Misplaced Pages

Montgomery County Toll Road Authority

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#858141

22-594: The Montgomery County Toll Road Authority ( MCTRA ), formerly the Montgomery County Transportation Program ( MCTP ), is a government agency created on August 24, 2006 by Montgomery County to oversee all future toll road projects within the county. MCTRA operates one toll road: the MCTRA 249 Tollway, which serves as the tolled mainlines of SH 249 ( Tomball Parkway ). This toll projects are located inside of Montgomery County , in

44-543: A non-tolled freeway until it reaches Northpointe Boulevard, where the Tomball Tollway begins. Phase one runs for 6 miles (9.7 km) from just north of Spring Cypress Road, the current terminus of the existing free lanes to just north of the existing Tomball bypass. The Tomball Tollway is three lanes in each direction that are used to bypass seven stoplights and will only accept electronic toll-tags ( EZ Tag , TollTag and TxTag ) as no cash payments will be allowed;

66-536: Is $ 1.95; however, unlike the HCTRA and MCTRA sections of the toll road, TxDOT allows a pay-by-mail option for all users in addition to EZ Tag, TollTag and TxTag, though at a higher cost per toll. Another eight miles of the Aggie Expressway from FM 1488 up to FM 1774 north Todd Mission opened to traffic on March 26, 2021. The current cost to drive segment 1B is $ 2.54 for two-axle vehicles, which took effect on

88-417: Is called West Mount Houston Road, a local arterial road. West Mount Houston Road, however, actually extends east past the intersection of SH 249 at I-45 to an intersection with Airline Drive. The section of SH 249 between West Montgomery Road and Spring Cypress Road is called Tomball Parkway. South of its intersection with Hollister Road, Tomball Parkway is a local arterial road, whereas north of it, it becomes

110-444: The Montgomery County Transportation Program ( MCTP ), is a government agency created on August 24, 2006 by Montgomery County to oversee all future toll road projects within the county. MCTRA operates one toll road: the MCTRA 249 Tollway, which serves as the tolled mainlines of SH 249 ( Tomball Parkway ). This toll projects are located inside of Montgomery County , in the U.S. state of Texas . In 2005, Montgomery County created

132-668: The Tomball Parkway , Tomball Tollway , MCTRA 249 Tollway , or the Aggie Expressway , is a 49.443-mile (79.571 km) generally north–south highway in Southeast Texas . The southern terminus is in North Houston at Interstate 45 (I-45). The current northern terminus of the highway is east of Navasota at SH 105 . The section of SH 249 along the east–west section between I-45 and West Montgomery

154-603: The Bryan/College Station area would benefit from faster connections to Bush-Intercontinental Airport, the Port of Houston and the Texas Medical Center. A bypass of Magnolia was desirable because of the large traffic load every October due to the annual Texas Renaissance Festival . Decreased funding for road projects in recent years had stalled the extension of SH 249. However the rapid growth in

176-593: The MCTRA began collecting tolls from the tolling facilities, it used the EZ TAG system along with the two Texas interoperable tags used in the state; Texas Department of Transportation 's TxTag and the North Texas Tollway Authority 's TollTag as well as any other state tags that Texas becomes interoperable with. Texas State Highway 249 State Highway 249 ( SH 249 ), also known depending on its location as West Mount Houston Road ,

198-764: The Montgomery County Transportation Program (MCTP) to oversee various pass through toll , called a shadow toll in other countries, financing projects for the state of Texas , located within Montgomery County . On August 24, 2006, Montgomery County created the Montgomery County Toll Road Authority (MCTRA) to oversee all future toll road projects, located within Montgomery County. When the MCTRA began collecting tolls from

220-675: The TxDOT maintained section north of Woodtrace Boulevard opened on August 8, 2020. The total cost of the toll for MCTRA's segment is $ 1.47 for two-axle vehicles and, like HCTRA's Tomball Tollway, will only accept electronic toll-tags (EZ Tag, TollTag and TxTag). From FM 1774 in Pinehurst to FM 1488 east of Magnolia, the toll road continues as SH 249 Toll, also known as the Aggie Expressway. The tolled mainlanes of Section 1A are maintained by TxDOT and were opened on August 8, 2020, with no tolls charged until December 2020. The cost to drive segment 1A

242-460: The U.S. state of Texas . In 2005, Montgomery County created the Montgomery County Transportation Program (MCTP) to oversee various pass through toll , called a shadow toll in other countries, financing projects for the state of Texas , located within Montgomery County . On August 24, 2006, Montgomery County created the Montgomery County Toll Road Authority (MCTRA) to oversee all future toll road projects, located within Montgomery County. When

SECTION 10

#1732793191859

264-623: The area has led to a renewed push in 2012 to build further segments. Plans for the middle segments (Pinehurst–Todd Mission) and north segment (Todd Mission–Navasota) were revived by TXDOT in early 2013. TxDOT has formed a working group with local officials and stakeholders to discuss alternatives for the SH ;249 corridor. The segment from Sentinel Oaks to FM 1774 in Pinehurst (maintained by MCTRA) opened in spring 2020. From FM 1774 in Pinehurst, north up to SH 105 in Grimes County, SH 249

286-404: The day of opening. The final segment of SH 249, Segment 2 of the Aggie Expressway began construction in late 2018 and was opened to all traffic on October 28, 2022. It is currently a 2-lane freeway with intermittent passing lanes that stretches from FM 1774 near Todd Mission to SH 105 east of Navasota . The segment is not tolled. Originally a part of FM 149 , the highway was given

308-502: The designation of SH 249 in 1988. Previously, SH 249 was designated on June 22, 1937 from then- SH 73 (now Interstate 10) near San Felipe north to the Brazos River. The route was redesignated on May 9, 1940, as Spur 99 . The route became part of Farm to Market Road 1458 on January 20, 1966. The highway's importance grew after Compaq , a former information technology company, chose to locate its headquarters near at

330-441: The downtown and hopefully alleviate traffic. The alignment of SH 249 from Hicks Road to Holderreith Road that went through the city proper was re-designated as SH 249 Business-B on September 25, 2003. Construction of the bypass was delayed many times, but eventually began in 2005 and was completed in 2008. This bypass was eventually incorporated into Phase I of the Tomball Tollway as the free to use frontage roads running alongside

352-512: The intersection of SH 249 and Louetta Rd in Harris County in the 1980s. The company became so important to Houston that it necessitated the expansion of SH 249 in the late 1980s, and many other technology companies appeared in what became known as the "249 Corridor". In 2015, SH 249 was extended northwest 24.4 miles from FM 149 and FM 1774 to SH 105 near Stoneham. A section of SH 249 from Woodtrace Boulevard to FM 149

374-457: The tolled main lanes. Phase two extends the tollway into Montgomery County from Business SH 249-B to Sentinel Oaks in Montgomery County north of Spring Creek . This $ 335 million project was overseen by the Harris and Montgomery County toll road authorities. Construction on Phase 2 commenced in fall 2016 and was opened to traffic on December 19, 2019. From Spring Creek to FM 1774 in Pinehurst,

396-622: The tolled mainlanes of SH 249 will be maintained by the Montgomery County Toll Road Authority . Signed as MCTRA 249 Tollway, the first section to open was between Spring Creek and Sentinel Oaks (coinciding with Phase two of the HCTRA segment) on December 19, 2019. Construction on the next segment of MCTRA 249 Tollway from Sentinel Oaks to FM 1774 commenced in spring 2018. The next section of MCTRA 249 Tollway opened from Sentinel Oaks to Woodtrace Boulevard on March 26, 2020. The remaining MCTRA segment connecting to

418-472: The total cost of the toll for HCTRA's segment is $ 1.50 for two-axle vehicles, while the SH 249 frontage roads will remain free to all drivers. Construction of phase one began in fall 2013 and was completed on April 12, 2015. In 1999, a bypass around the central business district of Tomball was proposed that would reroute SH 249 along the west side of the city, this would allow commercial and thru traffic to avoid

440-456: Was opened. On March 26, 2021, the section of SH 249 from FM 1488 to FM 1774 was opened. Since the designation of SH 249, TxDOT had long-term plans to extend the highway to Grimes County. Continued growth in the Bryan / College Station , Conroe and northwest Houston regions have congested existing roadways, including SH 105 and FM 1774 . Texas A&M University and businesses in

462-523: Was renumbered as a southern extension of FM 1774 in December 2019. On June 25, 2020, the FM ;1774 extension was modified so that it extended only over the frontage roads of SH 249 from FM 149 to Woodtrace Boulevard while the main lanes from Woodtrace Boulevard to FM 1774 and on to SH 105 retained the SH 249 designation. On August 8, 2020, the section of SH 249 from FM 1774 to FM 1488

SECTION 20

#1732793191859

484-602: Was under the jurisdiction of TxDOT. The remaining portion of SH 249 in Montgomery County from FM 1488 to FM 1774 in Todd Mission was completed on March 26, 2021. In Grimes County, the north segment was constructed as a non-tolled two-lane freeway . Construction in Grimes County began in late 2018 and was completed in October 2022. All exits are unnumbered. Montgomery County Toll Road Authority The Montgomery County Toll Road Authority ( MCTRA ), formerly

#858141