Misplaced Pages

Toronto and Region Conservation Authority

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Toronto and Region Conservation Authority ( TRCA ) is a conservation authority in southern Ontario , Canada . It owns about 16,000 hectares (40,000 acres) of land in the Toronto region, and it employs more than 400 full-time employees and coordinates more than 3,000 volunteers each year. TRCA's area of jurisdiction is watershed-based and includes 3,467 square kilometres (1,339 sq mi) – 2,506 on land and 961 water-based in Lake Ontario . This area comprises nine watersheds from west to east – Etobicoke Creek , Mimico Creek , Humber River , Don River , Highland Creek , Petticoat Creek , Rouge River , Duffins Creek and Carruthers Creek .

#718281

63-544: The lands that TRCA administers are used for flood control , recreation, education and watershed preservation activities, including drinking water source protection. On several sites, TRCA operates conservation areas open to the public for recreational use. TRCA also operates the Black Creek Pioneer Village , which preserves several 1800s-era buildings in a pioneer setting. Several municipal parks inside and outside Toronto are located on TRCA lands, such as

126-446: A canal's full capacity may cause flooding to spread to other waterways and areas of the community, which causes damage. Defenses (both long-term and short-term) can be constructed to minimize damage, which involves raising the edge of the water with levees , embankments or walls. The high population and value of infrastructure at risk often justifies the high cost of mitigation in larger urban areas. The most effective way of reducing

189-659: A 1 in 1000 year flood (light blue) and low-lying areas in need of flood defence (purple). The most sustainable way of reducing risk is to prevent further development in flood-prone areas and old waterways. It is important for at-risk communities to develop a comprehensive Floodplain Management plan. In the US, communities that participate in the National Flood Insurance Program must agree to regulate development in flood-prone areas. One way of reducing

252-409: A French teacher at Upper Canada College . He developed the community on his estate which he named after his daughter Claire Elizabeth (later Berthon b. 1831-d. 1903). A private street was built diagonally across northern Etobicoke as a shortcut to Albion Township through Toronto Gore Township (now part of Caledon and Brampton), with a toll at Claireville. The road was originally named Claireville but

315-525: A certain amount of space in which floodwaters can fill. Other beneficial uses of dam created reservoirs include hydroelectric power generation, water conservation , and recreation. Reservoir and dam construction and design is based upon standards, typically set out by the government. In the United States, dam and reservoir design is regulated by the US Army Corps of Engineers (USACE). Design of

378-556: A coast). The spawning grounds for fish and other wildlife habitats can become polluted or completely destroyed. Some prolonged high floods can delay traffic in areas which lack elevated roadways. Floods can interfere with drainage and economical use of lands, such as interfering with farming. Structural damage can occur in bridge abutments , bank lines, sewer lines, and other structures within floodways. Waterway navigation and hydroelectric power are often impaired. Financial losses due to floods are typically millions of dollars each year, with

441-517: A dam and reservoir follows guidelines set by the USACE and covers topics such as design flow rates in consideration to meteorological, topographic, streamflow, and soil data for the watershed above the structure. The term dry dam refers to a dam that serves purely for flood control without any conservation storage (e.g. Mount Morris Dam , Seven Oaks Dam ). Flood control channels are large and empty basins where surface water can flow through but

504-614: A director of the Metro Toronto and Region Conservation Authority (MTRCA). Watershed management also included promoting activities such as recreation and public education on authority lands. The Humber Valley CA opened Albion Hills Conservation Area in Caledon as well as Dalziel Pioneer Park, around a historic 1809 barn located on farmland in the Humber River valley. The designated conservation areas charged daily use fees for

567-417: A flood does happen, the city can recover quickly and costs are minimized. For example, homes can be put on stilts, electrical and HVAC equipment can be put on the roof instead of in the basement, and subway entrances and tunnels can have built-in movable water barriers. New York City began a substantial effort to plan and build for flood resilience after Hurricane Sandy . Flood resilience technologies support

630-641: A lowhead dam, is most often used to create millponds , but on the Humber River in Toronto, a weir was built near Raymore Drive to prevent a recurrence of the flood damage caused by Hurricane Hazel in October 1954. The Leeds flood alleviation scheme uses movable weirs which are lowered during periods of high water to reduce the chances of flooding upstream. Two such weirs, the first in the UK, were installed on

693-405: A method of using water to control flooding was discovered. This was accomplished by containing 2 parallel tubes within a third outer tube. When filled, this structure formed a non-rolling wall of water that can control 80 percent of its height in external water depth, with dry ground behind it. Eight foot tall water filled barriers were used to surround Fort Calhoun Nuclear Generating Station during

SECTION 10

#1732783129719

756-469: A portion of the facility. AquaFence consists of interlocking panels which are waterproof and puncture-resistant, can be bolted down to resist winds, and use the weight of floodwater to hold them in place. Materials include marine-grade batlic laminate, stainless steel, aluminum and reinforced PVC canvas. The panels are reusable and can be stored flat between uses. The technology was designed as an alternative to building seawalls or placing sandbags in

819-629: A wide range of flood management methods including but are not limited to flood mapping and physical implication measures. Flood risk management looks at how to reduce flood risk and how to appropriately manage risks that are associated with flooding. Flood risk management includes mitigating and preparing for flooding disasters, analyzing risk, and providing a risk analysis system to mitigate the negative impacts caused by flooding. Flooding and flood risk are especially important with more extreme weather and sea level rise caused by climate change as more areas will be effected by flood risk. Flood mapping

882-559: Is a broad term that includes measures to control or mitigate flood waters, such as actions to prevent floods from occurring or to minimize their impacts when they do occur. Flood management methods can be structural or non-structural: There are several related terms that are closely connected or encompassed by flood management. Flood management can include flood risk management, which focuses on measures to reduce risk, vulnerability and exposure to flood disasters and providing risk analysis through, for example, flood risk assessment . In

945-575: Is a flood defense system designed to protect people and property from inland waterway floods caused by heavy rainfall, gales, or rapid melting snow. The SCFB can be built to protect residential properties and whole communities, as well as industrial or other strategic areas. The barrier system is constantly ready to deploy in a flood situation, it can be installed in any length and uses the rising flood water to deploy. When permanent defenses fail, emergency measures such as sandbags , inflatable impermeable sacks, or other temporary barriers are used. In 1988,

1008-432: Is a neighbourhood and former hamlet in the city of Toronto , Ontario , Canada. It is located in the northwest corner of Toronto, in the former city of Etobicoke . The original hamlet was established in 1850 at the five-point intersection of Albion Road , Indian Line (later incorporated into Highway 50 and Highway 427 ), and Steeles Avenue . It was built on a land owned by Jean du Petit Pont de la Haye (1799-1872),

1071-472: Is a tool used by governments and policy makers to delineate the borders of potential flooding events, allowing educated decisions to prevent extreme flooding events. Flood maps are useful to create documentation that allows policy makers to make informed decisions about flood hazards. Flood mapping also provides conceptual models to both the public and private sectors with information about flooding hazards. Flood mapping has been criticized in many areas around

1134-425: Is an important part of climate change adaptation and climate resilience . For example, to prevent or manage coastal flooding , coastal management practices have to handle natural processes like tides but also sea level rise due to climate change. The prevention and mitigation of flooding can be studied on three levels: on individual properties, small communities, and whole towns or cities. Flood management

1197-604: Is focused in and around Toronto, including portions of the Regions of Peel, York and Durham. In 1946, a number of conservation authorities (CA) were established by the province to administer the numerous watersheds of the Toronto region (Don Valley CA, Etobicoke-Mimico CA, Humber Valley CA, Rouge CA, Duffins Creek CA, Highland Creek CA and Petticoat Creek CA) under the Conservation Authorities Act . These early conservation authorities were funded by

1260-520: Is indicated and in such cases environmentally helpful solutions may provide solutions. Natural flooding has many beneficial environmental effects. This kind of flooding is usually a seasonal occurrence where floods help replenish soil fertility, restore wetlands and promote biodiversity . Flooding has many impacts. It damages property and endangers the lives of humans and other species. Rapid water runoff causes soil erosion and concomitant sediment deposition elsewhere (such as further downstream or down

1323-404: Is not retained (except during flooding ), or dry channels that run below the street levels of some larger cities , so that if a flash flood occurs the excess water can drain out along these channels into a river or other bodies of water . Flood channels are sometimes built on the former courses of natural waterways as a way to reduce flooding. Channelization of this sort was commonly done in

SECTION 20

#1732783129719

1386-735: Is part of environmental engineering . It involves the management of water movement, such as redirecting flood run-off through the use of floodwalls and flood gates to prevent floodwaters from reaching a particular area. Flood mitigation is a related but separate concept describing a broader set of strategies taken to reduce flood risk and potential impact while improving resilience against flood events. These methods include prevention, prediction (which enables flood warnings and evacuation), proofing (e.g.: zoning regulations), physical control ( nature-based solutions and physical structures like dams and flood walls ) and insurance (e.g.: flood insurance policies). Flood relief methods are used to reduce

1449-594: Is situated in Malton ( Mississauga ), near the south end. The area is close to the large south Asian communities of Rexdale, as well as Brampton and Malton outside the city. This accessible area with large cheap lots has become home to several Hindu temples, most notably the BAPS Shri Swaminarayan Mandir Toronto . The Toronto District School Board operates an elementary school in the neighbourhood. Claireville Junior School provides

1512-436: The 2011 Missouri River Flooding . Instead of trucking in sandbag material for a flood, stacking it, then trucking it out to a hazmat disposal site, flood control can be accomplished by using the on site water. However, these are not fool proof. A 8 feet (2.4 m) high 2,000 feet (610 m) long water filled rubber flood berm that surrounded portions of the plant was punctured by a skid-steer loader and it collapsed flooding

1575-485: The River Aire in October 2017 at Crown Point, Leeds city centre and Knostrop . The Knostrop weir was operated during the 2019 England floods . They are designed to reduce potential flood levels by up to one metre. Coastal flooding is addressed with coastal defenses, such as sea walls , beach nourishment , and barrier islands . Tide gates are used in conjunction with dykes and culverts. They can be placed at

1638-623: The Toronto Zoo , Humber Bay Park and Milne Park. TRCA operates five dams for flood control. TRCA assists its partners in contributing to a healthy city region. This includes ecology and the study of water quality , natural habitats , plants, animals and more. It helps identify environmental needs, sets targets and restores natural areas. It advises partners about land use, development proposals and construction, and environmental education to help students and community members appreciate their local environment and learn to look after it. This work

1701-448: The structural type (i.e. flood control) and of the non-structural type. Structural methods hold back floodwaters physically, while non-structural methods do not. Building hard infrastructure to prevent flooding, such as flood walls , is effective at managing flooding. However, it is best practice within landscape engineering to rely more on soft infrastructure and natural systems , such as marshes and flood plains , for handling

1764-721: The 15 dams: Claireville , Milne and G. Ross Lord dam, plus others in Stouffville and on the Black Creek. The Authority constructed twelve flood control channels and two flood control dikes. Over 280 erosion control works were also constructed. The MTRCA continued to operate the Dalziel Pioneer Park. In 1960, the MTRCA opened Black Creek Pioneer Village on the Stong Farm, at the corner of Jane and Steeles on

1827-458: The 1960s, but is now often being undone, with "rechannelization" through meandering, vegetated, porous paths. This is because channellizing the flow in a concrete chute often made flooding worse. Water levels during a flood tend to rise, then fall, exponentially. The peak flood level occurs as a very steep, short spike; a quick spurt of water. Anything that slows the surface runoff (marshes, meanders, vegetation, porous materials, turbulent flow,

1890-660: The Black Creek, which expanded on the Dalziel lands. It subsequently added other pioneer buildings relocated from around the Toronto area. The village became a popular tourist destination in its own right. In 1982, the MTRCA opened the Kortright Centre for Conservation in Woodbridge, Ontario . Its mission is to be "a center of excellence in the field of sustainable technology". The 325- hectare property hosts educational programs for students, workshops for industry and

1953-560: The Province of Ontario passed legislation that made building on floodplains illegal. The authority retained the name until 1997, when Metro Toronto was abolished. In 1959, MTRCA developed its Plan for Flood Control and Water Conservation, which outlined a CDN $ 22 million plan of dam construction, flood channel construction and floodplain acquisition. In total, 15 dams, and four channels were to be built and 11,200 acres (4,500 ha) of land were to be acquired. The MTRCA constructed three of

Toronto and Region Conservation Authority - Misplaced Pages Continue

2016-589: The Toronto section of Claireville and replaced with warehousing and open storage / trucking uses, and most of the remaining homes are no longer used as residences. Claireville has today unofficially expanded into Brampton , with the portion west of an abandoned portion of former Indian Line and Highway 427 being in Brampton. Like in Toronto, the Brampton Portion largely consists of residential subdivisions, north of Queen Street. The Indian Line Campground

2079-504: The amount of mitigation needed to protect humans and buildings from flooding events. Similarly, flood warning systems are important for reducing risks. Following the occurrence of flooding events, other measures such as rebuilding plans and insurance can be integrated into flood risk management plans. Flood risk management strategy diversification is needed to ensure that management strategies cover several different scenarios and ensure best practices. Flood risk management aims to reduce

2142-650: The building site, including scour protection for shoreline developments, improving rainwater in filtration through the use of permeable paving materials and grading away from structures, and inclusion of berms , wetlands or swales in the landscape. When more homes, shops and infrastructure are threatened by the effects of flooding, then the benefits of protection are worth the additional cost. Temporary flood defenses can be constructed in certain locations which are prone to floods and provide protection from rising flood waters. Rivers running through large urban developments are often controlled and channeled. Water rising above

2205-601: The capacity of stormwater systems. This separates stormwater from blackwater , so that overflows in peak periods do not contaminate rivers. One example is the SMART Tunnel in Kuala Lumpur. Some methods of flood control have been practiced since ancient times. These methods include planting vegetation to retain extra water, terracing hillsides to slow flow downhill, and the construction of floodways (man-made channels to divert floodwater). Other techniques include

2268-463: The community. In the 1970s Highway 427 was built along the Indian Line alignment along the southwestern edge of the neighbourhood and in the 1990s was extended to Highway 407 when that toll road was built just to the north. This combined with the existing rail lines and proximity to Pearson Airport make the area prime industrial land. Today, some of original residential homes have disappeared in

2331-417: The construction of levees, lakes, dams, reservoirs, retention ponds to hold extra water during times of flooding. Many dams and their associated reservoirs are designed completely or partially to aid in flood protection and control. Many large dams have flood-control reservations in which the level of a reservoir must be kept below a certain elevation before the onset of the rainy/summer melt season to allow

2394-473: The context of natural hazards and disasters , risk management involves "plans, actions, strategies or policies to reduce the likelihood and/or magnitude of adverse potential consequences, based on assessed or perceived risks". Flood control , flood protection , flood defence and flood alleviation are all terms that mean "the detention and/or diversion of water during flood events for the purpose of reducing discharge or downstream inundation". Flood control

2457-568: The damage caused by flooding is to remove buildings from flood-prone areas, leaving them as parks or returning them to wilderness. Floodplain buyout programs have been operated in places like New Jersey (both before and after Hurricane Sandy ), Charlotte , North Carolina, and Missouri . In the United States, FEMA produces flood insurance rate maps that identify areas of future risk, enabling local governments to apply zoning regulations to prevent or minimize property damage. Buildings and other urban infrastructure can be designed so that even if

2520-541: The effects of flood waters or high water levels during a flooding event. They include evacuation plans and rescue operations. Flood relief is part of the response and recovery phase in a flood management plan. Floods are caused by many factors or a combination of any of these generally prolonged heavy rainfall (locally concentrated or throughout a catchment area), highly accelerated snowmelt , severe winds over water, unusual high tides, tsunamis , or failure of dams, levees , retention ponds , or other structures that retained

2583-443: The fast recovery of individuals and communities affected, but their use remains limited. Flooding can occur in cities or towns as urban flooding . It can also take place by the sea as coastal flooding . Sea level rise can make coastal flooding worse. In some areas there are also risks of glacial lake outburst floods . There are many adaptation options for flooding: More frequent drenching rains may make it necessary to increase

Toronto and Region Conservation Authority - Misplaced Pages Continue

2646-817: The flow", and deliberately flood some low-lying areas, ideally vegetated, to act as sponges, letting them drain again as the floodwaters go down. Excess water can be used for groundwater replenishment by diversion onto land that can absorb the water. This technique can reduce the impact of later droughts by using the ground as a natural reservoir. It is being used in California, where orchards and vineyards can be flooded without damaging crops, or in other places wilderness areas have been re-engineered to act as floodplains. In many countries, rivers are prone to floods and are often carefully managed. Defenses such as levees, bunds , reservoirs, and weirs are used to prevent rivers from bursting their banks. A weir, also known as

2709-441: The gate. A flood barrier , surge barrier or storm surge barrier is a specific type of floodgate , designed to prevent a storm surge or spring tide from flooding the protected area behind the barrier. A surge barrier is almost always part of a larger flood protection system consisting of floodwalls , levees (also known as dikes), and other constructions and natural geographical features. The self-closing flood barrier (SCFB)

2772-442: The general public to use their facilities, unlike typical public parks. After the deaths and damage of Hurricane Hazel in 1954, governments recognized the need for improved regulation of river floodplains . In 1957, the four Toronto-area authorities were merged into the single Metro Toronto and Region Conservation Authority and given full legal authority to purchase and expropriate lands for conservation. In conjunction with this,

2835-504: The general public, and technology demonstrations in a park-like setting. A list of parks and conservation areas under the TRCA: Flood control Flood management describes methods used to reduce or prevent the detrimental effects of flood waters. Flooding can be caused by a mix of both natural processes, such as extreme weather upstream, and human changes to waterbodies and runoff. Flood management methods can be either of

2898-520: The human and socio-economic losses caused by flooding and is part of the larger field of risk management . Flood risk management analyzes the relationships between physical systems and socio-economic environments through flood risk assessment and tries to create understanding and action about the risks posed by flooding. The relationships cover a wide range of topics, from drivers and natural processes, to models and socio-economic consequences. This relationship examines management methods which includes

2961-517: The increase in water. Flood management can include flood risk management, which focuses on measures to reduce risk, vulnerability and exposure to flood disasters and providing risk analysis through, for example, flood risk assessment . Flood mitigation is a related but separate concept describing a broader set of strategies taken to reduce flood risk and potential impact while improving resilience against flood events. As climate change has led to increased flood risk an intensity, flood management

3024-497: The integration of flood risks and required policies. In flood management, stakeholder engagement is seen as an important way to achieve greater cohesion and consensus. Integrating stakeholder engagement into flood management often provides a more complex analysis of the situation; this generally adds more demand in determining collective solutions and increases the time it takes to determine solutions. Claireville, Toronto Claireville (sometimes misspelled as Clairville )

3087-638: The lands of the Don River valley from a proposed development. The Association went on to other activities, including tree plantings, wildflower and tree preservation and advocacy. The Association organized popular 'conservation special' train outings from the Don Station north along the CNR line to Richmond Hill and other destinations to promote the conservation of the Don Valley. Sauriol would later become

3150-422: The main drivers of floods interact with each other. Flood modelling combines factors such as terrain, hydrology , and urban topography to reproduce the evolution of a flood in order to identify the different levels of flooding risks associated with each element exposed. The modelling can be carried out using hydraulic models, conceptual models, or geomorphic methods. Nowadays, there is a growing attention also in

3213-427: The mouth of streams or small rivers, where an estuary begins or where tributary streams, or drainage ditches connect to sloughs . Tide gates close during incoming tides to prevent tidal waters from moving upland, and open during outgoing tides to allow waters to drain out via the culvert and into the estuary side of the dike. The opening and closing of the gates is driven by a difference in water level on either side of

SECTION 50

#1732783129719

3276-554: The municipalities that bordered their valleys , and any land purchases had to be proposed and funded from either the Province of Ontario grants, local municipal levies or grants on a project-by-project basis. For example, in 1951, the Don Valley CA proposed a conservation area at the point where Lawrence Avenue today crosses the East Don River in Toronto. The Don Valley CA also proposed a halt on transportation uses in

3339-439: The path of floodwaters. Other solutions, such as HydroSack , are polypropylene exteriors with wood pulp within, though they are one-time use. There are several methods of non-structural flood management that form part of flood risk management strategies. These can involve policies that reduces the amount of urban structures built around floodplains or flood prone areas through land zoning regulations. This helps to reduce

3402-539: The production of maps obtained with remote sensing . Flood modelling is helpful for determining building development practices and hazard mitigation methods that reduce the risks associated with flooding. Stakeholder engagement is a useful tool for flood risk management that allows enhanced public engagement for agreements to be reached on policy discussions. Different management considerations can be taken into account including emergency management and disaster risk reduction goals, interactions of land-use planning with

3465-572: The risk to people and property is through the production of flood risk maps. Most countries have produced maps which show areas prone to flooding based on flood data. In the UK , the Environment Agency has produced maps which show areas at risk. The map to the right shows a flood map for the City of York , including the floodplain for a 1 in 100-year flood (dark blue), the predicted floodplain for

3528-455: The river spreading over a floodplain) will slow some of the flow more than other parts, spreading the flow over time and blunting the spike. Even slightly blunting the spike significantly decreases the peak flood level. Generally, the higher the peak flood level, the more flood damage is done. Straight, clear, smooth concrete-walled channels speed up flow, and are therefore likely to make flooding downstream worse. Modern flood control seeks to "slow

3591-432: The spike. Even slightly blunting the spike significantly decreases the peak flood level. Generally, the higher the peak flood level, the more flood damage is done. Modern flood control seeks to "slow the flow", and deliberately flood some low-lying areas, ideally vegetated, to act as sponges, letting them drain again as the floodwaters go down. Where floods interact with housing, industry and farming that flood management

3654-583: The valley. Funding was not approved for the project and the land was eventually used for the Don Valley Parkway project. In conjunction with the formation of the conservation authorities, volunteer organizations sprang up to assist the conservation authorities in their missions. In Toronto, the Don Valley Conservation Association was established in 1946 by Roy Cadwell, Rand Freeland and Charles Sauriol to protect

3717-400: The water. Water levels during a flood tend to rise, then fall, very abruptly. The peak flood level occurs as a very steep, short spike; a quick spurt of water. Anything that slows the surface runoff (marshes, meanders, vegetation, porous materials, turbulent flow, the river spreading over a floodplain) will slow some of the flow more than other parts, spreading the flow over time and blunting

3780-461: The water. Flooding can be exacerbated by increased amounts of impervious surface or by other natural hazards such as wildfires, which reduce the supply of vegetation that can absorb rainfall. During times of rain, some of the water is retained in ponds or soil, some is absorbed by grass and vegetation, some evaporates, and the rest travels over the land as surface runoff . Floods occur when ponds, lakes, riverbeds, soil, and vegetation cannot absorb all

3843-500: The world, due to the absence of public accessibility, technical writing and data, and lack of easy-to-understand information. However, revived attention towards flood mapping has renewed the interest in enhancing current flood mapping for use as a flood risk management method. Flood modelling is a tool used to model flood hazard and the effects on humans and the physical environment. Flood modelling takes into consideration how flood hazards, external and internal processes and factors, and

SECTION 60

#1732783129719

3906-419: The worst floods in recent U.S. history having cost billions of dollars. Property owners may fit their homes to stop water entering by blocking doors and air vents, waterproofing important areas and sandbagging the edges of the building. Private precautionary measures are increasingly important in flood risk management. Flood mitigation at the property level may also involve preventative measures focused on

3969-620: Was also called the Albion Road (the current name for the street). A flood control dam was built on the West Branch of the Humber River immediately south of the village in 1957, creating the Claireville reservoir and the establishment of Claireville Conservation Area . Claireville began to lose its rural character as suburban industrial development encroached. In the mid-1980, Albion Road and Steeles Avenue were realigned, bypassing

#718281