Misplaced Pages

East Perth railway station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#831168

5-747: East Perth railway station is located on the Midland line and Airport line in Perth , Western Australia. It is operated by Transperth serving the suburb of East Perth . It is adjacent to the East Perth Terminal and Public Transport Centre . The site occupied by East Perth station, East Perth Terminal and the Public Transport Centre was formerly the East Perth Locomotive Depot . The station took

10-437: The day outside peak every day of the year except Christmas Day. Trains are half-hourly or hourly at night time. The station saw 200,284 passengers in the 2013-14 financial year. The long, approximately 650 m (2,130 ft) platform to the west of platforms 1 and 2 is the East Perth Terminal platform. It is served by regional and interstate trains. Midland line, Perth Too Many Requests If you report this error to

15-471: The name of the previous East Perth station, which was renamed Claisebrook . The former East Perth railway station was removed on the change of the railway system in the late 1960s. The original East Perth railway station opened in 1883, and in the early 20th century was found the name East Perth Junction (the junction being the line that proceeded to Armadale and joined the Eastern Railway close to

20-635: The station fully compliant with disability access standards. East Perth railway station is located on the Midland line and the Airport line on the Transperth network. It will also be served by the Morley–Ellenbrook line when that opens in late-2024. Services on that line will go between Ellenbrook railway station and Perth railway station. Midland line trains stop at the station every 10 minutes during peak on weekdays, and every 15 minutes during

25-726: The station). It was renamed Claisebrook in 1969. As part of the Perth Stadium transport works, the station was upgraded over a two-year period from 2016 to 2018. Due to the large numbers expected to utilise the station on event days, an upgrade was required to ensure that the station could handle the large crowds, as well as to make it fully accessible. Works included lengthening platforms and associated shelters to handle four to six car trains, upgrading and expanding lifts, staircases and walkways, and expanding car and bike parking spaces. In addition, platforms were resurfaced, tactile markings were added and four new lifts were installed to make

#831168