The CU Events Center is an 11,064-seat multi-purpose arena in the Western United States , on the main campus of the University of Colorado in Boulder, Colorado . Opened 45 years ago in 1979, it is home to the Colorado Buffaloes men's and women's basketball teams and women's volleyball of the Big 12 Conference . The playing surface is named the Sox Walseth Court in honor of the former Buffaloes men's and women's basketball head coach.

#700299

10-409: The building is an eight-sided concrete structure, with three levels: arena floor, service level, and the concourse level. Single-tiered inside, it replaced Balch Fieldhouse , the current home of the indoor track and field team located directly adjacent to Folsom Field . The approximate elevation at street level is 5,400 feet (1,600 m) above sea level making it the college basketball arena with

20-476: A new weight room was finished in the remaining space on the second level where the conference rooms were once located, adjacent to the basketball offices that were relocated in 2008. In August 2017, a new high-definition video and scoreboard was installed at the center of the ceiling of the CEC. The scoreboard has shown a live feed of games as well as statistics and replays. Balch Fieldhouse Balch Fieldhouse

30-639: Is a 4,000, at one point seating 7,000, seat multi-purpose arena in Boulder, Colorado . It opened in 1937. It was home to the University of Colorado Buffaloes basketball teams until the CU Events Center opened in 1979. The Fieldhouse includes an annex that is home to the University of Colorado's Track and Field and Cross Country and Sports Information Offices. The fieldhouse is where

40-750: The 5th highest elevation in the country. The venue was initially called the CU Events/Conference Center and was renamed to the Coors Events/Conference Center in September 1990 after the Coors family, in recognition of a $ 5 million gift from the Adolph Coors Foundation. In 2008 with the addition of the basketball offices to the building on the service level, the "Conference" was removed from

50-657: The name as there were no longer conference rooms in the building. Although the naming agreement with the Coors Foundation had long expired, the Coors name remained on the building until 2018, when it was renamed the CU Events Center. At the time, the CU athletic department announced it was actively seeking a new naming rights partner. On December 9, 1981, the Grateful Dead played their last Boulder show at

60-533: The southwest and northeast corners. Along with the new video boards and as part of the new practice facility, a new production suite was built for the department's BuffVision office. The production room controls the video boards at both the Coors Events Center and Folsom Field. A new 44,000-square-foot (4,100 m) practice facility was opened in August 2011 for volleyball and basketball. The building

70-543: The then-named "CUC." It is the highest indoor arena in the Big XII Conference, approximately 600 feet (180 m) above the Huntsman Center at Utah . It is one of only two basketball arenas in a major conference that uses roof-mounted retractable goals: the other arena that also is equipped with this style of basket is Cameron Indoor Stadium at Duke. The most dramatic changes since the building

80-525: The track and cross country teams meet for practice during the winter. Track meets are also regularly held by Colorado during the indoor track season. USATF also holds meets on the weekends for athletes participating in club track and field. The past 3 years, in November it has played host to the Boulder Qualifier for FIRST Lego League , where about 40 teams compete for a chance to advance to

90-439: Was just the second athletic facility in the nation and third on CU's campus to earn LEED Platinum Certification, the highest possible by the internationally recognized system developed by the U.S. Green Building Council . In August 2013, a video room for the men's and women's basketball teams was opened for the first time, giving both teams additional meeting space and the ability to watch film more efficiently. In February 2014,

100-441: Was opened have come since 2008. After the 2007-08 basketball seasons, the CEC underwent a $ 200,000 "Floor Lift", in which a permanent maple surface with technology to reduce injuries and fatigue was installed. In April 2008, the men's and women's basketball offices were relocated to the CEC from Folsom Field second level where the conference rooms were previously located. In the summer of 2010, two new video boards were installed in