A road is a thoroughfare for the conveyance of traffic that mostly has an improved surface for use by vehicles (motorized and non-motorized) and pedestrians. Unlike streets , whose primary function is to serve as public spaces, the main function of roads is transportation.
83-458: The A5117 is a road in Cheshire , England . It runs between Shotwick ( 53°14′15″N 2°59′15″W / 53.2374°N 2.9875°W / 53.2374; -2.9875 ( A5117 road (western end) ) ) and Helsby ( 53°15′41″N 2°46′53″W / 53.2613°N 2.7814°W / 53.2613; -2.7814 ( A5117 road (eastern end) ) ) and connects
166-400: A road use tax , is payable on some vehicles used on the public road. The definition of a road depends on the definition of a highway; there is no formal definition for a highway in the relevant Act. A 1984 ruling said "the land over which a public right of way exists is known as a highway; and although most highways have been made up into roads, and most easements of way exist over footpaths,
249-411: A single carriageway road is converted into dual carriageway by building a second separate carriageway alongside the first, it is usually referred to as duplication , twinning or doubling . The original carriageway is changed from two-way to become one-way, while the new carriageway is one-way in the opposite direction. In the same way as converting railway lines from single track to double track ,
332-480: A thin section using a method like the Gazzi-Dickinson Method . This yields the relative percentages of quartz, feldspar, and lithic grains and the amount of clay matrix. The composition of a sandstone can provide important information on the genesis of the sediments when used with a triangular Q uartz, F eldspar, L ithic fragment ( QFL diagrams ). However, geologist have not been able to agree on
415-457: A 25 to 50 millimeter hole through the pavement into the sub-base with a dry-bit roto-hammer . Next, a two-part epoxy is poured into the hole – dyed for visual clarity. Once the epoxy hardens, technicians drill through the hole. If a void is present, the epoxy will stick to the core and provide physical evidence. Common stabilization materials include pozzolan -cement grout and polyurethane. The requirements for slab stabilization are strength and
498-614: A May 2009 report by the American Association of State Highway and Transportation Officials (AASHTO) and TRIP – a national transportation research organization – driving on rough roads costs the average American motorist approximately $ 400 a year in extra vehicle operating costs. Drivers living in urban areas with populations more than 250,000 are paying upwards of $ 750 more annually because of accelerated vehicle deterioration, increased maintenance, additional fuel consumption , and tire wear caused by poor road conditions. When
581-419: A double-wheeled, steel roller to insert the rod to the desired depth. After inserting the backer rod, the sealant is placed into the joint. There are various materials to choose for this method including hot pour bituminous liquid, silicone and preformed compression seals. Careful design and construction of roads can increase road traffic safety and reduce the harm (deaths, injuries, and property damage) on
664-506: A major highway (along its entire length, it was built with a wide width and setback bridge parapets for additional lanes, and extra drainage channels to accommodate a bigger road), when it came to building the final section of the M56 into North Wales, the road had been deemed obsolete and too costly to upgrade. Instead a new southerly route was chosen, which opened in 1981. The M56 crosses the Gowy on
747-413: A major two-level (and at one point, three-level) roadway in the downtown area, are being rebuilt with a designed service life of 100 years. Virtually all roads require some form of maintenance before they come to the end of their service life. Pro-active agencies use pavement management techniques to continually monitor road conditions and schedule preventive maintenance treatments as needed to prolong
830-578: A purpose-built embankment made of sandstone before it reaches a new junction with the M53 at Stoak . As the route of the M56 bypassed the A5117 road, it was relegated to a secondary route between the M56 and the A55 . It continues to be used as an alternative to the motorway but for much of its length it remains single carriageway in both directions apart from a short duelled section near Elton, Cheshire . The road
913-428: A road as "a line of communication (travelled way) using a stabilized base other than rails or air strips open to public traffic, primarily for the use of road motor vehicles running on their own wheels", which includes "bridges, tunnels, supporting structures, junctions, crossings, interchanges, and toll roads, but not cycle paths". The Eurostat , ITF and UNECE Glossary for Transport Statistics Illustrated defines
SECTION 10
#1732782315634996-494: A road as a "Line of communication (traveled way) open to public traffic, primarily for the use of road motor vehicles, using a stabilized base other than rails or air strips. [...] Included are paved roads and other roads with a stabilized base, e.g. gravel roads. Roads also cover streets, bridges, tunnels, supporting structures, junctions, crossings and interchanges. Toll roads are also included. Excluded are dedicated cycle lanes." The 1968 Vienna Convention on Road Traffic defines
1079-510: A road as the entire surface of any way or street open to public traffic. In urban areas roads may diverge through a city or village and be named as streets, serving a dual function as urban space easement and route. Modern roads are normally smoothed, paved, or otherwise prepared to allow easy travel . Part 2, Division 1, clauses 11–13 of the National Transport Commission Regulations 2006 defines
1162-524: A road in Australia as 'an area that is open to or used by the public and is developed for, or has as one of its main uses, the driving or riding of motor vehicles.' Further, it defines a shoulder (typical an area of the road outside the edge line, or the curb) and a road-related area which includes green areas separating roads, areas designated for cyclists and areas generally accessible to the public for driving, riding or parking vehicles. In New Zealand,
1245-478: A sandstone goes through as the degree of kinetic processing of the sediments increases. Dott's (1964) sandstone classification scheme is one of many such schemes used by geologists for classifying sandstones. Dott's scheme is a modification of Gilbert's classification of silicate sandstones, and it incorporates R.L. Folk's dual textural and compositional maturity concepts into one classification system. The philosophy behind combining Gilbert's and R. L. Folk's schemes
1328-462: A set of boundaries separating regions of the QFL triangle. Visual aids are diagrams that allow geologists to interpret different characteristics of a sandstone. For example, a QFL chart can be marked with a provenance model that shows the likely tectonic origin of sandstones with various compositions of framework grains. Likewise, the stage of textural maturity chart illustrates the different stages that
1411-445: A twofold classification: Cement is what binds the siliciclastic framework grains together. Cement is a secondary mineral that forms after deposition and during burial of the sandstone. These cementing materials may be either silicate minerals or non-silicate minerals, such as calcite. Sandstone that becomes depleted of its cement binder through weathering gradually becomes friable and unstable. This process can be somewhat reversed by
1494-432: Is 40 years for new bitumen and concrete pavement. Maintenance is considered in the whole life cost of the road with service at 10, 20 and 30-year milestones. Roads can be and are designed for a variety of lives (8-, 15-, 30-, and 60-year designs). When pavement lasts longer than its intended life, it may have been overbuilt, and the original costs may have been too high. When a pavement fails before its intended design life,
1577-495: Is a Motorway service area . The road then continues south east to terminate where it joins the A56 at Helsby. The upgrading of the A5117 on a section west of the M56 motorway , Dunkirk roundabout to Sealand was started in 2006 because that section was regularly congested. The improvement converted the road to grade separated two-lane dual carriageway standard. The British Government at
1660-837: Is a distinction that can be recognized in the field . In turn, the distinction between an orthoquartzite and a metaquartzite is the onset of recrystallization of existing grains. The dividing line may be placed at the point where strained quartz grains begin to be replaced by new, unstrained, small quartz grains, producing a mortar texture that can be identified in thin sections under a polarizing microscope. With increasing grade of metamorphism, further recrystallization produces foam texture , characterized by polygonal grains meeting at triple junctions, and then porphyroblastic texture , characterized by coarse, irregular grains, including some larger grains ( porphyroblasts .) Sandstone has been used since prehistoric times for construction, decorative art works and tools. It has been widely employed around
1743-433: Is a non-destructive method of solving this problem and is usually employed with other concrete pavement restoration methods including patching and diamond grinding. The technique restores support to concrete slabs by filing small voids that develop underneath the concrete slab at joints, cracks or the pavement edge. The process consists of pumping a cementitious grout or polyurethane mixture through holes drilled through
SECTION 20
#17327823156341826-487: Is also common. Some road fixtures such as road signs and fire hydrants are designed to collapse on impact. Light poles are designed to break at the base rather than violently stop a car that hits them. Highway authorities may also remove larger trees from the immediate vicinity of the road. During heavy rains, if the elevation of the road surface is not higher than the surrounding landscape, it may result in flooding. Speed limits can improve road traffic safety and reduce
1909-485: Is another common procedure used to locate voids. It is recommended to do this testing at night as during cooler temperatures, joints open, aggregate interlock diminishes and load deflections are at their highest. Ground penetrating radar pulses electromagnetic waves into the pavement and measures and graphically displays the reflected signal. This can reveal voids and other defects. The epoxy/core test, detects voids by visual and mechanical methods. It consists of drilling
1992-550: Is composed of quartz or feldspar , because they are the most resistant minerals to the weathering processes at the Earth's surface. Like uncemented sand , sandstone may be imparted any color by impurities within the minerals, but the most common colors are tan, brown, yellow, red, grey, pink, white, and black. Because sandstone beds can form highly visible cliffs and other topographic features, certain colors of sandstone have become strongly identified with certain regions, such as
2075-418: Is discovered it is removed, moisture content is managed and replaced with standard fill compacted to meet the design requirements (generally 90–95% relative compaction). Blasting is not frequently used to excavate the roadbed as the intact rock structure forms an ideal road base. When a depression must be filled to come up to the road grade the native bed is compacted after the topsoil has been removed. The fill
2158-547: Is dualled west of the M56. There is roundabout with the A540 and at Dunkirk at the western terminus of the M56. East of the junction the road is single carriageway and crosses the A41 by way of a roundabout at Backford Cross . The A5117 intersects the M53 at Junction 10. This junction is just east of Cheshire Oaks Designer Outlet . The road then continues almost parallel to the M56, which it intersects at Junction 14, at which there
2241-523: Is likely formed during eogenesis. Deeper burial is accompanied by mesogenesis , during which most of the compaction and lithification takes place. Compaction takes place as the sand comes under increasing pressure from overlying sediments. Sediment grains move into more compact arrangements, ductile grains (such as mica grains) are deformed, and pore space is reduced. In addition to this physical compaction, chemical compaction may take place via pressure solution . Points of contact between grains are under
2324-451: Is made by the "compacted layer method" where a layer of fill is spread then compacted to specifications, under saturated conditions. The process is repeated until the desired grade is reached. General fill material should be free of organics , meet minimum California bearing ratio (CBR) results and have a low plasticity index . The lower fill generally comprises sand or a sand-rich mixture with fine gravel, which acts as an inhibitor to
2407-571: Is primarily due to environmental effects such as frost heaves , thermal cracking and oxidation often contribute, however accumulated damage from vehicles also contributes. According to a series of experiments carried out in the late 1950s, called the AASHO Road Test , it was empirically determined that the effective damage done to the road is roughly proportional to the fourth power of axle weight . A typical tractor-trailer weighing 80,000 pounds (36.287 t ) with 8,000 pounds (3.629 t) on
2490-431: Is redeposited in the unstrained pore spaces. Mechanical compaction takes place primarily at depths less than 1,000 meters (3,300 ft). Chemical compaction continues to depths of 2,000 meters (6,600 ft), and most cementation takes place at depths of 2,000–5,000 meters (6,600–16,400 ft). Unroofing of buried sandstone is accompanied by telogenesis , the third and final stage of diagenesis. As erosion reduces
2573-522: Is some ambiguity between the terms highway and road . For the purposes of the English law , Highways Act 1980 , which covers England and Wales but not Scotland or Northern Ireland , road is "any length of highway or of any other road to which the public has access, and includes bridges over which a road passes". This includes footpaths, bridleways and cycle tracks, and also road and driveways on private land and many car parks. Vehicle Excise Duty ,
A5117 road - Misplaced Pages Continue
2656-410: Is taken to preserve reference Benchmarks Roads are designed and built for primary use by vehicular and pedestrian traffic. Storm drainage and environmental considerations are a major concern. Erosion and sediment controls are constructed to prevent detrimental effects. Drainage lines are laid with sealed joints in the road easement with runoff coefficients and characteristics adequate for
2739-443: Is that it is better able to "portray the continuous nature of textural variation from mudstone to arenite and from stable to unstable grain composition". Dott's classification scheme is based on the mineralogy of framework grains, and on the type of matrix present in between the framework grains. In this specific classification scheme, Dott has set the boundary between arenite and wackes at 15% matrix. In addition, Dott also breaks up
2822-546: Is the native material underneath a constructed road. Road construction requires the creation of an engineered continuous right-of-way or roadbed , overcoming geographic obstacles and having grades low enough to permit vehicle or foot travel , and may be required to meet standards set by law or official guidelines. The process is often begun with the removal of earth and rock by digging or blasting, construction of embankments , bridges and tunnels , and removal of vegetation (this may involve deforestation ) and followed by
2905-559: Is usually stripped and stockpiled nearby for rehabilitation of newly constructed embankments along the road. Stumps and roots are removed and holes filled as required before the earthwork begins. Final rehabilitation after road construction is completed will include seeding, planting, watering and other activities to reinstate the area to be consistent with the untouched surrounding areas. Processes during earthwork include excavation, removal of material to spoil, filling, compacting, construction and trimming. If rock or other unsuitable material
2988-573: The A550 at Woodbank to the M56 . As such it forms a northerly bypass to Chester and a shorter route between the North West and North Wales than the A55 . The road, which was originally known as the "Shotwick – Helsby Bypass", was completed in the mid-1930s. The construction was contemporaneous to other major transport projects in the region such as the East Lanc Road and the opening of
3071-542: The Showing Future Pattern of Principal National Routes which called for a new type of highway that would be restricted to specified classes of vehicle; which led to the Special Roads Act 1949 . In 1947 the first proposal for a motorway across north Cheshire was mooted in a report commissioned by Cheshire County Council , with a line for the route of the motorway being agreed in 1958 between
3154-406: The land zoning and storm water system. Drainage systems must be capable of carrying the ultimate design flow from the upstream catchment with approval for the outfall from the appropriate authority to a watercourse , creek , river or the sea for drainage discharge. A borrow pit (source for obtaining fill, gravel, and rock) and a water source should be located near or in reasonable distance to
3237-422: The ability to flow into or expand to fill small voids. Colloidal mixing equipment is necessary to use the pozzolan-cement grouts. The contractor must place the grout using a positive-displacement injection pump or a non-pulsing progressive cavity pump. A drill is also necessary but it must produce a clean hole with no surface spalling or breakouts. The injection devices must include a grout packer capable of sealing
3320-491: The application of tetraethyl orthosilicate (Si(OC 2 H 5 ) 4 ) which will deposit amorphous silicon dioxide between the sand grains. The reaction is as follows. Pore space includes the open spaces within a rock or a soil. The pore space in a rock has a direct relationship to the porosity and permeability of the rock. The porosity and permeability are directly influenced by the way the sand grains are packed together. Sandstones are typically classified by point-counting
3403-521: The average US motorist pays about $ 335/year. In contrast, the average motorist pays about $ 171/year in road maintenance taxes (based on 600 gallons/year and $ 0.285/gallon tax). Distress and serviceability loss on concrete roads can be caused by loss of support due to voids beneath the concrete pavement slabs. The voids usually occur near cracks or joints due to surface water infiltration . The most common causes of voids are pumping, consolidation, subgrade failure and bridge approach failure. Slab stabilization
A5117 road - Misplaced Pages Continue
3486-473: The common minerals most resistant to weathering processes at the Earth's surface, as seen in the Goldich dissolution series . Framework grains can be classified into several different categories based on their mineral composition: Matrix is very fine material, which is present within interstitial pore space between the framework grains. The nature of the matrix within the interstitial pore space results in
3569-732: The council and the Ministry of Transport and Civil Aviation . The first section, announced in November 1963 by the transport minister Ernest Marples , was a southwards extension of the Princess Parkway from Wythenshawe in Manchester to the A56 and A556 at Bowdon which entered the Trunk Road Programme for 1967/1968. Construction began in 1968, and the motorway opened in stages between 1971 and 1981: By
3652-551: The definition of a road is broad in common law where the statutory definition includes areas the public has access to, by right or not. Beaches, publicly accessible car parks and yards (even if privately owned), river beds, road shoulders (verges), wharves and bridges are included. However, the definition of a road for insurance purposes may be restricted to reduce risk. In the United Kingdom The Highway Code details rules for "road users", but there
3735-456: The depositional environment, older sand is buried by younger sediments, and it undergoes diagenesis . This mostly consists of compaction and lithification of the sand. Early stages of diagenesis, described as eogenesis , take place at shallow depths (a few tens of meters) and are characterized by bioturbation and mineralogical changes in the sands, with only slight compaction. The red hematite that gives red bed sandstones their color
3818-407: The depth of burial, renewed exposure to meteoric water produces additional changes to the sandstone, such as dissolution of some of the cement to produce secondary porosity . Framework grains are sand-sized (0.0625-to-2-millimeter (0.00246 to 0.07874 in) diameter) detrital fragments that make up the bulk of a sandstone. Most framework grains are composed of quartz or feldspar , which are
3901-465: The design structural capacity, stop erosion or eliminate faulting. It does, however, restore the slab support, therefore, decreasing deflections under the load. Stabilization should only be performed at joints and cracks where the loss of support exists. Visual inspection is the simplest manner to find voids. Signs that repair is needed are transverse joint faulting, corner breaks and shoulder drop off and lines at or near joints and cracks. Deflection testing
3984-446: The different types of framework grains that can be present in a sandstone into three major categories: quartz, feldspar, and lithic grains. When sandstone is subjected to the great heat and pressure associated with regional metamorphism , the individual quartz grains recrystallize, along with the former cementing material, to form the metamorphic rock called quartzite . Most or all of the original texture and sedimentary structures of
4067-561: The first Mersey tunnel . The road was envisaged to become part of a link that connected the A56 from Manchester to North Wales via the Jubilee Bridge at Queensferry, Flintshire . Several sections of the road were constructed in concrete. Vehicles experience an up and down vertical motion due to the need for "summit and valley" drainage as the road crosses the flood plain of the River Gowy . Poplar trees were planted along
4150-441: The first pathways were the trails made by animals has not been universally accepted; in many cases animals do not follow constant paths. Some believe that some roads originated from following animal trails. The Icknield Way may exemplify this type of road origination, where human and animal both selected the same natural line. By about 10,000 BC human travelers used rough roads/pathways. In transport engineering , subgrade
4233-416: The functional condition of the road while reducing the need for routing maintenance, leading to extended service life without increasing structural capacity. Older concrete pavements that develop faults can be repaired with a dowel bar retrofit , in which slots are cut in the pavement at each joint, and dowel bars are placed in the slots, which are then filled with concrete patching material. This can extend
SECTION 50
#17327823156344316-433: The greatest strain, and the strained mineral is more soluble than the rest of the grain. As a result, the contact points are dissolved away, allowing the grains to come into closer contact. Lithification follows closely on compaction, as increased temperatures at depth hasten deposition of cement that binds the grains together. Pressure solution contributes to cementing, as the mineral dissolved from strained contact points
4399-464: The growth of plants or other vegetable matter. The compacted fill also serves as lower-stratum drainage. Select second fill ( sieved ) should be composed of gravel , decomposed rock or broken rock below a specified particle size and be free of large lumps of clay . Sand clay fill may also be used. The roadbed must be "proof rolled" after each layer of fill is compacted. If a roller passes over an area without creating visible deformation or spring
4482-442: The hardness of individual grains, uniformity of grain size and friability of their structure, some types of sandstone are excellent materials from which to make grindstones , for sharpening blades and other implements. Non-friable sandstone can be used to make grindstones for grinding grain, e.g., gritstone . A type of pure quartz sandstone, orthoquartzite, with more of 90–95 percent of quartz, has been proposed for nomination to
4565-404: The highway system from traffic collisions. On neighborhood roads traffic calming , safety barriers , pedestrian crossings and cycle lanes can help protect pedestrians, cyclists, and drivers. Lane markers in some countries and states are marked with Cat's eyes or Botts dots. Botts dots are not used where it is icy in the winter, because frost and snowplows can break the glue that holds them to
4648-580: The hole. The injection device must also have a return hose or a fast-control reverse switch, in case workers detect slab movement on the uplift gauge. The uplift beam helps to monitor the slab deflection and has to have sensitive dial gauges. Also called joint and crack repair, this method's purpose is to minimize infiltration of surface water and incompressible material into the joint system. Joint sealants are also used to reduce dowel bar corrosion in concrete pavement restoration techniques. Successful resealing consists of old sealant removal, shaping and cleaning
4731-452: The late seventies, the M56 had approached the Helsby end of the A5117 road. Since the 1960s, the road had been marked out as a three-lane single carriageway , where the middle lane was known popularly as the "suicide" lane because overtaking vehicles drove towards each other at speed from both directions. Despite the original intention of the road's 1930 planners for it to be incorporated into
4814-404: The laying of pavement material. A variety of road building equipment is employed in road building. After design, approval , planning , legal, and environmental considerations have been addressed alignment of the road is set out by a surveyor . The radii and gradient are designed and staked out to best suit the natural ground levels and minimize the amount of cut and fill. Great care
4897-530: The life of the concrete pavement for 15 years. Failure to maintain roads properly can create significant costs to society. A 2009 report released by the American Association of State Highway and Transportation Officials estimated that about 50% of the roads in the US are in bad condition, with urban areas worse. The report estimates that urban drivers pay an average of $ 746/year on vehicle repairs while
4980-609: The lifespan of their roads. Technically advanced agencies monitor the road network surface condition with sophisticated equipment such as laser/inertial profilometers . These measurements include road curvature , cross slope , asperity , roughness , rutting and texture . Software algorithms use this data to recommend maintenance or new construction. Maintenance treatments for asphalt concrete generally include thin asphalt overlays, crack sealing, surface rejuvenating, fog sealing, micro milling or diamond grinding and surface treatments . Thin surfacing preserves, protects and improves
5063-493: The much lower temperatures and pressures associated with diagenesis of sedimentary rock, but diagenesis has cemented the rock so thoroughly that microscopic examination is necessary to distinguish it from metamorphic quartzite. The term orthoquartzite is used to distinguish such sedimentary rock from metaquartzite produced by metamorphism. By extension, the term orthoquartzite has occasionally been more generally applied to any quartz-cemented quartz arenite . Orthoquartzite (in
SECTION 60
#17327823156345146-464: The narrow sense) is often 99% SiO 2 with only very minor amounts of iron oxide and trace resistant minerals such as zircon , rutile and magnetite . Although few fossils are normally present, the original texture and sedimentary structures are preserved. The typical distinction between a true orthoquartzite and an ordinary quartz sandstone is that an orthoquartzite is so highly cemented that it will fracture across grains, not around them. This
5229-515: The new carriageway is not always constructed directly alongside the existing carriageway. Roads that are intended for use by a particular mode of transport can be reallocated for another mode of transport, i.e. by using traffic signs . For instance, in the ongoing road space reallocation effort, some roads (particularly in city centers) which are intended for use by cars are increasingly being repurposed for cycling and/or walking . Like all structures, roads deteriorate over time. Deterioration
5312-477: The number of road traffic casualties from traffic collisions . In their World report on road traffic injury prevention report, the World Health Organization (WHO) identify speed control as one of various interventions likely to contribute to a reduction in road casualties. Road conditions are the collection of factors describing the ease of driving on a particular stretch of road, or on
5395-506: The owner may have excessive repair and rehabilitation costs. Some asphalt pavements are designed as perpetual pavements with an expected structural life in excess of 50 years. Many asphalt pavements built over 35 years ago, despite not being specifically designed as a perpetual pavement, have remained in good condition long past their design life. Many concrete pavements built since the 1950s have significantly outlived their intended design lives. Some roads like Chicago 's Wacker Drive ,
5478-418: The pavement performance, reduce construction costs and decrease maintenance. The completed roadway is finished by paving or left with a gravel or other natural surface. The type of road surface is dependent on economic factors and expected usage. Safety improvements such as traffic signs , crash barriers , raised pavement markers and other forms of road surface marking are installed. According to
5561-576: The presence or absence of a made road has nothing to do with the distinction. Another legal view is that while a highway historically included footpaths , bridleways , driftways, etc., it can now be used to mean those ways that allow the movement of motor vehicles , and the term rights of way can be used to cover the wider usage. In the United States, laws distinguish between public roads , which are open to public use, and private roads , which are privately controlled. The assertion that
5644-638: The product of physical and chemical weathering of bedrock. Weathering and erosion are most rapid in areas of high relief, such as volcanic arcs , areas of continental rifting , and orogenic belts . Eroded sand is transported by rivers or by the wind from its source areas to depositional environments where tectonics has created accommodation space for sediments to accumulate. Forearc basins tend to accumulate sand rich in lithic grains and plagioclase . Intracontinental basins and grabens along continental margins are also common environments for deposition of sand. As sediments continue to accumulate in
5727-510: The public so that drivers going through a particular area can be aware of hazards that may exist in that area. News agencies, in turn, rely on tips from area residents with respect to certain aspects of road conditions in their coverage area. Sandstone Sandstone is a clastic sedimentary rock composed mainly of sand-sized (0.0625 to 2 mm) silicate grains, cemented together by another mineral. Sandstones comprise about 20–25% of all sedimentary rocks . Most sandstone
5810-712: The red rock deserts of Arches National Park and other areas of the American Southwest . Rock formations composed of sandstone usually allow the percolation of water and other fluids and are porous enough to store large quantities, making them valuable aquifers and petroleum reservoirs . Quartz-bearing sandstone can be changed into quartzite through metamorphism , usually related to tectonic compression within orogenic belts . Sandstones are clastic in origin (as opposed to either organic , like chalk and coal , or chemical , like gypsum and jasper ). The silicate sand grains from which they form are
5893-418: The reservoir, installing the backer rod and installing the sealant. Sawing, manual removal, plowing and cutting are methods used to remove the old sealant. Saws are used to shape the reservoir. When cleaning the reservoir, no dust, dirt or traces of old sealant should remain. Thus, it is recommended to water wash, sand-blast and then air blow to remove any sand, dirt or dust. The backer rod installation requires
5976-498: The road (most are now only adjacent to the short section passed Stanlow Refinery ). The new road was planned to be eventually incorporated into a dualled trunk road that would connect the North West of England with the industries of North Wales. However, with the outbreak of the Second World War , all major civil engineering projects were cancelled for the duration of conflict. In 1946 the Ministry of War Transport issued
6059-494: The road conditions". Specific aspects of road conditions can be of particular importance for particular purposes. For example, for autonomous vehicles such as self-driving cars , significant road conditions can include "shadowing and lighting changes, road surface texture changes, and road markings consisting of circular reflectors, dashed lines, and solid lines". Various government agencies and private entities, including local news services, track and report on road conditions to
6142-399: The road construction area may be marked for retention. These protected trees should not have the topsoil within the area of the tree's drip line removed and the area should be kept clear of construction material and equipment. Compensation or replacement may be required if a protected tree is damaged. Much of the vegetation may be mulched and put aside for use during reinstatement. The topsoil
6225-512: The road construction site. Approval from local authorities may be required to draw water or for working (crushing and screening) of materials for construction needs. The topsoil and vegetation is removed from the borrow pit and stockpiled for subsequent rehabilitation of the extraction area. Side slopes in the excavation area not steeper than one vertical to two horizontal for safety reasons. Old road surfaces, fences, and buildings may need to be removed before construction can begin. Trees in
6308-473: The road, although they can be embedded in short, shallow trenches carved in the roadway, as is done in the mountainous regions of California. For major roads risk can be reduced by providing limited access from properties and local roads, grade separated junctions and median dividers between opposite-direction traffic to reduce the likelihood of head-on collisions. The placement of energy attenuation devices (e.g. guardrails, wide grassy areas, sand barrels)
6391-404: The roads of a particular locality, including the quality of the pavement surface , potholes , road markings, and weather . It has been reported that "[p]roblems of transportation participants and road conditions are the main factors that lead to road traffic accidents". It has further been specifically noted that "weather conditions and road conditions are interlinked as weather conditions affect
6474-417: The sandstone are erased by the metamorphism. The grains are so tightly interlocked that when the rock is broken, it fractures through the grains to form an irregular or conchoidal fracture. Geologists had recognized by 1941 that some rocks show the macroscopic characteristics of quartzite, even though they have not undergone metamorphism at high pressure and temperature. These rocks have been subject only to
6557-406: The section is deemed to comply. Geosynthetics such as geotextiles , geogrids , and geocells are frequently used in the various pavement layers to improve road quality. These materials and methods are used in low-traffic private roadways as well as public roads and highways. Geosynthetics perform four main functions in roads: separation, reinforcement, filtration, and drainage; which increase
6640-437: The slab. The grout can fill small voids beneath the slab and/or sub-base. The grout also displaces free water and helps keep water from saturating and weakening support under the joints and slab edge after stabilization is complete. The three steps for this method after finding the voids are locating and drilling holes, grout injection and post-testing the stabilized slabs. Slab stabilization does not correct depressions, increase
6723-483: The steer axle and 36,000 pounds (16.329 t) on both of the tandem axle groups is expected to do 7,800 times more damage than a passenger vehicle with 2,000 pounds (0.907 t) on each axle. Potholes on roads are caused by rain damage and vehicle braking or related construction work. Pavements are designed for an expected service life or design life . In some parts of the United Kingdom the standard design life
6806-1227: The time decided that a motorway standard M56 extension would be too environmentally damaging, and instead opted to utilise part of the existing road while providing off-line bypasses for all of the at-grade junctions. The improvements tied in with completed works over the Welsh border which upgraded the A550 to a standard similar to that of motorways. Work started in late 2006 and was completed in 2008. Download coordinates as: 53°15′35″N 2°53′02″W / 53.2597°N 2.8839°W / 53.2597; -2.8839 ( A5117 road ) Road There are many types of roads , including parkways , avenues , controlled-access highways (freeways, motorways, and expressways), tollways , interstates , highways , thoroughfares , and local roads. The primary features of roads include lanes , sidewalks (pavement), roadways (carriageways), medians , shoulders , verges , bike paths (cycle paths), and shared-use paths . Historically many roads were simply recognizable routes without any formal construction or some maintenance. The Organization for Economic Co-operation and Development (OECD) defines
6889-626: The world in constructing temples, churches, homes and other buildings, and in civil engineering . Although its resistance to weathering varies, sandstone is easy to work. That makes it a common building and paving material, including in asphalt concrete . However, some types that have been used in the past, such as the Collyhurst sandstone used in North West England , have had poor long-term weather resistance, necessitating repair and replacement in older buildings. Because of
#633366