George David "Zambo" Zamka (born June 29, 1962) is a former NASA astronaut and United States Marine Corps pilot with over 3500 flight hours in more than 30 different aircraft. Zamka piloted the Space Shuttle Discovery in its October 2007 mission to the International Space Station and served as the commander of mission STS-130 in February 2010.
64-681: STS-130 ( ISS assembly flight 20A ) was a NASA Space Shuttle mission to the International Space Station (ISS). Space Shuttle Endeavour 's primary payloads were the Tranquility module and the Cupola , a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station. Endeavour launched at 04:14 EST (09:14 UTC ) on February 8, 2010, and landed at 22:22 EST on February 21, 2010, on runway 15 at
128-486: A forward air controller . In December 1994, he graduated from the U.S. Air Force Test Pilot School , following which, he served as an F/A-18 Hornet test pilot and operations officer. In 1997, he earned a Masters of Science degree in engineering management from the Florida Institute of Technology . In 1998, he returned to VMFA(AW)-121 and deployed to MCAS Iwakuni , Japan. In August 2010, Zamka retired from
192-684: A NASA poll as Tranquility . Space Shuttle Endeavour was moved from her hangar in the Orbiter Processing Facility 2 to the Vehicle Assembly Building High bay 1 on December 11, 2009. Roll over began at 13:00 EST and was completed 1 hour and 5 minutes later at 14:05 EST. Endeavour moved from the Vehicle Assembly Building to launch pad 39A . The process started at 04:13 EST on January 6, 2010. Before rolling out to
256-626: A crew of seven. Building the complete station required more than 40 assembly flights. As of 2020, 36 Space Shuttle flights delivered ISS elements. Other assembly flights consisted of modules lifted by the Falcon 9 , Russian Proton rocket or, in the case of Pirs and Poisk , the Soyuz-U rocket. Some of the larger modules include: The space station is located in orbit around the Earth at an altitude of approximately 410 km (250 mi),
320-638: A decade. The Nauka module finally launched in July 2021 and docked to the nadir port of Zvezda module after several days of free flight followed by the Prichal which launched on 24 November 2021. There are plans to add 2 or 3 more modules that would attach to Prichal during the mid-2020s. Adding more Russian modules will help the Zvezda module greatly because Zvezda's originally installed central command computers no longer work (three ThinkPad laptops are now
384-565: A number of transfer related activities during the morning of their work day. After a joint meal together, the crew of STS-130 and ISS commander Jeff Williams and flight engineer T.J. Creamer conducted a PAO event with television stations in Sacramento , California, Mobile , Alabama and a radio station in St. Louis , Missouri. Once the PAO event was finished, the joint crews had some off duty time for
448-677: A ribbon cutting ceremony to officially open the Cupola for use. After the conference and ribbon cutting ceremony the crews gathered one last time for a meal together in the Unity module. After their meal the crews conducted a farewell ceremony and closed the hatches between the two vehicles. The latter part of the STS-130 crew's day was spent stowing items and getting their rendezvous tools out and checking them out to ensure they are ready for undocking. Space Shuttle Endeavour successfully undocked with
512-682: A special event conducted by Capcom Mike Massimino . Massimino asked Bob Behnken and Nick Patrick questions he received through his Twitter account. Later in the day Kay Hire and Terry Virts took questions from the Associated Press , CBS News and Reuters . At the end of the day the whole crew conducted another EVA procedures review in preparation for EVA2. The second of three spacewalks was completed on flight day 7. Bob Behnken and Nick Patrick were able to complete all their planned tasks in 5 hours and 54 minutes. The tasks included installing ammonia coolant loops, thermal blankets to protect
576-914: A sufficient supply line of experimental equipment. As of November 2020, the crew capacity has increased to seven due to the launch of Crew Dragon by SpaceX , which can carry 4 astronauts to the ISS. Later additions included the Bigelow Expandable Activity Module (BEAM) in 2016, and numerous Russian components are planned as part of the in-orbit construction of OPSEK . The ISS is made up of 16 pressurized modules: six Russian modules ( Zarya , Zvezda , Poisk , Rassvet , Nauka , and Prichal ), eight US modules ( BEAM , Leonardo , Harmony , Quest , Tranquility , Unity , Cupola , and Destiny ), one Japanese module ( Kibō ) and one European module ( Columbus ). At least one Russian pressurized module ( Pirs )
640-585: A type of orbit usually termed low Earth orbit (the actual height varies over time by several kilometers due to atmospheric drag and reboosts ). It orbits Earth in a period of about 90 minutes; by August 2007 it had completed more than 50,000 orbits since launch of Zarya on 20 November 1998. A total of 14 main pressurized modules were scheduled to be part of the ISS by its completion date in 2010. A number of smaller pressurized sections will be adjunct to them ( Soyuz spacecraft (permanently 2 as lifeboats – 6 months rotations), Progress transporters (2 or more),
704-409: Is deorbited till now. Although not permanently docked with the ISS, Multi-Purpose Logistics Modules (MPLMs) formed part of the ISS during some Shuttle missions. An MPLM was attached to Harmony (initially to Unity ) and was used for resupply and logistics flights. Spacecraft attached to the ISS also extend the pressurized volume. At least one Soyuz spacecraft is always docked as a 'lifeboat' and
SECTION 10
#1732780967189768-703: Is married and has two children. His extended family resides in Colorado, Mississippi, Georgia, Indiana, Florida and Tennessee. Zamka is of Colombian and Polish ancestry . Zamka graduated with a Bachelor of Science degree in mathematics from the United States Naval Academy in 1984. He was then commissioned as a second lieutenant in the United States Marine Corps . He received A-6E Intruder training at Naval Air Station Whidbey Island , Washington in 1985–1987. He
832-487: Is now part of the ISS's configuration. During the shuttle stand-down, construction of the ISS was halted and the science conducted aboard was limited due to the crew size of two, adding to earlier delays due to Shuttle problems and the Russian space agency's budget constraints. In March 2006, a meeting of the heads of the five participating space agencies accepted the new ISS construction schedule that planned to complete
896-412: Is replaced every six months by a new Soyuz as part of crew rotation. Table below shows the sequence in which these components were added to the ISS. Decommissioned and deorbited Modules are shown in gray. (24 ft) (14 ft) (23 ft) (15 ft) (22 ft) The following module was built, but has not been used in future plans for the ISS as of January 2021. The ISS is credited as
960-518: Is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities. [REDACTED] This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration . ISS assembly sequence The process of assembling the International Space Station (ISS) has been under way since
1024-773: The Quest and Pirs airlocks, as well as periodically the H-II Transfer Vehicle ). The US Orbital Segment was completed in 2011 after the installation of the Alpha Magnetic Spectrometer during the STS-134 mission. The Russian Orbital Segment assembly has been on an indefinite hiatus since the installation of the Rassvet module in 2010 during the STS-132 mission. The Rassvet module on
1088-402: The Cupola for its move from the end of Node 3. While that was going on spacewalkers Bob Behnken and Nick Patrick re-sized and repaired Bob Behnken's original suit for use by Nick Patrick, after a small problem with a fan was discovered. Once that task was complete the pair began getting their tools ready for the second of three spacewalks. Throughout the day there were 2 PAO events, the first was
1152-400: The Cupola set-up for the robotics work station. He had a small problem installing some corner panels which are needed to hold the workstation. Spacewalkers Bob Behnken and Nick Patrick were busy reconfiguring the airlock for use by the station crew and later flights. They also transferred their spacesuits and tools back to the shuttle for the return trip home. After the rack transfers were done
1216-553: The Flight Control System (FCS) and did a hot fire test of the Reaction Control System (RCS). Commander Zamka also did communications checks with mission control through the tracking stations at Merit Island , White Sands Space Harbor and Edwards Air Force Base . These checks are routine for the day before landing and were all successful. While all the system checkouts were going on, the rest of
1280-798: The Kennedy Space Center 's Shuttle Landing Facility. STS-130 carried Tranquility and the Cupola to the International Space Station. Tranquility was manufactured at the Thales Alenia Space factory in Turin , Italy, and transported by aircraft to Florida. It arrived at the Kennedy Space Center Space Station Processing Facility on May 21, 2009. It is also known as Node 3, and was named by
1344-420: The Kennedy Space Center , but that degraded to 30% hours before the planned launch due to low clouds. The launch was scrubbed. The second launch attempt was successful at 04:14:08 EST (9:14:08 UTC) February 8, 2010. The mission marked: Endeavour launched successfully at 4:14:08 EST (9:14:08 UTC). When Endeavour lifted off, the space station was traveling about 212 miles over western Romania. Once in orbit
SECTION 20
#17327809671891408-531: The Kennedy Space Center's Shuttle Landing Facility runway 15. The crew exited the orbiter and inspected it about two hours after landing. All six crew members spoke to the press on the runway before heading back to the Operations and Check-out building. NASA began a tradition of playing music to astronauts during the Gemini program , which was first used to wake up a flight crew during Apollo 15 . Each track
1472-528: The STS-114 mission of Discovery . This mission to the ISS was intended both to test new safety measures implemented since the Columbia disaster and deliver supplies to the station. Although the mission succeeded safely, it was not without risk; foam was shed by the external tank , leading NASA to announce future missions would be grounded until this issue was resolved. Between the Columbia disaster and
1536-401: The STS-114 shuttle flight took care of this problem. Many changes were made to the originally planned ISS, even before the Columbia disaster. Modules and other structures were cancelled or replaced, and the number of Shuttle flights to the ISS was reduced from previously planned numbers. However, more than 80% of the hardware intended to be part of the ISS in the late 1990s was orbited and
1600-479: The Zvezda was made apparent when in October 2020 the toilet, oven, and Elektron all malfunctioned at the same time and the cosmonauts onboard had to make emergency repairs. The ISS, when completed, will consist of a set of communicating pressurized modules connected to a truss , on which four large pairs of photovoltaic modules (solar panels) are attached. The pressurized modules and the truss are perpendicular:
1664-523: The Zvezda's central command computers) and its Elektron oxygen generators are not replaceable and failed again for a short time in 2020 after multiple malfunctions throughout their history. In Russian modules all the hardware is launched with the equipment permanently installed. It is impossible to replace hardware like in the US Orbital Segment with its very wide 51 inch (105 cm) hatch openings between modules. This potential problem with
1728-398: The 1990s. Zarya , the first ISS module, was launched by a Proton rocket on 20 November 1998. The STS-88 Space Shuttle mission followed two weeks after Zarya was launched, bringing Unity , the first of three node modules, and connecting it to Zarya . This bare 2-module core of the ISS remained uncrewed for the next one and a half years, until in July 2000 the Russian module Zvezda
1792-459: The ISS at 00:54 UTC (19:54 EST) on flight day 13. After undocking, pilot Terry Virts backed Endeavour to a distance of 400 feet (120 m) and began conducting a fly around of the ISS. After the fly around was complete, Virts used Endeavour's jets to move the shuttle to a point behind the station. Once the separation burns were complete, the crew conducted the late inspection of the shuttles thermal protection system. The inspection took up most of
1856-403: The ISS at 5:26 UTC (00:06 EST ). After completing leak checks the hatches between both vehicles were opened at 6:26 UTC (1:26 EST). The joint Expedition 22 /STS-130 crew conducted the standard welcome ceremony and then conducted their safety brief. Once that was complete commander George Zamka, Bob Behnken and Steve Robinson began transferring the spacesuits Behnken and Nick Patrick will use for
1920-466: The ISS by 2010. As of May 2009, a crew of six has been established following 12 Shuttle construction flights after the second "Return to Flight" mission STS-121 . Requirements for stepping up the crew size included enhanced environmental support on the ISS, a second Soyuz permanently docked on the station to function as a second 'lifeboat', more frequent Progress flights to provide double the amount of consumables, more fuel for orbit raising maneuvers, and
1984-414: The ISS right now was originally supposed to be the on-ground dynamic testing mock-up of the now-cancelled Science Power Platform . The Nauka science laboratory module contains new crew quarters, life support equipment that can produce oxygen and water, and a new galley. The Nauka was originally supposed to be delivered to the ISS in 2007 but cost overruns and quality control problems delayed it for over
STS-130 - Misplaced Pages Continue
2048-963: The ISS: the SpaceX Dragon , the Russian Progress, the European ATV and the Japanese HTV , and space station downmass will be carried back to Earth facilities on the Dragon. After the Space Shuttle Columbia disaster on 1 February 2003, there was some uncertainty over the future of the ISS. The subsequent two and a half-year suspension of the U.S. Space Shuttle program , followed by problems with resuming flight operations in 2005, were major obstacles. The Space Shuttle program resumed flight on 26 July 2005, with
2112-715: The Marine Corps after almost 30 years of distinguished service. As of May 2018 he is chairman of the board of the National Association of Spaceports . In June 1998, Zamka was selected for the NASA astronaut program, and reported for training in August. He served as lead for the Shuttle training and procedures division and as supervisor for the astronaut candidate class of 2004. Zamka made his first spaceflight as
2176-477: The PMA-3. During the PMA-3 relocation, Kay Hire and Terry Virts continued work on outfitting the Cupola . The joint Expedition 22/STS-130 crews enjoyed a meal together and had some off-duty time in the 2nd half of their day. Before the scheduled bedtime the entire crew conducted another EVA procedures review for the third and final EVA of the mission. On flight day 10, astronauts Bob Behnken and Nick Patrick completed
2240-473: The airlock. The bake-out happened at the end of the spacewalk. While the spacewalk was happening, Terry Virts and Kay Hire along with ISS commander Jeff Williams , Soichi Noguchi and T.J. Creamer , continued outfitting the Tranquility module. This included setting up the ventilation system, connecting electrical and computer cables and configuring racks. They confirmed lights and computers were on in
2304-478: The ammonia hoses, outfitting the Earth-facing port of Tranquility for the Cupola , install handrails and a non-propulsive vent valve (NPV). During the connection of one of the ammonia hoses, a small amount of ammonia leaked out of a quick disconnect valve and floated towards Nick Patrick. Procedures called for a "bake-out" while Patrick worked during the sunlit portion of the orbit, and a contamination test in
2368-413: The bolts and hooks that held the Cupola in place and then securing it to its new home. The process was slightly delayed due to some bolts that were torqued tighter than expected on the ground, but flight controllers were able to increase the torque to release the bolts. Once the move of the Cupola was complete, outfitting continued to get the cupola ready. The crew will be able to ingress it tomorrow, but
2432-432: The conference with President Obama and the children, the crew members began transferring Environmental control and life support system (ECLSS) racks to the Tranquility module. These transfers were done by ISS commander Jeff Williams, flight engineer T.J. Creamer, Shuttle commander George Zamka and mission specialist Stephen Robinson and took most of the day. Also during the day pilot Terry Virts continued working on getting
2496-522: The crew completed some more transfers and passed the 75% complete mark. The Space Shuttle commanded by commander George Zamka and pilot Terry Virts completed a reboost of the station using its vernier thrusters . The STS-130 crew completed their remaining transfer tasks on flight day 12. The joint STS-130/Expedition 22 crew held a joint press conference with reports at NASA centers and in Japan. ISS commander Jeff Williams and shuttle commander George Zamka held
2560-476: The crew opened the payload bay doors, activated the radiators and deployed the K u band antenna. Nick Patrick and Kay Hire then proceeded to activate, did a check out of the Shuttle Robotic Arm (SRMS) and then conducted a survey of the payload bay. The crew was also successful in down-linking imagery and video of the external tank to the ground. Most of the crew day was spent on conducting
2624-526: The crew were stowing items no longer needed during the flight. During the early part of the day Stephen Robinson and Terry Virts also stowed and deactivated the Space Shuttle robotic arm. The entire crew also took time out of their day to conduct an in-flight interview with CNN , CNN Español and Univision . Space Shuttle Endeavour and her STS-130 crew awoke on flight day 15 to begin getting ready for landing. The landing preparations included closing
STS-130 - Misplaced Pages Continue
2688-479: The crews afternoon with crew members rotating in and out to help with it. Commander George Zamka performed a waste water and condensate water dump, with the help of Terry Virts. The crew of STS-130 began preparing the Space Shuttle Endeavour for landing. During the day commander George Zamka and pilot Terry Virts, with help from mission specialist and flight engineer Stephen Robinson checked out
2752-539: The first part of the crew's workday, they performed a series of burns to catch up and dock with the International Space Station (ISS). Once the shuttle was 600 feet (180 m) below the ISS, commander George Zamka began what is known as the Rendezvous Pitch Maneuver (RPM). During the maneuver, ISS commander Jeff Williams and flight engineer Oleg Kotov took photos of the shuttle's thermal protection system (TPS). Space Shuttle Endeavour docked with
2816-434: The launch locks were removed, pilot Terry Virts opened the windows on Cupola for the first time. During the day Kay Hire and Terry Virts hooked up and transferred the Cupola robotics station for its use in the future. Terry Virts also completed some transfer tasks in the morning. On flight day 11, the joint Expedition 22/STS-130 crew received a phone call from U.S. President Barack Obama and several school children. After
2880-422: The launch pad, engineers at Kennedy Space Center had an extended preparation time to get Endeavour ready to move to the launch pad due to the unusually cold weather. The 3.4 miles (5.5 km) was completed at 10:37 EST. The trip took 6hrs 24min. The first launch attempt was scheduled for 04:39:00 EST February 7, 2010, with forecasters originally predicting a 70% chance of favorable launch weather conditions at
2944-472: The mission's first spacewalk, which began on time at 02:17 UTC. Their first task was to move the payload bay of Endeavour and prepare and release launch locks on the Tranquility module and Cupola . Once Behnken and Patrick were clear of its path, the Tranquility module was moved to the port side of the Unity node using the space station's robot arm. Before Tranquility was installed the spacewalkers removed Dextre's ORU platform and secured it to one of
3008-711: The most expensive item ever built, costing around $ 150 billion (USD), making it more expensive than Skylab (costing US$ 2.2 billion) and Mir (US$ 4.2 billion). George Zamka George David Zamka was born in June 29, 1962 at Margaret Hague Hospital in Jersey City, New Jersey . He was raised in New York City ; Irvington, New York ; Medellin , Colombia ; and Rochester Hills, Michigan . He graduated from Rochester Adams High School in Michigan in 1980. Zamka
3072-456: The node once the ammonia cooling system had been activated. The crew also received word the mission had been extended by one day in the morning. On flight day 8, the Cupola was successfully moved from its launch location to its permanent location on the Earth-facing side of Tranquility . Cupola was moved by the space station robot arm (SSRMS), which was operated by Kay Hire and Terry Virts. ISS commander Jeff Williams assisted them by releasing
3136-487: The payload bay doors, activating the Auxiliary Power Units and getting into their launch and entry suits. Commander George Zamka and pilot Terry Virts fired Endeavours 2 OMS engines for 2 mins 38 secs, this slowed Endeavour by about 200 ft/s (140 mph). The decision to go ahead with the de-orbit burn was made 25 min prior to the burn occurring. Landing occurred at 22:22:10 EST at
3200-559: The pilot of mission STS-120 , and second as the commander for STS-130 . Zamka has received the following honors and awards: the Legion of Merit , Distinguished Flying Cross , Defense Meritorious Service Medal , Meritorious Service Medal , Navy Strike Air Medal (6), Navy Commendation Medal with Combat "V" , and various other military service and campaign awards. Distinguished Graduate, U.S. Naval Academy. Commodore's list and Academic Achievement Award, Training Air Wing Five. Recipient of
3264-500: The rest of the day. Before the two crews went to bed they conducted a spacewalk procedures review, then got Nick Patrick and Bob Behnken into the Quest Airlock . Behnken and Patrick spent the night there at 10.2 psi instead of at the station's 14.6 psi, breathing pure oxygen for an hour before and after their sleep period in order to prevent decompression sickness . Flight day 5 saw astronauts Nick Patrick and Bob Behnken perform
SECTION 50
#17327809671893328-513: The resumption of Shuttle launches, crew exchanges were carried out solely using the Russian Soyuz spacecraft . Starting with Expedition 7 , two-astronaut caretaker crews were launched in contrast to the previously launched crews of three. Because the ISS had not been visited by a shuttle for an extended period, a larger than planned amount of waste accumulated, temporarily hindering station operations in 2004. However Progress transports and
3392-420: The spacewalk, other crew members completed transfer-related tasks. The transfers are now over halfway complete. On flight day 6 members of the joint crew opened the hatches to the new Tranquility module for the first time. STS-130 crew-members George Zamka, Terry Virts, Stephen Robinson and Kay Hire all helped in the initial outfitting of the node. During the initial outfitting, Terry Virts and Kay Hire prepared
3456-578: The standard inspection of the thermal protection system (TPS). All six of the crew members participated at one point during this task. Once the inspection process had moved to the port wing, astronauts Bob Behnken and Nick Patrick began working on checking out and preparing the spacesuits that will be used during the mission's three spacewalks. Once the survey of the TPS was complete, Stephen Robinson and Kay Hire , with Bob Behnken joining once his spacesuit tasks were complete, began checking out and preparing
3520-424: The third and final spacewalk of the STS-130 mission. Their tasks included hooking up heater and data cables for PMA-3, removing thermal covers and launch locks on Cupola , and installing handrails on Tranquility and a video cable for another base to be installed on the Russian segment of the ISS. Bob Behnken also connected the second ammonia cooling loop and disconnected a temporary power cable on Tranquility . Once
3584-489: The three spacewalks. Also during this time Nick Patrick and ISS flight engineer T.J. Creamer picked up the OBSS boom and handed it off to the Space Shuttle robot arm using the station's SSRMS or Canadarm2 . The shuttle arm was operated by Kay Hire and pilot Terry Virts . Flight day 4 saw Nick Patrick and Bob Behnken get all the tools they need ready for their spacewalk on flight day 5. While Patrick and Behnken were getting
3648-544: The tools ready, commander George Zamka and ISS flight engineer Soichi Noguchi swapped out the Hard Upper Torso (HUT) on Bob Behnken's suit, since the original HUT had developed a problem with a wire harness and was not powering the Wireless Video System (WVS) or the heaters in his gloves and boots. Once the swap was complete, Zamka and Noguchi tested the suit successfully. The crew also performed
3712-544: The tools that will be used during the rendezvous with the International Space Station (ISS). These tools include a hand-held LIDAR gun used for finding out the closing rate of the shuttle and distance from the ISS, the Orbiter Docking System (ODS) which is the part of the shuttle that connects to the space station and a centerline camera in the ODS to assist the commander George Zamka during docking. During
3776-417: The truss segments to function as a backup for a platform to be installed on STS-132 . Once the new module was in place, the spacewalkers proceeded to connect temporary heater and data cables between Unity and Tranquility . Behnken and Patrick were ahead of the timeline so they were also able to complete some get-ahead tasks. The spacewalk was completed six and a half hours later, on Friday, 08:49 UTC. After
3840-544: The truss spanning from starboard to port and the habitable zone extending on the aft -forward axis. Although during the construction the station attitude may vary, when all four photovoltaic modules are in their definitive position the aft-forward axis will be parallel to the velocity vector. In addition to the assembly and utilization flights, approximately 30 Progress spacecraft flights are required to provide logistics until 2010. Experimental equipment, fuel and consumables are and will be delivered by all vehicles visiting
3904-450: The window covers will not be opened until after the third and final spacewalk. While the Cupola relocation was going on, some of the crew members participated in transferring items between the shuttle and station. Also during this time Bob Behnken and Nick Patrick prepared the tools that they will use during the final spacewalk scheduled for flight day 10. During this time the pair re-sized another spacesuit on station for use by Behnken. This
SECTION 60
#17327809671893968-450: Was assigned to VMA(AW)-242 at Marine Corps Air Station El Toro , California . In addition to flight safety and administration, he was a squadron weapons and tactics instructor. In 1990, he trained as an F/A-18D Hornet pilot and was then assigned to VMFA(AW)-121 . Zamka flew 66 combat missions during Operation Desert Storm . In 1993, he was assigned to the 1st Battalion, 5th Marines at Marine Corps Base Camp Pendleton , California as
4032-532: Was done because the suit Behnken had been using had some problems with its communications equipment. Flight day 9 saw the relocation of Pressurized Mating Adapter 3 (PMA-3) from the Harmony node , where it was temporarily located, to the end of Tranquility , where it remained until 2017. The PMA will provide protection from micro-meteoroids and orbital debris. PMA-3 was moved by Bob Behnken and Nick Patrick, with help from Jeff Williams and Soichi Noguchi to release
4096-406: Was launched by a Proton rocket, allowing a maximum crew of three astronauts or cosmonauts to be on the ISS permanently. The ISS has a pressurized volume of approximately 1,000 cubic metres (35,000 cu ft), a mass of approximately 410,000 kilograms (900,000 lb), approximately 100 kilowatts of power output, a truss 108.4 metres (356 ft) long, modules 74 metres (243 ft) long, and
#188811