Misplaced Pages

Danhai

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Taiwan Rolling Stock Company ( TRSC ) is a rail vehicle company. TRSC is located in Hukou, Hsinchu County, near Xinfeng railway station . It was previously a rolling stock production division of Tang Eng Iron Works before 2002. After privatization , the company received several orders from Taiwan Railways Administration and also Kawasaki Heavy Industries . For example, some vehicles (type C371, C381) of the Taipei Metro system were built by TRSC.

#696303

14-471: Danhai may refer to: Danhai light rail , a light rail transit line in Tamsui District, New Taipei Danhai New Town , a large residential development in Tamsui District, New Taipei, Taiwan Danhai Williams, an East Kingston businessman Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with

28-600: Is a light rail transit (LRT) line in Tamsui District, New Taipei City , Taiwan . It opened on 23 December 2018 and began service the following day. The system is built to provide public transportation to Danhai New Town , whose population is expected to reach 340,000 by 2041. The initial feasibility study for a heavy-capacity extension line of the Taipei Metro was completed in 1992. Further planning reports were completed in 1998 and 1999. At that time

42-683: The Danhai Light Rail Transit system. On 26 August 2015, TRSC got additional order of EMU800 . The total number of this order is 48 cars. TRSC is now owned by China Steel Corporation since 2015. TRSC's products range from locomotives, cabs, EMUs, trams and it receives more and more orders from customers. It is one of the only companies that can design, manufacture and maintain rolling stock in Taiwan (some freight wagons are built and maintained by another company in DaHu near LuZhu in

56-444: The manufacturing of many components were done in Taiwan. Through this project, Taiwan seeks to lessen its dependence on foreign manufacturers for rail systems. Each of the 15 bi-directional standard gauge trams is 34.5 metres (113 ft) long and can carry up to 265 passengers. They are designed with electrical onboard storage capacity so that they can travel short distances under their power; this feature allows simplification of

70-678: The mouth of the Tamsui River on the Taiwan strait is under construction to accommodate an extension of the Danhai LRT over the river to connect the town of Bali . Taiwan Rolling Stock Company TRSC cooperated with Nippon Sharyo in several products, such as DHL100, Alishan Forest locomotive, EMU700 , EMU800 . There was a dispute regarding the EMU800 at its beginning stage. The brake system differed from specifications because

84-990: The opening of the Green Mountain Line, the first phase of the Danhai light rail is almost completed. The other three stations along the Blue Coast Line will be completed later. The second phase completes the remaining 4.4 kilometres (2.7 mi) and six more stations of the Blue Coast Line. Its planned completion is in 2024. The line is being developed by China Steel Corporation and subsidiaries United Steel Engineering & Construction Corporation and Taiwan Rolling Stock Company . Other contractors are Thales Rail Signalling Solutions for signalling, communications, and control equipment , CTCI Corporation for track work, Pandrol for track, maintenance, and safety equipment, TÜV Rheinland for testing, and ABB for electrical equipment. The Danjiang Bridge over

98-449: The overhead power cabling by eliminating the need to run the power cables across major intersections. The prototype was scheduled to be ready in 2016, with all 15 cars to be delivered by the end of 2017. The light rail was expected to cost NT$ 15.31 billion, in which NT$ 1.67 billion will be provided by the central government , NT$ 7.09 billion by Construction and Planning Agency and NT$ 6.55 billion by New Taipei City Government when it

112-545: The project was put on hold due to budgetary considerations. In 2005, planning shifted from a metro system to a light rail system. A light rail feasibility study was completed in 2007, with a review of funding and operation throughout 2008. The study was completed and presented for approval to the Executive Yuan in 2010. The light rail two-stage construction plan by the Ministry of Transportation and Communications

126-590: The remaining four at ground level. The bike sharing service YouBike is available at seven stations. A two-kilometre (1.2 mi) branch with three stations opened in November 2020. The branch runs from Tamsui Fisherman's Wharf , turns eastward to join the Kanding branch, with which it shares 1.21 kilometres (0.75 mi) and three stops. The line follows Highway No. 2B , Binhai Road, and Shalun Road. All nine stations will be at ground level. Mackay Street

140-581: The supplier made a mistake on the type of brake system. After the dispute was solved, the TRSC started to deliver EMU800 trains to the Taiwan Railways Administration . On 29 May 2015, the TRSC delivered the 37th train to TRA, which marks a milestone of Taiwanese rail-vehicle industry. Furthermore, the TRSC is anticipated to be the future of manufacturing industry. In recent years, TRSC cooperated with Voith Engineering Services for

154-618: The title Danhai . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Danhai&oldid=1194490436 " Category : Disambiguation pages Hidden categories: Short description is different from Wikidata All article disambiguation pages All disambiguation pages Danhai light rail The Danhai light rail ( traditional Chinese : 淡海輕軌 ; simplified Chinese : 淡海轻轨 ; pinyin : Dànhǎi Qīngguǐ , also known as Tamhai light rail)

SECTION 10

#1732780391697

168-806: Was approved by Council for Economic Planning and Development on 7 January 2013. The first phase of the construction began in September 2014. The system is projected to carry 120,000 passengers per day. The system currently consists of 14 stations, with 6 additional stations planned. . Tracks are at ground level and elevated. The total length will be 13.99 kilometres (8.69 mi). The Hongshulin–Kanding section opened in December 2018. Trains run from Hongshulin Station northward and turn west along Zhongzheng East Road, Highway No. 2 , Binhai Road and Shalun Road. Seven of its eleven stations are elevated, with

182-460: Was approved in 2013. The current estimate is NT$ 31.357 billion. The project is divided into two phases. The first phase is the 11-station Green Mountain Line and part of the Blue Coast Line comprising three stations, totaling 9.7 kilometres (6.0 mi) and the depot. The whole first phase costs NT$ 12.8 billion. Work began in September 2014 and as of May 2016 is approximately one-third complete. With

196-626: Was originally planned as two one-way stations, but now that plan has changed due to the strong opposition of the residents in Tamsui Old Street. [REDACTED] The cars were built in Taiwan by the Taiwan Rolling Stock Company under the first program to domestically build light rail vehicles. The company partnered with the German firm Voith Engineering Services on the design of the cars. Final assembly and

#696303