Misplaced Pages

Interstate 240

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Swannanoa River flows through the Swannanoa Valley of the region of Western North Carolina , and is a major tributary to the French Broad River . Its headwaters arise in Black Mountain, North Carolina ; however, it also has a major tributary near its headwaters: Flat Creek, which begins on the slopes of Mount Mitchell . The Swannanoa River ends at its confluence with the French Broad, now within the grounds of the 8,000-acre Biltmore Estate in Asheville .

#457542

24-450: (Redirected from I-240 ) Interstate 240 may refer to: Interstate 240 (North Carolina) , a connection into Asheville, North Carolina Interstate 240 (Oklahoma) , a freeway on the south side of Oklahoma City Interstate 240 (Tennessee) , a bypass of Memphis, Tennessee [REDACTED] Topics referred to by the same term This disambiguation page lists articles about roads and streets with

48-573: A freeway, which carried U.S. Highway 19 Business (US 19 Bus.)/ US 23 Bus. /NC 191; additional freeway was constructed from Haywood Street to I-40. In 1968, eastbound lanes were added to the Smoky Park Bridge, the main connector across the French Broad River . The original lanes, opened January 23, 1952, became westbound lanes. The next step began with the 1964 presentation by J. O. "Buck" Buchanan to

72-489: A spur route in Wilmington . I-240 begins at an interchange with I-26 and I-40 west of Asheville . I-240 and I-26 travel concurrently for four miles (6.4 km) along the western section of the routing. I-240 travels almost parallel to the French Broad River to its east. In the northwestern part of the route, US 19 , US 23 , and U.S. Highway 74 Alternate (US 74A) merge onto I-240 to cross

96-544: Is a 9.1-mile-long (14.6 km) Interstate Highway loop in the US state of North Carolina . It serves as an urban connector for Asheville and runs in a semicircle around the north of the city's downtown district between exits 53B and 46B of I-40 . Between those points, I-40 continues in an east–west direction further south of the city, roughly parallel to the Swannanoa and French Broad rivers. The western segment of I-240

120-419: Is now being cosigned with I-26 as part of a larger project extending I-26 from its former western terminus at I-40/I-240 to U.S. Highway 23 (US 23) near Kingsport, Tennessee . However, NCDOT officially identifies this part of I-26 as Future 26. Years prior to the loop's completion, I-240 was known as I-140; however, no signage was ever posted for I-140. The I-140 designation has now been given to

144-522: Is part of their traditional homeland in this region. The mound has been identified as an area of feasting. The Cherokee called this site near the confluence Untokiasdiyi , meaning "where they race." They used it as a meeting place and area of competitive ritual games. Under pressure from European-American settlers, the Cherokee ceded their land here in 1819. This site near the Swannanoa River

168-556: The 2016–2025 STIP. Section A, between Haywood Road and Brevard Road, will be a widening project with reconfiguration of ramps at Haywood, Amboy and Brevard. Section B, between north of Haywood Road to US 19 /US 23/ US 70 , is the most expensive section of the project at $ 332 million. After a review of various alternative designs, both state and federal agencies chose Alternative 4B , which will convert Patton Avenue along Bowen Bridges to local traffic and reroute I-240 along I-26 further north. Section C,

192-473: The French Broad River. After crossing the river, I-26 proper ends and becomes Future I-26. Future I-26/US 19/US 23 exit off to the north and US 70 merges with I-240. The concurrent highways travel through the northern section of downtown Asheville. US 70/US 74A exits off I-240 at Charlotte Street. The Interstate continues through a cut in the mountain before turning back to

216-490: The I-26/I-240/I-40 interchange, will be reconfigured to include missing ramp connects and a widening of I-40 through the area. The approximately seven-mile (11 km) project planned to begin right-of-way acquisition in 2019, though delays included state money and worries over how neighborhoods would be affected. The estimated cost increased from $ 750 million in 2017 to $ 1.2 billion in 2023. The final contract for

240-670: The I-26/I-240/I-40 interchange, will be reconfigured to include missing ramp connects and a widening of I-40 through the area. The approximately seven-mile (11 km) project will begin right-of-way acquisition in 2019, with construction on all three sections in 2021. Additional plans for I-240 in west Asheville call for its expansion from four lanes to eight lanes. As part of the I-26 Connector , in 2016, both state and federal agencies chose Alternative 4B , which will convert Patton Avenue along Bowen Bridge to local traffic and reroute I-240 along I-26 further north. In addition,

264-560: The NC Highway Commission Board. An Interstate Highway was to be built from the east to downtown Asheville to connect with the existing freeway. The best way to do this, it was concluded, was to blast an 800-foot-wide (240 m) passage through Beaucatcher Mountain . The Beaucatcher Mountain Defense Association, formed in the early 1970s, endorsed a tunnel , which would mean only about five percent of

SECTION 10

#1732790476458

288-520: The Swannanoa River. Based on evidence from excavations conducted there in the early 21st century, the mound was started by indigenous people between 400 and 550CE, with the second to last stage of the mound built about 580-600CE. It was built over a Connestee Phase habitation (built during the Pisgah phase ) in the Middle Woodland period. The historic Cherokee people occupied this area, which

312-591: The geographical boundaries of Buncombe County . It is a valuable resource to the county, providing drinking water to the Asheville metropolitan area, and numerous recreational opportunities. In September 2004, extremely heavy rains from the remnants of Hurricane Frances and Hurricane Ivan caused the Swannanoa to flood , causing major damage to the Biltmore Village section of Asheville, and to

336-465: The main project, awarded to Archer–Wright Joint Venture, totalled $ 1.15 billion, the largest contract in the state's history. The design was selected May 15, 2024. The entire route is in Asheville , Buncombe County . Swannanoa River The estate encompasses numerous ancient Native American sites, including an earthwork platform mound , now known as Biltmore Mound , that is located south of

360-491: The mountain would be disturbed. In 1977, the North Carolina Department of Transportation (NCDOT) selected Asheville Contracting Co. for the project. Three million cubic feet (0.085 × 10 ^  m ) of rock, including greywacke believed to be one billion years old, would have to be moved, and all of it could be used in the construction. The company had several connections to those responsible for

384-482: The road plan: company president Baxter Taylor was a business partner of Ted Jordan, a highway board member and a member of the Chamber of Commerce Highway Committee; they founded Hyde Insurance Company, which sold $ 39.9 million (equivalent to $ 157 million in 2023 ) in bonds to finance the plan. And Buchanan went on to work in public relations for Asheville Contracting. One of the Defense Association's arguments

408-518: The same name. If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Interstate_240&oldid=1161043673 " Categories : Road disambiguation pages Interstate 40 Hidden categories: Short description is different from Wikidata All article disambiguation pages All disambiguation pages Interstate 240 (North Carolina) Interstate 240 ( I-240 )

432-543: The south. I-240 cross the Swannanoa River near Asheville Mall before terminating at an interchange with I-40 while the roadway continues on as US 74A, known locally as Charlotte Highway. In the early 1960s, the east–west freeway around downtown Asheville, designated US 19/US 23, opened from the Beaucatcher Tunnel westward to NC 191 . By 1966, Hanover Street had been converted to

456-574: The state's March decision led to the change. North Carolina Department of Transportation statistics show the eight-lane bridge to be the most traveled section of highway in Western North Carolina, with 99,000 vehicles a day. A planned construction project, dubbed the I-26 Connector, is a $ 600–800-million project to build the missing gap of I-26 through Asheville. Broken into three sections, they are all planned and funded in

480-476: Was extended along part of the unsigned freeway from Haywood Street to Brevard Road. On November 1, 1980, I-240 was officially established on the western half of the freeway from I-40 to Charlotte Street; NC 191 was rerouted north along Brevard Road to its current terminus at Haywood Street. By 1982, I-240 was extended through the Beaucatcher Cut onto new freeway east to I-40. In 1995, all of I-240

504-411: Was later abandoned and became overgrown. At one time there was plowing in the area, reducing the height of the mound, but it is distinguished by a much wider, oval-shaped base. The mound was rediscovered in 1984. It was first excavated in a more than two-year project by a team from Appalachian State University , beginning in 2000. The river is 22 miles or 35 kilometers long, and it flows entirely within

SECTION 20

#1732790476458

528-610: Was named the Billy Graham Freeway. In 1989, the North Carolina General Assembly approved a plan for urban loops around the state's major cities. Included in this plan was a bypass for Asheville, which included an "I-26 Connector" to link two sections of I-26 , one ending south of Asheville, and the other north of the city designated "Future 26". For the controversial plan, $ 14.2 million (equivalent to $ 30.4 million in 2023 )

552-603: Was spent, but, in 2010, the I-26 Connector was demoted to last among 21 urban loop projects. Improvements to I-240 were scheduled for 2020. On April 5, 2012, the North Carolina Board of Transportation voted unanimously to rename the Smoky Park Bridge for Capt. Jeffrey Bowen, an Asheville firefighter who died in July ;2011 fighting a fire. The board's policy traditionally prohibited naming state roads and bridges for firefighters, but numerous protests of

576-473: Was the highway's proximity to Zealandia , the estate of Philip Henry, whose Tudor mansion was covered by the 1966 National Historic Preservation Act . However, when the mansion was named to the National Register of Historic Places on March 14, 1977, the destruction of the mountain had started. The four-mile (6.4 km) project was completed October 31, 1980. In 1971, NC 191

#457542