-Train and Monterrey Metro have higher light rail ridership than Boston or San Francisco. Systems outside North America often have much higher passenger volumes. The Manila Light Rail Transit System

4650-533: The United States as an English equivalent for the German word Stadtbahn , meaning "city railway". Different definitions exist in some countries, but in the United States, light rail operates primarily along exclusive rights-of-way and uses either individual tramcars or multiple units coupled together, with a lower capacity and speed than a long heavy rail passenger train or rapid transit system. Narrowly defined, light rail transit uses rolling stock that

4743-472: The United States, "light rail" has become a catch-all term to describe a wide variety of passenger rail systems. Light rail corridors may constitute a fully segregated corridor, a dedicated right-of-way on a street, an on-street corridor shared with other traffic, a corridor shared with other public transport, or a corridor shared with pedestrians. The most difficult distinction to draw is that between low-floor light rail and streetcar or tram systems. There

SECTION 50

#1732798581638

4836-415: The ability of buses to travel closer to each other than rail vehicles and their ability to overtake each other at designated locations allowing express services to bypass those that have stopped at stations. However, to achieve capacities this high, BRT station footprints need to be significantly larger than a typical LRT station. In terms of cost of operation, each bus vehicle requires a single driver, whereas

4929-482: The bus timetables to the Traveline information service, which covers all public transport modes, and from there to other information services such as Google Transit . The deployment of real-time bus information systems is a gradual process and currently extends to around half of the national fleet and a high proportion of town-centre stops but relatively few suburban and rural locations. The first use of such systems

5022-866: The case of the Disney amusement parks , even a land train . (The usual British term for an aerial tramway is cable car , which in the US usually refers to a ground-level car pulled along by subterranean cables .) The word trolley is often used as a synonym for streetcar in the United States but is usually taken to mean a cart, particularly a shopping cart, in the UK and elsewhere. Many North American transportation planners reserve streetcar for traditional vehicles that operate exclusively in mixed traffic on city streets, while they use light rail to refer to more modern vehicles operating mostly in exclusive rights of way, since they may operate both side-by-side targeted at different passenger groups. The difference between British English and American English terminology arose in

5115-421: The closure of Glasgow Corporation Tramways (one of the largest in Europe) in 1962. Although some traditional trolley or tram systems continued to exist in San Francisco and elsewhere, the term "light rail" has come to mean a different type of rail system as modern light rail technology has primarily post-WWII West German origins. An attempt by Boeing Vertol to introduce a new American light rail vehicle in

5208-415: The day. This combination of factors limits roads carrying only automobile commuters to a maximum observed capacity of about 3,000 passengers per hour per lane. The problem can be mitigated by introducing high-occupancy vehicle ( HOV ) lanes and ride-sharing programs, but in most cases, policymakers have chosen to add more lanes to the roads, despite a small risk that in unfavorable situations an extension of

5301-421: The derivation of tangible financial benefits is far more difficult to establish and as so there is very little research. That directs the business model for information systems towards the "softer" merits such as traveller confidence. There must be an actual value, as individuals are willing to pay for systems that give them access to real-time data relating to their journey. The difficulty is establishing what that

5394-755: The direct translation, which is city rail (the Norwegian term, by bane , means the same). However, UMTA finally adopted the term light rail instead. Light in this context is used in the sense of "intended for light loads and fast movement", rather than referring to physical weight. The infrastructure investment is also usually lighter than would be found for a heavy rail system. The American Public Transportation Association (APTA), in its Glossary of Transit Terminology, defines light rail as: ...a mode of transit service (also called streetcar, tramway, or trolley) operating passenger rail cars singly (or in short, usually two-car or three-car, trains) on fixed rails in

5487-489: The entire 32 strong T-68/T-68A fleet with M5000s than to overhaul them, and so 32 more M5000s were ordered in two batches of 12 and then 20 (Nos. 3063-3094) in order to replace them. In 2013, ten more trams were ordered in anticipation of the Trafford Park Line before the production line closed. In September 2014, TfGM ordered a further 16, bringing the total number of units ordered to 120. The last of this order

5580-797: The existing T-68/T-68A fleet and increase capacity on the Bury - Altrincham line, which was suffering from overcrowding. Based on the K5000 design used in the German cities of Cologne and Bonn , these were designated the M5000. On 13 July 2009, the first M5000 (numbered 3001) was delivered to Manchester. The M5000s were built by Bombardier Transportation factories in Bautzen , Germany and tested at their facility in Vienna , Austria, with all electrical equipment supplied by Vossloh Kiepe of Werdohl , Germany. Unlike

5673-458: The late 19th century when Americans adopted the term "street railway", rather than "tramway", with the vehicles being called "streetcars" rather than "trams". Some have suggested that the Americans' preference for the term "street railway" at that time was influenced by German emigrants to the United States (who were more numerous than British immigrants in the industrialized Northeast), as it is

SECTION 60

#1732798581638

5766-524: The latter is described as light rail. In those places, trams running on mixed rights-of-way are not regarded as a light rail but considered distinctly as streetcars or trams. However, the requirement for saying that a rail line is "separated" can be quite low—sometimes just with concrete "buttons" to discourage automobile drivers from getting onto the tracks. Some systems such as Seattle's Link had on-road mixed sections but were closed to regular road traffic, with light rail vehicles and buses both operating along

5859-462: The light rail concept was the "Shaker Heights Rapid Transit" which started in the 1920s, was renovated in 1980-81 and is now part of RTA Rapid Transit . Many original tram and streetcar systems in the United Kingdom , United States , and elsewhere were decommissioned starting in the 1950s as subsidies for the car increased. Britain abandoned its tram systems, except for Blackpool , with

5952-573: The next service or services from the platform and warn passengers to stand clear of trains that are not scheduled to stop, not in use or are about to depart. Additionally, concourses and ticket offices have large screen displays that show all of the services available at the station for the next hour or more and, at major stations, the full route of the service and any restrictions applicable (e.g. ticket types, catering services, bicycle carriage). Many smaller and less well-used railway stations have, instead of such systems, "passenger help points", which connect

6045-518: The non ATS/VRS vehicles can occasionally be found terminating at Timperley but this is infrequent. Some of the 3001-60 batch have since had the ATS/VRS removed when the equipment has failed, with the reduction of ATS signalling across the network there is no need for a full 60 vehicles to be fitted. As of January 2022 the VRS has been completely withdrawn from all units, as the last section of line that had it

6138-465: The old and new systems. Since the 1980s, Portland, Oregon , has built all three types of system: a high-capacity light rail system in dedicated lanes and rights-of-way, a low-capacity streetcar system integrated with street traffic, and an aerial tram system . The opposite phrase heavy rail , used for higher-capacity, higher-speed systems, also avoids some incompatibilities in terminology between British and American English, for instance in comparing

6231-494: The peak direction during rush hour. Passenger information system Static information has traditionally been made available in printed form though route network maps and timetable booklets at transit stations. However, most transit operators now also use integrated passenger information systems that provide either schedule-based information through a journey planner application or schedule-based information in combination with real-time information. Real-time information

6324-571: The previous T-68/T-68A trams, the M5000s lacked retractable steps, as a result the low-height platforms on several of the stops in central Manchester were either raised or removed to create an entirely high-floor network. A further four were ordered in November 2007 (Nos. 3009-3012) to allow for a 12-minute service between Cornbrook and the new MediaCityUK extension in Salford Quays . Another 28 were then ordered (Nos. 3013-3040) to complete

6417-673: The public on major mobile device software platforms ( iPhone / iPad , Android , Windows Phone , Palm ). The system also began providing real-time train information by phone in 2010. The New York City Subway began installing its public address/customer information screens, commonly known as " countdown clocks", in its stations in 2007. In 2012, the system began offering SubTime, a website and iPhone app for real-time train arrival estimates for several of its subway services. The arrival data are shared with outside software developers to support creation of additional apps. There are also PIDS installed on some MTA Regional Bus Operations routes over

6510-454: The published timetable, as well as known delays and expected arrival and departure times of the trains . The information is made available to the train conductor (via SMS ) as well as to the passenger via loudspeaker in the train station or schedule boards on the internet. The corresponding VRR and VRS information systems also process RIS data. The data can also be queried in real-time via mobile devices like mobile phones . The RIS

6603-556: The required clearance height can be reduced significantly compared to conventional light rail vehicles. Reference speed from major light rail systems, including station stop time, is shown below. However, low top speed is not always a differentiating characteristic between light rail and other systems. For example, the Siemens S70 LRVs used in the Houston METRORail and other North American LRT systems have

6696-432: The right-of-way that is often separated from other traffic for part or much of the way. Light rail vehicles are typically driven electrically with power being drawn from an overhead electric line via a trolley [pole] or a pantograph ; driven by an operator onboard the vehicle; and may have either high platform loading or low-level boarding using steps." However, some diesel-powered transit is designated light rail, such as

6789-415: The road network might lead to increased travel times ( Downs–Thomson paradox , Braess's paradox ). By contrast, light rail vehicles can travel in multi-car trains carrying a theoretical ridership up to 20,000 passengers per hour in much narrower rights-of-way , not much more than two car lanes wide for a double track system. They can often be run through existing city streets and parks , or placed in

6882-401: The roads. Typically roadways have 1,900 passenger cars per lane per hour (pcplph). If only cars are allowed, the capacity will be less and will not increase when the traffic volume increases. When there is a bus driving on this route, the capacity of the lane will be higher and will increase when the traffic level increases. And because the capacity of a light rail system is higher than that of

6975-618: The same as the German term for the mode, Straßenbahn (meaning "street railway"). A further difference arose because, while Britain abandoned all of its trams after World War II except in Blackpool , eight major North American cities ( Toronto , Boston , Philadelphia , San Francisco , Pittsburgh , Newark , Cleveland , and New Orleans ) continued to operate large streetcar systems. When these cities upgraded to new technology, they called it light rail to differentiate it from their existing streetcars since some continued to operate both

7068-408: The standard gauge is that standard railway maintenance equipment can be used on it, rather than custom-built machinery. Using standard gauges also allows light rail vehicles to be conveniently moved around using the same tracks as freight railways. Additionally, wider gauges (e.g. standard gauge) provide more floor clearance on low-floor trams that have constricted pedestrian areas at the wheels, which

7161-478: The street whistle are a recognisable symbol of the Metrolink network and common background noise in Manchester City Centre. Light rail Light rail (or light rail transit , abbreviated to LRT ) is a form of passenger urban rail transit that uses rolling stock derived from tram technology while also having some features from heavy rapid transit . The term was coined in 1972 in

7254-551: The system was a success with the public, gaining up to 190,000 passengers per day. Automatic train operation is employed on light rail networks, tracking the position and speed of a train and hence adjusting its movement for safety and efficiency. One line of light rail (requires 7.6 m, 25' right of way) has a theoretical capacity of up to 8 times more than one 3.7 m (12 foot) lane on a freeway, excluding busses, during peak times. Roads have ultimate capacity limits that can be determined by traffic engineering , and usually experience

7347-637: The technical scope (e.g. the size of the display screen) At a station or stop, it is normal to provide up-to-date predictions of: On a vehicle, it is normal to provide up to date predictions of: Personalised channels (web, mobile device, or kiosk) is normally set up to mimic the view from a station or stop, but they may in addition be linked to journey planners . Using such systems, a passenger may (re)plan their journey to take into account current circumstances (such as cancelled services or excessive delays). In Paris , France, SIEL indicator systems (abbreviated from Système d’information en ligne) are installed in

7440-521: The tram order for the Phase 3A expansion of the network. After funding had been secured for the Phase 3B expansion of the network, another 22 M5000s were ordered (Nos. 3041-3062). Meanwhile, the M5000 trams were proving to be considerably more reliable than the older T-68/T-68A fleet, which were found to be in need of expensive overhauls to keep them in service. In 2011, Transport for Greater Manchester (TfGM) decided it would be more cost effective to replace

7533-503: The trams, making it safe on city streets. Several systems in Europe and a few recently opened systems in North America use diesel -powered trains. When electric streetcars were introduced in the late 19th century, conduit current collection was one of the first ways of supplying power, but it proved to be much more expensive, complicated, and trouble-prone than overhead wires . When electric street railways became ubiquitous, conduit power

7626-618: The user by telephone to a control room by pressing an "Information" button. The information is available online at the National Rail website and on mobile devices. Most London Underground stations have "countdown" displays on each platform. They are simpler than the national rail displays since most platforms serves only a single line, and there are few or no variations in carriage restrictions and destinations served. Audio announcements are also made regularly. Local authorities and some transport operators provide electronic versions of

7719-460: The vast majority of light rail systems. This avoids the danger potentially presented by an electrified third rail . The Docklands Light Railway uses an inverted third rail for its electrical power, which allows the electrified rail to be covered and the power drawn from the underside. Trams in Bordeaux , France, use a special third-rail configuration where the power is only switched on beneath

7812-434: The widest range of latitude of any rail system in the design, engineering, and operating practices. The challenge in designing light rail systems is to realize the potential of LRT to provide fast, comfortable service while avoiding the tendency to overdesign that results in excessive capital costs beyond what is necessary to meet the public's needs. The BART railcar in the following chart is not generally considered to be

7905-578: The years, but mostly, the MTA offers real-time bus tracking through another website/app called MTA Bus Time . The Boston MBTA Red, Orange, and Blue Lines introduced countdown clocks in early 2014, and the Green Line introduced them the following year. The eastern end of the Green Line introduced clocks in early 2016. They reflect how many "stops away" the train is, rather than how many minutes it will take to arrive. Amtrak has deployed PIDS throughout

7998-893: Was brought to riders in the US by NextBus corporation, a small start-up, in 1999. The first systems were installed in Emeryville, California , and later in San Francisco, California . As of 2012 , both initial systems are still in operation. The Washington Metro installed a passenger information display system (PIDS) in all of its stations in 2000. The system provides real-time information on next train arrivals, delayed trains, emergency announcements, and related information. Metro also provides current train and related information to customers with conventional web browsers , as well as users of smartphones and other mobile devices. In 2010, Metro began sharing its PIDS data with outside software developers for use in creating additional real-time applications for mobile devices. Free apps are available to

8091-543: Was coined in 1972 by the U.S. Urban Mass Transportation Administration (UMTA; the precursor to the Federal Transit Administration ) to describe new streetcar transformations that were taking place in Europe and the United States. In Germany, the term Stadtbahn (to be distinguished from S-Bahn , which stands for Stadtschnellbahn ) was used to describe the concept, and many in UMTA wanted to adopt

8184-515: Was delivered in October 2016. In July 2018, a further 27 trams were ordered to help relieve overcrowding at a cost of £72m. The first of these was delivered on 14 November 2020. Alstom purchased Bombardier Transportation in January 2021, taking over production of the M5000. The final tram (numbered 3147) was delivered on 24 September 2022, taking the fleet to a total of 147 trams. Each vehicle

8277-581: Was in Brighton and Hove . The Traveline NextBuses information service provides the next departures from any bus stop in the UK, and some trams as well. The information has the real-time feed that has been connected in; otherwise, the scheduled times are given. The government-sponsored Transport Direct project provided journey planning across all transport modes (including private car) and was increasingly linked to real-time information systems prior to its discontinuation in 2014. Real-time passenger information

8370-677: Was introduced in North America in 1972 to describe this new concept of rail transportation. Prior to that time the abbreviation "LRT" was used for " Light Rapid Transit " and " Light Rail Rapid Transit ". The first of the new light rail systems in North America began operation in 1978 when the Canadian city of Edmonton, Alberta , adopted the German Siemens-Duewag U2 system, followed three years later by Calgary, Alberta , and San Diego, California . The concept proved popular, with there now being numerous light rail systems in

8463-615: Was started in 2003, and by 2007, it was planned to have 30,000 trains equipped with the necessary train describer (electronic train number). In an accompanying program the older split-flap displays were replaced by electronic dot-matrix signage. Large stations have platform displays with multiple rows, but the Deutsche Bahn network operator developed the Dynamic Font Indicator ( German : Dynamischer Schriftanzeiger (DSA)) standard system for smaller stations with

8556-632: Was the Gross-Lichterfelde tramway in Lichterfelde near Berlin in Germany, which opened in 1881. It was built by Werner von Siemens who contacted Pirotsky. It initially drew current from the rails, with overhead wire being installed in 1883. The first interurban to emerge in the United States was the Newark and Granville Street Railway in Ohio, which opened in 1889. An early example of

8649-527: Was used in those cities that did not permit overhead wires. In Europe, it was used in London, Paris, Berlin, Marseille, Budapest, and Prague. In the United States, it was used in parts of New York City and Washington, D.C. Third rail technology was investigated for use on the Gold Coast of Australia for the G:link light rail, though power from overhead lines was ultimately utilized for that system. In