Misplaced Pages

Greater Nile Petroleum Operating Company

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Greater Nile Petroleum Operating Company ( GNPOC ) is a petroleum exploration and production company operating in Sudan . It was incorporated on 18 June 1997 and undertook construction of the Greater Nile Oil Pipeline which links Sudan's inland oil fields with refineries at Khartoum and Port Sudan .

#321678

50-640: The GNPOC concession in the Western Upper Nile area includes the large Unity and Heglig oil fields plus smaller fields at El Toor, El Noor, Toma South, Bamboo, Munga and Diffra. GNPOC Headquarters building is known the Greater Nile Petroleum Oil Company Tower or GNPOC Tower . The building is a high-rise building in Khartoum , Sudan . Construction of the 65.72 m (215.6 ft), 18-storey building

100-465: A conventional reservoir can be calculated using a volume equation: Recoverable volume = Gross Rock Volume * Net/Gross * Porosity * Oil or Gas Saturation * Recovery Factor / Formation Volume Factor Deterministic volumes are calculated when single values are used as input parameters to this equation, which could include analog content. Probabilistic volumes are calculations when uncertainty distributions are applied as input to all or some of

150-664: A reasonable certainty of being recoverable under existing economic and political conditions, and with existing technology. Industry specialists refer to this category as "P90" (that is, having a 90% certainty of producing or exceeding the P90 volume on the probability distribution). Proven reserves are also known in the industry as 1P . Proven reserves may be referred to as proven developed (PD) or as proven undeveloped (PUD). PD reserves are reserves that can be produced with existing wells and perforations, or from additional reservoirs where minimal additional investment (operating expense)

200-428: A "best technical" outcome. Reservoir simulation is an area of reservoir engineering in which computer models are used to predict the flow of fluids (typically, oil, water, and gas) through porous media . The amount of oil & gas recoverable from a conventional reservoir is assessed by accurately characterising the static recoverable volumes and history matching that to dynamic flow. Reservoir performance

250-412: A discovery has been made, prospective resources can be reclassified as contingent resources . Contingent resources are those accumulations or fields that are not yet considered mature enough for commercial development, where development is contingent on one or more conditions changing. The uncertainty in the estimates for recoverable oil & gas volumes is expressed in a probability distribution and

300-564: A framework for a consistent approach to the estimation process to comply with reporting requirements of particularly, listed companies. Energy companies may employ specialist, independent, reserve valuation consultants to provide third party reports as part of SEC filings for either reserves or resource booking. Reserves reporting of discovered accumulations is regulated by tight controls for informed investment decisions to quantify differing degrees of uncertainty in recoverable volumes. Reserves are defined in three sub-categories according to

350-453: A half slope on a log-plot of flow-rates against time believed to be caused by drainage from matrix surfaces into adjoining fractures. Such reservoirs are commonly believed to be regionally pervasive that may be interrupted by regulatory or ownership boundaries with the potential for large oil & gas volumes, which are very hard to verify. Non-unique flow characteristics in unconventional accumulations means that commercial viability depends on

400-439: A lower probability to recovering Possible reserves include varying interpretations of geology, uncertainty due to reserve infill (associated with variability in seepage towards a production well from adjacent areas) and projected reserves based on future recovery methods. The probabilistic, cumulative sum of proven, probable and possible reserves is referred to in the industry as " 3P " (proven plus probable plus possible) where there

450-463: A risk or chance to exist in reality, depending on the level of appraisal or resource maturity that governs the amount of reliable geologic and engineering data available and the interpretation of those data. Estimating and monitoring of reserves provides an insight into, for example, a company's future production and a country's oil & gas supply potential. As such, reserves are an important means of expressing value and longevity of resources. In

500-583: A static reservoir model . Static models and dynamic flow models can be populated with analog reservoir performance data to increase the confidence in forecasting as the amount and quality of static geoscientific and dynamic reservoir performance data increase. Once production has commenced, production rates and pressure data allow a degree of prediction on reservoir performance, which was previously characterized by substituting analog data. Analog data can still be substituted for expected reservoir performance where specific dynamic data may be missing, representing

550-421: A subsurface reservoir , is called oil or gas initially in place ( STOIIP or GIIP respectively). However, only a fraction of in place oil & gas can be brought to the surface ( recoverable ), and it is only this producible fraction that is considered to be either reserves or a resource of any kind. The ratio between in place and recoverable volumes is known as the recovery factor ( RF ), which

SECTION 10

#1732772603322

600-536: Is a joint operating company owned by: Both Gulf Petroleum and Al Thani Corporation formerly owned a 5% share each. Canadian company Talisman Energy (previously known as Arakis) was an original stakeholder. Its share was sold to ONGC Videsh in 2003. The U.S. government imposed economic sanctions against Sudan in 1997, due to the Sudanese government's alleged sponsorship of international terrorism and poor human rights record. The sanctions prohibited trade between

650-628: Is a state in South Sudan . Unity State is in the Greater Upper Nile region. Unity is inhabited predominantly by two ethnic groups: the Nuer majority, and the Dinka minority. In 2015, a presidential decree established a new system of 28 states, replacing the previously established 10. Unity State was replaced by the states of Ruweng , Northern Liech and Southern Liech . Unity State

700-524: Is a 10% chance of delivering or exceeding the P10 volume.( ibid ) Resource estimates are undiscovered volumes, or volumes that have not yet been drilled and flowed to surface. A non-reserve resource , by definition, does not have to be technically or commercially recoverable and can be represented by a single, or an aggregate of multiple potential accumulations, e.g. an estimated geological basin resource. There are two non-reserve resource categories: Once

750-441: Is assumed that the production will decline on a reasonably smooth curve, and so allowances must be made for wells shut in and production restrictions. The curve can be expressed mathematically or plotted on a graph to estimate future production. It has the advantage of (implicitly) conflating all reservoir characteristics. It requires a sufficient production history to establish a statistically significant trend, ideally when production

800-963: Is determined by a combination of subsurface geology and the technology applied to extraction . When reporting oil & gas volumes , in order to avoid confusion, it should be clarified whether they are in place or recoverable volumes. The appropriate technique for resource estimations is determined by resource maturity. There are three main categories of technique, which are used through resource maturation to differing degrees: analog (substitution), volumetric (static) and performance-based (dynamic), which are combined to help fill gaps in knowledge or data. Both probabilistic and deterministic calculation methods are commonly used to calculate resource volumes, with deterministic methods predominantly applied to reserves estimation (low uncertainty) and probabilistic methods applied to general resource estimation (high uncertainty). The combination of geological, geophysical and technical engineering constraints means that

850-417: Is important because the recovery changes as the physical environment of the reservoir adjusts with every molecule extracted; the longer a reservoir has been flowing, the more accurate the prediction of remaining reserves. Dynamic simulations are commonly used by analysts to update reserves volumes, particularly in large complex reservoirs. Daily production can be matched against production forecasts to establish

900-618: Is known about a segment. The opportunity segment can be scaled to any level depending on the specific interest of the analyst, whether at a global, country, basin, structural domain, play, license or reservoir level. YTF is conceptual and is commonly used as a method for scoping potential in frontier areas where there is no oil or gas production or where new play concepts are being introduced with perceived potential. However, analog content can also be substituted for any subsurface parameters where there are gaps in data in more mature reserves or resource settings (below). Oil & gas volumes in

950-759: Is not curtailed by regulatory or other artificial conditions. Experience shows that initial estimates of the size of newly discovered oil & gas fields are usually too low. As years pass, successive estimates of the ultimate recovery of fields tend to increase. The term reserve growth refers to the typical increases (but narrowing range) of estimated ultimate recovery that occur as oil & gas fields are developed and produced. Many oil-producing nations do not reveal their reservoir engineering field data and instead provide unaudited claims for their oil reserves. The numbers disclosed by some national governments are suspected of being manipulated for political reasons. In order to achieve international goals for decarbonisation ,

1000-430: Is required ( e.g. opening a set of perforations already installed). PUD reserves require additional capital investment (e.g., drilling new wells) to bring the oil and/or gas to the surface. Accounting for production is an important exercise for businesses. Produced oil or gas that has been brought to surface (production) and sold on international markets or refined in-country are no longer reserves and are removed from

1050-414: Is sub-classified based on project maturity and/or economic status ( 1C , 2C , 3C , ibid ) and in addition are assigned a risk, or chance, to exist in reality (POS or COS). Prospective resources , being undiscovered, have the widest range in volume uncertainties and carry the highest risk or chance to be present in reality (POS or COS). At the exploration stage (before discovery) they are categorized by

SECTION 20

#1732772603322

1100-459: Is the state's primary economic activity. Many people of the state are nomadic agro-pastoralists who engage in both agriculture and rearing of livestock, especially cattle. Farming is primarily conducted during the rainy season, although some cultivation also occurs during summer. Vegetables are not widely cultivated, as most farmers are rural rather than urban, and therefore lack access to markets for their produce. Some NGOs have introduced farmers to

1150-1238: The International Energy Agency said in 2021 that countries should no longer expand exploration or invest in projects to expand reserves to meet climate goals set by the Paris Agreement . The categories and estimation techniques framed by the PRMS above apply to conventional reservoirs, where oil & gas accumulations are controlled by hydrodynamic interactions between the buoyancy of oil & gas in water versus capillary forces. Oil or gas in unconventional reservoirs are much more tightly bound to rock matrices in excess of capillary forces and therefore require different approaches to both extraction and resource estimation. Unconventional reservoirs or accumulations also require different means of identification and include coalbed methane (CBM), basin-centered gas (low permeability), low permeability tight gas (including shale gas ) and tight oil (including shale oil ), gas hydrates, natural bitumen (very high viscosity oil), and oil shale (kerogen) deposits. Ultra low permeability reservoirs exhibit

1200-542: The Muglad rift basin and contains an estimated 150,000,000 barrels (24,000,000 m ) of oil. The Greater Nile Oil Pipeline begins in the Unity oilfield. Oil reserves Oil and gas reserves denote discovered quantities of crude oil and natural gas (oil or gas fields ) that can be profitably produced/recovered from an approved development. Oil and gas reserves tied to approved operational plans filed on

1250-487: The PRMS , the terms 'Resources' and 'Reserves' have distinct and specific meaning with respect to oil & gas accumulations and hydrocarbon exploration in general. However, the level of rigor required in applying these terms varies depending on the resource maturity which informs reporting requirements. Oil & gas reserves are resources that are, or are reasonably certain to be, commercial (i.e. profitable). Reserves are

1300-787: The Society of Petroleum Engineers (SPE), the World Petroleum Council (WPC), the American Association of Petroleum Geologists (AAPG), the Society of Petroleum Evaluation Engineers (SPEE) and the Society of Economic Geologists (SEG). Public companies that register securities in the U.S. market must report proved reserves under the Securities and Exchange Commission (SEC) reporting requirements which shares many elements with PRMS. Attempts have also been made to standardize more generalized methodologies for

1350-547: The SPE and the WPC in 1997, requiring that reserves are discovered, recoverable, commercial and remaining based on rules governing the classification into sub-categories and the declared development project plans applied. Probable and Possible reserves may be used internally by oil companies and government agencies for future planning purposes but are not routinely or uniformly compiled. Proven reserves are discovered volumes claimed to have

1400-569: The United States and Sudan, as well as investment by U.S. businesses in Sudan. In February 2000, the U.S. government extended its sanctions to include Sudapet and GNPOC. These sanctions were lifted after the Sudanese revolution of 2018/19 and ensuing negotiations between the two governments at the end of 2020. Western Upper Nile Unity State , also known as Western Upper Nile ,

1450-557: The accuracy of simulation models based on actual volumes of recovered oil or gas. Unlike analogs or volumetric methods above, the degree of confidence in the estimates (or the range of outcomes) increases as the amount and quality of geological, engineering and production performance data increase. These must then be compared with previous estimates, whether derived from analog, volumetric or static reservoir modelling before reserves can be adjusted and booked. The materials balance method for an oil or gas field uses an equation that relates

1500-405: The accuracy of these estimation techniques, significant uncertainties still remain, which are expressed as a range of potential recoverable oil & gas quantities using probabilistic methods. In general, most early estimates of the reserves of an oil or gas field (rather than resource estimates) are conservative and tend to grow with time . This may be due to the availability of more data and/or

1550-811: The booking and company balance sheets. Until January 2010, "1P" proven reserves were the only type the U.S. SEC allowed oil companies to report to investors. Companies listed on U.S. stock exchanges may be called upon to verify their claims confidentially, but many governments and national oil companies do not disclose verifying data publicly. Since January 2010 the SEC now allows companies to also provide additional optional information declaring 2P (both proven and probable) and 3P (proven plus probable plus possible) with discretionary verification by qualified third party consultants, though many companies choose to use 2P and 3P estimates only for internal purposes. Probable additional reserves are attributed to known accumulations and

Greater Nile Petroleum Operating Company - Misplaced Pages Continue

1600-514: The day of reserves reporting are also sensitive to fluctuating global market pricing. The remaining resource estimates (after the reserves have been accounted) are likely sub-commercial and may still be under appraisal with the potential to be technically recoverable once commercially established. Natural gas is frequently associated with oil directly and gas reserves are commonly quoted in barrels of oil equivalent (BOE). Consequently, both oil and gas reserves, as well as resource estimates, follow

1650-430: The field. It requires some production to occur (typically 5% to 10% of ultimate recovery), unless reliable pressure history can be used from a field with similar rock and fluid characteristics. The decline curve method is an extrapolation of known production data to fit a decline curve and estimate future oil & gas production. The three most common forms of decline curves are exponential, hyperbolic, and harmonic. It

1700-458: The financial status of the company, which may be obliged to report those estimates to shareholders and "resource holders" at the various stages of resource maturation. Currently, the most widely accepted classification and reporting methodology is the 2018 petroleum resources management system ( PRMS ), which summarizes a consistent approach to estimating oil and gas quantities within a comprehensive classification framework, jointly developed by

1750-476: The improved matching between predicted and actual production performance. Appropriate external reporting of resources and reserves is required from publicly traded companies, and is an accounting process governed by strict definitions and categorisation administered by authorities regulating the stock market and complying with governmental legal requirements. Other national or industry bodies may voluntarily report resources and reserves but are not required to follow

1800-518: The main asset of an oil & gas company ; booking is the process by which they are added to the balance sheet . Contingent and prospective resource estimates are much more speculative and are not booked with the same degree of rigor, generally for internal company use only, reflecting a more limited data set and assessment maturity. If published externally, these volumes add to the perception of asset value , which in turn can influence oil & gas company share or stock value . The PRMS provides

1850-473: The point when a sufficient accumulation of commercial oil and/or gas are proven by drilling, with authorized and funded development plans to begin production within a recommended five years. Reserve estimates are required by authorities and companies, and are primarily made to support operational or investment decision-making by companies or organisations involved in the business of developing and producing oil and gas. Reserve volumes are necessary to determine

1900-455: The practice of cultivation for market. Southern Sudan's first oil reserves were discovered in the area during the 1970s. The international oil companies which engaged in oil exploration contributed to massive displacement of the indigenous population. Oilfields in the state include the Unity oilfield and most of Block 5A . The Unity oilfield is within the largest hydrocarbon accumulation in

1950-478: The probabilistic, cumulative sum of proven and probable reserves (with a probability of P50), also referred to in the industry as " 2P " (Proven plus Probable) The P50 designation means that there should be at least a 50% chance that the actual volumes recovered will be equal to or will exceed the 2P estimate. Possible additional reserves are attributed to known accumulations that have a lower chance of being recovered than probable reserves. Reasons for assigning

2000-399: The quantification of volumes is usually undertaken by integrated technical, and commercial teams composed primarily of geoscientists and subsurface engineers , surface engineers and economists. Because the geology of the subsurface cannot be examined directly, indirect techniques must be used to estimate the size and recoverability of the resource. While new technologies have increased

2050-466: The reporting of national or basin level oil and gas resource assessments. An oil or gas resource refers to known (discovered fields ) or potential accumulations of oil and/or gas ( i.e undiscovered prospects and leads ) in the subsurface of the Earth's crust. All reserve and resource estimates involve uncertainty in volume estimates (expressed below as Low, Mid or High uncertainty), as well as

Greater Nile Petroleum Operating Company - Misplaced Pages Continue

2100-446: The same reporting guidelines, and are referred to collectively hereinafter as oil & gas . As with other mineral resource estimation , detailed classification schemes have been devised by industry specialists to quantify volumes of oil and gas accumulated underground (known as subsurface ). These schemes provide management and investors with the means to make quantitative and relative comparisons between assets, before underwriting

2150-452: The same strict definitions and controls. Analogs are applied to prospective resources in areas where there are little, or sometimes no, existing data available to inform analysts about the likely potential of an opportunity or play segment. Analog-only techniques are called yet-to-find ( YTF ), and involve identifying areas containing producing assets that are geologically similar to those being estimated and substituting data to match what

2200-509: The significant cost of exploring for, developing and extracting those accumulations. Classification schemes are used to categorize the uncertainty in volume estimates of the recoverable oil and gas and the chance that they exist in reality (or risk that they do not) depending on the resource maturity. Potential subsurface oil and gas accumulations identified during exploration are classified and reported as prospective resources . Resources are re-classified as reserves following appraisal , at

2250-548: The system used in the PRMS: Proven ( 1P ), Probable and Possible. Reserves defined as Probable and Possible are incremental (or additional) discovered volumes based on geological and/or engineering criteria similar to those used in estimating Proven reserves. Though not classified as contingent, some technical, contractual, or regulatory uncertainties preclude such reserves being classified as Proven. The most accepted definitions of these are based on those originally approved by

2300-466: The terms of the equation (see also Copula (probability theory) ), which preserve dependencies between parameters. These geostatistical methods are most commonly applied to prospective resources that still need to be tested by the drill bit. Contingent resources are also characterized by volumetric methods with analog content and uncertainty distributions before significant production has occurred, where spatial distribution information may be preserved in

2350-418: The volume of oil, water and gas that has been produced from a reservoir and the change in reservoir pressure to calculate the remaining oil & gas. It assumes that, as fluids from the reservoir are produced, there will be a change in the reservoir pressure that depends on the remaining volume of oil & gas. The method requires extensive pressure-volume-temperature analysis and an accurate pressure history of

2400-408: The wide range of volume uncertainties (typically P90-P50-P10 ). In the PRMS the range of volumes is classified by the abbreviations 1U , 2U and 3U again reflecting the degrees of uncertainty. Companies are commonly not required to report publicly their views of prospective resources but may choose to do so voluntarily. The total estimated quantity ( volumes ) of oil and/or gas contained in

2450-601: Was finished in 2010 and was designed by KEO International Consultants . The 14,000 m (150,000 sq ft) building housed the headquarters of the Greater Nile Petroleum Operating Company and it was designed by KEO International Consultants. On 17 September 2023, the building suffered heavy fire damage amid the 2023 Sudan war during clashes between the Sudanese Armed Forces and Rapid Support Forces . GNPOC

2500-691: Was re-established by a peace agreement signed on 22 February 2020 with smaller boundaries as the northern part of the former state became the Ruweng Administrative Area . The capital of Unity state is Bentiu . Before an administrative reorganization in 1994, Unity was part of a much larger province of Upper Nile, and the state was sometimes called Western Upper Nile. The counties of Unity are: Large towns in Unity include Bentiu , Mayom , Rubkona and Leer . Other towns include Riangnom , Rub-Koni , Yoahnyang , Tam , Mankien , Wang-Kay , Koch , Nyal and Ganyliel . Agriculture

#321678