Misplaced Pages

Xochimilco Light Rail

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

#683316

99-625: The Xochimilco Light Rail (locally known as the Tren Ligero and known by the government as Tren ligero de la Ciudad de México ) is a light rail line that serves the southern part of Mexico City . It connects to, but is not considered a part of the Mexico City Metro . Rather, it is operated by the Servicio de Transportes Eléctricos (STE), the authority that operates Mexico City's electric trolleybus system and formerly operated

198-404: A metro train or articulated tram can have several separate signboxes each—and only infrequently on buses, where it is comparatively easy for the driver to change the display. These signs are controlled by a computer through an interface in the driver's cabin. Barcodes are printed on the reverse of the blind, and as the computer rolls the blind an optical sensor reads the barcodes until reaching

297-724: A "light rail" vehicle (it is a heavy rail vehicle), and is only included for comparison purposes. Low-floor LRVs have the advantage of a low-floor design, allowing them to load passengers directly from low-rise platforms that can be little more than raised curbs. High-floor light rail systems also exist, featuring larger stations. Historically, the track gauge has had considerable variations, with narrow gauge common in many early systems. However, most light rail systems are now standard gauge . Older standard-gauge vehicles could not negotiate sharp turns as easily as narrow-gauge ones, but modern light rail systems achieve tighter turning radii by using articulated cars . An important advantage of

396-458: A bus, there will be even more capacity when there is a combination of cars and light rail. Table 3 shows an example of peak passenger capacity. The cost of light rail construction varies widely, largely depending on the amount of tunneling and elevated structures required. A survey of North American light rail projects shows that costs of most LRT systems range from $ 15 million to over $ 100 million per mile. Seattle's new light rail system

495-496: A button to flip them at the terminus, and one slot at the front, side and back of the bus respectively for the route number only. All buses with plastic signs were retired in 2017 upon completing 18 years of service. In the United States, the first electronic destination signs for buses were developed by Luminator in the mid-1970s and became available to transit operators in the late 1970s, but did not become common until

594-403: A chaotic breakdown inflow and a dramatic drop in speed (a traffic jam ) if they exceed about 2,000 vehicles per hour per lane (each car roughly two seconds behind another). Since most people who drive to work or on business trips do so alone, studies show that the average car occupancy on many roads carrying commuters is only about 1.5 people per car during the high-demand rush hour periods of

693-1142: A common right-of-way (however, Link converted to full separation in 2019). Some systems, such as the AirTrain JFK in New York City, the DLR in London, and Kelana Jaya Line in Kuala Lumpur , have dispensed with the need for an operator. The Vancouver SkyTrain was an early adopter of driverless vehicles, while the Toronto Scarborough rapid transit operated the same trains as Vancouver, but used drivers. In most discussions and comparisons, these specialized systems are generally not considered light rail but as light metro systems. Around Karlsruhe , Kassel , and Saarbrücken in Germany, dual-voltage light rail trains partly use mainline railroad tracks, sharing these tracks with heavy rail trains. In

792-715: A common routing between Tasqueña and Huipulco, with the Tlalpan service branching off of the main line for only about 2 kilometres (1.2 mi) to its terminus at Avenida San Fernando, in the historic centre of Tlalpan borough. On the common section, the tracks were located in the wide median of Calzada de Tlalpan. The tracks between Huipulco and Xochimilco were also in a separate right-of-way . The separation from street traffic, except at crossings, made routes 53 and 54 more like what later came to be called light rail unlike Mexico City's other tramlines which were closed by 1979, but these lines still lacked other light-rail attributes such

891-496: A crank. The blind system is integrated with a system controlling announcements & passenger information, which uses satellites to download stop data in a sequential order. It uses GPS to determine that a bus has departed a stop, and announce the next stop. As of 2024, TfL no longer require McKenna-brand motorised blind system installed on London Buses, with most operators ordering new vehicles with McKenna-brand Mobitec 'Luminator' LED displays or Hanover high-density LED displays after

990-529: A fleet of Optare Solo SRs were put into service on the Hampstead Garden Suburb routes with LED displays fitted in 2017. Plastic signs are inserted by the driver into the slot at the front of the bus before a service run. In Hong Kong, plastic signs had been used since the mid-1990s on Kowloon Motor Bus (KMB) and Long Win Bus (LWB) buses to replace rollsigns on the existing fleet, and became

1089-557: A full stations. Thus the decision was made in the early 1980s to convert these lines to modern light rail transit. Both lines ceased operation in September 1984, for rebuilding as light rail. Changes to allow faster operation included replacing the simple tram stops with semi-enclosed estaciones (stations), which were spaced farther apart, fitted with high-level boarding platforms and set up as paid areas , so that all payment of fares would take place before boarding. In between

SECTION 10

#1732772672684

1188-416: A light rail train may have three to four cars of much larger capacity in one train under the control of one driver, or no driver at all in fully automated systems, increasing the labor costs of BRT systems compared to LRT systems. BRT systems are also usually less fuel-efficient as they use non-electrified vehicles. The peak passenger capacity per lane per hour depends on which types of vehicles are allowed on

1287-435: A live rail. In outer areas, the trams switch to conventional overhead wires . The Bordeaux power system costs about three times as much as a conventional overhead wire system and took 24 months to achieve acceptable levels of reliability, requiring the replacement of all the main cables and power supplies. Operating and maintenance costs of the innovative power system still remain high. However, despite numerous service outages,

1386-409: A long loop through the historic centre of Xochimilco, along narrow city streets, but this was not included in the upgrading to light rail, and was permanently abandoned when closed in 1984. The 1.7-kilometre (1.1 mi) branch from Huipulco junction to Tlalpan was also rebuilt, but in a different manner, changed from private right-of-way to street running (without separation from other traffic) in

1485-543: A longer distance. Light rail cars are often coupled into multiple units of two to four cars. Light rail systems may also exhibit attributes of heavy rail systems, including having downtown subways, as in San Francisco and Seattle . Light rail is designed to address a gap in interurban transportation between heavy rail and bus services, carrying high passenger numbers more quickly than local buses and more cheaply than heavy rail. It serves corridors in which heavy rail

1584-642: A more diverse range of design characteristics than LRT, depending on the demand and constraints that exist, and BRT using dedicated lanes can have a theoretical capacity of over 30,000 passengers per hour per direction (for example, the Guangzhou Bus Rapid Transit system operates up to 350 buses per hour per direction). For the effective operation of a bus or BRT system, buses must have priority at traffic lights and have their dedicated lanes, especially as bus frequencies exceed 30 buses per hour per direction. The higher theoretical of BRT relates to

1683-560: A one-car shuttle to and from Estadio Azteca, no longer through to Tasqueña. Patronage was low, and service was discontinued only one year later, in March 1991, after an accident damaged the one car (No. 000) normally assigned to the Tlalpan route. Service was reinstated on 13 December 1991, as STE began to place new cars into service on the Xochimilco line, but ceased again on 6 October 1992 and has never resumed. The overhead line voltage

1782-407: A result, has many of the operating characteristics of a metro system rather than a light rail system. A capacity of 1,350 passengers per train is more similar to the heavy rail than light rail. Bus rapid transit (BRT) is an alternative to LRT and many planning studies undertake a comparison of each mode when considering appropriate investments in transit corridor development. BRT systems can exhibit

1881-404: A standard equipment until 2000 when electronic display became mainstream, with the exception of single decker buses, presumably because the number of destinations in the network was so large that rolling the destination between every trip was impractical. These buses were equipped with a destination sign slot which 2 plastic destination signs could be placed in it, such that the driver could press

1980-534: A top speed of 55–71.5 miles per hour (88.51–115.1 km/h) depending on the system, while the trains on the all-underground Montreal Metro can only reach a top speed of 72 kilometres per hour (44.74 mph). LACMTA light rail vehicles have higher top and average speeds than Montreal Metro or New York City Subway trains. Many light rail systems—even fairly old ones—have a combination of both on- and off-road sections. In some countries (especially in Europe), only

2079-418: A tramway, a light metro, and, in a narrow sense, rapid transit. This is especially common in the United States, where there is not a popularly perceived distinction between these different types of urban rail systems. The development of technology for low-floor and catenary-free trams facilitates the construction of such mixed systems with only short and shallow underground sections below critical intersections as

SECTION 20

#1732772672684

2178-470: Is a generic international English phrase for types of rail systems using modern streetcars/trams, which means more or less the same thing throughout the English-speaking world . Light rail systems can range from trams runnig in streets along with other traffic, to semi-metro systems having portions of grade separated track. People movers are even "lighter", in terms of capacity. Monorail

2277-575: Is a separate technology that has been more successful in specialized services than in a commuter transit role. The use of the generic term light rail avoids some serious incompatibilities between British and American English . The word tram , for instance, is generally used in the UK and many former British colonies to refer to what is known in North America as a streetcar , but in North America tram can instead refer to an aerial tramway , or, in

2376-602: Is a significant amount of overlap between the technologies; similar rolling stock may be used for either, and it is common to classify streetcars or trams as a subcategory of light rail rather than as a distinct type of transportation. However, some distinctions can be made, though systems may combine elements of both. Low-floor light rail lines tend to follow a reserved right-of-way and with trains receiving priority at intersections, and tend not to operate in mixed traffic, enabling higher operating speeds. Light rail lines tend to have less frequent stops than tramways, and operate over

2475-459: Is about 29 metres (95 ft) long and capable of carrying up to 300 passengers. The first 16 of these replaced older cars over the period 1991–95. The line's original fleet consisted of semi-new articulated LRVs built by Moyada ( Motores y Adaptaciones Automotrices, S.A. ), incorporating the bogies (trucks) and some other parts from STE 's large fleet of withdrawn 1940s-vintage PCC streetcars . STE originally intended to rebuild about 20 PCCs for

2574-563: Is by far the most expensive in the US, at $ 179 million per mile, since it includes extensive tunneling in poor soil conditions, elevated sections, and stations as deep as 180 feet (55 m) below ground level. This results in costs more typical of subways or rapid transit systems than light rail. At the other end of the scale, four systems (Baltimore, Maryland; Camden, New Jersey; Sacramento, California; and Salt Lake City, Utah) incurred construction costs of less than $ 20 million per mile. Over

2673-414: Is easier to change between routes/destinations and to update for changes to a transit system's route network. However, given the long life of public transit vehicles and of sign rolls, if well made, some transit systems continue to use these devices in the present day. The roll is attached to metal tubes at the top and bottom, and flanges at the ends of the tubes are inserted into a mechanism which controls

2772-426: Is especially important for wheelchair access, as narrower gauges (e.g. metre gauge) can make it challenging or impossible to pass the tram's wheels. Furthermore, standard-gauge rolling stock can be switched between networks either temporarily or permanently, and both newly built and used standard-gauge rolling stock tends to be cheaper to buy, as more companies offer such vehicles. Overhead lines supply electricity to

2871-502: Is expensive. Similarly, the most expensive US highway expansion project was the " Big Dig " in Boston, Massachusetts, which cost $ 200 million per lane mile for a total cost of $ 14.6 billion. A light rail track can carry up to 20,000 people per hour as compared with 2,000–2,200 vehicles per hour for one freeway lane. For example, in Boston and San Francisco, light rail lines carry 9,600 and 13,100 passengers per hour, respectively, in

2970-575: Is hard to distinguish between what is called light rail, and other forms of urban and commuter rail. A system described as a light rail in one city may be considered to be a streetcar or tram system in another. Conversely, some lines that are called "light rail" are very similar to rapid transit ; in recent years, new terms such as light metro have been used to describe these medium-capacity systems. Some "light rail" systems, such as Sprinter , bear little similarity to urban rail, and could alternatively be classified as commuter rail or even inter-city rail. In

3069-559: Is impractical. Light metro systems are essentially hybrids of light rail and rapid transit. Metro trains are larger and faster than light rail trains, with stops being further apart. Many systems have mixed characteristics. Indeed, with proper engineering, a rail line could run along a street, then go underground, and then run along an elevated viaduct. For example, the Los Angeles Metro Rail 's A Line "light rail" has sections that could alternatively be described as

Xochimilco Light Rail - Misplaced Pages Continue

3168-491: Is motorized. These rollsigns were usually made of linen until Mylar (a type of PET film) became the most common material used for them, in the 1960s/70s. They can also be made of other material, such as Tyvek . In the 1990s rollsigns were still commonly seen in older public transport vehicles, and were sometimes used in modern vehicles of that time. Since the 1980s, they have largely been supplanted by electronic signs. A digital display may be somewhat less readable, but

3267-503: Is not very helpful in determining where the vehicle is going. Several different types of technology have been used for destination signs, from simple rigid placards held in place by a frame or clips, to rollsigns , to various types of computerized, and more recently electronically controlled signs, such as flip-dot , LCD or LED displays. All of these can still be found in use today, but most transit-vehicle destination signs now in use in North America and Europe are electronic signs. In

3366-484: Is one of the highest capacity ones, having been upgraded in a series of expansions to handle 40,000 passengers per hour per direction, and having carried as many as 582,989 passengers in a single day on its Line 1 . It achieves this volume by running four-car trains with a capacity of up to 1,350 passengers each at a frequency of up to 30 trains per hour. However, the Manila light rail system has full grade separation and as

3465-414: Is outweighed by the need (compared to manual) to change each destination separately; if changing routes, this could be up to seven different blinds. Automatic-setting rollsigns are common on many light rail and subway/metro systems in North America. Most Transport for London buses use a standard system with up & down buttons to change the destination shown on the blinds & a manual override using

3564-407: Is similar to that of a traditional tram, while operating at a higher capacity and speed, often on an exclusive right-of-way. In broader use, it includes tram-like operations mostly on streets. A few light rail networks have characteristics closer to rapid transit or even commuter rail , yet only when these systems are fully grade-separated are they referred to as light metros . The term light rail

3663-462: Is sometimes seen as a continuation of that line, albeit on a more modest scale. The light rail line has 18 stations: two terminals and 16 intermediate stations. Three of these stations were built later than the others; Huipulco, Periférico and Huichapan stations opened in November 1993. The travel time from one end of the line to the other is approximately 37 minutes. Until 1995, the outer terminus

3762-542: The Cádiz TramBahia , where trams share track with commuter and long-distance trains from the main terminus in the city and curve off to serve cities without a railway connection. Some of the issues involved in such schemes are: There is a history of what would now be considered light rail vehicles operating on heavy rail rapid transit tracks in the US, especially in the case of interurban streetcars . Notable examples are Lehigh Valley Transit trains running on

3861-758: The London Underground and the New York City Subway . Conventional rail technologies including high-speed , freight, commuter , and rapid transit urban transit systems are considered "heavy rail". The main difference between light rail and heavy rail rapid transit is the ability for a light rail vehicle to operate in mixed traffic if the routing requires it. The world's first electric tram operated in Sestroretsk near Saint Petersburg , Russia , invented and operated on an experimental basis by Fyodor Pirotsky in 1880. The first tramway

3960-637: The Netherlands , this concept was first applied on the RijnGouweLijn . This allows commuters to ride directly into the city center, rather than taking a mainline train only as far as a central station and then having to change to a tram. In France, similar tram-trains are planned for Paris, Mulhouse , and Strasbourg ; further projects exist. In some cases, tram trains use previously abandoned or lightly used heavy rail lines in addition to or instead of still in use mainline tracks. In 2022, Spain opened

4059-874: The O-Train Trillium Line in Ottawa, Ontario , Canada, the River Line in New Jersey , United States, and the Sprinter in California , United States, which use diesel multiple unit (DMU) cars. Light rail is different from the British English term light railway , long-used to distinguish railway operations carried out under a less rigorous set of regulations using lighter equipment at lower speeds from mainline railways. Light rail

Xochimilco Light Rail - Misplaced Pages Continue

4158-703: The Philadelphia and Western Railroad high-speed third rail line (now the Norristown High-Speed Line ). Such arrangements are almost impossible now, due to the Federal Railroad Administration refusing (for crash safety reasons) to allow non-FRA compliant railcars (i.e., subway and light rail vehicles) to run on the same tracks at the same times as compliant railcars, which includes locomotives and standard railroad passenger and freight equipment. Notable exceptions in

4257-530: The medians of roads . If run in streets , trains are usually limited by city block lengths to about four 180-passenger vehicles (720 passengers). Operating on two-minute headways using traffic signal progression, a well-designed two-track system can handle up to 30 trains per hour per track, achieving peak rates of over 20,000 passengers per hour in each direction. More advanced systems with separate rights-of-way using moving block signaling can exceed 25,000 passengers per hour per track. Most light rail systems in

4356-599: The municipal electric tram system. Many of Mexico City's original tram lines were abandoned in the 1960s and 1970s. The original Xochimilco tramline had been in operation since 1910, but the Xochimilco tramway's section between Avenida Tasqueña and the city centre was replaced by a new metro line in 1970. With the subsequent Mexico City tramway closures that took effect in May 1979, the only tramlines left in operation were routes 53 and 54, running from Tasqueña metro station to Tlalpan and Xochimilco , respectively. These shared

4455-624: The 1970s was proven to have been a technical failure by the following decade. After World War II, the Germans retained many of their streetcar networks and evolved them into model light rail systems ( Stadtbahnen ). With the exception of Hamburg , all large and most medium-sized German cities maintain light rail networks. The concept of a "limited tramway" was proposed by American transport planner H. Dean Quinby in 1962. Quinby distinguished this new concept in rail transportation from historic streetcar or tram systems as: The term light rail transit

4554-495: The 1980s. These are known as flip-disc, or "flip-dot", displays. Some transit systems still use these today. Another technology that has been employed for destination signs is the split-flap display , or Solari display, but outside Italy , this technology was never common for use in transit vehicles. Such displays were more often used at transit hubs and at airports to display arrival and departure information, rather than as destination signs on transit vehicles. Starting in

4653-495: The French city of Bordeaux , the tramway network is powered by a third rail in the city center, where the tracks are not always segregated from pedestrians and cars. The third rail (actually two closely spaced rails) is placed in the middle of the track and divided into eight-metre sections, each of which is powered only while it is completely covered by a tram. This minimizes the risk of a person or animal coming into contact with

4752-662: The US are the NJ Transit River Line from Camden to Trenton and Austin's Capital MetroRail , which have received exemptions to the provision that light rail operations occur only during daytime hours and Conrail freight service only at night, with several hours separating one operation from the other. The O-Train Trillium Line in Ottawa also has freight service at certain hours. With its mix of right-of-way types and train control technologies, LRT offers

4851-455: The US as a whole, excluding Seattle, new light rail construction costs average about $ 35 million per mile. By comparison, a freeway lane expansion typically costs $ 1.0 million to $ 8.5 million per lane mile for two directions, with an average of $ 2.3 million. However, freeways are frequently built in suburbs or rural areas, whereas light rail tends to be concentrated in urban areas, where right of way and property acquisition

4950-500: The US, the Americans with Disabilities Act of 1990 specifies certain design criteria for transit-vehicle destination signs, such as maximum and minimum character height-to-width ratio and contrast level, to ensure the signs are sufficiently readable to visually impaired persons. In the 2010s, LED signs have replaced flip-dot signs as the most common type of destination sign in new buses and rail transit vehicles. For many decades,

5049-666: The United States and in North America . In Britain, modern light rail systems began to appear in the 1980s, starting with the Tyne and Wear Metro from 1980 and followed by the Docklands Light Railway (DLR) in London in 1987, continuing into the 1990s including the establishment of the Manchester Metrolink in 1992 and the Sheffield Supertram from 1994. Due to varying definitions, it

SECTION 50

#1732772672684

5148-590: The United States are limited by demand rather than capacity (by and large, most American LRT systems carry fewer than 4,000 persons per hour per direction), but Boston's and San Francisco's light rail lines carry 9,600 and 13,100 passengers per hour per track during rush hour. Elsewhere in North America, the Calgary C-Train and Monterrey Metro have higher light rail ridership than Boston or San Francisco. Systems outside North America often have much higher passenger volumes. The Manila Light Rail Transit System

5247-533: The United States as an English equivalent for the German word Stadtbahn , meaning "city railway". Different definitions exist in some countries, but in the United States, light rail operates primarily along exclusive rights-of-way and uses either individual tramcars or multiple units coupled together, with a lower capacity and speed than a long heavy rail passenger train or rapid transit system. Narrowly defined, light rail transit uses rolling stock that

5346-472: The United States, "light rail" has become a catch-all term to describe a wide variety of passenger rail systems. Light rail corridors may constitute a fully segregated corridor, a dedicated right-of-way on a street, an on-street corridor shared with other traffic, a corridor shared with other public transport, or a corridor shared with pedestrians. The most difficult distinction to draw is that between low-floor light rail and streetcar or tram systems. There

5445-415: The ability of buses to travel closer to each other than rail vehicles and their ability to overtake each other at designated locations allowing express services to bypass those that have stopped at stations. However, to achieve capacities this high, BRT station footprints need to be significantly larger than a typical LRT station. In terms of cost of operation, each bus vehicle requires a single driver, whereas

5544-436: The blind and disengages the other, until the desired display is found. A small viewing window in the back of the signbox (the compartment housing the sign mechanism) permits the driver to see an indication of what is being shown on the exterior. Automatic changing of rollsign/blind displays, through electronic control, has been possible since at least the 1970s, but is an option that primarily has been used on rail systems—where

5643-453: The branch to Tlalpan), opened as light rail on 1 August 1986, but ran for only three days before poor reliability with the heavily rebuilt rail cars led to a decision to suspend service. Service resumed in November 1986. Right-of-way work then shifted to the line's outer section, between Estadio Azteca and Xochimilco, with similar upgrading for higher-speed operation. This section opened on 29 November 1988. The old tram line 54 had included

5742-866: The case of the Disney amusement parks , even a land train . (The usual British term for an aerial tramway is cable car , which in the US usually refers to a ground-level car pulled along by subterranean cables .) The word trolley is often used as a synonym for streetcar in the United States but is usually taken to mean a cart, particularly a shopping cart, in the UK and elsewhere. Many North American transportation planners reserve streetcar for traditional vehicles that operate exclusively in mixed traffic on city streets, while they use light rail to refer to more modern vehicles operating mostly in exclusive rights of way, since they may operate both side-by-side targeted at different passenger groups. The difference between British English and American English terminology arose in

5841-421: The closure of Glasgow Corporation Tramways (one of the largest in Europe) in 1962. Although some traditional trolley or tram systems continued to exist in San Francisco and elsewhere, the term "light rail" has come to mean a different type of rail system as modern light rail technology has primarily post-WWII West German origins. An attempt by Boeing Vertol to introduce a new American light rail vehicle in

5940-433: The code for the requested display. The on-board computer is normally programmed with information on the order of the displays, and can be programmed using the non-volatile memory should the blind/roll be changed. Although these sign systems are normally accurate, over time the blind becomes dirty and the computer may not be able to read the markings well, leading occasionally to incorrect displays. For buses, this disadvantage

6039-415: The day. This combination of factors limits roads carrying only automobile commuters to a maximum observed capacity of about 3,000 passengers per hour per lane. The problem can be mitigated by introducing high-occupancy vehicle ( HOV ) lanes and ride-sharing programs, but in most cases, policymakers have chosen to add more lanes to the roads, despite a small risk that in unfavorable situations an extension of

SECTION 60

#1732772672684

6138-755: The direct translation, which is city rail (the Norwegian term, by bane , means the same). However, UMTA finally adopted the term light rail instead. Light in this context is used in the sense of "intended for light loads and fast movement", rather than referring to physical weight. The infrastructure investment is also usually lighter than would be found for a heavy rail system. The American Public Transportation Association (APTA), in its Glossary of Transit Terminology, defines light rail as: ...a mode of transit service (also called streetcar, tramway, or trolley) operating passenger rail cars singly (or in short, usually two-car or three-car, trains) on fixed rails in

6237-420: The driver to write the route number and the destination text through a keypad if required). In many systems, the vehicle has three integrated signs in the system, the front sign over the windshield, the side sign over the passenger entrance, both showing the route number and destination, and a rear sign usually showing the route number. An internal sign, that could also provide different kinds of information such as

6336-417: The early 1990s, and becoming the primary type of destination sign by the end of the decade, electronic displays consist of liquid crystal display (LCD) or light-emitting diode (LED) panels that can show animated text, colors (in the case of LED signs), and a potentially unlimited number of routes (so long as they are programmed into the vehicle's sign controller unit; some sign controller units may also allow

6435-449: The front of the vehicle, usually located above (or at the top of) the windshield, is often called the headsign , most likely from the fact that these signs are located on the front, or head, end of the vehicle. Depending on the type of the sign, it might also display intermediate points on the current route, or a road that comprises a significant amount of the route, especially if the route is particularly long and its final terminus by itself

6534-458: The late 19th century when Americans adopted the term "street railway", rather than "tramway", with the vehicles being called "streetcars" rather than "trams". Some have suggested that the Americans' preference for the term "street railway" at that time was influenced by German emigrants to the United States (who were more numerous than British immigrants in the industrialized Northeast), as it is

6633-524: The latter is described as light rail. In those places, trams running on mixed rights-of-way are not regarded as a light rail but considered distinctly as streetcars or trams. However, the requirement for saying that a rail line is "separated" can be quite low—sometimes just with concrete "buttons" to discourage automobile drivers from getting onto the tracks. Some systems such as Seattle's Link had on-road mixed sections but were closed to regular road traffic, with light rail vehicles and buses both operating along

6732-462: The light rail concept was the "Shaker Heights Rapid Transit" which started in the 1920s, was renovated in 1980-81 and is now part of RTA Rapid Transit . Many original tram and streetcar systems in the United Kingdom , United States , and elsewhere were decommissioned starting in the 1950s as subsidies for the car increased. Britain abandoned its tram systems, except for Blackpool , with

6831-463: The line, and so the Xochimilco station was rebuilt 200 metres (219 yd) to the west and equipped with two tracks and three loading platforms. The old Xochimilco station closed in November 2007 for the start of construction, and the new station opened on 14 December 2008. The Xochimilco line's rolling stock currently consists of 24 articulated light rail vehicles (LRVs) built by Concarril or Bombardier / Siemens , between 1990 and 2014. Each car

6930-619: The lines, a project well underway at STE's Tetepilco Depot when the workshop building collapsed during the 1985 Mexico City earthquake , crushing the cars. The prototype LRV was numbered 000, and the remainder 001-016. The Moyada cars had all-new bodies and were equipped with pantographs instead of trolley poles to collect current from the overhead wires . Unlike the old streetcars/trams, they were also bi-directional, having operating cabs at both ends and doors on both sides. Perhaps because of their vintage running gear or electrical components, these cars were found to be unreliable, even after

7029-455: The mid-2000s, four more cars were purchased later from Bombardier, numbered 033–036, and they entered service on the Xochimilco light rail line in September and October 2008, increasing the fleet size to 20 cars, numbered 017–036. On 30 August 2011, on its way to Huichapan station, car 031 was hit, while coming to a stop, at full speed by car 027. Twenty-nine people were injured. The two LRVs sustained heavy damage. One half of each two-section LRV

7128-403: The middle lanes of Calle Ferrocarril (now known as Renato Leduc) and also shortened by about 125 metres (410 ft) at its outer end, no longer reaching Avenida San Fernando. Three high-platform stops were built, one being at the new terminus, which was referred to simply as "Tlalpan" on the rail cars' destination signs . Service to Tlalpan was reintroduced on 13 March 1990, now running only as

7227-407: The most common type of multiple-option destination sign was the rollsign (or bus blind , curtain sign , destination blind , or tram scroll ): a roll of flexible material with pre-printed route number/letter and destinations (or route name), which is turned by the vehicle operator at the end of the route when reversing direction, either by a hand crank or by holding a switch if the sign mechanism

7326-433: The new terminus was named Embarcadero . However, as the new terminus was now located closer to the centre of Xochimilco than was the actual station bearing that name, STE eventually renamed Embarcadero station as "Xochimilco", and the original "Xochimilco" station—now the line's penultimate station—became Francisco Goitia station. However, the partly single-track segment from Francisco Goitia to Xochimilco limited capacity on

7425-465: The old and new systems. Since the 1980s, Portland, Oregon , has built all three types of system: a high-capacity light rail system in dedicated lanes and rights-of-way, a low-capacity streetcar system integrated with street traffic, and an aerial tram system . The opposite phrase heavy rail , used for higher-capacity, higher-speed systems, also avoids some incompatibilities in terminology between British and American English, for instance in comparing

7524-474: The peak direction during rush hour. Destination sign A destination sign (North American English) or destination indicator / destination blind (British English) is a sign mounted on the front, side or rear of a public transport vehicle, such as a bus , tram/streetcar or light rail vehicle , that displays the vehicle's route number and destination, or the route's number and name on transit systems using route names. The main such sign, mounted on

7623-528: The refurbishment of six in 1989–91. In 1989, STE placed an order with Concarril for 12 all-new LRVs with similar capacity, to the same design as LRVs Concarril had recently supplied to Guadalajara's light rail system . Numbered 017–028, the order's first cars arrived in January 1991 entered service on 6 December 1991, replacing all of the Moyada cars except on the Tlalpan shuttle service. When Tlalpan service

7722-556: The required clearance height can be reduced significantly compared to conventional light rail vehicles. Reference speed from major light rail systems, including station stop time, is shown below. However, low top speed is not always a differentiating characteristic between light rail and other systems. For example, the Siemens S70 LRVs used in the Houston METRORail and other North American LRT systems have

7821-432: The right-of-way that is often separated from other traffic for part or much of the way. Light rail vehicles are typically driven electrically with power being drawn from an overhead electric line via a trolley [pole] or a pantograph ; driven by an operator onboard the vehicle; and may have either high platform loading or low-level boarding using steps." However, some diesel-powered transit is designated light rail, such as

7920-415: The road network might lead to increased travel times ( Downs–Thomson paradox , Braess's paradox ). By contrast, light rail vehicles can travel in multi-car trains carrying a theoretical ridership up to 20,000 passengers per hour in much narrower rights-of-way , not much more than two car lanes wide for a double track system. They can often be run through existing city streets and parks , or placed in

8019-401: The roads. Typically roadways have 1,900 passenger cars per lane per hour (pcplph). If only cars are allowed, the capacity will be less and will not increase when the traffic volume increases. When there is a bus driving on this route, the capacity of the lane will be higher and will increase when the traffic level increases. And because the capacity of a light rail system is higher than that of

8118-426: The rolling of the sign. The upper and lower rollers are positioned sufficiently far apart to permit a complete "reading" (a destination or route name) to be displayed, and a strip light is located behind the blind to illuminate it at night. When the display needs to be changed, the driver/operator/conductor turns a handle/crank —or holds a switch if the sign mechanism is motorized—which engages one roller to gather up

8217-618: The same as the German term for the mode, Straßenbahn (meaning "street railway"). A further difference arose because, while Britain abandoned all of its trams after World War II except in Blackpool , eight major North American cities ( Toronto , Boston , Philadelphia , San Francisco , Pittsburgh , Newark , Cleveland , and New Orleans ) continued to operate large streetcar systems. When these cities upgraded to new technology, they called it light rail to differentiate it from their existing streetcars since some continued to operate both

8316-416: The size of the fleet to 24 cars (numbered 017–040). [REDACTED] Media related to Mexico City light rail at Wikimedia Commons Light rail Light rail (or light rail transit , abbreviated to LRT ) is a form of passenger urban rail transit that uses rolling stock derived from tram technology while also having some features from heavy rapid transit . The term was coined in 1972 in

8415-408: The standard gauge is that standard railway maintenance equipment can be used on it, rather than custom-built machinery. Using standard gauges also allows light rail vehicles to be conveniently moved around using the same tracks as freight railways. Additionally, wider gauges (e.g. standard gauge) provide more floor clearance on low-floor trams that have constricted pedestrian areas at the wheels, which

8514-613: The stations the work included installing new tracks set in concrete; putting fencing along the line's right-of-way and closing some street crossings; and installing overhead catenary designed for higher speeds. The fleet of 1940s PCC streetcars was also replaced by a fleet of new articulated light rail cars built partially using components from the old cars, including their PCC bogies (trucks) and propulsion systems (see Rolling stock , below, for more details). The 5.5-kilometre (3.4 mi) section between Tasqueña and Estadio Azteca (Aztec Stadium), just short of Huipulco junction (for

8613-551: The system was a success with the public, gaining up to 190,000 passengers per day. Automatic train operation is employed on light rail networks, tracking the position and speed of a train and hence adjusting its movement for safety and efficiency. One line of light rail (requires 7.6 m, 25' right of way) has a theoretical capacity of up to 8 times more than one 3.7 m (12 foot) lane on a freeway, excluding busses, during peak times. Roads have ultimate capacity limits that can be determined by traffic engineering , and usually experience

8712-503: The trams, making it safe on city streets. Several systems in Europe and a few recently opened systems in North America use diesel -powered trains. When electric streetcars were introduced in the late 19th century, conduit current collection was one of the first ways of supplying power, but it proved to be much more expensive, complicated, and trouble-prone than overhead wires . When electric street railways became ubiquitous, conduit power

8811-460: The vast majority of light rail systems. This avoids the danger potentially presented by an electrified third rail . The Docklands Light Railway uses an inverted third rail for its electrical power, which allows the electrified rail to be covered and the power drawn from the underside. Trams in Bordeaux , France, use a special third-rail configuration where the power is only switched on beneath

8910-550: The voltage of the line was raised from 600 V DC to 750 V. The newer cars had already been able to operate at the higher voltage. Four additional LRVs of the same type as the Concarril units were purchased later, in 1995, numbered 029–032. These were built by Bombardier , which had acquired Concarril in 1992, but were built in the same factory (in Ciudad Sahagún) and were nearly identical to STE's 12 Concarril cars. In

9009-434: The widest range of latitude of any rail system in the design, engineering, and operating practices. The challenge in designing light rail systems is to realize the potential of LRT to provide fast, comfortable service while avoiding the tendency to overdesign that results in excessive capital costs beyond what is necessary to meet the public's needs. The BART railcar in the following chart is not generally considered to be

9108-599: Was 600 volts DC until around the end of 1995, when it was raised to 750 V. The line runs between Metro Tasqueña and the town of Xochimilco , south of Mexico City. It serves the Coyoacán , Tlalpan , and Xochimilco boroughs, giving residents a fast link to the urban south of Mexico City. For the northern stretch of its run, it travels along the central reservation of the Calzada de Tlalpan, as does Metro Line 2 south of Metro San Antonio Abad – for this reason, it

9207-543: Was coined in 1972 by the U.S. Urban Mass Transportation Administration (UMTA; the precursor to the Federal Transit Administration ) to describe new streetcar transformations that were taking place in Europe and the United States. In Germany, the term Stadtbahn (to be distinguished from S-Bahn , which stands for Stadtschnellbahn ) was used to describe the concept, and many in UMTA wanted to adopt

9306-677: Was introduced in North America in 1972 to describe this new concept of rail transportation. Prior to that time the abbreviation "LRT" was used for " Light Rapid Transit " and " Light Rail Rapid Transit ". The first of the new light rail systems in North America began operation in 1978 when the Canadian city of Edmonton, Alberta , adopted the German Siemens-Duewag U2 system, followed three years later by Calgary, Alberta , and San Diego, California . The concept proved popular, with there now being numerous light rail systems in

9405-401: Was located just beyond Calle Francisco Goitia, at what is now named Francisco Goitia station; it was named "Xochimilco" station originally. In that year, the line was extended east by about 800 metres (875 yd) to a new terminus at the western edge of Delegación Xochimilco's centre, along a section of former tram line 54, closed in 1984. This new section was opened on 14 September 1995, and

9504-422: Was scrapped, and in 2013 STE hired Bombardier to supply two all-new half-car sections and to combine them with the undamaged halves of the two LRVs. Cars 027 and 031 both returned to service in autumn 2014. Meanwhile, another four new LRVs were purchased from Bombardier in 2013–14, which would be assigned STE fleet numbers 037–040. They were delivered in summer 2014 and entered service on 16 March 2015, increasing

9603-632: Was the Gross-Lichterfelde tramway in Lichterfelde near Berlin in Germany, which opened in 1881. It was built by Werner von Siemens who contacted Pirotsky. It initially drew current from the rails, with overhead wire being installed in 1883. The first interurban to emerge in the United States was the Newark and Granville Street Railway in Ohio, which opened in 1889. An early example of

9702-527: Was used in those cities that did not permit overhead wires. In Europe, it was used in London, Paris, Berlin, Marseille, Budapest, and Prague. In the United States, it was used in parts of New York City and Washington, D.C. Third rail technology was investigated for use on the Gold Coast of Australia for the G:link light rail, though power from overhead lines was ultimately utilized for that system. In

9801-519: Was withdrawn again in October 1992, the Moyada cars were no longer used. However, in 1992–93 three Moyada cars (005, 010 and 016) were again fitted with all-new bodies, now to a design intended to resemble the Concarril cars, this work being undertaken by local firm Sintra S.A. The three "Sintra" cars, as they were known, the fleet's last to use PCC -type control systems, entered service on 1 June 1993. They were withdrawn in late 1995, and shortly afterward

#683316