Misplaced Pages

Mount Lowe Railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

#132867

106-594: The Mount Lowe Railway was the third in a series of scenic mountain railroads in the United States created as a tourist attraction on Echo Mountain and Mount Lowe , north of Los Angeles, California . The railway, originally incorporated by Thaddeus S. C. Lowe as the Pasadena and Mt. Wilson Railroad Co., existed from 1893 until its official abandonment in 1938, and was the only scenic mountain, electric traction ( overhead electric trolley ) railroad ever built in

212-416: A 3 ft 6 in ( 1,067 mm ) narrow gauge , three-railed inclined plane railway , the "Great Incline," and ascend Echo Mountain (elevation 3,250 feet [990 m]). The Incline powering mechanism was designed by San Francisco cable car inventor Andrew Smith Hallidie . It had grades as steep as 62% and as slight as 48%, and gained 1,900 feet (580 m) in elevation. The Great Incline

318-508: A slipformed (or pre-cast) concrete base (development 2000s). The 'embedded rail structure', used in the Netherlands since 1976, initially used a conventional UIC 54 rail embedded in concrete, and later developed (late 1990s) to use a 'mushroom' shaped SA42 rail profile; a version for light rail using a rail supported in an asphalt concrete –filled steel trough has also been developed (2002). Modern ladder track can be considered

424-599: A train track or permanent way (often " perway " in Australia or " P Way " in Britain and India), is the structure on a railway or railroad consisting of the rails , fasteners , railroad ties (sleepers, British English) and ballast (or slab track ), plus the underlying subgrade . It enables trains to move by providing a dependable surface for their wheels to roll upon. Early tracks were constructed with wooden or cast iron rails, and wooden or stone sleepers; since

530-440: A "clickety-clack" sound. Unless it is well-maintained, jointed track does not have the ride quality of welded rail and is less desirable for high speed trains . However, jointed track is still used in many countries on lower speed lines and sidings , and is used extensively in poorer countries due to the lower construction cost and the simpler equipment required for its installation and maintenance. A major problem of jointed track

636-476: A 62% grade. The trestle was named, as was customary in railroad constructions, for the chief engineer, David Macpherson, thus, the Macpherson Trestle. The Great Incline cable mechanism was engineered by Andrew Smith Hallidie of San Francisco cable car fame. It climbed 2,200 feet (670 m) with approximately 6,000 feet (1,800 m) of cable spliced into a complete loop which raised and lowered

742-415: A continuous reinforced concrete slab and the use of pre-cast pre-stressed concrete units laid on a base layer. Many permutations of design have been put forward. However, ballastless track has a high initial cost, and in the case of existing railroads the upgrade to such requires closure of the route for a long period. Its whole-life cost can be lower because of the reduction in maintenance. Ballastless track

848-402: A day to travel up and down. Several proposals were floated to establish some sort of mechanical transportation to the summits, but they all lacked funding. David J. Macpherson (b. 1854, Ontario, Canada), a civil engineer from Cornell University and a newcomer to Pasadena (1885), proposed a steam driven cog wheel train to reach the crest via Mount Wilson. It wasn't until he was introduced to

954-481: A development of baulk road. Ladder track utilizes sleepers aligned along the same direction as the rails with rung-like gauge restraining cross members. Both ballasted and ballastless types exist. Modern track typically uses hot-rolled steel with a profile of an asymmetrical rounded I-beam . Unlike some other uses of iron and steel , railway rails are subject to very high stresses and have to be made of very high-quality steel alloy. It took many decades to improve

1060-402: A few rare photos and was described as a dance hall, not a gambling facility. Most historians believe that the casino was built only a few months before the fire of 1905. The blaze began when a forceful wind blew the roof from the casino onto the power generating station across the track, setting a fire that razed everything on Echo except the observatory and the astronomer's cabin. The only part of

1166-446: A large block brick annex was added to "Ye Alpine Tavern" and the facility was renamed "Mount Lowe Tavern." In September 1936 the tavern burned to the ground from an electrical fire. The PE was officially out of business, but left train operators on the line, so as not to abandon the railway. Though there was a slight consideration to rebuild, lack of water, poor area for relocation, and the financial burden of construction and insurance left

SECTION 10

#1732775765133

1272-601: A menagerie (zoo) which housed several species of local fauna: lynxes, raccoons, snakes, squirrels, and even a black bear. Alongside the zoo was a dormitory and shop facility for maintenance of the trains. Lowe purchased a three million candlepower searchlight from the Columbian Exposition held in Chicago in 1893. The light was installed on Echo in 1894. So powerful was the light, that a claim by Lowe's publicist, George Wharton James , stated that he could read

1378-404: A newspaper by the beam of the light coming through his hotel window on Catalina Island . Exaggeration or not, the beam from the light did have a 35-mile (56 km) projection. Residents announcing their birthdays could have the light shone on their homes in the evening. It was also known to stir up a corral of horses, invade lovers’ privacy, and interrupt an evening's revival meeting. By the 1930s

1484-455: A safety cable which ran through an emergency braking mechanism under each car and provided an emergency stopping of the cars within 15 feet (4.6 m) should a failure of the main cable occur. The Echo Mountain site was ready for opening day, July 4, 1893, with the 40-room "Echo Chalet." By November 1894 the 80-room Victorian "Echo Mountain House" was completed as a luxury facility to rival

1590-419: A series of routes that could be built upon with a series of rail cars to reach miles back into the forest and eventually all the way to the top of Mount Wilson . Financing the project himself, Lowe proceeded to build the railway which eventually reached the base of Mount Lowe (named after Lowe, previously known as Oak Mountain). At its peak, it was the top honeymoon destination in the United States. Beginning with

1696-553: A station called Mountain Junction. Atop Echo Mountain was a 70-room Victorian hotel, the Echo Mountain House. A short distance away stood the 40-room Echo Chalet, which was ready for opening day. Other buildings on Echo Mountain included an astronomical observatory, car barns, dormitories, repair facilities, a casino and dance hall, and a menagerie of local fauna. For the seven years during which Lowe owned and operated

1802-569: A stream of water that poured from the hillside, and it was here that the last of the hotels, the 12-room Swiss-style chalet, "Ye Alpine Tavern," was built. The Mount Lowe Railway was born from a desire of the Pasadena Pioneers to have a scenic mountain railroad to the crest of the San Gabriel Mountains. A trail had already been established to the peak of Mount Wilson, but that trip was arduous and often required more than

1908-465: A temperature roughly midway between the extremes experienced at that location. (This is known as the "rail neutral temperature".) This installation procedure is intended to prevent tracks from buckling in summer heat or pulling apart in the winter cold. In North America, because broken rails are typically detected by interruption of the current in the signaling system, they are seen as less of a potential hazard than undetected heat kinks. Joints are used in

2014-438: A time due to electrical limitations, and there was no two-way traffic. The division spanned the broad face of Las Flores Canyon, rounded a promontory called the "Cape of Good Hope," traveled deep into Millard Canyon, reappeared at the front face of the mountain, and eventually disappeared into Grand Canyon where it terminated at the foot of Mount Lowe. This location was called Crystal Springs (elev. 4,995 ft or 1,522 m) for

2120-646: A trail. This trail made a large figure eight traverse of Mt. Lowe and Mount Echo, starting and ending at the Alpine Tavert without ever traversing the same terrain twice. In 1922 Henry Ford visited the Mount Lowe Railway and returned with a Hollywood filming crew who made a silent film documentary of the trip with the camera mounted on the various cars, including the Great Incline. A reel containing 618 feet (188 m) of this historic film

2226-540: A turnoff near Las Flores Street, along a private right-of-way through the Poppyfields district, and proceeded into Rubio Canyon to the foot of Echo Mountain . Since this part of the line ran through the upper end of the residential community, it had station stops at Newkirk (Las Flores), Poppyfields, Hygeia (recovery hospital), and Roca before entering the Rubio Canyon. A transition bridge was installed to cross

SECTION 20

#1732775765133

2332-471: Is 115 to 141 lb/yd (57 to 70 kg/m). In Europe, rail is graded in kilograms per metre and the usual range is 40 to 60 kg/m (81 to 121 lb/yd). The heaviest mass-produced rail was 155 pounds per yard (77 kg/m), rolled for the Pennsylvania Railroad . The rails used in rail transport are produced in sections of fixed length. Rail lengths are made as long as possible, as

2438-408: Is a manual process requiring a reaction crucible and form to contain the molten iron. North American practice is to weld 1 ⁄ 4 -mile-long (400 m) segments of rail at a rail facility and load it on a special train to carry it to the job site. This train is designed to carry many segments of rail which are placed so they can slide off their racks to the rear of the train and be attached to

2544-471: Is available at the Library of Congress . In all, there were four hotels along the line, but the extent of the construction and the poor patronage had stretched Lowe to his limit. By 1898 the railroad fell into receivership under Jared Sidney Torrance , founder of Torrance, California . Both men applied to the government for rights of way to the top of Mt. Lowe. The government realized that the whole railroad

2650-494: Is cracking around the bolt holes, which can lead to breaking of the rail head (the running surface). This was the cause of the Hither Green rail crash which caused British Railways to begin converting much of its track to continuous welded rail. Where track circuits exist for signalling purposes, insulated block joints are required. These compound the weaknesses of ordinary joints. Specially-made glued joints, where all

2756-466: Is graded by its linear density , that is, its mass over a standard length. Heavier rail can support greater axle loads and higher train speeds without sustaining damage than lighter rail, but at a greater cost. In North America and the United Kingdom, rail is graded in pounds per yard (usually shown as pound or lb ), so 130-pound rail would weigh 130 lb/yd (64 kg/m). The usual range

2862-497: Is most visible as a short mountain extension whose ridge protrudes below the peak of Inspiration Point. Echo Mountain's name is derived from the number of repetitions one's voice could emit into Castle Canyon. Boy Scout projects were made to find the "sweet spot" where the largest number of repetitions could be heard. During the days of the Mount Lowe Railway "echophones" were set up to assist in voice projections near

2968-402: Is scarce and where tonnage or speeds are high. Steel is used in some applications. The track ballast is customarily crushed stone, and the purpose of this is to support the sleepers and allow some adjustment of their position, while allowing free drainage. A disadvantage of traditional track structures is the heavy demand for maintenance, particularly surfacing (tamping) and lining to restore

3074-456: Is starting to paint rails white to lower the peak temperatures reached in summer days. After new segments of rail are laid, or defective rails replaced (welded-in), the rails can be artificially stressed if the temperature of the rail during laying is cooler than what is desired. The stressing process involves either heating the rails, causing them to expand, or stretching the rails with hydraulic equipment. They are then fastened (clipped) to

3180-767: Is to bolt them together using metal fishplates (jointbars in the US), producing jointed track . For more modern usage, particularly where higher speeds are required, the lengths of rail may be welded together to form continuous welded rail (CWR). Jointed track is made using lengths of rail, usually around 20 m (66 ft) long (in the UK) and 39 or 78 ft (12 or 24 m) long (in North America), bolted together using perforated steel plates known as fishplates (UK) or joint bars (North America). Fishplates are usually 600 mm (2 ft) long, used in pairs either side of

3286-435: Is usually considered for new very high speed or very high loading routes, in short extensions that require additional strength (e.g. railway stations), or for localised replacement where there are exceptional maintenance difficulties, for example in tunnels. Most rapid transit lines and rubber-tyred metro systems use ballastless track. Early railways (c. 1840s) experimented with continuous bearing railtrack, in which

Mount Lowe Railway - Misplaced Pages Continue

3392-594: The Hotel Del Coronado in San Diego . Lowe also installed a 16-inch (410 mm) telescope and observatory on Echo, as he was a patron of the astronomical arts. He even sought to have the Mount Lowe Railway considered the astronomical center of the San Gabriels. He was even able to enlist astronomer Dr. Lewis Swift , whose reputation preceded him. Given the lack of light pollution in the area, Swift

3498-615: The San Gabriel Mountains , in the Angeles National Forest above Altadena , in Los Angeles County, California . Echo Mountain was shaped from an alluvial fan between Rubio and Las Flores canyons. It is geographically defined by Castle Canyon to its leeward side, Rubio Canyon at its foot, and Las Flores Canyon on its windward side. Echo has a mean elevation of 3,207 feet (977 m). It

3604-588: The 1870s, rails have almost universally been made from steel. The first railway in Britain was the Wollaton Wagonway , built in 1603 between Wollaton and Strelley in Nottinghamshire. It used wooden rails and was the first of around 50 wooden-railed tramways built over the next 164 years. These early wooden tramways typically used rails of oak or beech, attached to wooden sleepers with iron or wooden nails. Gravel or small stones were packed around

3710-723: The Echo Mountain Promontory. Blasting into the Rubio Canyon began in September 1892, three months before the establishment of the San Gabriel Timberland Reserve (now Angeles National Forest ). A terminal was built at the corner of Calaveras Street and Lake Avenue in Altadena adjacent to the L. A. Terminal Railway station, and a narrow gauge line was laid up the 8% grade to a point near Las Flores Street where it turned eastward traversing

3816-610: The Echo operation that was restored was the Incline Powerhouse in 1906. Other improvements were made to the railway, such as the replacement of rock pile footings under each trestle with reinforced concrete pilings. In 1909, an unseasonable electrical storm and flash flood destroyed the Rubio Pavilion and buried one of the caretakers’ children in the mud. The injured parents spent years in the hospital recuperating from

3922-700: The PE all but giving up on the Mount Lowe Railway. In December, 1937, the Railroad Booster's Club, enthusiasts of the PE Railroad, requested a final paid excursion on the line for photos and memorabilia. A few months later, in March, 1938 a three-day deluge of rain destroyed what was left of the railway and stranded the caretakers on Echo for 17 days. Following this disaster, the railway was officially abandoned. The Red Car line ran into Altadena until 1941. At

4028-507: The Pasadena ;& Mount Wilson Railroad Co. in 1891 with intentions to build the railroad to Mount Wilson . Unable to obtain rights of way to Mt. Wilson, Macpherson suggested an alternate route, toward Oak Mountain , a high peak to the west of Mount Wilson. They hired electrical engineer, Almarian W. Decker , who had contrived all the mathematical possibilities of an electric line and the funicular which would be required to ascend

4134-530: The Poppyfields district and headed into Rubio Canyon. At the Rubio division terminus was built a broad platform to span the Canyon which included the Rubio Pavilion, a 12-room hotel, with dining facilities and other amenities. The pavilion also consisted of power generating facilities with the use of gas engines and Pelton waterwheels. Water was made available from reservoirs built in the canyon's streams, though water

4240-605: The Railroad Boosters, began a project of "revealment" which, under the supervision of Mike McIntyre, Angeles National Forest archaeologist, sought to uncover the ruins of Echo Mountain. On January 6, 1993, the Mount Lowe Railway was listed on the National Register of Historic Places, and the Forestry Service dedicated a block of land for the monument that would encompass all the artifacts from

4346-598: The Rubio Wash named Las Flores Bridge. At Rubio there was a large platform that spanned the canyon with an integrated 12-room hotel, the Rubio Pavilion. Other features at the pavilion were a series of stairways and bridges that ascended the canyon for viewing some eleven waterfalls, all of which were named. The Mountain Division's tracks were converted to 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ) in 1903. From this platform passengers could transfer to

Mount Lowe Railway - Misplaced Pages Continue

4452-474: The United States. Lowe's partner and engineer was David J. Macpherson , a civil engineer graduate of Cornell University . The Mount Lowe Railway was a fulfillment of 19th century Pasadenans' desire to have a scenic mountain railroad to the crest of the San Gabriel Mountains . The Railway opened on July 4, 1893, and consisted of nearly seven miles (11 km) of track starting in Altadena, California , at

4558-531: The back canyons and receive a number of echoes. The "sweet spot" where the most repeaters could be heard had at least nine reverberations of anything that was shouted loud enough. The study of the sweet spot has even been used as boy scout projects. Along the way in Millard Canyon, a special station stop was made at Dawn Station above the Dawn Mines, an old gold mining operation. The mines were deep in

4664-415: The back of laborers; grading became a particular problem. While funiculars were usually considered to require four rails, two for the ascending car, and two for the descending car, there was not enough room to widen the grade to accommodate four rails. Over night the inventive Thaddeus Lowe came up with a plan to only use four rails where the cars pass each other and three rails on the upper and lower ends of

4770-401: The back side of the bluff was a section of straight track labeled "longest straight track 225 ft [68.6 m]." From there the rails led deep into Millard Canyon before making a complete turnabout at Horseshoe Curve and heading back to the face of the mountain. Once again overlooking the valley, the train made a broad sweep around Circular Bridge. The design of the bridge, more a trestle, was to allow

4876-520: The best sweet spots. On January 6, 1993, Echo Mountain, also referred to as Mount Echo, was delineated as part of the Mount Lowe Railway monument area listed by the U.S. Forest Service on the National Register of Historic Places . On top of the mountain are the ruins of "White City", a resort along the scenic Mount Lowe Railway , which could easily be seen from the valley below. From its point and down an incline to its foot in Rubio Canyon

4982-400: The bolt heads on the same side of the rail. Small gaps which function as expansion joints are deliberately left between the rail ends to allow for expansion of the rails in hot weather. European practice was to have the rail joints on both rails adjacent to each other, while North American practice is to stagger them. Because of these small gaps, when trains pass over jointed tracks they make

5088-421: The canyon and visitors stopping off to see the digs spent an exorbitant amount of time getting back to the train. A false pit was dug just a hundred feet below the track to trick people into thinking they had visited the mine and were shortly ready to return to the train. The mountain itself offered a grand display of nature and hiking trails, plus a mule ride, the "Mount Lowe Eight," that transported guests around

5194-486: The cars of the Incline. At the Echo summit an incline powerhouse was erected to house the winding motor and gear works which powered the 9-foot-diameter (2.7 m) grip wheel. The wheel consisted of 72 clamping "finger" mechanisms which bit down on the cable creating a smooth, non-slip actuation of the winding cable. The cable was a 1 + 5 ⁄ 8 -inch (41 mm) steel cable spliced in two spots, one below each of

5300-465: The continuous welded rail when necessary, usually for signal circuit gaps. Instead of a joint that passes straight across the rail, the two rail ends are sometimes cut at an angle to give a smoother transition. In extreme cases, such as at the end of long bridges, a breather switch (referred to in North America and Britain as an expansion joint ) gives a smooth path for the wheels while allowing

5406-440: The desired track geometry and smoothness of vehicle running. Weakness of the subgrade and drainage deficiencies also lead to heavy maintenance costs. This can be overcome by using ballastless track. In its simplest form this consists of a continuous slab of concrete (like a highway structure) with the rails supported directly on its upper surface (using a resilient pad). There are a number of proprietary systems; variations include

SECTION 50

#1732775765133

5512-564: The devastation that left them trapped in the rubble of the Pavilion. Three of the children, who knew how to move the incline cars, escaped to the top of the incline. In 1928 a strong Santa Ana Wind blew down the observatory. Its curator at the time, Mt. Lowe photographer Charles Lawrence, escaped the collapse within an inch of his life. Fortunately, he had the foresight to pack up the expensive lens pieces ahead of time. The instrument has since been reinstalled at Santa Clara University. In 1925

5618-440: The end of one rail to expand relative to the next rail. A sleeper (tie or crosstie) is a rectangular object on which the rails are supported and fixed. The sleeper has two main roles: to transfer the loads from the rails to the track ballast and the ground underneath, and to hold the rails to the correct width apart (to maintain the rail gauge ). They are generally laid transversely to the rails. Various methods exist for fixing

5724-511: The forestry headquarters in Arcadia, California. In 2005 Stacey Camp began an archaeological dig on a section of Mount Echo where there once stood a barrack for workers. The dig is part of Camp's Doctoral thesis and has come about by a grant from Stanford University and is also being coordinated with the Forestry Service. Echo Mountain Echo Mountain is a mountain promontory of

5830-428: The gaps are filled with epoxy resin , increase the strength again. As an alternative to the insulated joint, audio frequency track circuits can be employed using a tuned loop formed in approximately 20 m (66 ft) of the rail as part of the blocking circuit. Some insulated joints are unavoidable within turnouts. Another alternative is an axle counter , which can reduce the number of track circuits and thus

5936-509: The hill. On a ridge behind the Echo Mountain ridge was an observatory building with a working 16-inch (410 mm) telescope housed in a round domed building. The extant foundations and cement telescope stand remain. Lowe intended to build the rail system all the way to the top of Mount Wilson along with additional hotels and facilities on the top. Later, much of the path of the large 100-inch telescope and observatory built on Mount Wilson

6042-415: The incline passenger cars and looped in a continuous strand around the grip wheel at the top of the incline and a tension wheel at the bottom. The cable was replaced every two or three years. The incline grade changed three times from a steep 62% grade at the base to a gentler 48% grade at the top, but the cars were designed to comfortably adjust to the differences in grade. The incline was also equipped with

6148-626: The intrinsic weakness in resisting vertical loading results in the ballast becoming depressed and a heavy maintenance workload is imposed to prevent unacceptable geometrical defects at the joints. The joints also needed to be lubricated, and wear at the fishplate (joint bar) mating surfaces needed to be rectified by shimming. For this reason jointed track is not financially appropriate for heavily operated railroads. Timber sleepers are of many available timbers, and are often treated with creosote , chromated copper arsenate , or other wood preservatives. Pre-stressed concrete sleepers are often used where timber

6254-480: The iron came loose, began to curl, and intruded into the floors of the coaches. The iron strap rail coming through the floors of the coaches came to be referred to as "snake heads" by early railroaders. The Deeside Tramway in North Wales used this form of rail. It opened around 1870 and closed in 1947, with long sections still using these rails. It was one of the last uses of iron-topped wooden rails. Rail

6360-402: The joints between rails are a source of weakness. Throughout the history of rail production, lengths have increased as manufacturing processes have improved. The following are lengths of single sections produced by steel mills , without any thermite welding . Shorter rails may be welded with flashbutt welding , but the following rail lengths are unwelded. Welding of rails into longer lengths

6466-483: The light was considered a public nuisance and was shut off permanently. A third division, the Alpine Division, was begun in 1894 and took a lengthy stretch of narrow gauge track across three canyons to the foot of Mount Lowe (formerly Oak Mountain). The line ran from alongside the incline landing where passengers could transfer directly to the next trolley. There were three trains available on this line, but

SECTION 60

#1732775765133

6572-490: The limited electrical power only allowed one at a time to travel. The line set out across the broad Las Flores Canyon which gave a tremendous panorama of the Los Angeles area below. At one point a tall trestle was required to bridge a broad and deep chasm with a bridge so named High Bridge. At the ridge which separates Las Flores Canyon from Millard Canyon, the right of way was cut around a bluff named Cape of Good Hope. On

6678-888: The mid- to late-20th century used rails 39 feet (11.9 m) long so they could be carried in gondola cars ( open wagons ), often 40 feet (12.2 m) long; as gondola sizes increased, so did rail lengths. According to the Railway Gazette International the planned-but-cancelled 150-kilometre rail line for the Baffinland Iron Mine , on Baffin Island , would have used older carbon steel alloys for its rails, instead of more modern, higher performance alloys, because modern alloy rails can become brittle at very low temperatures. Early North American railroads used iron on top of wooden rails as an economy measure but gave up this method of construction after

6784-447: The millionaire Thaddeus S. C. Lowe (arrived in Pasadena 1890) that a fully funded plan could be put into action. The two men visited Colorado to view the mountain railway to Pike's Peak. Lowe was impressed with the trolley car systems in the city and thought that should be the way to go. This would make the Mount Lowe Railway the only electric traction rail line ever to be put into scenic mountain railway service. The two men incorporated

6890-620: The number of insulated rail joints required. Most modern railways use continuous welded rail (CWR), sometimes referred to as ribbon rails or seamless rails . In this form of track, the rails are welded together by utilising flash butt welding to form one continuous rail that may be several kilometres long. Because there are few joints, this form of track is very strong, gives a smooth ride, and needs less maintenance; trains can travel on it at higher speeds and with less friction. Welded rails are more expensive to lay than jointed tracks, but have much lower maintenance costs. The first welded track

6996-554: The observatory. Though he was not as prominent as Prof. Swift, he did stay with the Mount Lowe Observatory until his sudden death in 1925. Disenchanted, Peyton sold the railway to Henry E. Huntington , after which it became part of the Pacific Electric Railway (PE), of the famed Los Angeles Red Car system. Part of the PE improvements included a "casino" on Echo Mountain. The building appears in

7102-566: The onset of World War II , the dismantling of the Mount Lowe Railway was contracted to a scrapper who stripped the railway of all salvageable materials. In 1959 the Forestry service began dynamiting the remains of buildings as "hazardous nuisances." In 1962 the Incline Powerhouse was dynamited, but the gear mechanism was placed as a monument to the enterprise. In 1992 a committee of the Pacific Railroad Society, successors to

7208-404: The outside of sharp curves compared to the rails on the inside. Rails can be supplied pre-drilled with boltholes for fishplates or without where they will be welded into place. There are usually two or three boltholes at each end. Rails are produced in fixed lengths and need to be joined end-to-end to make a continuous surface on which trains may run. The traditional method of joining the rails

7314-423: The quality of the materials, including the change from iron to steel. The stronger the rails and the rest of the trackwork, the heavier and faster the trains the track can carry. Other profiles of rail include: bullhead rail ; grooved rail ; flat-bottomed rail (Vignoles rail or flanged T-rail); bridge rail (inverted U–shaped used in baulk road ); and Barlow rail (inverted V). North American railroads until

7420-682: The rail by special clips that resist longitudinal movement of the rail. There is no theoretical limit to how long a welded rail can be. However, if longitudinal and lateral restraint are insufficient, the track could become distorted in hot weather and cause a derailment. Distortion due to heat expansion is known in North America as sun kink , and elsewhere as buckling. In extreme hot weather special inspections are required to monitor sections of track known to be problematic. In North American practice, extreme temperature conditions will trigger slow orders to allow for crews to react to buckling or "sun kinks" if encountered. The German railway company Deutsche Bahn

7526-425: The rail ends and bolted together (usually four, but sometimes six bolts per joint). The bolts have alternating orientations so that in the event of a derailment and a wheel flange striking the joint, only some of the bolts will be sheared, reducing the likelihood of the rails misaligning with each other and exacerbating the derailment. This technique is not applied universally; European practice being to have all

7632-500: The rail to the sleeper. Historically, spikes gave way to cast iron chairs fixed to the sleeper. More recently, springs (such as Pandrol clips ) are used to fix the rail to the sleeper chair. Sometimes rail tracks are designed to be portable and moved from one place to another as required. During construction of the Panama Canal , tracks were moved around excavation works. These track gauge were 5 ft ( 1,524 mm ) and

7738-655: The rail was supported along its length, with examples including Brunel's baulk road on the Great Western Railway , as well as use on the Newcastle and North Shields Railway , on the Lancashire and Yorkshire Railway to a design by John Hawkshaw , and elsewhere. Continuous-bearing designs were also promoted by other engineers. The system was tested on the Baltimore and Ohio railway in the 1840s, but

7844-571: The railroad. On July 4, 1993, a centennial celebration was held on Mount Echo, and a separate celebration was held on Macpherson Parkway in the Poppyfields district. Today care of the artifacts and other restorative projects are being carried out by the Scenic Mount Lowe Railway Historical Committee under the leadership of Brian Marcroft and John Harrigan. The committee has become a group of uniformed forestry volunteers who continue to work closely with

7950-440: The railway, it was not financially successful, and was eventually sold. A series of natural disasters destroyed the facilities, the first of which was a kitchen fire that destroyed the Echo Mountain House in 1900. Further fires and floods eventually destroyed any remaining facilities, and the railway was officially abandoned in 1938 after a flood washed railway property off the mountain sides. The ruins of Mount Lowe Railway remain. It

8056-553: The red car lines in California, Lowe extended the line up through the hills in Rubio Canyon where a small hotel was built at the base of new incline rail systems that would take a visitor up a mile along a ridge overlooking the Los Angeles Basin to the top of Echo Mountain. The top of Echo Mountain had restaurants, stores, dormitories for employees, and a power generating station to power Echo Mountain facilities. There

8162-538: The remote Mountain Junction. Up to this point there was only one means of public transportation from the valleys below to the hillside community of Altadena. It was the Los Angeles Terminal Railway which by this time was running from Terminal Island in San Pedro to Mountain Junction. The trains ran twice a day, and very irregularly at that, so the only sure means of getting to Altadena on time

8268-562: The rolling stock full size. Portable tracks have often been used in open pit mines. In 1880 in New York City , sections of heavy portable track (along with much other improvised technology) helped in the move of the ancient obelisk in Central Park to its final location from the dock where it was unloaded from the cargo ship SS Dessoug . Cane railways often had permanent tracks for the main lines, with portable tracks serving

8374-412: The run, whereby the cars shared the center rail. The ingenious three-railed funicular not only fit, but it also reduced the amount of required materials. This three-railed design has been applied on other places as well (e.g. Angels Flight ). A great feat of engineering was realized with a trestle that was built to negotiate a 150-foot-deep (46 m) granite chasm across 250 feet (76 m) of track on

8480-426: The sleepers in their expanded form. This process ensures that the rail will not expand much further in subsequent hot weather. In cold weather the rails try to contract, but because they are firmly fastened, cannot do so. In effect, stressed rails are a bit like a piece of stretched elastic firmly fastened down. In extremely cold weather, rails are heated to prevent "pull aparts". CWR is laid (including fastening) at

8586-617: The sleepers to hold them in place and provide a walkway for the people or horses that moved wagons along the track. The rails were usually about 3 feet (0.91 m) long and were not joined - instead, adjacent rails were laid on a common sleeper. The straight rails could be angled at these joints to form primitive curved track. The first iron rails laid in Britain were at the Darby Ironworks in Coalbrookdale in 1767. When steam locomotives were introduced, starting in 1804,

8692-540: The sleepers with base plates that spread the load. When concrete sleepers are used, a plastic or rubber pad is usually placed between the rail and the tie plate. Rail is usually attached to the sleeper with resilient fastenings, although cut spikes are widely used in North America. For much of the 20th century, rail track used softwood timber sleepers and jointed rails, and a considerable amount of this track remains on secondary and tertiary routes. In North America and Australia, flat-bottomed rails were typically fastened to

8798-480: The sleepers with dog spikes through a flat tie plate. In Britain and Ireland, bullhead rails were carried in cast-iron chairs which were spiked to the sleepers. In 1936, the London, Midland and Scottish Railway pioneered the conversion to flat-bottomed rail in Britain, though earlier lines had made some use of it. Jointed rails were used at first because contemporary technology did not offer any alternative. However,

8904-511: The ties (sleepers) in a continuous operation. If not restrained, rails would lengthen in hot weather and shrink in cold weather. To provide this restraint, the rail is prevented from moving in relation to the sleeper by use of clips or anchors. Attention needs to be paid to compacting the ballast effectively, including under, between, and at the ends of the sleepers, to prevent the sleepers from moving. Anchors are more common for wooden sleepers, whereas most concrete or steel sleepers are fastened to

9010-533: The top of the incline was perched Charles Lawrence, the official photographer, on a special scaffold from which he would take pictures of the arriving visitors. For 25 cents, visitors could purchase a souvenir photo of their arrival on the incline car, with everyone else aboard, of course. George Wharton James, Lowe's publicist, had his own publication which touted the railway in its conception, construction, and operation. Megaphones, called "echophones", were installed on Mount Echo through which visitors could bellow into

9116-406: The track then in use proved too weak to carry the additional weight. Richard Trevithick 's pioneering locomotive at Pen-y-darren broke the plateway track and had to be withdrawn. As locomotives became more widespread in the 1810s and 1820s, engineers built rigid track formations, with iron rails mounted on stone sleepers, and cast-iron chairs holding them in place. This proved to be a mistake, and

9222-426: The trolley to negotiate a 12-foot (3.7 m) switchback, over 500 feet (150 m) of track, at a 4% grade in a 340° turn. The wooden structure resembled a section of roller coaster offering an awesome sight over the side of the car looking almost 100 feet (30 m) straight down. From the switchback the train made a return trip into Millard Canyon. At the transition point of Millard and Grand Canyons, construction

9328-508: The year, Independence Day and Christmas, during which he would mark special events of his lifetime. A publication which emanated from the Tavern daily was the Echo , a preprinted newspaper with a blank page that had the names and home states of the daily arrivals surprinted. The four-page tabloid had three pages of biographical information on the railroad and other announcements of daily events. At

9434-510: Was able to discover some 95 new nebulae from the Echo vantage point. ("It could be noted that in an earlier 1892 plan, Charles William Eliot President of Harvard University sought to have a 40-inch (1,000 mm) telescope put on Mt. Wilson. Lowe offered the use of his new Mount Wilson Railroad to transport the lenses up. However, the project benefactor died without leaving a trust, and the whole plan failed, and of course Lowe's train didn't end up going to Mt. Wilson either"). Prof. Lowe's success

9540-484: Was also a trolley repair building and pit, observation decks at various spots, trails that could be hiked up and down the mountain and into the Alpine regions, tennis courts, stables and a zoo. The entire assembly of buildings were painted white and because of the view from far below, became known as "The White City in the sky". The "opera box" great incline cars were also white and could be seen from afar ferrying up and down

9646-411: Was also flanked by cottages and tent cabins to augment its occupancy. The Tavern boasted several amenities, such as a wading pool, tennis courts, mule rides, gift shop, restaurant, and a silver fox farm. This spot marked the end of the line, nearly 7 miles (11 km) from its starting point at Mountain Junction. The Mount Lowe Railway opened officially on July 4, 1893. Folks amassed themselves at

9752-428: Was by your own horse and buggy. This lack of transportation, coupled with Lowe's inability to establish any at all, would be in part the downfall of the railway. Nevertheless, over its 45 years of existence, it is estimated that some 3 million people had ridden the railway, many coming from all parts of the country and the world. In its own inimitable way, it was a Disneyland of the day. Lowe had two favorite days of

9858-421: Was electric traction railway, and a cable driven incline funicular . Electrical power for the railway consisted of several power generating stations equipped with either gas engines or Pelton wheels , depending on the availability of mountain water. The Mountain Division, originally built as a 3 ft 6 in ( 1,067 mm ) narrow gauge line, began with a trolley that ascended Lake Avenue to

9964-467: Was first introduced around 1893, making train rides quieter and safer. With the introduction of thermite welding after 1899, the process became less labour-intensive, and ubiquitous. Modern production techniques allowed the production of longer unwelded segments. Newer longer rails tend to be made as simple multiples of older shorter rails, so that old rails can be replaced without cutting. Some cutting would be needed as slightly longer rails are needed on

10070-432: Was found to be more expensive to maintain than rail with cross sleepers . This type of track still exists on some bridges on Network Rail where the timber baulks are called waybeams or longitudinal timbers. Generally the speed over such structures is low. Later applications of continuously supported track include Balfour Beatty 's 'embedded slab track', which uses a rounded rectangular rail profile (BB14072) embedded in

10176-415: Was greatly drawn from his nationally renowned process of generating large amounts of hydrogen gas (see water gas ). He had built a gas plant in Pasadena and had piped the gas some eight miles (13 km) to the top of Echo where there was a storage container seen in several earlier photographs. The technology, mainly used for heating and lighting, was soon replaced by electricity. Echo Mountain also sported

10282-452: Was met by a large granite crag that required eight months of dynamiting and mucking to allow just enough passage for the narrow gauge cars. The site was named Granite Gate at 4,072 feet (1,241 m) in elevation. The last stretch of track reached deep into Grand Canyon on a gentle grade that ended up at the foot of Mt. Lowe. There in a location called Crystal Springs, Lowe built a 12-room, Swiss chalet styled hotel named "Ye Alpine Tavern." It

10388-435: Was not always plentiful year round. As part of the entertainment experience, Lowe had a series of stairways and bridges built over the streams and waterfalls that emanated from the canyon. The 11 waterfalls were individually named and today exist as local landmarks. Work was begun on the Great Incline, which featured such steep grades that no mule could be flogged enough into negotiating it. Instead, materials were carried up on

10494-493: Was on Federal property (vis-à-vis the San Gabriel Timberland Reserve ) and demanded that a proper lease be taken out on the properties. Having reviewed Lowe's standing with the railway, Congress awarded the receivership to Torrance in 1899, and Lowe was left with only the title to the observatory. It was at this time that the railway was reorganized and incorporated as the Mount Lowe Railway. The railway

10600-538: Was placed on the National Register of Historic Places on January 6, 1993, a listing that was enlarged in January 2015. The railway terminal, called Mountain Junction, was located at the corner of Lake Avenue and Calaveras Street in the unincorporated community of Altadena . The line was divided into three divisions: the Mountain Division, the Great Incline, and the Alpine Division. The mode of locomotion

10706-405: Was sold at auction to a Mr. Valentine Peyton of Danville, Illinois , who personally came to California to run the operation. In 1900, the Echo Mountain House burned down. It was grossly under-insured and was never rebuilt. Later, the astronomer Dr. Swift went blind and was forced to leave his post at the observatory. A second astronomer, Prof. Edgar Lucien Larkin (1847–1925), was hired to oversee

10812-466: Was soon replaced with flexible track structures that allowed a degree of elastic movement as trains passed over them. Traditionally, tracks are constructed using flat-bottomed steel rails laid on and spiked or screwed into timber or pre-stressed concrete sleepers (known as ties in North America), with crushed stone ballast placed beneath and around the sleepers. Most modern railroads with heavy traffic use continuously welded rails that are attached to

10918-586: Was the Great Incline funicular of the Mount Lowe Railway, whose white cars could be seen ascending and descending Echo. Echo Mountain can be reached by the Sam Merrill Trail located at the top of Lake Avenue , or via the fire road which extends from Millard Canyon to a point along the old right of way, which will lead to the backside of the promontory. Rail tracks#Railway rail A railway track ( British English and UIC terminology ) or railroad track ( American English ), also known as

11024-618: Was the first of its kind built with three rails and featuring a four-railed passing track at the halfway point. A particular feature on the Incline was the Macpherson Trestle named by Lowe for his engineer, David J. Macpherson , as was custom, and noted for its design in crossing a granite chasm over 150 feet (46 m) deep. Lowe wanted to make the mountains overlooking Altadena and Pasadena accessible to average citizens. After much planning, and many exploratory trips on horseback, he and his engineer, Thomas McPherson, located

11130-505: Was used in Germany in 1924. and has become common on main lines since the 1950s. The preferred process of flash butt welding involves an automated track-laying machine running a strong electric current through the touching ends of two unjoined rails. The ends become white hot due to electrical resistance and are then pressed together forming a strong weld. Thermite welding is used to repair or splice together existing CWR segments. This

11236-439: Was used to transport the delicate 100-inch (2,500 mm) mirror to the top of Mount Wilson. The third division, the Alpine Division, opened in 1896 and consisted of 3.5 miles (5.6 km) of 3 ft 6 in ( 1,067 mm ) narrow gauge track with 127 curves and 18 bridges and trestles. On this line there were three cars available for shuttling between Echo and the end-of-line, though only one car ever operated at

#132867