The Renewables Obligation ( RO ) was designed to encourage generation of electricity from eligible renewable sources in the United Kingdom . It was introduced in April 2002, both in England and Wales and in Scotland albeit in a slightly different form: the Renewables Obligation (Scotland). The RO was later introduced in Northern Ireland in April 2005. In all cases, replacing the Non-Fossil Fuel Obligation which operated from 1990.
44-533: The RO placed an obligation on licensed electricity suppliers in the United Kingdom to source an increasing proportion of electricity from renewable sources, similar to a renewable portfolio standard . In 2010/11 it was 11.1% (4.0% in Northern Ireland). This figure was initially set at 3% for the period 2002/03 and under current political commitments will rise to 15.4% (6.3% in Northern Ireland) by
88-736: A different form (the Renewables Obligation (Scotland)) in Scotland in April 2002 and in Northern Ireland in April 2005, replacing the Non-Fossil Fuel Obligation which operated from 1990. The RO places an obligation on licensed electricity suppliers in the United Kingdom to source an increasing proportion of electricity from renewable sources, similar to a renewable portfolio standard. In 2010/11 it
132-638: A different number of Renewable Energy Credits depending on the generation technology; for example, solar generation counts for twice as much as other renewable sources in Michigan and Virginia. The Lawrence Berkeley National Laboratory claims that RPS requirements were responsible for 60% of the total increase in American renewable electricity generation since the year 2000. However, the LBNL also reports that RPSs' role has been declining in recent years from 71% of
176-683: A newly created Department of Energy . On 5 March that year, following a Labour Party victory in the February 1974 general election , the department was split into the Department of Trade , the Department of Industry and the Department of Prices and Consumer Protection . In 1983 the departments of Trade and Industry were reunited. The Department of Energy was re-merged back into the DTI in 1992, but various media-related functions transferred to
220-517: A payment is made into the buy-out fund. The buy-out price suppliers pay is a fixed price per MWh shortfall and is adjusted in line with the Retail Prices Index each year. The proceeds of the buy-out fund are paid back to suppliers in proportion to how many ROCs they have presented. For example, if they were to submit 5% of the total number of ROCs submitted they would receive 5% of the total funds that defaulting supply companies pay into
264-401: A specified fraction of their electricity from renewable energy sources. Certified renewable energy generators earn certificates for every unit of electricity they produce and can sell these along with their electricity to supply companies. Supply companies then pass the certificates to some form of regulatory body to demonstrate their compliance with their regulatory obligations. RPS can rely on
308-512: Is 11.1% (4.0% in Northern Ireland). This figure was initially set at 3% for the period 2002/03 and under current political commitments rose to 15.4% (6.3% in Northern Ireland) by the period 2015/16 and then it runs until 2037 (2033 in Northern Ireland). The extension of the scheme from 2027 to 2037 was declared on 1 April 2010 and is detailed in the National Renewable Energy Action Plan . Since its introduction
352-516: Is a regulation that requires the increased production of energy from renewable energy sources , such as wind , solar , biomass , and geothermal . Other common names for the same concept include Renewable Electricity Standard ( RES ) at the United States federal level and Renewables Obligation in the UK . The RPS mechanism places an obligation on electricity supply companies to produce
396-651: Is anticipated the CfDs will start) and 2017 to choose between CfDs and ROCs. After that date, the government intends to close the Renewables Obligation to new generation and ‘vintage’ existing ROCs, meaning that levels and length of support for existing participants in the Renewables Obligation will be maintained. However, the government subsequently announced that it would bring forward the deadline for Renewables Obligation accreditation for large scale (>5MW) solar photovoltaic power projects, to 1 April 2015. The government further announced on 18 June 2015 that it intended to close
440-757: Is issued annually detailing the precise level of the obligation for the coming year-long period of obligation and the level of the buy-out price. The Renewables Obligation (England and Wales) was introduced by the Department of Trade and Industry , the Renewables Obligation (Scotland) was introduced by the Scottish Executives and the Northern Ireland Renewables Obligation was introduced by the Department of Enterprise Trade and Investment (DETINI). The Orders were subject to review in 2005/06 and new Orders came into effect on 1 April 2006. The relevant pieces of legislation for
484-418: Is less renewable production than the obligation, the price of ROCs would increase above the buy-out price, as purchasers anticipate later payments from the buy-out fund on each ROC. Obligation periods run for one year, beginning on 1 April and running to 31 March. Supply companies have until the 31 August following the period to submit sufficient ROCs to cover their obligation, or to submit sufficient payment to
SECTION 10
#1732780248145528-468: The Department for International Trade (DIT) was split off. Energy returned in 2017 with the creation of the Department for Business, Energy and Industrial Strategy (BEIS); BEIS lasted until 2023 when this department was again split and mixed with other responsibilities, into the Department for Business and Trade (DBT), the Department for Energy Security and Net Zero (DESNZ) and the Department for Science, Innovation and Technology (DSIT). The DTI had
572-582: The Department of National Heritage . Until it was succeeded in June 2007 the DTI continued to set the energy policy of the United Kingdom . After the 2005 general election the DTI was renamed to the Department for Productivity, Energy and Industry , but the name reverted to Department of Trade and Industry less than a week later, after widespread derision, including some from the Confederation of British Industry . In 2007, part of DTI merged into
616-555: The Northern Ireland Authority for Energy Regulation (NIAER). The following sources of electricity are eligible for ROCs (although the scheme is closed to new entrants): Co-firing of biomass is also eligible. Not all technologies which are eligible will actually be supported due to cost. Some renewable sources of electricity are not eligible for ROCs (e.g. larger hydroelectric schemes which were in operation before April 2002). The Renewables Obligation represents
660-607: The United Kingdom , Italy , Poland , Sweden , Belgium , and Chile , as well as in 29 of 50 U.S. states , and the District of Columbia . Renewable Energy (Electricity) Act 2000 (Cth) China adopted a renewable energy target in 2006 and modified it in 2009 to the following targets: The European Union passed the Directive on Electricity Production from Renewable Energy Sources in 2001 and expanded it in 2007 to
704-464: The Government to steer industry towards investment in less well developed forms of renewable energy to enable them to contribute to meeting the long-term targets, rather than concentrating investment in technologies that are economically favourable in the short-term. The Government has reviewed the banding levels for appropriate incentives for the period 2013–2017. These bands include a reduction in
748-630: The Promotion of New Energy Usage, 118 million KWh was targeted in 2012 (METI). The Republic of Korea adopted the Act on the Promotion of the Development, Use, and Diffusion of New and Renewable Energy since 2012. The Renewables Obligation (RO) is designed to encourage generation of electricity from eligible renewable sources in the United Kingdom . It was introduced in England and Wales and in
792-656: The RO has more than tripled the level of eligible renewable electricity generation (from 1.8% of total UK supply to 7.0% in 2010 ). The Public Utility Regulatory Policies Act is a law, passed in 1978 by the United States Congress as part of the National Energy Act . It was meant to promote greater use of renewable energy, mostly through feed-in tariffs , but contains little language declaring explicit renewable energy objectives or quotas. In 2009,
836-574: The ROC Register and so are electronic certificates. Normally, a renewable generator will transfer the related ROCs through Ofgem's electronic registry when it sells power to an electricity supplier. The Utilities Act 2000 gives the Secretary of State the power to require electricity suppliers to supply a certain proportion of their total sales in the United Kingdom from electricity generated from renewable sources. A Renewables Obligation Order
880-426: The Renewables Obligation in this way, and scheduling regular future reviews, the Government recognised that the market would not deliver the mix of renewable energy generation required to meet the targets if the incentives remained technology-neutral. It was therefore necessary for the Government to perform a continuing strategic role and retain the capability to intervene if necessary. The introduction of banding allowed
924-422: The Renewables Obligation to be replaced, claiming that the scheme is a 'very costly way' of supporting renewable electricity generation. In particular they are concerned that electricity customers pay for renewables projects even if they are not built due to problems obtaining planning permission , and the failure of the Renewables Obligation to link financial support for renewables to either the electricity price or
SECTION 20
#1732780248145968-538: The Renewables Obligation to new onshore wind power projects on 1 April 2016 (bringing the deadline forward by one year). In addition to the introduction of feed-in tariffs , the UK Government's proposed electricity market reform included two further initiatives to encourage the decarbonisation of electricity generation : a Carbon Price Floor and an Emissions Performance Standard . Renewable portfolio standard A renewable portfolio standard ( RPS )
1012-462: The UK Government's main policy measure for stimulating the growth of electricity generation from renewable sources. The Government envisages that 30% of electricity demand will need to be generated by renewable sources in order for the UK to meet a legally binding EU target of obtaining 15% of energy from renewable sources by 2020. The Renewables Obligation is a market-based mechanism designed to incentivise
1056-531: The UK electricity market which saw feed-in tariffs with contracts for difference (CfD) replace the Renewables Obligation as the main renewable generation support mechanism. Unlike ROCs, CfDs will also be available to generators of nuclear electricity . Other than with respect to large scale (>5MW) solar photovoltaic power projects and onshore wind power projects, the Renewables Obligation remained open to new generation until 31 March 2017, allowing new renewable generation that comes online between 2014 (when it
1100-588: The US Congress considered Federal level RPS requirements. The American Clean Energy and Security Act reported out of committee in July by the Senate Committee on Energy & Natural Resources includes a Renewable Electricity Standard that called for 3% of U.S. electrical generation to come from non-hydro renewables by 2013, but the full Senate did not pass the bill. Different state RPS programs issue
1144-494: The United Kingdom and supplied to customers in the United Kingdom by a licensed supplier. ROCs are issued by Ofgem to accredited renewable generators (or in the case of generating stations subject to a NFFO ( non-fossil fuels obligation ), Scottish Renewables Obligation or Northern Ireland NFFO contract, to the nominated electricity supplier). It is worth noting that the Scottish Renewables Obligation
1188-534: The adoption of RPS mechanisms claim that market implementation will result in competition, efficiency, and innovation that will deliver renewable energy at the lowest possible cost, allowing renewable energy to compete with cheaper fossil fuel energy sources. Since 2013, the Levelized cost of electricity from Wind energy dropped below that of all fossil fuels, followed in 2015 by Solar energy . RPS-type mechanisms have been adopted in several countries, including
1232-471: The annual American renewables builds in the year 2013 to 46% just two years later, in 2015. Department of Trade and Industry (United Kingdom) The Department of Trade and Industry ( DTI ) was a United Kingdom government department formed on 19 October 1970. It was replaced with the creation of the Department for Business, Enterprise and Regulatory Reform and the Department for Innovation, Universities and Skills on 28 June 2007. The department
1276-478: The buy-out fund to cover the shortfall. The cost of ROCs is effectively paid by electricity consumers of supply companies that fail to present sufficient ROCs, whilst reducing the cost to consumers of supply companies who submit large numbers of ROCs, assuming that all costs and savings are passed on to consumers. (1 April to 31 March) (£/MWh) per Unit (p/kWh) Sources: A ROC is the green certificate issued for eligible renewable electricity generated within
1320-443: The buy-out fund. ROCs are intended to create a market, and be traded at market prices that differ from the official buy-out price. If there is an excess of renewable production, beyond the supplier obligation, the price of ROCs would fall below the buy-out price. The price of ROCs could approach zero if renewable and non-renewable generation costs became similar, when there would be little or no subsidy of renewable generation. If there
1364-511: The following EU-wide targets (although member states are free to pass more aggressive targets): The German Renewable Energy Act , since its adoption in 2000, is producing strong growth in renewable power capacity by encouraging private investors through guaranteed Feed-in tariffs . Germany adopted targets more aggressive than the EU mandated targets in September 2010: Based on the 1997 Act on
Renewables Obligation (United Kingdom) - Misplaced Pages Continue
1408-460: The generation of electricity from renewable energy sources over more traditional alternatives at a reasonable cost. When it was first introduced in 2002, each form of renewable energy technology received the same level of support, namely one ROC/MWh of electricity generated. This was a conscious decision as the Government was keen to promote a market-led approach, emphasising competition between technologies to minimise cost, and did not want to distort
1452-459: The market by appearing to place the importance of certain technologies above others. As a result, whilst being ostensibly technology-neutral, the Renewables Obligation in its original form in fact favoured the deployment of the more established, near-market technologies such as landfill gas and onshore wind , those which were most economically efficient, over less well developed technologies that were further from commercial viability. A review of
1496-581: The marketplace to maintain the confidence of investors. The concerns of both bodies seem to be shared by the Renewable Energy Association . The Scottish Wind Assessment Project has criticised the scheme for rewarding reductions in renewable electricity output: two electricity suppliers, Scottish and Southern Energy and Npower , down-rated several large hydro-power stations in order to qualify for Renewables Obligation Certificates. The UK Government proposed wide-ranging reforms to
1540-431: The new Department for Innovation, Universities and Skills (DIUS), while most of it was renamed as the Department for Business, Enterprise and Regulatory Reform (BERR); part of that would become the Department of Energy and Climate Change (DECC) in 2008. The responsibilities which had gone to DIUS largely returned in 2009 with a remerger to create the Department for Business, Innovation and Skills (BIS), though in 2016
1584-495: The original scheme. The Government announced its intention to reform the Renewables Obligation in 2006. Banding was introduced in 2009 to provide differing levels of support to groups of technologies depending upon their relative maturity, development cost and associated risk. Whilst increasing the incentive for technologies in the early stages of development this also allowed the level of support for well established technologies to be reduced to avoid over-subsidisation. In reforming
1628-434: The performance of the Renewables Obligation was announced in 2003. Modelling of future deployment scenarios indicated that targets would not be met with current levels of support due to constraints on the availability and deployment of the most established technologies. A significant contribution would therefore be required from less mature technologies which lacked sufficient incentive to develop into feasible alternatives under
1672-604: The period 2015/16 and then it runs until 2037 (2033 in Northern Ireland). An extension of the scheme from 2027 to 2037 was declared on 1 April 2010 and is detailed in the National Renewable Energy Action Plan . The RO closed to new generation in March 2017, and was replaced by the Contracts for Difference scheme. Suppliers meet their obligations by presenting Renewable Obligation Certificates (ROCs) to Ofgem . Where suppliers do not have sufficient ROCs to cover their obligation,
1716-583: The period April 2006 – March 2007 are: All pieces of legislation are published on the National Archives legislation site. Ofgem is the Office of Gas and Electricity Markets in Great Britain. The Orders detail Ofgem's powers and functions to administer the Renewables Obligation. These functions include: Ofgem also administers the Northern Ireland Renewables Obligation (NIRO) on behalf of
1760-564: The price of renewables in the European Union Emissions Trading Scheme . The British Wind Energy Association , whose members are major beneficiaries of the existing scheme, claims that Ofgem is partly responsible for the costs because it has failed to prioritise work on the National Grid which would allow more renewable capacity to be connected. They also stressed the need to maintain stability in
1804-575: The private market for its implementation. In jurisdictions such as California, minimum RPS requirements are legislated. California Senate Bill 350 passed in October 2015 requires retail sellers and publicly owned utilities to procure 50 percent of their electricity from eligible renewable energy resources by 2030. RPS programs tend to allow more price competition between different types of renewable energy, but can be limited in competition through eligibility and multipliers for RPS programs. Those supporting
Renewables Obligation (United Kingdom) - Misplaced Pages Continue
1848-473: The tariff for onshore wind to 0.9 ROCs/MWh and an increase for small wave and tidal stream projects, under 30 MW, to 5 ROCs/MWh. The obligation was reviewed by government following a consultation period that finished in September 2007. The document at the centre of the consultation set out an amended form of the RO which will see different technologies earn different numbers of ROCs. This has not yet been adopted as policy. On 22 January 2007, Ofgem called for
1892-575: Was formed on 19 October 1970 through the merger of the Board of Trade and the Ministry of Technology , creating a new cabinet post of Secretary of State for Trade and Industry . Additionally, the department also took over the Department of Employment 's former responsibilities for monopolies and mergers. However, in January 1974, the department's responsibilities for energy production were transferred to
1936-404: Was superseded by the Renewables Obligation (Scotland) in 2002. The default is that one ROC is issued for each megawatt-hour (MWh) of eligible renewable output. Some technologies get more, some less. For instance, offshore wind installations receive 2 ROCs per MWh; onshore wind installations receive 0.9 ROCs per MWh and sewage gas -fired plants receive half a ROC per MWh. ROCs are issued into
#144855