65-673: Totley Tunnel is a 6,230-yard (3.5 mi; 5.7 km) tunnel under Totley Moor , on the Hope Valley line between Totley on the outskirts of Sheffield and Grindleford in Derbyshire , England. Totley Tunnel was constructed by the Midland Railway on its line between Sheffield and Manchester via the Hope Valley. The engineers were Parry and Storey of Nottingham and the contractor for 10.5 miles (16.9 km) of

130-695: A canal . The central portions of a rapid transit network are usually in the tunnel. Some tunnels are used as sewers or aqueducts to supply water for consumption or for hydroelectric stations. Utility tunnels are used for routing steam, chilled water, electrical power or telecommunication cables, as well as connecting buildings for convenient passage of people and equipment. Secret tunnels are built for military purposes, or by civilians for smuggling of weapons , contraband , or people . Special tunnels, such as wildlife crossings , are built to allow wildlife to cross human-made barriers safely. Tunnels can be connected together in tunnel networks . A tunnel

195-612: A ban on overtime and a series of rolling strikes. That same month, the operator reinstated direct train services between Castleford and York for the first time in 50 years; this service change was facilitated by recent infrastructure improvement work undertaken as part of the Transpennine Route Upgrade (TRU). TransPennine Trains took over all services operated by its predecessor, TransPennine Express , on 28 May 2023. The TransPennine Express routes are subdivided into three operations: As of December 2023,

260-626: A downturn in passengers due to COVID-19 , and noise complaints from neighbours of the Scarborough maintenance facility, which resulted in a persistently low utilisation rate being achieved. The DfT believes that the withdrawal of the Nova 3 sets can be adequately offset by maximising the utilisation of other trains, such as 19 Class 802 bi-mode train sets and the Class 185 DMUs. Chris Jackson, managing director of TransPennine Express, has advocated for

325-449: A large factor in the decision making process. Civil engineers usually use project management techniques for developing a major structure. Understanding the amount of time the project requires, and the amount of labor and materials needed is a crucial part of project planning. The project duration must be identified using a work breakdown structure and critical path method . Also, the land needed for excavation and construction staging, and

390-468: A new long-term depot and maintenance strategy. During September 2023, following a radical review by the DfT, it was announced that TransPennine Express's Nova 3 train sets, comprising Class 68 diesel locomotives hauling rakes of Mark 5A carriages, had been scheduled for withdrawal. This rolling stock was relatively new, yet had been beset by multiple challenges including technical issues, driver training,

455-467: A pipe jack, with the span of some box jacks in excess of 20 metres (66 ft). A cutting head is normally used at the front of the box being jacked, and spoil removal is normally by excavator from within the box. Recent developments of the Jacked Arch and Jacked deck have enabled longer and larger structures to be installed to close accuracy. There are also several approaches to underwater tunnels,

520-640: A regular stopping service at the Hope Valley stations, TransPennine Express and East Midlands Railway . Above ground, there are a number of ventilation shafts still visible along the Dore and Totley Moss moorland. Several shafts are visible in Dore from Strawberry Lee Road, but safety railings have now been added across the top of the shafts. Additionally, the Western portal is easily observed by hikers at its location in Grindleford . Tunnel A tunnel

585-421: A specialized method called clay-kicking for digging tunnels in clay-based soils. The clay-kicker lies on a plank at a 45-degree angle away from the working face and rather than a mattock with his hands, inserts with his feet a tool with a cup-like rounded end, then turns the tool with his hands to extract a section of soil, which is then placed on the waste extract. Clay-kicking is a specialized method developed in

650-434: A tube can be sunk into a body of water, which is called an immersed tunnel. Cut-and-cover is a simple method of construction for shallow tunnels where a trench is excavated and roofed over with an overhead support system strong enough to carry the load of what is to be built above the tunnel. There are two basic forms of cut-and-cover tunnelling: Shallow tunnels are often of the cut-and-cover type (if under water, of

715-747: A tunnel than a sufficiently strong bridge). Some water crossings are a mixture of bridges and tunnels, such as the Denmark to Sweden link and the Chesapeake Bay Bridge-Tunnel in Virginia . There are particular hazards with tunnels, especially from vehicle fires when combustion gases can asphyxiate users, as happened at the Gotthard Road Tunnel in Switzerland in 2001. One of the worst railway disasters ever,

SECTION 10

#1732779738950

780-432: A tunnel. Bridges usually require a larger footprint on each shore than tunnels. In areas with expensive real estate, such as Manhattan and urban Hong Kong , this is a strong factor in favor of a tunnel. Boston's Big Dig project replaced elevated roadways with a tunnel system to increase traffic capacity, hide traffic, reclaim land, redecorate, and reunite the city with the waterfront. The 1934 Queensway Tunnel under

845-463: Is allowed in this tunnel tube, and motorcyclists are directed to the other tube. Each level was built with a three-lane roadway, but only two lanes per level are used – the third serves as a hard shoulder within the tunnel. The A86 Duplex is Europe's longest double-deck tunnel. TransPennine Express TransPennine Trains Limited , trading as TransPennine Express (TPE), is a British train operating company that has operated passenger services in

910-547: Is an underground or undersea passageway. It is dug through surrounding soil, earth or rock, or laid under water, and is usually completely enclosed except for the two portals common at each end, though there may be access and ventilation openings at various points along the length. A pipeline differs significantly from a tunnel, though some recent tunnels have used immersed tube construction techniques rather than traditional tunnel boring methods. A tunnel may be for foot or vehicular road traffic , for rail traffic, or for

975-505: Is intended to carry both the Istanbul metro and a two-level highway, over a length of 6.5 km (4.0 miles). The French A86 Duplex Tunnel  [ fr ] in west Paris consists of two bored tunnel tubes, the eastern one of which has two levels for light motorized vehicles, over a length of 10 km (6.2 miles). Although each level offers a physical height of 2.54 m (8.3 ft), only traffic up to 2 m (6.6 ft) tall

1040-494: Is relatively long and narrow; the length is often much greater than twice the diameter , although similar shorter excavations can be constructed, such as cross passages between tunnels. The definition of what constitutes a tunnel can vary widely from source to source. For example, in the United Kingdom, a road tunnel is defined as "a subsurface highway structure enclosed for a length of 150 metres (490 ft) or more." In

1105-401: Is sometimes necessary during the excavation of a tunnel. They are usually circular and go straight down until they reach the level at which the tunnel is going to be built. A shaft normally has concrete walls and is usually built to be permanent. Once the access shafts are complete, TBMs are lowered to the bottom and excavation can start. Shafts are the main entrance in and out of the tunnel until

1170-515: Is that the open building pit is muted after tunnel construction; no roof is placed. Some tunnels are double-deck, for example, the two major segments of the San Francisco–Oakland Bay Bridge (completed in 1936) are linked by a 160-metre (540 ft) double-deck tunnel section through Yerba Buena Island , the largest-diameter bored tunnel in the world. At construction this was a combination bidirectional rail and truck pathway on

1235-698: Is the Siloam Tunnel , built in Jerusalem by the kings of Judah around the 8th century BC. Another tunnel excavated from both ends, maybe the second known, is the Tunnel of Eupalinos , which is a tunnel aqueduct 1,036 m (3,400 ft) long running through Mount Kastro in Samos , Greece. It was built in the 6th century BC to serve as an aqueduct . In Ethiopia , the Siqurto foot tunnel , hand-hewn in

1300-569: The Balvano train disaster , was caused by a train stalling in the Armi tunnel in Italy in 1944, killing 426 passengers. Designers try to reduce these risks by installing emergency ventilation systems or isolated emergency escape tunnels parallel to the main passage. Government funds are often required for the creation of tunnels. When a tunnel is being planned or constructed, economics and politics play

1365-471: The Port Authority of New York and New Jersey was not aware of this bill and had not asked for a grant for such a project. Increased taxes to finance a large project may cause opposition. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the groundwater conditions, the length and diameter of

SECTION 20

#1732779738950

1430-848: The Queens-Midtown Tunnel between Manhattan and the borough of Queens on Long Island ; the Detroit-Windsor Tunnel between Michigan and Ontario ; and the Elizabeth River tunnels between Norfolk and Portsmouth, Virginia ; the 1934 River Mersey road Queensway Tunnel ; the Western Scheldt Tunnel , Zeeland, Netherlands; and the North Shore Connector tunnel in Pittsburgh, Pennsylvania . The Sydney Harbour Tunnel

1495-472: The River Mersey at Liverpool was chosen over a massively high bridge partly for defense reasons; it was feared that aircraft could destroy a bridge in times of war, not merely impairing road traffic but blocking the river to navigation. Maintenance costs of a massive bridge to allow the world's largest ships to navigate under were considered higher than for a tunnel. Similar conclusions were reached for

1560-679: The United Kingdom of digging tunnels in strong clay-based soil structures. This method of cut and cover construction required relatively little disturbance of property during the renewal of the United Kingdom's then ancient sewerage systems. It was also used during the First World War by Royal Engineer tunnelling companies placing mines beneath German lines, because it was almost silent and so not susceptible to listening methods of detection. Tunnel boring machines (TBMs) and associated back-up systems are used to highly automate

1625-610: The canton of Glarus . The borehole has a diameter of 8.03 metres (26.3 ft). The four TBMs used for excavating the 57-kilometre (35 mi) Gotthard Base Tunnel , in Switzerland , had a diameter of about 9 metres (30 ft). A larger TBM was built to bore the Green Heart Tunnel (Dutch: Tunnel Groene Hart) as part of the HSL-Zuid in the Netherlands, with a diameter of 14.87 metres (48.8 ft). This in turn

1690-489: The water table . This pressurizes the ground ahead of the TBM cutter head to balance the water pressure. The operators work in normal air pressure behind the pressurized compartment, but may occasionally have to enter that compartment to renew or repair the cutters. This requires special precautions, such as local ground treatment or halting the TBM at a position free from water. Despite these difficulties, TBMs are now preferred over

1755-689: The 16th century as a metaphor for a narrow, confined space like the inside of a cask. Some of the earliest tunnels used by humans were paleoburrows excavated by prehistoric mammals. Much of the early technology of tunneling evolved from mining and military engineering . The etymology of the terms "mining" (for mineral extraction or for siege attacks ), " military engineering ", and " civil engineering " reveals these deep historic connections. Predecessors of modern tunnels were adits that transported water for irrigation , drinking, or sewerage . The first qanats are known from before 2000 BC. The earliest tunnel known to have been excavated from both ends

1820-638: The 1960s. The main idea of this method is to use the geological stress of the surrounding rock mass to stabilize the tunnel, by allowing a measured relaxation and stress reassignment into the surrounding rock to prevent full loads becoming imposed on the supports. Based on geotechnical measurements, an optimal cross section is computed. The excavation is protected by a layer of sprayed concrete, commonly referred to as shotcrete . Other support measures can include steel arches, rock bolts, and mesh. Technological developments in sprayed concrete technology have resulted in steel and polypropylene fibers being added to

1885-716: The 1971 Kingsway Tunnel under the Mersey. In Hampton Roads, Virginia , tunnels were chosen over bridges for strategic considerations; in the event of damage, bridges might prevent US Navy vessels from leaving Naval Station Norfolk . Water-crossing tunnels built instead of bridges include the Seikan Tunnel in Japan; the Holland Tunnel and Lincoln Tunnel between New Jersey and Manhattan in New York City ;

1950-521: The Burbage Brook to drive a fan. During construction a natural cavern, several hundred feet in area, was discovered, which was incorporated into the tunnel and a large air shaft was installed to the surface. The entrance to the cavern can be seen on the up side (towards Sheffield) of the tunnel halfway through. Because of the damp conditions, the workforce suffered outbreaks of typhoid , diphtheria , smallpox and scarlet fever . Accommodation

2015-709: The Middle Ages, crosses a mountain ridge. In the Gaza Strip , the network of tunnels was used by Jewish strategists as rock-cut shelters, in first links to Judean resistance against Roman rule in the Bar Kokhba revolt during the 2nd century AD. A major tunnel project must start with a comprehensive investigation of ground conditions by collecting samples from boreholes and by other geophysical techniques. An informed choice can then be made of machinery and methods for excavation and ground support, which will reduce

Totley Tunnel - Misplaced Pages Continue

2080-487: The Padley (Grindleford) end, the situation was little better and work stopped for several weeks until a drain was laid. Then, at about 2,000 yards (1,800 m), a spring was encountered which flooded the workings at 5,000 imperial gallons (23,000 L) per hour or 1.4 imperial gallons (6.3 L) per second. A raft was used to inspect the workings. Shortly after that, the shale became drier and work proceeded toward Totley,

2145-492: The TransPennine Express franchise area since May 2023. It runs regional and inter-city rail services between the major cities and towns of Northern England and Scotland. The company, which is government-owned, was established following poor performance by the previous commercially owned operator, also called TransPennine Express . It has carried over the rolling stock, passenger services, and branding. During

2210-599: The United States, the NFPA definition of a tunnel is "An underground structure with a design length greater than 23 m (75 ft) and a diameter greater than 1,800 millimetres (5.9 ft)." The word "tunnel" comes from the Middle English tonnelle , meaning "a net", derived from Old French tonnel , a diminutive of tonne ("cask"). The modern meaning, referring to an underground passageway, evolved in

2275-400: The blocky nature of rocks, the exact location of fault zones, or the stand-up times of softer ground. This may be a particular concern in large-diameter tunnels. To give more information, a pilot tunnel (or "drift tunnel") may be driven ahead of the main excavation. This smaller tunnel is less likely to collapse catastrophically should unexpected conditions be met, and it can be incorporated into

2340-502: The concrete mix to improve lining strength. This creates a natural load-bearing ring, which minimizes the rock's deformation . By special monitoring the NATM method is flexible, even at surprising changes of the geomechanical rock consistency during the tunneling work. The measured rock properties lead to appropriate tools for tunnel strengthening . In pipe jacking , hydraulic jacks are used to push specially made pipes through

2405-561: The early 2020s, the incumbent operator of the TransPennine Express franchise, FirstGroup 's TransPennine Express , suffered severe disruption of its services, which was largely attributable to events such as the COVID-19 pandemic and the 2022–2023 United Kingdom railway strikes . On 11 May 2023, following numerous cancellations and service disruptions, the Department for Transport (DfT) announced that First Group's contract to operate

2470-409: The entire tunnelling process, reducing tunnelling costs. In certain predominantly urban applications, tunnel boring is viewed as a quick and cost-effective alternative to laying surface rails and roads. Expensive compulsory purchase of buildings and land, with potentially lengthy planning inquiries, is eliminated. Disadvantages of TBMs arise from their usually large size – the difficulty of transporting

2535-441: The final tunnel or used as a backup or emergency escape passage. Alternatively, horizontal boreholes may sometimes be drilled ahead of the advancing tunnel face. Other key geotechnical factors: For water crossings, a tunnel is generally more costly to construct than a bridge. However, both navigational and traffic considerations may limit the use of high bridges or drawbridges intersecting with shipping channels, necessitating

2600-586: The following services operate off-peak, seven days a week: Following the December 2023 timetable change the following changes are made to services during peak hours: Upon commencing operations, TransPennine Express inherited the fleet of the previous franchisee. Various minor refurbishment programmes were quickly enacted. The oldest trains in the fleet, the Class 185 multiple-units, were subject to an interior deep clean, which included

2665-422: The franchise would not be renewed and, as a result, TPE would cease operations on 28 May 2023. In its place, operations were taken over by operator of last resort (OLR) TransPennine Trains. The performance of TransPennine Trains has been criticised, being amongst the least punctual train operators during 2023 and having a cancellation rate that exceeded one in eight trains during summer 2023. In October 2023,

Totley Tunnel - Misplaced Pages Continue

2730-494: The full timetable by December 2024 at the latest. Shortly thereafter, the company released a new timetable comparison tool to aid customers in interpreting the service levels and changes enacted. During early December 2023, TransPennine Trains' services were disrupted by industrial action as the train drivers belonging to the Associated Society of Locomotive Engineers and Firemen (ASLEF) trade union implemented

2795-405: The ground behind a TBM or shield. This method is commonly used to create tunnels under existing structures, such as roads or railways. Tunnels constructed by pipe jacking are normally small diameter bores with a maximum size of around 3.2 metres (10 ft). Box jacking is similar to pipe jacking, but instead of jacking tubes, a box-shaped tunnel is used. Jacked boxes can be a much larger span than

2860-578: The grouse shooting season. Four permanent and three temporary shafts were sunk near to the Totley end. The latter were cut through shale, and water was encountered in the first eight feet. The permanent shafts took longer, encountering beds of ganister , coal and rock. As the 10-by-9-foot (3.0 m × 2.7 m) headings were driven from the base of each shaft, water flow increased to 2.25 million imperial gallons (10,200,000 L) per day – equivalent to 26 imperial gallons (118 L) per second. At

2925-412: The headings finally meeting in 1892. The tunnel was the proving ground of a number of boring machines for the shot holes, using gelignite to blast the rock. No limit was set on the amount and, in all, some 163 long tons (166 t; 183 short tons) were used. The atmosphere in the workings was hot and humid, and compressed air used for ventilation. For a time at the Padley end, a turbine was installed in

2990-640: The immersed-tube type), while deep tunnels are excavated, often using a tunnelling shield . For intermediate levels, both methods are possible. Large cut-and-cover boxes are often used for underground metro stations, such as Canary Wharf tube station in London. This construction form generally has two levels, which allows economical arrangements for ticket hall, station platforms, passenger access and emergency egress, ventilation and smoke control, staff rooms, and equipment rooms. The interior of Canary Wharf station has been likened to an underground cathedral, owing to

3055-435: The inevitable smoke and steam. A major disadvantage of cut-and-cover is the widespread disruption generated at the surface level during construction. This, and the availability of electric traction, brought about London Underground's switch to bored tunnels at a deeper level towards the end of the 19th century. Prior to the replacement of manual excavation by the use of boring machines, Victorian tunnel excavators developed

3120-468: The large TBM to the site of tunnel construction, or (alternatively) the high cost of assembling the TBM on-site, often within the confines of the tunnel being constructed. There are a variety of TBM designs that can operate in a variety of conditions, from hard rock to soft water-bearing ground. Some TBMs, the bentonite slurry and earth-pressure balance types, have pressurized compartments at the front end, allowing them to be used in difficult conditions below

3185-629: The lower deck with automobiles above, now converted to one-way road vehicle traffic on each deck. In Turkey, the Eurasia Tunnel under the Bosphorus , opened in 2016, has at its core a 5.4 km (3.4 miles) two-deck road tunnel with two lanes on each deck. Additionally, in 2015 the Turkish government announced that it will build three -level tunnel, also under the Bosporus. The tunnel

3250-483: The older method of tunnelling in compressed air, with an airlock/decompression chamber some way back from the TBM, which required operators to work in high pressure and go through decompression procedures at the end of their shifts, much like deep-sea divers . In February 2010, Aker Wirth delivered a TBM to Switzerland, for the expansion of the Linth–Limmern Power Stations located south of Linthal in

3315-540: The operation of empty and loaded trains at the same time. The temporary way is replaced by the permanent way at completion, thus explaining the term " Perway ". The vehicles or traffic using a tunnel can outgrow it, requiring replacement or enlargement: An open building pit consists of a horizontal and a vertical boundary that keeps groundwater and soil out of the pit. There are several potential alternatives and combinations for (horizontal and vertical) building pit boundaries. The most important difference with cut-and-cover

SECTION 50

#1732779738950

3380-428: The operator announced that it would be temporarily cutting services from 320 services per day to 300, reducing off-peak trains between the cities of Leeds and Manchester , with the goal of improving both punctuality and reliability. TransPennine Trains' managing director, Chris Jackson, stated that this move allowed for greater driver training and helped to stabilise the timetable, and that the operator would reintroduce

3445-522: The project is completed. If a tunnel is going to be long, multiple shafts at various locations may be bored so that entrance to the tunnel is closer to the unexcavated area. Once construction is complete, construction access shafts are often used as ventilation shafts , and may also be used as emergency exits. The New Austrian Tunnelling method (NATM)—also referred to as the Sequential Excavation Method (SEM) —was developed in

3510-490: The proper machinery must be selected. Large infrastructure projects require millions or even billions of dollars, involving long-term financing, usually through issuance of bonds . The costs and benefits for an infrastructure such as a tunnel must be identified. Political disputes can occur, as in 2005 when the US House of Representatives approved a $ 100 million federal grant to build a tunnel under New York Harbor. However,

3575-407: The railway, including the tunnel, was Thomas Oliver of Horsham , West Sussex. Work began in 1888 with the construction of three brick surveying towers along the tunnel's proposed line, followed by a vertical shafts to the level of the rails. The Duke of Rutland had decreed that no more than one ventilation shaft should be sunk through his land and that work should cease from August to October, during

3640-457: The replacement of all carpets. Furthermore, all of the seats were recovered and improvements to the onboard toilet facilities were made. By late 2023, TransPennine Express had also formulated its new trains programme, a longer-term initiative in which the operator stated its intention to introduce new technologies to support decarbonisation , the acceleration of efforts to cascade and eventually entirely remove diesel trains from its fleet, and enact

3705-482: The risk of encountering unforeseen ground conditions. In planning the route, the horizontal and vertical alignments can be selected to make use of the best ground and water conditions. It is common practice to locate a tunnel deeper than otherwise would be required, in order to excavate through solid rock or other material that is easier to support during construction. Conventional desk and preliminary site studies may yield insufficient information to assess such factors as

3770-542: The sheer size of the excavation. This contrasts with many traditional stations on London Underground , where bored tunnels were used for stations and passenger access. Nevertheless, the original parts of the London Underground network, the Metropolitan and District Railways, were constructed using cut-and-cover. These lines pre-dated electric traction and the proximity to the surface was useful to ventilate

3835-400: The tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and the shape of the tunnel and appropriate risk management. There are three basic types of tunnel construction in common use. Cut-and-cover tunnels are constructed in a shallow trench and then covered over. Bored tunnels are constructed in situ, without removing the ground above. Finally,

3900-519: The tunnel starts level, then falls on gradients of 1 in 150, 1 in 176, and 1 in 100. The Totley History Group examined the life history of Joseph Hibberd, a labourer, who was injured whilst building the tunnel, and lingered, "crippled", for "five years". His grave has an inscription from Philippians 3:8. Totley Tunnel is frequently used by both passenger trains between Sheffield and Manchester and freight lines operating from Hope . The passenger services are operated by Northern Trains , which operates

3965-504: The two High Speed 1 tunnels opened in 2007, it became the fourth longest mainline railway tunnel in the UK. Because of its length, in addition to the Midland's normal block system , signal wires were installed which, when cut, caused alarms to ring in the signal boxes at each end. The same system was used in the shorter Cowburn and Clay Cross Tunnels . From the Hope Valley towards Totley

SECTION 60

#1732779738950

4030-428: The two most common being bored tunnels or immersed tubes , examples are Bjørvika Tunnel and Marmaray . Submerged floating tunnels are a novel approach under consideration; however, no such tunnels have been constructed to date. During construction of a tunnel it is often convenient to install a temporary railway, particularly to remove excavated spoil , often narrow gauge so that it can be double track to allow

4095-575: Was constructed to provide a second harbour crossing and to alleviate traffic congestion on the Sydney Harbour Bridge , without spoiling the iconic view. Other reasons for choosing a tunnel instead of a bridge include avoiding difficulties with tides, weather, and shipping during construction (as in the 51.5-kilometre or 32.0-mile Channel Tunnel ), aesthetic reasons (preserving the above-ground view, landscape, and scenery), and also for weight capacity reasons (it may be more feasible to build

4160-427: Was scarce, and the workers lived often twenty to thirty in a house. Working 24-hour shifts, as soon as one man got out of his bed, another would take his place, with little in the way of washing or sanitary facilities. At the time the tunnel was completed in 1893, it was the second-longest railway tunnel in the UK, the older Severn Tunnel being 0.8 miles (1.3 km) longer. Passenger services commenced in 1894. After

4225-732: Was superseded by the Madrid M30 ringroad , Spain, and the Chong Ming tunnels in Shanghai , China. All of these machines were built at least partly by Herrenknecht . As of August 2013 , the world's largest TBM was " Big Bertha ", a 17.5-metre (57.5 ft) diameter machine built by Hitachi Zosen Corporation , which dug the Alaskan Way Viaduct replacement tunnel in Seattle, Washington (US). A temporary access shaft