The Silahtarağa Power Station ( Turkish : Silahtarağa Elektrik Santralı ) was a coal-fired generating station located in Istanbul Turkey . The Ottoman Empire 's first urban-scaled power plant, it was in use from 1914 to 1983. The site has since been converted into a university campus for the Istanbul Bilgi University and houses two museums and several facilities. It was refurbished and renamed SantralIstanbul in 2007.
66-657: The power plant was designed as the first in the Ottoman Empire apart from a small hydroelectric power station built in 1902 outside Tarsus in Anatolia . The Budapest based Austria - Hungarian Gas and Electric Company, Ganz, was contracted to build the power station. In 1910 the firm had established the Ottoman Electric Company in cooperation with two Belgian banks: the Banque de Bruxelles and
132-601: A caftan belonging to the Sultan, a painting of him, and a historic Koran were destroyed in the fire, the source of which was never identified. By June 2008, the Cultural Center was closed for renovations. The Board for the Protection of Cultural Property decided on 31 December 2009 that it should be renovated on the original site and on 9 April 2012, a tender was held for the renovation contract. The re-opening
198-745: A greenhouse gas . According to the World Commission on Dams report, where the reservoir is large compared to the generating capacity (less than 100 watts per square metre of surface area) and no clearing of the forests in the area was undertaken prior to impoundment of the reservoir, greenhouse gas emissions from the reservoir may be higher than those of a conventional oil-fired thermal generation plant. In boreal reservoirs of Canada and Northern Europe, however, greenhouse gas emissions are typically only 2% to 8% of any kind of conventional fossil-fuel thermal generation. A new class of underwater logging operation that targets drowned forests can mitigate
264-463: A low-head hydro power plant with hydrostatic head of few meters to few tens of meters can be classified either as an SHP or an LHP. The other distinction between SHP and LHP is the degree of the water flow regulation: a typical SHP primarily uses the natural water discharge with very little regulation in comparison to an LHP. Therefore, the term SHP is frequently used as a synonym for the run-of-the-river power plant . The largest power producers in
330-426: A dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel -powered energy plants. However, when constructed in lowland rainforest areas, where part of
396-547: A few dozen Megawatts. The museum is open to public from 10.00 to 22.00 hours everyday except Mondays. Admission is free of charge. Parking and pedestrian access is from the south, immediately after the Kağıthane bridge. Pedestrian access is also possible from the north, adjacent to Fil Köprusü (Alibey elephant bridge), which permits foot and bike access from Eyüp and the west side of the Haliç. A shuttle bus service free of charge
462-421: A flood and fail. Changes in the amount of river flow will correlate with the amount of energy produced by a dam. Lower river flows will reduce the amount of live storage in a reservoir therefore reducing the amount of water that can be used for hydroelectricity. The result of diminished river flow can be power shortages in areas that depend heavily on hydroelectric power. The risk of flow shortage may increase as
528-653: A gallery dedicated to modern art, the other an energy museum. It was this blueprint which received official backing. An alternative project was submitted by the Istanbul branch of the Chamber of Electrical Engineers in cooperation with the Istanbul Technical University , Bilgi University's project was approved by the Ministry of Energy and Natural Resources, and was realized in three years with
594-809: A large natural height difference between two waterways, such as a waterfall or mountain lake. A tunnel is constructed to take water from the high reservoir to the generating hall built in a cavern near the lowest point of the water tunnel and a horizontal tailrace taking water away to the lower outlet waterway. A simple formula for approximating electric power production at a hydroelectric station is: P = − η ( m ˙ g Δ h ) = − η ( ( ρ V ˙ ) g Δ h ) {\displaystyle P=-\eta \ ({\dot {m}}g\ \Delta h)=-\eta \ ((\rho {\dot {V}})\ g\ \Delta h)} where Efficiency
660-451: A larger amount of methane than those in temperate areas. Like other non-fossil fuel sources, hydropower also has no emissions of sulfur dioxide, nitrogen oxides, or other particulates. Reservoirs created by hydroelectric schemes often provide facilities for water sports , and become tourist attractions themselves. In some countries, aquaculture in reservoirs is common. Multi-use dams installed for irrigation support agriculture with
726-592: A positive risk adjusted return, unless appropriate risk management measures are put in place. While many hydroelectric projects supply public electricity networks, some are created to serve specific industrial enterprises. Dedicated hydroelectric projects are often built to provide the substantial amounts of electricity needed for aluminium electrolytic plants, for example. The Grand Coulee Dam switched to support Alcoa aluminium in Bellingham, Washington , United States for American World War II airplanes before it
SECTION 10
#1732787121898792-548: A relatively constant water supply. Large hydro dams can control floods, which would otherwise affect people living downstream of the project. Managing dams which are also used for other purposes, such as irrigation , is complicated. In 2021 the IEA called for "robust sustainability standards for all hydropower development with streamlined rules and regulations". Large reservoirs associated with traditional hydroelectric power stations result in submersion of extensive areas upstream of
858-540: A result of climate change . One study from the Colorado River in the United States suggest that modest climate changes, such as an increase in temperature in 2 degree Celsius resulting in a 10% decline in precipitation, might reduce river run-off by up to 40%. Brazil in particular is vulnerable due to its heavy reliance on hydroelectricity, as increasing temperatures, lower water flow and alterations in
924-448: A small TV/radio). Even smaller turbines of 200–300 W may power a few homes in a developing country with a drop of only 1 m (3 ft). A Pico-hydro setup is typically run-of-the-river , meaning that dams are not used, but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before returning it to the stream. An underground power station is generally used at large facilities and makes use of
990-455: A source of low-cost renewable energy. Alternatively, small hydro projects may be built in isolated areas that would be uneconomic to serve from a grid, or in areas where there is no national electrical distribution network. Since small hydro projects usually have minimal reservoirs and civil construction work, they are seen as having a relatively low environmental impact compared to large hydro. This decreased environmental impact depends strongly on
1056-414: A start-up time of the order of a few minutes. Although battery power is quicker its capacity is tiny compared to hydro. It takes less than 10 minutes to bring most hydro units from cold start-up to full load; this is quicker than nuclear and almost all fossil fuel power. Power generation can also be decreased quickly when there is a surplus power generation. Hence the limited capacity of hydropower units
1122-581: A total of 1,500 terawatt-hours (TWh) of electrical energy in one full cycle" which was "about 170 times more energy than the global fleet of pumped storage hydropower plants". Battery storage capacity is not expected to overtake pumped storage during the 2020s. When used as peak power to meet demand, hydroelectricity has a higher value than baseload power and a much higher value compared to intermittent energy sources such as wind and solar. Hydroelectric stations have long economic lives, with some plants still in service after 50–100 years. Operating labor cost
1188-550: A year's worth of rain fell within 24 hours (see 1975 Banqiao Dam failure ). The resulting flood resulted in the deaths of 26,000 people, and another 145,000 from epidemics. Millions were left homeless. The creation of a dam in a geologically inappropriate location may cause disasters such as 1963 disaster at Vajont Dam in Italy, where almost 2,000 people died. Atat%C3%BCrk Cultural Center The Atatürk Cultural Center ( Turkish : Atatürk Kültür Merkezi ), commonly called
1254-435: Is electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity , almost 4,210 TWh in 2023, which is more than all other renewable sources combined and also more than nuclear power . Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has
1320-452: Is hydroelectric power on a scale serving a small community or industrial plant. The definition of a small hydro project varies but a generating capacity of up to 10 megawatts (MW) is generally accepted as the upper limit. This may be stretched to 25 MW and 30 MW in Canada and the United States. Small hydro stations may be connected to conventional electrical distribution networks as
1386-635: Is also usually low, as plants are automated and have few personnel on site during normal operation. Where a dam serves multiple purposes, a hydroelectric station may be added with relatively low construction cost, providing a useful revenue stream to offset the costs of dam operation. It has been calculated that the sale of electricity from the Three Gorges Dam will cover the construction costs after 5 to 8 years of full generation. However, some data shows that in most countries large hydropower dams will be too costly and take too long to build to deliver
SECTION 20
#17327871218981452-470: Is highest in the winter when solar energy is at a minimum. Pico hydro is hydroelectric power generation of under 5 kW . It is useful in small, remote communities that require only a small amount of electricity. For example, the 1.1 kW Intermediate Technology Development Group Pico Hydro Project in Kenya supplies 57 homes with very small electric loads (e.g., a couple of lights and a phone charger, or
1518-445: Is initially produced during construction of the project, and some methane is given off annually by reservoirs, hydro has one of the lowest lifecycle greenhouse gas emissions for electricity generation. The low greenhouse gas impact of hydroelectricity is found especially in temperate climates . Greater greenhouse gas emission impacts are found in the tropical regions because the reservoirs of power stations in tropical regions produce
1584-462: Is not an energy source, and appears as a negative number in listings. Run-of-the-river hydroelectric stations are those with small or no reservoir capacity, so that only the water coming from upstream is available for generation at that moment, and any oversupply must pass unused. A constant supply of water from a lake or existing reservoir upstream is a significant advantage in choosing sites for run-of-the-river. A tidal power station makes use of
1650-452: Is not generally used to produce base power except for vacating the flood pool or meeting downstream needs. Instead, it can serve as backup for non-hydro generators. The major advantage of conventional hydroelectric dams with reservoirs is their ability to store water at low cost for dispatch later as high value clean electricity. In 2021, the IEA estimated that the "reservoirs of all existing conventional hydropower plants combined can store
1716-410: Is often higher (that is, closer to 1) with larger and more modern turbines. Annual electric energy production depends on the available water supply. In some installations, the water flow rate can vary by a factor of 10:1 over the course of a year. Hydropower is a flexible source of electricity since stations can be ramped up and down very quickly to adapt to changing energy demands. Hydro turbines have
1782-437: Is preserved as part of the display at Santralİstanbul energy museum. It was integrated into the design by architect Han Tümertekin . Situated in the turbine hall with three generator groups, the museum is a collection of the steam turbines , the electrical generators and the equipment of the former Silahtarağa power plant, on display in almost original conditions. Tours are self-guided. Here, modern glass escalators replaced
1848-559: Is provided for the visitors departing from Atatürk Cultural Center in Taksim every half an hour. İETT does operate several bus lines in the immediate vicinity. Address : Eski Silahtarağa Elektrik Santrali (Former Silahtarağa Power Station) Silahtar Mah. Kazım Karabekir Cad. 1 Eyüp, Istanbul 41°4′2″N 28°56′45″E / 41.06722°N 28.94583°E / 41.06722; 28.94583 Hydroelectric power station Hydroelectricity , or hydroelectric power ,
1914-504: The AKM , is a concert hall, theatre and cultural centre running along the eastern side of Taksim Square in Beyoğlu , Istanbul . Originally opened on April 12, 1969, it was closed for renovation works in 2008, but was ultimately demolished in 2018 and rebuilt in 2021 as a state-of-the-art cultural complex. On October 29, 2021, it reopened to the public after a 13-year interval. The new AKM building
1980-584: The Banque Generale de Credit Hangrois . The company obtained an imperial concession lasting 50 years, and built its first station a coal-fired plant in the Silahtarağa neighbourhood, Eyüp at the upper end of Golden Horn . The power plant started service on the February 11, 1914 it supplied power initially to the tram network and shortly after to the sultan's palace . Before long electrical power
2046-679: The Bonneville Dam in 1937 and being recognized by the Flood Control Act of 1936 as the premier federal flood control agency. Hydroelectric power stations continued to become larger throughout the 20th century. Hydropower was referred to as "white coal". Hoover Dam 's initial 1,345 MW power station was the world's largest hydroelectric power station in 1936; it was eclipsed by the 6,809 MW Grand Coulee Dam in 1942. The Itaipu Dam opened in 1984 in South America as
Silahtarağa Power Station - Misplaced Pages Continue
2112-549: The Industrial Revolution would drive development as well. In 1878, the world's first hydroelectric power scheme was developed at Cragside in Northumberland , England, by William Armstrong . It was used to power a single arc lamp in his art gallery. The old Schoelkopf Power Station No. 1 , US, near Niagara Falls , began to produce electricity in 1881. The first Edison hydroelectric power station,
2178-806: The International Exhibition of Hydropower and Tourism , with over one million visitors 1925. By 1920, when 40% of the power produced in the United States was hydroelectric, the Federal Power Act was enacted into law. The Act created the Federal Power Commission to regulate hydroelectric power stations on federal land and water. As the power stations became larger, their associated dams developed additional purposes, including flood control , irrigation and navigation . Federal funding became necessary for large-scale development, and federally owned corporations, such as
2244-633: The Tennessee Valley Authority (1933) and the Bonneville Power Administration (1937) were created. Additionally, the Bureau of Reclamation which had begun a series of western US irrigation projects in the early 20th century, was now constructing large hydroelectric projects such as the 1928 Hoover Dam . The United States Army Corps of Engineers was also involved in hydroelectric development, completing
2310-583: The Vulcan Street Plant , began operating September 30, 1882, in Appleton, Wisconsin , with an output of about 12.5 kilowatts. By 1886 there were 45 hydroelectric power stations in the United States and Canada; and by 1889 there were 200 in the United States alone. At the beginning of the 20th century, many small hydroelectric power stations were being constructed by commercial companies in mountains near metropolitan areas. Grenoble , France held
2376-506: The potential energy of dammed water driving a water turbine and generator . The power extracted from the water depends on the volume and on the difference in height between the source and the water's outflow. This height difference is called the head . A large pipe (the " penstock ") delivers water from the reservoir to the turbine. This method produces electricity to supply high peak demands by moving water between reservoirs at different elevations. At times of low electrical demand,
2442-400: The water frame , and continuous production played a significant part in the development of the factory system, with modern employment practices. In the 1840s, hydraulic power networks were developed to generate and transmit hydro power to end users. By the late 19th century, the electrical generator was developed and could now be coupled with hydraulics. The growing demand arising from
2508-790: The Concert Hall, which had a seating capacity for 502 spectators and was used for concerts, meetings and conferences. There was also an exhibition hall of 1,200 m (13,000 sq ft) in the lobby, a Chamber Theatre with 296 seats, the Aziz Nesin Stage with 190 seats, and a cinema hall with 206 seats. Until 2008, the center was home to the Over the summer, the AKM hosted the Istanbul Arts and Culture Festival. After it had been empty for ten years since 2008, demolition works of
2574-463: The IEA released a main-case forecast of 141 GW generated by hydropower over 2022–2027, which is slightly lower than deployment achieved from 2017–2022. Because environmental permitting and construction times are long, they estimate hydropower potential will remain limited, with only an additional 40 GW deemed possible in the accelerated case. In 2021 the IEA said that major modernisation refurbishments are required. Most hydroelectric power comes from
2640-487: The Istanbul Culture Palace, was completed in 13 years and opened on April 12, 1969, twenty-three years after the initial proposal. On November 27, 1970, fire broke out during a performance of Arthur Miller 's play The Crucible ( Turkish : Cadı Kazanı , "The Witch's Cauldron"). Although there was no loss of life, some items brought from Topkapı Palace for the play of Sultan Murad IV , including
2706-464: The ability to transport particles heavier than itself downstream. This has a negative effect on dams and subsequently their power stations, particularly those on rivers or within catchment areas with high siltation. Siltation can fill a reservoir and reduce its capacity to control floods along with causing additional horizontal pressure on the upstream portion of the dam. Eventually, some reservoirs can become full of sediment and useless or over-top during
Silahtarağa Power Station - Misplaced Pages Continue
2772-595: The balance between stream flow and power production. Micro hydro means hydroelectric power installations that typically produce up to 100 kW of power. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without purchase of fuel. Micro hydro systems complement photovoltaic solar energy systems because in many areas water flow, and thus available hydro power,
2838-644: The building was supposedly under police protection. The original AKM building covered 31,702 m (341,240 sq ft) and had a floor plan area of 14,606 m (157,220 sq ft) with a usable area of 52,000 m (560,000 sq ft). The complex consisted of the Grand Stage, a hall with a 1,317 seat capacity hosting the Turkish State Theatres and performances of the Turkish State Opera and Ballet ; and
2904-404: The daily rise and fall of ocean water due to tides; such sources are highly predictable, and if conditions permit construction of reservoirs, can also be dispatchable to generate power during high demand periods. Less common types of hydro schemes use water's kinetic energy or undammed sources such as undershot water wheels . Tidal power is viable in a relatively small number of locations around
2970-505: The dams, sometimes destroying biologically rich and productive lowland and riverine valley forests, marshland and grasslands. Damming interrupts the flow of rivers and can harm local ecosystems, and building large dams and reservoirs often involves displacing people and wildlife. The loss of land is often exacerbated by habitat fragmentation of surrounding areas caused by the reservoir. Hydroelectric projects can be disruptive to surrounding aquatic ecosystems both upstream and downstream of
3036-705: The effect of forest decay. Another disadvantage of hydroelectric dams is the need to relocate the people living where the reservoirs are planned. In 2000, the World Commission on Dams estimated that dams had physically displaced 40–80 million people worldwide. Because large conventional dammed-hydro facilities hold back large volumes of water, a failure due to poor construction, natural disasters or sabotage can be catastrophic to downriver settlements and infrastructure. During Typhoon Nina in 1975 Banqiao Dam in Southern China failed when more than
3102-399: The excess generation capacity is used to pump water into the higher reservoir, thus providing demand side response . When the demand becomes greater, water is released back into the lower reservoir through a turbine. In 2021 pumped-storage schemes provided almost 85% of the world's 190 GW of grid energy storage and improve the daily capacity factor of the generation system. Pumped storage
3168-490: The financial support of some leading Turkish companies. The complex was renamed SantralIstanbul after the Turkish word "Santral" meaning power station. The complex was officially opened on September 8, 2007. Alongside the art gallery and energy museum, the university has created: a public library, amphitheatre several smaller facilities for art, cultural events and educational institutions. The remaining generating equipment
3234-534: The forest is inundated, substantial amounts of greenhouse gases may be emitted. Construction of a hydroelectric complex can have significant environmental impact, principally in loss of arable land and population displacement. They also disrupt the natural ecology of the river involved, affecting habitats and ecosystems, and siltation and erosion patterns. While dams can ameliorate the risks of flooding, dam failure can be catastrophic. In 2021, global installed hydropower electrical capacity reached almost 1,400 GW,
3300-429: The former coal conveyors between the floors. In order to have a good overview of the machinery in the huge hall, a podium is hanged at 12 m height, which leads the visitors to the control room. After the control room, the tour route returns to the entrance by way of the turbine hall floor. The podium has a rough wooden floor and glass sides framed in steel. The control room is preserved nearly in its original form, and
3366-506: The highest among all renewable energy technologies. Hydroelectricity plays a leading role in countries like Brazil, Norway and China. but there are geographical limits and environmental issues. Tidal power can be used in coastal regions. China added 24 GW in 2022, accounting for nearly three-quarters of global hydropower capacity additions. Europe added 2 GW, the largest amount for the region since 1990. Meanwhile, globally, hydropower generation increased by 70 TWh (up 2%) in 2022 and remains
SECTION 50
#17327871218983432-519: The largest renewable energy source, surpassing all other technologies combined. Hydropower has been used since ancient times to grind flour and perform other tasks. In the late 18th century hydraulic power provided the energy source needed for the start of the Industrial Revolution . In the mid-1700s, French engineer Bernard Forest de Bélidor published Architecture Hydraulique , which described vertical- and horizontal-axis hydraulic machines, and in 1771 Richard Arkwright 's combination of water power ,
3498-750: The largest, producing 14 GW , but was surpassed in 2008 by the Three Gorges Dam in China at 22.5 GW . Hydroelectricity would eventually supply some countries, including Norway , Democratic Republic of the Congo , Paraguay and Brazil , with over 85% of their electricity. In 2021 the International Energy Agency (IEA) said that more efforts are needed to help limit climate change . Some countries have highly developed their hydropower potential and have very little room for growth: Switzerland produces 88% of its potential and Mexico 80%. In 2022,
3564-555: The newly created Turkish national grid. From 1962 it was operated by Etibank and in 1970 control was passed to the Turkish Electric Institution (TEK). The Silahtarağa power station initially had three 6 MW generators. This capacity was later increased to 80 MW. On the March 13, 1983, Silahtarağa power station was shut down because it was no longer economic to operate. The plant was left largely derelict for
3630-422: The next 20 years . In 1991, the plant was listed as a 'cultural and natural object of Istanbul' giving it special protection. In 2002, a redevelopment plan was drawn up by Oğuz Özerden , a young businessman and the founder of Istanbul Bilgi University . The project aimed to convert the former plant into a university campus. Under this plan the former station buildings would be used to house two new museums. One
3696-406: The original AKM building began on 13 February 2018, for the purpose of rebuilding it. The demolition works were completed on 30 May 2018. On 10 February 2019, construction of the new complex began with a groundbreaking ceremony attended by President Recep Tayyip Erdoğan . The new Cultural Center consists of five sections, with a total area of 95,000 m (1,020,000 sq ft). It features
3762-633: The plant site. Generation of hydroelectric power changes the downstream river environment. Water exiting a turbine usually contains very little suspended sediment, which can lead to scouring of river beds and loss of riverbanks. The turbines also will kill large portions of the fauna passing through, for instance 70% of the eel passing a turbine will perish immediately. Since turbine gates are often opened intermittently, rapid or even daily fluctuations in river flow are observed. Drought and seasonal changes in rainfall can severely limit hydropower. Water may also be lost by evaporation. When water flows it has
3828-450: The rainfall regime, could reduce total energy production by 7% annually by the end of the century. Lower positive impacts are found in the tropical regions. In lowland rainforest areas, where inundation of a part of the forest is necessary, it has been noted that the reservoirs of power plants produce substantial amounts of methane . This is due to plant material in flooded areas decaying in an anaerobic environment and forming methane,
3894-405: The roof of the AKM during the night. The roof was evacuated and the police occupied the empty building and turned it into a logistics center. By February 2015, it was clear that the building, which had been empty for seven years, had been plundered; its technical installations, lighting and audio equipment as well as many other objects were sold at second hand markets or junk shops, even though
3960-524: The world are hydroelectric power stations, with some hydroelectric facilities capable of generating more than double the installed capacities of the current largest nuclear power stations . Although no official definition exists for the capacity range of large hydroelectric power stations, facilities from over a few hundred megawatts are generally considered large hydroelectric facilities. Currently, only seven facilities over 10 GW ( 10,000 MW ) are in operation worldwide, see table below. Small hydro
4026-539: The world. The classification of hydropower plants starts with two top-level categories: The classification of a plant as an SHP or LHP is primarily based on its nameplate capacity , the threshold varies by the country, but in any case a plant with the capacity of 50 MW or more is considered an LHP. As an example, for China, SHP power is below 25 MW, for India - below 15 MW, most of Europe - below 10 MW. The SHP and LHP categories are further subdivided into many subcategories that are not mutually exclusive. For example,
SECTION 60
#17327871218984092-586: Was allowed to provide irrigation and power to citizens (in addition to aluminium power) after the war. In Suriname , the Brokopondo Reservoir was constructed to provide electricity for the Alcoa aluminium industry. New Zealand 's Manapouri Power Station was constructed to supply electricity to the aluminium smelter at Tiwai Point . Since hydroelectric dams do not use fuel, power generation does not produce carbon dioxide . While carbon dioxide
4158-570: Was designed by Murat Tabanlıoğlu , the son of Hayati Tabanlıoğlu who had designed the original AKM building. Werner Sobek AG was responsible for the facade engineering, creating a transparent facade that opens the building to Taksim Square. Two Turkish architects, Feridun Kip and Rüknettin Güney, proposed the building of the center on May 29, 1946, and work started on it before funding was halted in 1953. In 1956, construction resumed under architect Hayati Tabanlıoğlu . The building, originally called
4224-411: Was only cleaned. The lower level of the technical museum has also moving exhibits, where the visitors are encouraged to push buttons and work levers for interactive learning. Original relay and control instrumentation and wiring is visible. There are many examples from dozens of former and existing manufacturers. Most impressive is the large scale of equipment which was once necessary to generate only
4290-539: Was planned for 29 October 2013, Republic Day with an estimated budget of ₺ 70 million (approx. US$ 39 million). However, in May 2013 the project was halted. Reports suggested that the AKM was to be demolished as part of redevelopment plans for Taksim Square and Gezi Park and was to be replaced with a new opera house and a mosque . During the Gezi Park protests , which began on 28 May 2013, many protesters climbed onto
4356-518: Was prevalent in the city's more prosperous districts as well. The foreign-owned company was nationalized in 1937 and turned over on July 1, 1938 to the Municipality of Istanbul. From then on it was managed by the 'Electricity, Tunnel and Tram Company of Istanbul' ( IETT ). Silahtarağa power station was the sole electricity producer in Istanbul until the 1950s. In 1952, the station was linked to
#897102