A train station , railroad station , or railroad depot (mainly North American terminology) and railway station (mainly UK and other Anglophone countries) is a railway facility where trains stop to load or unload passengers , freight , or both. It generally consists of at least one platform , one track , and a station building providing such ancillary services as ticket sales, waiting rooms , and baggage/freight service. Stations on a single-track line often have a passing loop to accommodate trains travelling in the opposite direction.
78-475: The Mombasa–Nairobi Standard Gauge Railway , completed in 2017, was built as the first phase of the Kenya Standard Gauge Railway . It is a standard-gauge railway (SGR) in Kenya that connects the large Indian Ocean city of Mombasa with Nairobi , the country's capital and largest city. This SGR runs parallel to the narrow-gauge Uganda Railway that was completed in 1901 under British colonial rule . The East African Railway Master Plan provides for
156-404: A bar or pub . Other station facilities may include: toilets , left-luggage , lost-and-found , departures and arrivals schedules , luggage carts, waiting rooms , taxi ranks , bus bays and even car parks . Larger or staffed stations tend to have a greater range of facilities including also a station security office. These are usually open for travellers when there is sufficient traffic over
234-406: A bypass line, used by freight trains that do not need to stop at the terminus. Some termini have a newer set of through platforms underneath (or above, or alongside) the terminal platforms on the main level. They are used by a cross-city extension of the main line, often for commuter trains , while the terminal platforms may serve long-distance services. Examples of underground through lines include
312-539: A commercial viability study is conducted on the entire Mombasa–Kisumu railway. This section, measuring approximately 135 kilometres (84 mi), takes the SGR line to the town of Malaba , at the international border with Uganda. CCCC, is the contractor for this section as well. The contract price for this section is about KSh. 169 billion (US$ 1.69 billion). The price for the Naivasha–Kisumu–Malaba section
390-455: A common standard allows for seamless integration between the railways of NCIP countries. In the 2000s, Kenya's colonial-era metre-gauge railways deteriorated from lack of maintenance. By 2016, passenger trains were taking an entire day to travel from Nairobi to Mombasa, compared to 12 hours during the early 1990s. Freight transported from the Port of Mombasa fell from 4.8 million tonnes per year in
468-404: A few intermediate stations that take the form of a stub-end station, for example at some zigzags . If there is a station building , it is usually located to the side of the tracks. In the case of intermediate stations used for both passenger and freight traffic, there is a distinction between those where the station building and goods facilities are on the same side of the tracks and those in which
546-472: A few small railway stations are designated as "halts" ( Irish : stadanna , sing. stad ). In some Commonwealth countries the term "halt" is used. In Australia, with its sparse rural populations, such stopping places were common on lines that were still open for passenger traffic. In the state of Victoria , for example, a location on a railway line where a small diesel railcar or railmotor could stop on request, allowing passengers to board or alight,
624-499: A further 20 coaches from CRRC Nanjing Puzhen (four premium coaches, four first class coaches, 10 economy coaches and two power wagons) were shipped from Shanghai. The Mombasa-Nairobi Railway is one of the largest recipients of Belt and Road Initiative funding, as of at least 2024. The project cost of the first phase of the SGR from Mombasa to Nairobi was 90% financed by the Export-Import Bank of China . The remainder of
702-831: A further 40 from other companies at the Grouping of 1923. Peak building periods were before the First World War (145 built) and 1928–1939 (198 built). Ten more were opened by British Rail on ex-GWR lines. The GWR also built 34 "platforms". Many such stops remain on the national railway networks in the United Kingdom, such as Penmaenmawr in North Wales , Yorton in Shropshire , and The Lakes in Warwickshire , where passengers are requested to inform
780-571: A line was dual-purpose there would often be a freight depot apart from the passenger station. This type of dual-purpose station can sometimes still be found today, though in many cases goods facilities are restricted to major stations. Many stations date from the 19th century and reflect the grandiose architecture of the time, lending prestige to the city as well as to railway operations. Countries where railways arrived later may still have such architecture, as later stations often imitated 19th-century styles. Various forms of architecture have been used in
858-407: A long enough period of time to warrant the cost. In large cities this may mean facilities available around the clock. A basic station might only have platforms, though it may still be distinguished from a halt , a stopping or halting place that may not even have platforms. Many stations, either larger or smaller, offer interchange with local transportation; this can vary from a simple bus stop across
SECTION 10
#1732775964789936-504: A member of on-board train staff if they wish to alight, or, if catching a train from the station, to make themselves clearly visible to the driver and use a hand signal as the train approaches. Most have had "Halt" removed from their names. Two publicly advertised and publicly accessible National Rail stations retain it: Coombe Junction Halt and St Keyne Wishing Well Halt . A number of other halts are still open and operational on privately owned, heritage, and preserved railways throughout
1014-675: A new through-station, including the cases of Berlin Hauptbahnhof , Vienna Hauptbahnhof and numerous examples throughout the first century of railroading. Stuttgart 21 is a controversial project involving the replacement of a terminus station by a through-station. An American example of a terminal with this feature is Union Station in Washington, DC , where there are bay platforms on the main concourse level to serve terminating trains and standard island platforms one level below to serve trains continuing southward. The lower tracks run in
1092-558: A second batch of 50 cars, with an additional 250 cars to be delivered within the month. 20 of the expected wagons will have power plugins to enable the movement of refrigerated containers, while another 20 will be passenger coaches. Originally envisioned to extend to Kisangani , in line with the East Africa Railway Masterplan , the SGR project ran into political and financial hurdles, caused by Uganda's initial wait-and-see approach, and Chinese hesitance to fund
1170-407: A spot at the station to board and disembark trains is called station track or house track regardless of whether it is a main line or loop line. If such track is served by a platform , the track may be called platform track. A loop line without a platform, which is used to allow a train to clear the main line at the station only, is called passing track. A track at the station without a platform which
1248-417: A station and various other features set certain types apart. The first is the level of the tracks . Stations are often sited where a road crosses the railway: unless the crossing is a level crossing , the road and railway will be at different levels. The platforms will often be raised or lowered relative to the station entrance: the station buildings may be on either level, or both. The other arrangement, where
1326-576: A station stop does not. A station stop usually does not have any tracks other than the main tracks, and may or may not have switches (points, crossovers). An intermediate station does not have any other connecting route, unlike branch-off stations , connecting stations, transfer stations and railway junctions . In a broader sense, an intermediate station is generally any station on the route between its two terminal stations . The majority of stations are, in practice, intermediate stations. They are mostly designed as through stations ; there are only
1404-405: A station track as a temporary storage of a disabled train. A "terminus" or "terminal" is a station at the end of a railway line. Trains arriving there have to end their journeys (terminate) or reverse out of the station. Depending on the layout of the station, this usually permits travellers to reach all the platforms without the need to cross any tracks – the public entrance to the station and
1482-647: A substantial improvement in wildlife protection from that which obtained under the old Uganda Railway. Passing through the transportation corridor between Tsavo East National Park and Tsavo West National Park concurrently with the Nairobi–Mombasa Road , the road and old metre-gauge railway were built at ground level, causing frequent collisions with wildlife. Passenger trains run between Mombasa Terminus in Miritini and Nairobi Terminus in Syokimau , near
1560-405: A three-way junction and platforms are built on all three sides, for example Shipley and Earlestown stations. In a station, there are different types of tracks to serve different purposes. A station may also have a passing loop with a loop line that comes off the straight main line and merge back to the main line on the other end by railroad switches to allow trains to pass. A track with
1638-650: A tunnel beneath the concourse and emerge a few blocks away to cross the Potomac River into Virginia. Terminus stations in large cities are by far the biggest stations, with the largest being Grand Central Terminal in New York City. Other major cities, such as London, Boston , Paris, Istanbul , Tokyo, and Milan have more than one terminus, rather than routes straight through the city. Train journeys through such cities often require alternative transport ( metro , bus , taxi or ferry ) from one terminus to
SECTION 20
#17327759647891716-464: Is Arbroath . Occasionally, a station serves two or more railway lines at differing levels. This may be due to the station's position at a point where two lines cross (example: Berlin Hauptbahnhof ), or may be to provide separate station capacity for two types of service, such as intercity and suburban (examples: Paris-Gare de Lyon and Philadelphia's 30th Street Station ), or for two different destinations. Stations may also be classified according to
1794-665: Is KSh. 549 billion (US$ 5.49 billion) and includes the laying of railway tracks in both sections, dredging and expansion of the port of Kisumu, and the expansion and modernization of the inland container depot at Embakasi , in Nairobi. In May 2024, the Exim Bank of China indicated willingness to fund the extension of the Kenya SGR to the Ugandan border at Malaba. This railway line, totaling 1,500 kilometres (932 mi),
1872-590: Is a component of the Lamu Port and Lamu-Southern Sudan-Ethiopia Transport Corridor (LAPSSET) development project. Under the LAPSSET plan, this line would be extended to Juba in South Sudan. This 700 kilometres (435 mi) section also falls under the LAPSSET program. It extends from Nairobi to Moyale, at the international border with Kenya's northern neighbor. It is planned to be extended to Addis Ababa ,
1950-455: Is any longer served by trains), or military base (such as Lympstone Commando ) or railway yard. The only two such "private" stopping places on the national system, where the "halt" designation is still officially used, seem to be Staff Halt (at Durnsford Road, Wimbledon) and Battersea Pier Sidings Staff Halt, both of which are solely for railway staff. In Portugal , railway stops are called halts ( Portuguese : apeadeiro ). In Ireland ,
2028-499: Is contracted to operate the line for its first five years. As of 2020, railway operation expenses exceeded revenues. An extension from Nairobi to Naivasha and Suswa , begun in 2018, was completed in October 2019, extending the line's length by 120 km from its original length of 472 km to approximately 592 km (368 mi). The first fare-paying passengers boarded the "Madaraka Express" on Madaraka Day (1 June 2017),
2106-404: Is frequently, but not always, the final destination of trains arriving at the station. Especially in continental Europe, a city may have a terminus as its main railway station, and all main lines converge on it. In such cases all trains arriving at the terminus must leave in the reverse direction from that of their arrival. There are several ways in which this can be accomplished: There may also be
2184-497: Is known as the Mombasa–Nairobi Standard Gauge Railway , and connects the port city of Mombasa and Nairobi , the capital and largest city of Kenya. Passenger rail services between Mombasa and Nairobi started on 1 June 2017, and freight rail services on 1 January 2018. It was built between October 2016 and January 2018, by China Road and Bridge Corporation , at a cost of US$ 3.6 billion, 90 per cent of which
2262-514: Is the terminology typically used in the U.S. In Europe, the terms train station and railway station are both commonly used, with railroad being obsolete. In British Commonwealth usage, where railway station is the traditional term, the word station is commonly understood to mean a railway station unless otherwise specified. In the United States, the term depot is sometimes used as an alternative name for station , along with
2340-411: Is used for trains to pass the station without stopping is called through track. There may be other sidings at the station which are lower speed tracks for other purposes. A maintenance track or a maintenance siding, usually connected to a passing track, is used for parking maintenance equipment, trains not in service, autoracks or sleepers . A refuge track is a dead-end siding that is connected to
2418-786: The Democratic Republic of the Congo , Rwanda , and Burundi . There are also plans to link to Addis Ababa , in neighboring Ethiopia to the north. The first segment, between Mombasa and Nairobi, opened passenger rail service in June 2017, and freight rail service in January 2018. Other segments are under construction or planned. The new standard gauge railway is intended to replace the old, inefficient metre-gauge railway system. The railway system consists of several major sections: This section, measuring 609 kilometres (378 mi),
Mombasa–Nairobi Standard Gauge Railway - Misplaced Pages Continue
2496-660: The Democratic Republic of the Congo . In March 2019, during a state visit to Kenya, President Yoweri Museveni of Uganda and his host, President Uhuru Kenyatta of Kenya, jointly, publicly committed to extend the Standard Gauge Railway (SGR) to Kampala via Malaba. The Kenyan government in 2020 reached a deal with AfriStar to take over operations and maintenance by May 2022. Kenya received its first SGR rolling stock in May 2017: 18 locomotives and 60 double-stack container cars. In early February 2024, Kenya received
2574-624: The Jomo Kenyatta International Airport . Freight services are provided between Port Reitz , just west of Mombasa Island , and the inland container depot in the Embakasi division of Nairobi. There are nine passenger stations between Mombasa and Nairobi. Each station's architecture is inspired by local elements. Passengers can transfer at Nairobi Terminus to metre-gauge trains into the Nairobi city centre. Although they are currently designated as terminals ,
2652-684: The Shinkansen in Japan, THSR in Taiwan, TGV lines in France, and ICE lines in Germany. Stations normally have staffed ticket sales offices, automated ticket machines , or both, although on some lines tickets are sold on board the trains. Many stations include a shop or convenience store . Larger stations usually have fast-food or restaurant facilities. In some countries, stations may also have
2730-1000: The Thameslink platforms at St Pancras in London, the Argyle and North Clyde lines of Glasgow's suburban rail network , in Antwerp in Belgium, the RER at the Gare du Nord in Paris, the Milan suburban railway service 's Passante railway , and many of the numerous S-Bahn lines at terminal stations in Germany, Austria and Switzerland, such as at Zürich Hauptbahnhof . Due to the disadvantages of terminus stations there have been multiple cases in which one or several terminus stations were replaced with
2808-536: The Uganda Railway , a metre-gauge line that was built during British colonial rule. The SGR, however, has a straighter alignment that accommodates higher speeds. Because of the rough and hilly terrain, large portions of the SGR were built on viaducts and embankments and in cuttings . For example, the Uganda Railway tackled the hilly terrain near Mazeras township by using a spiral . In contrast,
2886-722: The 1980s to 1.5 million tonnes per year in 2012. In 2014, the Rift Valley Railways Consortium , the operator of railways in Kenya and Uganda, reported a loss of US$ 1.5 million. At the same time, the Chinese government was funding railway construction in other African countries. In 2011, Kenya signed a memorandum of understanding with the China Road & Bridge Corporation to build a standard-gauge railway between Mombasa and Nairobi. The US$ 3.6 billion railway
2964-456: The 54th anniversary of Kenya's attainment of self-rule from Great Britain. Commercial freight services began on 1 January 2018. Passenger uptake has exceeded expectations, with the train carrying 2 million riders in the first 17 months of operation. By November 2018, the SGR was operating 30 freight trains and 4 passenger trains per day. Double stack freight trains have run on the line since 2018. The Mombasa-Nairobi SGR generally runs parallel to
3042-609: The British Isles. The word is often used informally to describe national rail network stations with limited service and low usage, such as the Oxfordshire Halts on the Cotswold Line . It has also sometimes been used for stations served by public services but accessible only by persons travelling to/from an associated factory (for example IBM near Greenock and British Steel Redcar – although neither of these
3120-713: The Mombasa and Nairobi stations were built as through stations, and were originally designated Mombasa West Station and Nairobi South Station. When Phase 2 of the SGR is completed, trains will continue through the Nairobi station to the Uganda border. Kenya is a member of the Northern Corridor Integration Project (NCIP), which has selected the Chinese National Railway Class 1 standard for its railways. The adoption of
3198-549: The Mombasa–Nairobi SGR to link with other SGRs being built in the East African Community . At a cost of US$ 3.6 billion , the SGR was among Kenya's most expensive infrastructure projects as at the time it was launched. The prime contractor was the China Road & Bridge Corporation CRBC, which hired 25,000 Kenyans to work on the railway. CRBC's holding company, China Communications Construction Company
Mombasa–Nairobi Standard Gauge Railway - Misplaced Pages Continue
3276-642: The Naivasha-Kisumu, Kisumu-Malaba, and Malaba-Kampala sections due to the Chinese economic crisis . Since 2023, Kenya and Uganda have embarked on a joint initiative to fund the completion of the SGR to Kampala, with Kenya announcing the commencement of works on the Naivasha-Kisumu section in 2024. In May 2024, Rwanda and the Democratic Republic of the Congo committed to join the Kenyan-Ugandan initiative and funding drive, with an aim to extend
3354-415: The SGR are Kenyans, as of July 2018 Chinese workers still occupied most of the critical positions, including dispatchers and locomotive drivers. This sparked political controversy in Kenya, as after one year of operations a full handover to Kenyans was yet to take place. The Kenya Transport Ministry explained that a full handover would occur in 2027, according to the current agreement; later, the interim review
3432-542: The SGR passes through this area on two bridges, with the 43.5 metres (142 ft 9 in) high Mazeras-2 bridge being the highest one on the route. As it approaches Nairobi, the SGR crosses the 2.6 kilometres (1.6 mi) Athi River Super Bridge , which at the time of its completion was the sixth-longest bridge in Africa. The SGR has a total of 98 bridges. The SGR's viaducts and embankments are elevated above ground level, allowing wildlife to pass underneath. This has brought
3510-644: The SGR to Kigali and Kisangani . The lines are being built according to Chinese standards. Train station#Terminus Locations at which passengers only occasionally board or leave a train, sometimes consisting of a short platform and a waiting area but sometimes indicated by no more than a sign, are variously referred to as "stops", " flag stops ", " halts ", or "provisional stopping places". The stations themselves may be at ground level, underground, or elevated. Connections may be available to intersecting rail lines or other transport modes such as buses , trams , or other rapid transit systems. Train station
3588-407: The capital city of Ethiopia. In January 2024, Kenya Railways Corporation estimated the cost for this section at Ksh835.5 billion (US$ 5.57 billion), with the link from Nairobi to Isiolo costing Ksh358.8 billion (US$ 2.392 billion) and the remaining stretch to Moyale costing Ksh476.7 billion (US$ 3.178 billion). This proposed railway link, measuring an estimated 460 kilometres (286 mi), would link
3666-558: The chairman of National Land Commission, and Atanas Kariuki Maina, managing director of the Kenya Railways Corporation, were among 18 officials, businesspeople and companies arrested on corruption charges involving land allocation for the $ 3 billion flagship Nairobi–Mombasa railway. The railway is owned by the Kenya Railways Corporation (KRC), a state-owned corporation of Kenya. It contracts
3744-478: The compound forms train depot , railway depot , and railroad depot —it is used for both passenger and freight facilities. The term depot is not used in reference to vehicle maintenance facilities in the U.S., whereas it is used as such in Canada and the United Kingdom. The world's first recorded railway station, for trains drawn by horses rather than engined locomotives , began passenger service in 1807. It
3822-533: The construction of stations, from those boasting grand, intricate, Baroque - or Gothic -style edifices, to plainer utilitarian or modernist styles. Stations in Europe tended to follow British designs and were in some countries, like Italy, financed by British railway companies. Train stations built more recently often have a similar feel to airports, with a simple, abstract style. Examples of modern stations include those on newer high-speed rail networks, such as
3900-453: The financing was 40% of the total project costs or about 130 billion Kenyan shillings would be spent on local supplies including sand, cement, electric cables, galvanised iron and steel. A condition by Exim Bank for the loan was to have an operator acceptable to the bank for the initial phase of operations, which led the Kenyan government to reject a planned international tender and to contract
3978-476: The goods facilities are on the opposite side of the tracks from the station building. Intermediate stations also occur on some funicular and cable car routes. A halt , in railway parlance in the Commonwealth of Nations , Ireland and Portugal , is a small station, usually unstaffed or with very few staff, and with few or no facilities. In some cases, trains stop only on request , when passengers on
SECTION 50
#17327759647894056-401: The layout of the platforms. Apart from single-track lines, the most basic arrangement is a pair of tracks for the two directions; there is then a basic choice of an island platform between, two separate platforms outside the tracks ( side platforms ), or a combination of the two. With more tracks, the possibilities expand. Some stations have unusual platform layouts due to space constraints of
4134-417: The less developed KTM East Coast railway line to serve rural 'kampongs' (villages), that require train services to stay connected to important nodes, but do not have a need for staff. People boarding at halts who have not bought tickets online can buy it through staff on board. In rural and remote communities across Canada and the United States, passengers wanting to board the train at such places had to flag
4212-731: The line was officially opened for passenger train service in October 2019. International freight for neighbouring countries interchanges at the Naivasha Inland Container Depot. This section, measuring 267 kilometres (166 mi), stretching from Naivasha to Kisumu , on the eastern shores of Lake Victoria , is contracted to China Communications Construction Company , at a budgeted cost of KSh. 380 billion (US$ 3.8 billion), borrowed from China Exim Bank. Loan papers between Kenya and China were scheduled for signatures in September 2018, but were deferred until
4290-541: The loading and unloading of goods and may well have marshalling yards (classification yards) for the sorting of wagons. The world's first goods terminal was the 1830 Park Lane Goods Station at the South End Liverpool Docks. Built in 1830, the terminal was reached by a 1.24-mile (2 km) tunnel. As goods are increasingly moved by road, many former goods stations, as well as the goods sheds at passenger stations, have closed. Many are used purely for
4368-403: The main reception facilities being at the far end of the platforms. Sometimes the track continues for a short distance beyond the station, and terminating trains continue forward after depositing their passengers, before either proceeding to sidings or reversing to the station to pick up departing passengers. Bondi Junction , Australia and Kristiansand Station , Norway are examples. A terminus
4446-585: The mother company of CRBC. In January 2020, Business Daily Africa reported that the second loan, related to the Nairobi-Naivasha section of the Kenyan SGR, amounting to $ 1.482 billion, with a five-year grace period, fell due in January 2021. It attracts an interest rate of approximately 3.34 percent per annum and will be due in 30 semi-annual installments, beginning on 21 January 2021 until 21 July 2035. On 22 July 2020, Mohammed Abdalla Swazuri,
4524-466: The operation, rising to 6 million by 2024. There has been some debate about whether the SGR has brought lower freight costs or higher costs due to high "last mile transport" from Nairobi terminus. Kenya Standard Gauge Railway The Kenya Standard Gauge Railway (SGR) is a partially finished railway system connecting Kenya's cities. Once completed, it will link the country to the neighboring country of Uganda , and through Uganda, to South Sudan ,
4602-497: The operations and maintenance of the line to the Africa Star Railway Operations Company (Afristar), a subsidiary of the China Road and Bridge Corporation (CRBC), and the primary constructor of the line. Afristar was given the legal right to the first ten years of operation of the SGR, with an interim review set for the end of the fifth year of the contract. While many of the employees working on
4680-816: The other. For instance, in Istanbul transfers from the Sirkeci Terminal (the European terminus) and the Haydarpaşa Terminal (the Asian terminus) historically required crossing the Bosphorus via alternative means, before the Marmaray railway tunnel linking Europe and Asia was completed. Some cities, including New York, have both termini and through lines. Terminals that have competing rail lines using
4758-596: The platform indicate that they wish to board, or passengers on the train inform the crew that they wish to alight. These can sometimes appear with signals and sometimes without. The Great Western Railway in Great Britain began opening haltes on 12 October 1903; from 1905, the French spelling was Anglicised to "halt". These GWR halts had the most basic facilities, with platforms long enough for just one or two carriages; some had no raised platform at all, necessitating
SECTION 60
#17327759647894836-424: The project cost was funded by the Kenyan government. The $ 3.23 billion financing from Exim was finalised in May 2014. Exim advanced the loan amount in two subsidized loans of US$ 1.63 billion each. One of the loans was a foreign aid loan provided on a concessional basis (very low interest rate) while the other was a below-market rate preferential export buyer's credit. A condition imposed by the Kenyan government for
4914-469: The provision of steps on the carriages. Halts were normally unstaffed, tickets being sold on the train. On 1 September 1904, a larger version, known on the GWR as a "platform" instead of a "halt", was introduced; these had longer platforms, and were usually staffed by a senior grade porter, who sold tickets and sometimes booked parcels or milk consignments. From 1903 to 1947 the GWR built 379 halts and inherited
4992-501: The railway handled 1.6 million passengers and 5 million tonnes of freight. In 2019, the government required all cargo being cleared in the port in Mombasa to be handled by the railway, leading to protests from cargo transporters. According to a contract between the Exim bank, Kenya Railways Corporation , and Kenya Ports Authority , the KPA must provide 1 million tonnes of freight at the start of
5070-405: The station entrance and platforms are on the same level, is also common, but is perhaps rarer in urban areas , except when the station is a terminus. Stations located at level crossings can be problematic if the train blocks the roadway while it stops, causing road traffic to wait for an extended period of time. Stations also exist where the station buildings are above the tracks. An example of this
5148-477: The station frequently set up a jointly owned terminal railroad to own and operate the station and its associated tracks and switching operations. During a journey, the term station stop may be used in announcements, to differentiate halts during which passengers may alight and halts for another reasons, such as a locomotive change . While a junction or interlocking usually divides two or more lines or routes, and thus has remotely or locally operated signals ,
5226-567: The station location, or the alignment of the tracks. Examples include staggered platforms, such as at Tutbury and Hatton railway station on the Crewe–Derby line , and curved platforms, such as Cheadle Hulme railway station on the Macclesfield to Manchester Line. Stations at junctions can also have unusual shapes – a Keilbahnhof (or "wedge-shaped" station) is sited where two lines split. Triangular stations also exist where two lines form
5304-557: The street to underground rapid-transit urban rail stations. In many African, South American, and Asian countries, stations are also used as a place for public markets and other informal businesses. This is especially true on tourist routes or stations near tourist destinations . As well as providing services for passengers and loading facilities for goods, stations can sometimes have locomotive and rolling stock depots, usually with facilities for storing and refuelling rolling stock and carrying out minor repairs. The basic configuration of
5382-442: The train down to stop it, hence the name " flag stops " or "flag stations". Accessibility for disabled people is mandated by law in some countries. Considerations include: In the United Kingdom, rail operators will arrange alternative transport (typically a taxi ) at no extra cost to the ticket holder if the station they intend to travel to or from is inaccessible. Goods or freight stations deal exclusively or predominantly with
5460-872: The two main standard gauge railway systems in Kenya; the Mombasa–Malaba SGR System and the Lamu–Nakodok SGR System. This 1435 mm (4 ft 8 + 1 ⁄ 2 in) railway line is intended to ease the transfer of goods and passengers between the port of Mombasa and the cities of Nairobi and Kisumu , in Kenya , Kampala in Uganda , Kigali in Rwanda and subsequently to Bujumbura in Burundi, Juba in South Sudan and to Goma and Bunia in
5538-446: The world was Crown Street railway station in Liverpool, England , built in 1830, on the locomotive-hauled Liverpool to Manchester line. The station was slightly older than the still extant Liverpool Road railway station terminal in Manchester. The station was the first to incorporate a train shed . Crown Street station was demolished in 1836, as the Liverpool terminal station moved to Lime Street railway station . Crown Street station
5616-591: Was The Mount in Swansea , Wales, on the Oystermouth (later the Swansea and Mumbles ) Railway. The world's oldest station for engined trains was at Heighington , on the Stockton and Darlington railway in north-east England built by George Stephenson in the early 19th century, operated by locomotive Locomotion No. 1 . The station opened in 1827 and was in use until the 1970s. The building, Grade II*-listed ,
5694-635: Was borrowed from the Exim Bank of China , with the Kenyan government providing the remaining 10 per cent. This section was also contracted to the company that constructed the Mombasa–Nairobi Section. The line stretches from Nairobi to Naivasha , a distance of about 120 kilometres (75 mi), at cost of KSh. 150 billion (US$ 1.5 billion), borrowed from the China Export-Import Bank. Construction began in 2018 and
5772-526: Was called a "rail motor stopping place" (RMSP). Usually situated near a level crossing , it was often designated solely by a sign beside the railway. The passenger could hail the driver to stop, and could buy a ticket from the train guard or conductor. In South Australia, such facilities were called "provisional stopping places". They were often placed on routes on which "school trains" (services conveying children from rural localities to and from school) operated. In West Malaysia , halts are commonplace along
5850-742: Was converted to a goods station terminal. The first stations had little in the way of buildings or amenities. The first stations in the modern sense were on the Liverpool and Manchester Railway , opened in 1830. Manchester's Liverpool Road Station , the second oldest terminal station in the world, is preserved as part of the Museum of Science and Industry in Manchester . It resembles a row of Georgian houses. Early stations were sometimes built with both passenger and freight facilities, though some railway lines were goods-only or passenger-only, and if
5928-519: Was in bad condition, but was restored in 1984 as an inn. The inn closed in 2017; in 2024 there were plans to renovate the derelict station in time for the 200th anniversary of the opening of the railway line. The two-storey Mount Clare station in Baltimore , Maryland , United States, which survives as a museum, first saw passenger service as the terminus of the horse-drawn Baltimore and Ohio Railroad on 22 May 1830. The oldest terminal station in
6006-588: Was initiated to study the feasibility of transferring critical positions to the Kenya Railways Corporation, which successfully negotiated takeover shifting towards an earlier date of May 2022 with the CRBC. Kenyans would gradually take over all positions on the SGR, completing the full takeover in 2022. During the transition period in June 2021, the Kenya Railroad Company had already taken over the ticketing, security, and refuelling departments. In 2018,
6084-585: Was the largest infrastructure project in Kenya since independence. Financing was finalised in May 2014, with the Exim Bank of China extending a loan for 90 percent of the project cost and the remaining 10 percent coming from the Kenyan government. 25,000 Kenyans were hired to work on the project. Tracklaying was completed in December 2016. Passenger service was officially inaugurated on 31 May 2017, eighteen months ahead of schedule. In 2022 500 additional freight wagons were ordered to increase capacity. In June 2024,
#788211