The Ilim ( Russian : Илим ) is a river in Irkutsk Oblast in Russia , a right tributary of the Angara . It flows north between and parallel to the rivers Angara and Lena , and then swings west to join the Angara 40 kilometres (25 mi) south of Ust-Ilimsk .
7-606: The Ust-Ilimsk Dam on the Angara (downstream from the older, bigger, and better known Bratsk Dam ), completed in the mid-1970s, not only backs up the Angara, but also the Ilim as far as Zheleznogorsk-Ilimsky . The site of the old town of Ilimsk was flooded by the reservoir. The Ilim is 589 kilometres (366 mi) long, and its basin covers 30,300 square kilometres (11,700 sq mi). The river freezes up in late October and stays icebound until early May. Its main tributaries are
14-672: Is located near Ust-Ilimsk , Irkutsk Oblast in Russia and is the third dam on the Angara cascades. Construction of the dam began in 1963, its reservoir began to fill in 1974, and the power plant was commissioned in 1980. Between 1951 and 1955, construction of the Ust-Ilimsk HPS was designated as a priority and in September 1960, the State Commission determined the most suitable spot for the dam. It would be constructed on
21-737: The Angara River, 20 km (12 mi) below the mouth of the Ilim River . Gidroproekt All-Union Design and Exploratory Institute produced the design of the HPS and on June 8, 1962, the Central Committee of the CPSU and Ministerial Council of the USSR determined the schedule of construction and the project's scope. Construction on Stage I of the HPS began in 1963. This included preparing
28-739: The Kochenga and the Tuba from the right, and the Chora from the left. This Irkutsk Oblast location article is a stub . You can help Misplaced Pages by expanding it . This article related to a river in Siberia is a stub . You can help Misplaced Pages by expanding it . Ust-Ilimsk Dam The Ust-Ilimsk Hydroelectric Power Station ( Ust-Ilimsk HPS ) is a concrete gravity dam on the Angara River and adjacent hydroelectric power station . It
35-448: The dam began to inundate the Angara River, creating its reservoir. The dam was accepted for industrial operation in 1980. By 1981, the HPS had generated its first 100 billion kWh which had doubled by 1986 and doubled again by 1995 with 400 billion kWh. By October 1, 2005, it had produced 600 billion kWh of electricity. For comparison, in 2008, U.S. residential and commercial sectors consumed about 517 billion kWh for lighting. On average,
42-527: The dam's foundation, various construction facilities and 220 kV power lines. In addition, the village of Ust-Ilimsk was created as well to support workers on the project. By 1966, the Bratsk-Ust-Ilimsk motorway was opened to traffic and in March of that year, construction began on the actual power plant. On April 22, 1968, the first concrete was poured into the dam's foundation and by October 3, 1974,
49-421: The station produces 21.7 billion kWh annually and utilizes its installed capacity for 5,050 hours out of 8,760 a year. The main dam is 1,475 m (4,839 ft) long and 105 m (344 ft) high with a spillway of 242 m (794 ft) in length. It is flanked by two earth-fill auxiliary dams, the one on its left (west) bank that is 1,710 m (5,610 ft) long and 28 m (92 ft) high. On