The Saturn C-8 was the largest member of the Saturn series of rockets to be designed. It was a potential alternative to the Nova rocket, should NASA have chosen a direct ascent method of lunar exploration for the Apollo program . The first stage was an increased-diameter version of the S-IC . The second stage was an increased-diameter version of the S-II . Both of these stages had eight engines, as opposed to the standard five. The third stage was a stretched S-IVB stage, which retained its original diameter and engine.
82-659: NASA announced on September 7, 1961, that the government-owned Michoud Ordnance Plant near New Orleans , Louisiana, would be the site for fabrication and assembly of the Saturn first stages as well as larger vehicles in the Saturn program. Finalists were two government-owned plants in St. Louis and New Orleans. The height of the factory roof at Michoud meant that a 40-foot-diameter (12 m) launch vehicle with eight F-1 engines (Saturn C-8, Nova class) could not be built; four or five engines (33 ft or 10 m diameter) would have to be
164-521: A crewed spacecraft to the Moon. During these revisions, the team rejected the single engine of the V-2's design and moved to a multiple-engine design. The Saturn V's final design had several key features. F-1 engines were chosen for the first stage, while new liquid hydrogen propulsion system called J-2 for the second and third stage. NASA had finalized its plans to proceed with von Braun's Saturn designs, and
246-401: A dry mass of about 303,000 pounds (137,000 kilograms); when fully fueled at launch, it had a total mass of 4,881,000 pounds (2,214,000 kilograms). The S-IC was powered by five Rocketdyne F-1 engines arrayed in a quincunx . The center engine was held in a fixed position, while the four outer engines could be hydraulically turned with gimbals to steer the rocket. In flight, the center engine
328-401: A portion of the facility to Big Easy Studios, a New Orleans film studio. This deal has been criticized by competing studios as violating NASA's rule that any deal with an outside entity must serve the agency's mission and must not compete with the private sector. NASA officials defend the agreement, stating that this helps to offset the cost of unused space on the facility and that their pricing
410-513: A proposed replacement for the first stage was the AJ-260x . This solid rocket motor would have simplified the design by removing the five-engine configuration and, in turn, reduced launch costs. The S-II was built by North American Aviation at Seal Beach, California . Using liquid hydrogen and liquid oxygen, it had five Rocketdyne J-2 engines in a similar arrangement to the S-IC, and also used
492-461: A riskier option, as a space rendezvous had yet to be performed in Earth orbit, much less in lunar orbit. Several NASA officials, including Langley Research Center engineer John Houbolt and NASA Administrator George Low , argued that a lunar orbit rendezvous provided the simplest landing on the Moon with the most cost–efficient launch vehicle, and the best chance to accomplish the lunar landing within
574-426: A rocket varies with air density and the square of relative velocity . Although velocity continues to increase, air density decreases so quickly with altitude that dynamic pressure falls below max q. The propellant in just the S-IC made up about three-quarters of Saturn V's entire launch mass, and it was consumed at 13,000 kilograms per second (1,700,000 lb/min). Newton's second law of motion states that force
656-587: A second time for translunar injection (TLI). The Saturn V's instrument unit was built by IBM and was placed on top of the rocket's third stage. It was constructed at the Space Systems Center in Huntsville, Alabama . This computer controlled the operations of the rocket from just before liftoff until the S-IVB was discarded. It included guidance and telemetry systems for the rocket. By measuring
738-507: A second. Once the rocket had lifted off, it could not safely settle back down onto the pad if the engines failed. The astronauts considered this one of the tensest moments in riding the Saturn V, for if the rocket did fail to lift off after release they had a low chance of survival given the large amounts of propellant. To improve safety, the Saturn Emergency Detection System (EDS) inhibited engine shutdown for
820-468: A three-man spacecraft to land directly on the lunar surface. An EOR would launch the direct-landing spacecraft in two smaller parts which would combine in Earth orbit. A LOR mission would involve a single rocket launching two spacecraft: a mother ship , and a smaller, two-man landing module which would rendezvous back with the main spacecraft in lunar orbit. The lander would be discarded and the mother ship would return home. At first, NASA dismissed LOR as
902-454: A time with a delay to reduce peak acceleration further. After S-IC separation, the S-II second stage burned for 6 minutes and propelled the craft to 109 miles (175 km) and 15,647 mph (25,181 km/h), close to orbital velocity . For the first two uncrewed launches, eight solid-fuel ullage motors ignited for four seconds to accelerate the S-II stage, followed by the ignition of
SECTION 10
#1732779489166984-427: A total of just 20 minutes. Although Apollo 6 experienced three engine failures, and Apollo 13 experienced one engine shutdown, the onboard computers were able to compensate by burning the remaining engines longer to achieve parking orbit. In the event of an abort requiring the destruction of the rocket, the range safety officer would remotely shut down the engines and after several seconds send another command for
1066-543: Is a retired American super heavy-lift launch vehicle developed by NASA under the Apollo program for human exploration of the Moon . The rocket was human-rated , had three stages , and was powered by liquid fuel . Flown from 1967 to 1973, it was used for nine crewed flights to the Moon, and to launch Skylab , the first American space station . As of 2024, the Saturn V remains the only launch vehicle to have carried humans beyond low Earth orbit (LEO). The Saturn V holds
1148-404: Is equal to mass multiplied by acceleration, or equivalently that acceleration is equal to force divided by mass, so as the mass decreased (and the force increased somewhat), acceleration rose. Including gravity, launch acceleration was only 1 + 1 ⁄ 4 g , i.e., the astronauts felt 1 + 1 ⁄ 4 g while the rocket accelerated vertically at 1 ⁄ 4 g . As
1230-443: Is home to the first stage of the last-constructed Saturn V, SA-515, built by The Boeing Company. The factory's ceiling height limitation - 12 meters, was unable to allow the construction of the bigger Saturn C-8 direct Moon vehicle, and therefore was one of the major reasons why the smaller C-5 (later renamed Saturn V) was chosen instead of the originally planned Moon vehicle. The runway was slowly transformed into Saturn Boulevard in
1312-612: Is located 600 meters southwest of the main manufacturing building. Transporting vehicles carrying manufactured SLS components move down Saturn Blvd, past large open fields, to the pier - where the Pegasus Barge is docked. This is where the components are shipped to either their final destination - Kennedy Space Center , or rarely back to the main Marshall Space Flight Center in Huntsville, Alabama, or
1394-594: Is one of the largest manufacturing plants in the world with 43 environmentally controlled acres—174,000 m (1,870,000 sq ft)—under one roof, and it employs more than 4,200 people. From September 1961 to the end of the Apollo program in December 1972 the site was utilized by Chrysler Corporation to build the first stages of the Saturn I and Saturn IB , later joined by Boeing Corporation to build
1476-570: Is vetted by state and local economic development agencies to ensure it is not competing with the private market. Portions of Ender's Game , G.I. Joe: Retaliation , and Dawn of the Planet of the Apes were filmed at the factory. On May 24, 1988, TACA Flight 110 operated with a Boeing 737-300 jetliner made a successful emergency landing on a grassy levee in the Michoud grounds after power
1558-775: The John C. Stennis Space Center in Mississippi for testing. The Michoud Assembly Facility also houses other organizations such as the National Finance Center operated by the United States Department of Agriculture , the United States Coast Guard , and GE . The factory complex is open to the public (though through pre-booking in advance). Visitors must sign in at main reception and clear security. NASA planned to use
1640-629: The Jupiter series of rockets . The Juno I rocket launched the first American satellite in January 1958. Von Braun considered the Jupiter series of rockets to be a prototype of the upcoming Saturn series of rockets , and referred to it as "an infant Saturn". Named after the sixth planet from the Sun , the design of the various Saturn rockets evolved from the Jupiter vehicles. Between 1960 and 1962,
1722-684: The Marshall Space Flight Center (MSFC) designed a series of Saturn rockets that could be deployed for Earth orbit and lunar missions. NASA planned to use the Saturn C-3 as part of the Earth orbit rendezvous (EOR) method for a lunar mission, with at least two or three launches needed for a single landing on the Moon. However, the MSFC planned an even bigger rocket, the C-4, which would use four F-1 engines in its first stage, an enlarged C-3 second stage, and
SECTION 20
#17327794891661804-918: The Mississippi River to the Gulf of Mexico . After rounding Florida , the stages were transported up the Intra-Coastal Waterway to the Vehicle Assembly Building (originally called the Vertical Assembly Building). This was essentially the same route which would be used later to ship Space Shuttle external tanks . The S-II was constructed in California and traveled to Florida via the Panama Canal . The third stage and Instrument Unit
1886-450: The Orion spacecraft , whose crew module is also being built at Michoud, but by Lockheed Martin . It has 50% more volume than the Apollo command capsule and will carry four to six astronauts. The first launch occurred on November 16, 2022. The facility did not experience significant flooding during Hurricane Katrina due to a natural ridge that runs along its northwestern boundary,
1968-735: The S-IVB stage and delivered less sea level thrust (78,000 pounds-force (350 kN)) than the Launch Escape System rocket (150,000 pounds-force (667 kN) sea level thrust) mounted atop the Apollo command module. The Apollo LES fired for a much shorter time than the Mercury-Redstone (3.2 seconds vs. 143.5 seconds). The Saturn V was principally designed by the Marshall Space Flight Center in Huntsville, Alabama , although numerous major systems, including propulsion systems, were designed by subcontractors. The rocket used
2050-504: The S-IVB , a stage with a single J-2 engine, as its third stage. The C-4 would only need to carry out two launches to carry out an EOR lunar mission. On January 10, 1962, NASA announced plans to build the C-5. The three-stage rocket would consist of the S-IC first stage, with five F-1 engines; the S-II second stage, with five J-2 engines; and the S-IVB third stage, with a single J-2 engine. The C-5 would undergo component testing even before
2132-557: The instrument unit . All three stages used liquid oxygen (LOX) as the oxidizer . The first stage used RP-1 for fuel, while the second and third stages used liquid hydrogen (LH2). LH2 has a higher specific energy (energy per unit mass) than RP-1, which makes it more suitable for higher-energy orbits, such as the trans-lunar injection required for Apollo missions. Conversely, RP-1 offers higher energy density (energy per unit volume) and higher thrust than LH2, which makes it more suitable for reducing aerodynamic drag and gravity losses in
2214-414: The levee that makes up the southern and eastern boundaries, and the work of the pump operators who stayed to protect the facility during the storm. Several buildings sustained wind and rainwater damage. All shifts were initially canceled up to September 26, 2005, potentially setting back future Shuttle flights. All the buildings and the shuttle hardware within survived the hurricane without grave damage, but
2296-653: The 1940s and briefly as a National Guard field in 1949, but became inactive by 1952. During the Korean War it made engines for Sherman and Patton tanks, and boasted a 1,700-metre (5,500 ft) paved runway. It came under the management of NASA in 1961, and was used for the construction of the S-IC first stage of the Saturn V rockets and the S-IB first stage of the Saturn IB rockets built by Chrysler Corporation. It
2378-594: The 1960s with the middle becoming a heliport and decommissioned by the 1970s. The majority of the NASA factory's history was focused on construction and production of NASA's Space Shuttle external tank (ET). Beginning with the rollout of ET-1 on June 29, 1979, which flew on STS-1 , 136 tanks were produced throughout the Space Shuttle program, ending with the flight-ready tank ET-122, which flew on STS-134 , rolled out on September 20, 2010. A single tank produced at
2460-540: The Apollo space program gained speed. The stages were designed by von Braun's Marshall Space Flight Center in Huntsville, and outside contractors were chosen for the construction: Boeing ( S-IC ), North American Aviation ( S-II ), Douglas Aircraft ( S-IVB ), and IBM ( instrument unit ). Early in the planning process, NASA considered three methods for the Moon mission: Earth orbit rendezvous (EOR), direct ascent , and lunar orbit rendezvous (LOR). A direct ascent configuration would require an extremely large rocket to send
2542-687: The Moon. At a height of 363 feet (111 m), the Saturn V stood 58 feet (18 m) taller than the Statue of Liberty from the ground to the torch, and 48 feet (15 m) taller than the Elizabeth Tower , which houses Big Ben at the Palace of Westminster . In contrast, the Mercury-Redstone Launch Vehicle used on Freedom 7 , the first crewed American spaceflight, was approximately 11 feet (3.4 m) longer than
Saturn C-8 - Misplaced Pages Continue
2624-606: The S-IC from the rest of the vehicle at an altitude of about 42 miles (67 km). The first stage continued on a ballistic trajectory to an altitude of about 68 miles (109 km) and then fell in the Atlantic Ocean about 350 miles (560 km) downrange. The engine shutdown procedure was changed for the launch of Skylab to avoid damage to the Apollo Telescope Mount . Rather than shutting down all four outboard engines at once, they were shut down two at
2706-481: The S-IC, the S-II was transported from its manufacturing plant to Cape Kennedy by sea. The S-IVB stage was built by the Douglas Aircraft Company at Huntington Beach, California . It had one Rocketdyne J-2 engine and used the same fuel as the S-II. The S-IVB used a common bulkhead to separate the two tanks. It was 58.6 feet (17.86 m) tall with a diameter of 21.7 feet (6.604 m) and
2788-565: The Saturn V shared characteristics with the one carried by the Saturn IB. The Saturn V was primarily constructed of aluminum . It was also made of titanium , polyurethane , cork and asbestos . Blueprints and other plans of the rocket are available on microfilm at the Marshall Space Flight Center. The Saturn V consisted of three stages—the S-IC first stage, S-II second stage, and S-IVB third stage—and
2870-695: The U.S. government brought the German rocket technologist Wernher von Braun and over 1,500 German rocket engineers and technicians to the United States in Operation Paperclip , a program authorized by President Truman . Von Braun, who had helped create the German V-2 rocket, was assigned to the Army's rocket design division. Between 1945 and 1958, his work was restricted to conveying
2952-537: The United States at that time. Two main reasons for the cancellation of the last three Apollo missions were the heavy investments in Saturn V and the ever-increasing costs of the Vietnam War to the U.S. in money and resources. In the time frame from 1969 to 1971 the cost of launching a Saturn V Apollo mission was between $ 185,000,000 to $ 189,000,000, of which $ 110 million were used for the production of
3034-535: The acceleration and vehicle attitude , it could calculate the position and velocity of the rocket and correct for any deviations. After the construction and ground testing of each stage was completed, they were each shipped to the Kennedy Space Center. The first two stages were so massive that the only way to transport them was by barge. The S-IC, constructed in New Orleans, was transported down
3116-589: The decade. Other NASA officials became convinced, and LOR was then officially selected as the mission configuration for the Apollo program and announced by NASA administrator James E. Webb on November 7, 1962. Arthur Rudolph became the project director of the Saturn V rocket program in August 1963. He developed the requirements for the rocket system and the mission plan for the Apollo program. The first Saturn V launch lifted off from Kennedy Space Center and performed flawlessly on November 9, 1967, Rudolph's birthday. He
3198-418: The early stages of launch. If the first stage had used LH2, the volume required would have been more than three times greater, which would have been aerodynamically infeasible at the time. The upper stages also used small solid-propellant ullage motors that helped to separate the stages during the launch, and to ensure that the liquid propellants were in a proper position to be drawn into the pumps. The S-IC
3280-675: The entire stack was moved from the Vehicle Assembly Building (VAB) to the launch pad using the Crawler Transporter (CT). Built by the Marion Power Shovel Company (and later used for transporting the smaller and lighter Space Shuttle, as well as the Space Launch System ), the CT ran on four double-tracked treads, each with 57 "shoes". Each shoe weighed 2,000 pounds (910 kg). This transporter
3362-595: The facility and probably were the reason that the rocket factory suffered very little damage. These employees were each awarded the NASA Exceptional Bravery Medal , NASA's highest bravery award. On September 16, 2005 NASA announced that the repairs were progressing faster than anticipated, and so they would continue to use Michoud for external tank work. On October 3, 2005, the facility officially reopened for essential personnel, though some key personnel had returned earlier. On October 31, 2005,
Saturn C-8 - Misplaced Pages Continue
3444-473: The facility reopened to all personnel. On February 7, 2017, an EF3 tornado carved a path through Orleans Parish , in which the factory is located. Two major buildings including the main manufacturing building were damaged, with multiple broken windows. 5 people were injured, and resulting repairs and other factors contributed to the delay of the first SLS launch until late 2022. The facility consists of various buildings in one complex: The shipping port
3526-497: The facility, ET-94, was not used in spaceflight and remained at Michoud as a test article . Modular parts for the International Space Station were fabricated at the facility in the mid-1990s until 2010. The factory is now the location for the Space Launch System (SLS)'s core and future second stage construction by Boeing. SLS is the most powerful rocket in the history of spaceflight. It carries
3608-443: The fins, was 33 feet (10 m) in diameter. Fully fueled, the Saturn V weighed 6.5 million pounds (2,900,000 kg) and had a low Earth orbit (LEO) payload capacity originally estimated at 261,000 pounds (118,000 kg), but was designed to send at least 90,000 pounds (41,000 kg) to the Moon. Later upgrades increased that capacity; on the final three Apollo lunar missions, it sent up to 95,901 lb (43,500 kg) to
3690-417: The first 30 seconds of flight. If all three stages were to explode simultaneously on the launch pad, an unlikely event, the Saturn V had a total explosive yield of 543 tons of TNT or 0.543 kilotons (2,271,912,000,000 J or 155,143 lbs of weight loss), which is 0.222 kt for the first stage, 0.263 kt for the second stage and 0.068 kt for the third stage. (See Saturn V Instrument Unit ) Contrary to popular myth ,
3772-456: The first model was constructed. The S-IVB third stage would be used as the second stage for the C-1B, which would serve both to demonstrate proof of concept and feasibility for the C-5, but would also provide flight data critical to the development of the C-5. Rather than undergoing testing for each major component, the C-5 would be tested in an "all-up" fashion, meaning that the first test flight of
3854-457: The first stage ignition sequence started. The center engine ignited first, followed by opposing outboard pairs at 300-millisecond intervals to reduce the structural loads on the rocket. When thrust had been confirmed by the onboard computers, the rocket was "soft-released" in two stages: first, the hold-down arms released the rocket, and second, as the rocket began to accelerate upwards, it was slowed by tapered metal pins pulled through holes for half
3936-619: The first stage of the Saturn V rockets. From September 5, 1973, to September 20, 2010, the factory was used for the construction of the Space Shuttle 's external fuel tanks by Martin Marietta Corporation . The facility was originally constructed in 1940 at the village of Michoud, Louisiana , by the Higgins-Tucker division of Higgins Industries under the direction of Andrew Jackson Higgins . Construction
4018-426: The five J-2 engines. For the first seven crewed Apollo missions, only four ullage motors were used on the S-II, and they were eliminated for the final four launches. About 30 seconds after first stage separation, the interstage ring dropped from the second stage. This was done with an inertially fixed attitude—orientation around its center of gravity —so that the interstage, only 3 feet 3 inches (1 m) from
4100-416: The four outer engines for control. The S-II was 81.6 feet (24.87 m) tall with a diameter of 33 feet (10 m), identical to the S-IC, and thus was the largest cryogenic stage until the launch of the Space Shuttle in 1981. The S-II had a dry mass of about 80,000 pounds (36,000 kg); when fully fueled, it weighed 1,060,000 pounds (480,000 kg). The second stage accelerated the Saturn V through
4182-479: The ideas and methods behind the V-2 to American engineers, though he wrote books and articles in popular magazines. This approach changed in 1957, when the Soviets launched Sputnik 1 atop an R-7 ICBM, which could carry a thermonuclear warhead to the U.S. The Army and government began putting more effort towards sending Americans into space before the Soviets. They turned to von Braun's team, who had created
SECTION 50
#17327794891664264-427: The lead contractors for construction of the rocket were Boeing , North American Aviation , Douglas Aircraft Company , and IBM . Fifteen flight-capable vehicles were built, not counting three used for ground testing. A total of thirteen missions were launched from Kennedy Space Center , nine of which carried 24 astronauts to the Moon from Apollo 8 (December 1968) to Apollo 17 (December 1972). In September 1945,
4346-477: The manufacture and structural assembly of aerospace vehicles and components. It is owned by NASA and located in New Orleans East , a section of New Orleans, Louisiana , in the United States. Organizationally it is part of NASA's Marshall Space Flight Center , and is currently a multi-tenant complex to allow commercial and government contractors, as well as government agencies, to use the site. MAF
4428-537: The maximum. This decision ended consideration of a Nova-class launch vehicle for direct ascent to the Moon or as heavy-lift derivatives for Earth orbit rendezvous . Ultimately, the lunar orbit rendezvous ("LOR") concept approved in 1962 rendered the C-8 obsolete, and the smaller Saturn C-5 was developed instead under the designation " Saturn V ", as the LOR spacecraft was within its payload capacity. The Saturn C-8 configuration
4510-459: The most fuel-efficient trajectory toward its target orbit. If the instrument unit failed, the crew could switch control of the Saturn to the command module's computer, take manual control, or abort the flight. About 90 seconds before the second stage cutoff, the center engine shut down to reduce longitudinal pogo oscillations. At around this time, the LOX flow rate decreased, changing the mix ratio of
4592-500: The noise produced was not able to melt concrete . It took about 12 seconds for the rocket to clear the tower. During this time, it yawed 1.25 degrees away from the tower to ensure adequate clearance despite adverse winds; this yaw, although small, can be seen in launch photos taken from the east or west. At an altitude of 430 feet (130 m) the rocket rolled to the correct flight azimuth and then gradually pitched down until 38 seconds after second stage ignition. This pitch program
4674-503: The outboard J-2 engines, would fall cleanly without hitting them, as the interstage could have potentially damaged two of the J-2 engines if it was attached to the S-IC. Shortly after interstage separation the Launch Escape System was also jettisoned. About 38 seconds after the second stage ignition, the Saturn V switched from a preprogrammed trajectory to a "closed loop" or Iterative Guidance Mode. The instrument unit now computed in real time
4756-495: The powerful F-1 and J-2 rocket engines ; during testing at Stennis Space Center, the force developed by the engines shattered the windows of nearby houses. Designers decided early on to attempt to use as much technology from the Saturn I program as possible for the Saturn V. Consequently, the S-IVB -500 third stage of the Saturn V was based on the S-IVB-200 second stage of the Saturn IB . The instrument unit that controlled
4838-421: The record for the largest payload capacity to low Earth orbit, 311,152 lb (141,136 kg), which included unburned propellant needed to send the Apollo command and service module and Lunar Module to the Moon. The largest production model of the Saturn family of rockets , the Saturn V was designed under the direction of Wernher von Braun at the Marshall Space Flight Center in Huntsville, Alabama ;
4920-577: The rocket factory to build the structure for several components of the cancelled Constellation program , including the Orion spacecraft , the Ares I Upper Stage , and the Ares V Core Stage. Under the Obama administration, the Constellation Program was cancelled in 2010, but was replaced with SLS a year later to continue space exploration efforts. NASA has an agreement in place to rent out
5002-511: The rocket rapidly lost mass, total acceleration including gravity increased to nearly 4 g at T+135 seconds. At this point, the inboard (center) engine was shut down to prevent acceleration from increasing beyond 4 g . When oxidizer or fuel depletion was sensed in the suction assemblies, the remaining four outboard engines were shut down. First stage separation occurred a little less than one second after this to allow for F-1 thrust tail-off. Eight small solid fuel separation motors backed
SECTION 60
#17327794891665084-468: The rocket would include complete versions of all three stages. By testing all components at once, far fewer test flights would be required before a crewed launch. The C-5 was confirmed as NASA's choice for the Apollo program in early 1962, and was named the Saturn ;V. The C-1 became the Saturn I and C-1B became Saturn IB. Von Braun headed a team at the MSFC to build a vehicle capable of launching
5166-490: The roof of the main manufacturing building was breached and debris damaged ET-122 stored inside; that tank was refurbished and later flew on the final flight of Space Shuttle Endeavour , STS-134 . Thirty-eight NASA and Lockheed Martin employees stayed behind during Hurricane Katrina to operate the pumping systems, knowing that if not activated and sustained, the facility would have been destroyed. The workers pumped more than one billion gallons (3,800,000 m ) of water out of
5248-400: The same height and mass and contained the same electrical connections as the actual stages. NASA stacked (assembled) the Saturn V on a Mobile Launcher , which consisted of a Launch Umbilical Tower with nine swing arms (including the crew access arm), a "hammerhead" crane, and a water suppression system which was activated prior to engine ignition during a launch. After assembly was completed,
5330-527: The shaped explosive charges attached to the outer surfaces of the rocket to detonate. These would make cuts in fuel and oxidizer tanks to disperse the fuel quickly and to minimize mixing. The pause between these two actions would give time for the crew to escape via the Launch Escape Tower or (in the later stages of the flight) the propulsion system of the Service module. A third command, "safe",
5412-458: The top of the LOX tank and bottom of the LH2 tank. It consisted of two aluminum sheets separated by a honeycomb structure made of phenolic resin . This bulkhead had to be able to insulate against the 126 °F (70 °C) temperature difference between the two tanks. The use of a common bulkhead saved 7,900 pounds (3.6 t) by both eliminating one bulkhead and reducing the stage's length. Like
5494-465: The two launch pads). From 1964 until 1973, $ 6.417 billion (equivalent to $ 40.9 billion in 2023) was appropriated for the Research and Development and flights of the Saturn V, with the maximum being in 1966 with $ 1.2 billion (equivalent to $ 8.61 billion in 2023). That same year, NASA received its largest total budget of $ 4.5 billion, about 0.5 percent of the gross domestic product (GDP) of
5576-439: The two propellants and ensuring that there would be as little propellant as possible left in the tanks at the end of second stage flight. This was done at a predetermined delta-v . Five level sensors in the bottom of each S-II propellant tank were armed during S-II flight, allowing any two to trigger S-II cutoff and staging when they were uncovered. One second after the second stage cut off it separated and several seconds later
5658-422: The upper atmosphere with 1,100,000 pounds-force (4,900 kN) of thrust in a vacuum. When loaded with fuel, more than 90 percent of the mass of the stage was propellant; however, the ultra-lightweight design had led to two failures in structural testing. Instead of having an intertank structure to separate the two fuel tanks as was done in the S-IC, the S-II used a common bulkhead that was constructed from both
5740-583: The vehicle (equivalent to $ 1.18 billion–$ 1.2 billion in 2023). The Saturn V carried all Apollo lunar missions, which were launched from Launch Complex 39 at the John F. Kennedy Space Center in Florida . After the rocket cleared the launch tower, flight control transferred to Mission Control at the Johnson Space Center in Houston, Texas . An average mission used the rocket for
5822-471: Was also designed with high mass efficiency, though not quite as aggressively as the S-II. The S-IVB had a dry mass of about 23,000 pounds (10,000 kg) and, when fully fueled, weighed about 262,000 pounds (119,000 kg). The S-IVB was the only rocket stage of the Saturn V small enough to be transported by the cargo plane Aero Spacelines Pregnant Guppy . For lunar missions it was fired twice: first for Earth orbit insertion after second stage cutoff, and
5904-585: Was also required to keep the rocket level as it traveled the 3 miles (4.8 km) to the launch site, especially at the 3 percent grade encountered at the launch pad. The CT also carried the Mobile Service Structure (MSS), which allowed technicians access to the rocket until eight hours before launch, when it was moved to the "halfway" point on the Crawlerway (the junction between the VAB and
5986-573: Was built by the Boeing Company at the Michoud Assembly Facility , New Orleans , where the Space Shuttle external tanks would later be built by Lockheed Martin . Most of its mass at launch was propellant: RP-1 fuel with liquid oxygen as the oxidizer . The stage was 138 feet (42 m) tall and 33 feet (10 m) in diameter. It provided 7,750,000 lbf (34,500 kN) of thrust at sea level. The S-IC stage had
6068-567: Was carried by the Aero Spacelines Pregnant Guppy and Super Guppy , but could also have been carried by barge if warranted. Upon arrival at the Vertical Assembly Building, each stage was inspected in a horizontal position before being oriented vertically. NASA also constructed large spool-shaped structures that could be used in place of stages if a particular stage was delayed. These spools had
6150-529: Was done on behalf of the United States government for the war production during World War II of plywood C-76 cargo planes and the Higgins Boat landing craft . The project cost $ 180 million ($ 2.8 billion in 2018). Production of the C-76 never commenced and instead produced 2 Curtiss C-46 Commando in 1943 and remaining order cancelled in 1944. The facility was referred to as Michoud (Factory) Airfield in
6232-424: Was lost in both engines during a severe thunderstorm. The aircraft was towed into the Michoud facility, where its engines were replaced. On 6 June, it took off, with a crew of two and minimal fuel, using the former runway at Michoud, which had been reused as a road, Saturn Boulevard. It was flown the short distance to New Orleans International Airport, where it was fully repaired. Saturn V The Saturn V
6314-516: Was never taken further than the design process, as it was too large and costly. [REDACTED] This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration . This rocketry article is a stub . You can help Misplaced Pages by expanding it . Michoud Ordnance Plant The Michoud Assembly Facility ( MAF ) is an 832-acre (337-hectare) industrial complex for
6396-400: Was set according to the prevailing winds during the launch month. The four outboard engines also tilted toward the outside so that in the event of a premature outboard engine shutdown the remaining engines would thrust through the rocket's center of mass . The Saturn V reached 400 feet per second (120 m/s) at over 1 mile (1,600 m) in altitude. Much of the early portion of the flight
6478-451: Was spent gaining altitude, with the required velocity coming later. The Saturn V broke the sound barrier at just over 1 minute at an altitude of between 3.45 and 4.6 miles (5.55 and 7.40 km). At this point, shock collars, or condensation clouds, would form around the bottom of the command module and around the top of the second stage. At about 80 seconds, the rocket experienced maximum dynamic pressure (max q). The dynamic pressure on
6560-483: Was then assigned as the special assistant to the director of MSFC in May 1968 and subsequently retired from NASA on January 1, 1969. On July 16, 1969, the Saturn V launched Apollo 11 , putting the first men on the Moon. The size and payload capacity of the Saturn V dwarfed those of all other previous rockets successfully flown at that time. With the Apollo spacecraft on top, it stood 363 feet (111 m) tall, and, ignoring
6642-427: Was turned off about 26 seconds earlier than the outboard engines to limit acceleration. During launch, the S-IC fired its engines for 168 seconds (ignition occurred about 8.9 seconds before liftoff) and at engine cutoff, the vehicle was at an altitude of about 42 miles (67 km), was downrange about 58 miles (93 km), and was moving around 7,500 feet per second (2,300 m/s). While not put into production,
6724-453: Was used after the S-IVB stage reached orbit to irreversibly deactivate the self-destruct system. The system was also held inactive as long as the rocket was still on the launch pad. The first stage burned for about 2 minutes and 41 seconds, lifting the rocket to an altitude of 42 miles (68 km) and a speed of 6,164 miles per hour (2,756 m/s) and burning 4,700,000 pounds (2,100,000 kg) of propellant. At 8.9 seconds before launch,
#165834