Misplaced Pages

Gare de l'Est

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#238761

89-650: The Gare de l'Est ( pronounced [ɡaʁ də lɛst] ; English: "Station of the East" or "East station"), officially Paris Est , is one of the seven large mainline railway station termini in Paris , France . It is located in the 10th arrondissement , not far southeast from the Gare du Nord , facing the Boulevard de Strasbourg , part of the north–south axis of Paris created by Georges-Eugène Haussmann . Opened in 1849, it

178-582: A 'Reuilly' freight station off of its Paris-Vincennes line in 1877, and the Ceinture Rive Gauche 'Bel-Air' junction opened to freight service two years later. The Ceinture Rive Gauche's first dedicated-freight station, 'Grenelle-Marchandises', also opened in 1879. The Chemin de Fer de Ceinture's passenger traffic was on the rise, and it was expected to be higher for the upcoming 1878 Universal Exposition . The Nord and Paris-Lyon-Méditerranée lines still had no passenger correspondence points with

267-448: A 1,000,000 Franc contribution from each company, the government would organise and finance the landscaping, bridges and rails for the line, to be completed no later than two years from the concession signing. Once completed, it would be placed at the disposal of a 'Compagnie de Chemin de fer de Ceinture de Paris' (not yet Rive Droite), a syndicate comprising two members of each company, for a period of 99 years, during which they would provide

356-629: A Petite Ceinture passenger service beginning the same year ended fruitlessly two years later, with the only change being a "Courcelles-Ceinture à Auteuil-Boulogne" renaming. World War II left the Petite Ceinture practically unscathed: a 1943 allied bomb (aimed at the Javel and Billancourt factories) damaged an arch of the Point du Jour bridge, and the 1944 Liberation of Paris made the Ceinture

445-635: A full Courcelles-Ceinture/Courcelles-Ceinture circle, a 1h30 trip. ` The Syndicate Ceinture passenger cars then were largely unheated, oil-lit 'impèriale ouverte' ( bilevel cars with an open top deck) cars, but from 1884 they had ordered 16 new 'impèriale fermée' (covered bilevel cars) gas-lit cars, and heated all wagons from winter of 1891. That year, the Ceinture Syndicate park was 24 single-level first-class cars, 77 second-class cars, 1 class-mixed car (impèriale fermée), and 51 wagons used for baggage and freight. The open-second-level cars had been

534-528: A height that would ease passenger access to the trains: deemed a success, and extended to all Ceinture Syndicate stations, it condemned many of the line's older step-access cars to disuse. The Ouest company, in light of the upcoming 1900 Universal Exposition, was granted a concession on 6 July 1896 to extend its Moulineaux line from its Champ de Mars terminus to a new 'Invalides' station; the Ouest not only extended its line, but lowered its river-hugging length into

623-419: A map of pre-programmed railway concessions that made Paris the centre of a spiderweb network of lines reaching to all regions and borders of France. By the end of the decade, France's rail was ruled by five distinct railway companies, each with their own exclusive monopoly over their respective regions of France. Paris was only half its present size in the years of the Ceinture's creation: its limits then were

712-510: A service 'for freight and passengers' using rolling stock from each company. The first stretch of Parisian-station-connecting rail built was not part of the Ceinture concession at all, but one originating from an earlier inter-company deal which had become a separate concession of its own, an arc of rail between the Nord and Strasbourg (later: Est) lines: open in April 1852, it would be connected to

801-512: A single complex near La Villette in 1859, Napoleon III demanded that the new slaughterhouse be connected to the Ceinture by rail, a plan that became a concession and decree on 19 October 1864. It was a stretch of rail that, after leaving the Ceinture to either side of the Belleville-Villette station to form a triangle to its east, arced northward to two stations, 'Paris Bestiaux' in the slaughterhouse marketplace and, further on to

890-555: A terminus for trains from all destinations. The schedule was modified as well to accommodate the many shorter-distance 'navette' trains travelling to and from the exposition: in all, the Champ de Mars station transported 3,979,429 passengers, and the total Ceinture passengers for 1900, all companies confounded, was 38,985,079 passengers, its absolute peak. Construction of what would become the Paris Métro had been underway since 1898:

979-429: A trench to eliminate its railway crossings at every bridge and added four new, minuscule, Chinese-pagoda-esque stations: travelling from the Ceinture inwards, one passed 'pont Mirabeau' (later 'Javel'), 'pont de Grenelle', 'de la Bourdonnais' and 'pont de l’Alma' before reaching the 'Invalides' terminus. Not concerning the Ceinture directly, but attached to this extension, was another Ouest project approved on 14 June 1897:

SECTION 10

#1732797228239

1068-610: Is a list of railway stations in Paris, France, current and historical. These stations are the terminal stations of major lines (trains going beyond the Île-de-France region), and, except for Bercy, the suburban Transilien lines. Austerlitz, Saint-Lazare, Lyon and Nord are also stations on the RER network. All stations connect to stations of the Paris Métro . The stations of major lines (the preceding section) which are also stations of

1157-650: Is currently the fifth-busiest of the six main railway stations in Paris before the Gare d'Austerlitz . The Gare de l'Est is the western terminus of the Paris–Strasbourg railway and Paris–Mulhouse railway which then proceeds to Basel , Switzerland . The Gare de l'Est was opened in 1849 by the Compagnie du Chemin de Fer de Paris à Strasbourg (Paris–Strasbourg Railway Company) under the name "Strasbourg platform" ( Embarcadère de Strasbourg ); an official inauguration with President Louis Napoléon Bonaparte took place

1246-472: Is worth mentioning that, during the above, Paris had doubled in size : from 1860, Paris annexed all the 'country communes' between its city tax walls and the fortifications, which put the formerly countryside Ceinture line within the new City limits. Providing a passenger service for these 'new arrondissements ' became yet another State goal, as was the need for railway transport to the upcoming 1867 International Exposition that would bring crowds of visitors to

1335-541: The RER are not included. These stations are used only by the RER lines designated. The Chemin de fer de Petite Ceinture is a line which circled Paris which is no longer in use. The majority of the stations on this line have been abandoned, though some have been reused. From the west clockwise, the stations are: Chemin de fer de Petite Ceinture Paris's former Chemin de fer de Petite Ceinture ('small(er) belt railway'), also colloquially known as La Petite Ceinture ,

1424-549: The gare de Lyon lines (that was dismantled after the exposition end) stations appeared, and four new permanent stations: 'Saint-Ouen', 'Boulevard Ornano', 'Pont de Flandre', and 'Avenue de Vincennes'. Replacing the Nord company engines, the Ceinture Syndicate bought and ran its own 040 T locomotives from 1869, which were stored and maintained in new hangars near the Chapelle-Saint-Denis freight yards. The Chemin de Fer de Ceinture served its military purpose when it

1513-501: The 'Boulanvilliers' line extension that, crossing the river on a 'viaduc de Passy' just below the pont de l'Alma , would allow Ceinture and St-Lazare passengers a much shorter trip between the city centre and the Champ de Mars. It was an extensive project: the Paris-Auteuil ravine between Courcelles-Levallois and Passy was widened into a straight-walled trench wide enough to accommodate two additional sets of rails to either side of

1602-807: The 'temporary' Grenelle-Champ de Mars portion of track entered service two days later, all in time for the Exposition opening. All that remained was the portion of rail connecting the Auteuil lines to the Ceinture Rive Droite under the railway lines from the (rebuilt and renamed since 1853) Gare St-Lazare : the underpass construction began in February 1867, and it and its new station, Courcelles-Ceinture , began service from 25 March 1869. In November 1856, four Est-company locomotives (and one in reserve) were enough to provide freight service between

1691-422: The 1889 Universal Exposition that was accredited with a 'boost' of around 4 million visitors during its May–November eight-month duration. A train every fifteen minutes in both directions was the absolute minimum cadence, and, after the exposition's end, the service to the gare St-Lazare was re-established, with two of those trains travelling between St-Lazare and Courcelles-Ceinture, and the other two travelling in

1780-471: The 1900 Universal Exposition approached: a temporary 'Claude Decaen' stop (that would become permanent from 1906) to serve Exposition installations in the Parc de Vincennes, new Ceinture Syndicate cars and engines (more Nord-built 030Ts), electric lighting for all 186 cars, and the Champ de Mars station was modified with, in addition to its platforms serving for trains continuing to Invalides, twenty platforms as

1869-607: The Batignolles (Rouen), La Chapelle (Nord) and La Villette (Strasbourg-Est) freight yards. The construction of the line between the Pont du Nord and Ivry (the Rive Gauche Orléans company freight yard), as it undercut the hills of Montmartre and Belleville , was more problematic: several landslides delayed the work there, but it was delivered in one track from December 1853, freight service began from 25 March, and

SECTION 20

#1732797228239

1958-531: The Batignolles tunnels to the Gare St. Lazare from 1911, and the temporary station that replaced it took the name 'Pont Cardinet' from 1919; that same station would become the line's terminus in 1922 when, after a rail-traffic interrupting collapse of those same tunnels in 1921, it was moved there when the station's definite construction was complete. From then the only connection to the Gare St-Lazare from

2047-567: The Ceinture Rive Droite did), it was built below ground level for most of its 9.5 km length, an endeavour that required the construction of 14 bridges across its entrenched path. Besides its rue St-Lazare embarcadère terminus (also serving the Ouest company's other lines), the line had five stations: Pont-Cardinet (an SNCF station today), Courcelles (today's Pereire - Levallois RER C station), Neuilly-Porte Maillot , Avenue de l'Impératrice ( Avenue Foch ), Passy ( Avenue Henri-Martin ) and Auteuil (unused today). The Paris-Auteuil passenger line

2136-474: The Ceinture Rive Droite's terminus moved to 'Courcelles-Ceinture', passengers still had to change trains over walkways to the 'Courcelles-Levallois' station. Also for the Universal Exposition, the Ceinture Rive Droite dotted its line with two new temporary 'for-exposition correspondence' stations, 'Est-Ceinture' (where the ceinture crossed the lines to the gare de l'Est ) and 'Bercy-Ceinture' over

2225-476: The Ceinture Rive Gauche, its quays were lowered, and a new Auteuil terminal, lateral to the first, took trains from the Saint-Lazare station, creating a correspondence with the old platforms that were from then dedicated to Ceinture Rive Gauche service. The also-Ouest-owned Ceinture Rive Gauche's stations were: From the Auteuil terminus, the 'Point du Jour' station at the end of a new bridge-viaduct across

2314-406: The Ceinture Syndicate modified their ticketing, signage and colour-coding to more easily differentiate trains and their destinations. The Petite Ceinture had become a popular mode of transport towards the end of the 19th century. The number of Ceinture passengers was near 5 million passengers a year in 1880, but rose sharply from then at 13 million in 1883 peaking at between 18 and 19 million for

2403-417: The Ceinture Syndicate, added its trains to the Ceinture schedule with a new full-circle Nord-Station-Nord-Station service. Already decreed 'of public interest' since 1889, new 'rue d'Avron' station opened by the street of the same name in 1895, lightening the load of the nearby Avenue de Vincennes station. The new station would be used, from 1896, to experiment with raising the platform from its track level to

2492-403: The Ceinture had created a junction in 1899 with the 'Est/Ouest' metro line company ateliers near the porte de Vincennes , and used it to deliver rolling stock to Paris's first metro line, the ' Porte Maillot–Porte de Vincennes ' line that was inaugurated on 19 July 1900. The Ceinture Syndicate was already preparing to meet future competition through lowering passenger ticket prices and increasing

2581-515: The Ceinture on its way into Paris towards its Champ de Mars terminus. Also for the 1889 exposition, the Ceinture eliminated the train-change required between Courcelles-Ceinture and Courcelles-Levallois: from then, Ceinture trains could travel a full circle around Paris, and Ceinture trains no longer went to the Gare Saint-Lazare, serviced through a transfer to or from a Paris-Auteuil train at Courcelles-Levallois. To accommodate this change,

2670-484: The Ceinture schedule, its train cadence for the duration of the Exposition rose to one every fifteen minutes, and passengers to the Champ de Mars passed 50,000 per day. The Ceinture Syndicate, pleased with its Exposition-passenger service results, after a period of experimentation after the Est company withdrew its trains at the Exposition's end, decided to make the fifteen-minute passenger service permanent from 1881, and from

2759-559: The Ceinture upon its completion. The first length of the Ceinture railway was completed 12 December 1852 between Rouen's Batignolles freight yards and the Pont du Nord, a point above the Nord company rails south to their station in Paris. The second Ceinture section delivered, between Pont du Nord and Aubervilliers (the point where the Nord-Strasbourg arc-connection joined with the Ceinture railway), opened to service on 30 September 1853. From then, trains could travel freely between

Gare de l'Est - Misplaced Pages Continue

2848-611: The Ceinture, but this changed with the 1875 opening of the Nord-line 'Nord Ceinture' station near the Ceinture's 'La Chapelle-Saint-Denis' station, and the Paris-Lyon-Méditerranée's 'Bercy-Ceinture' station on their lines near the Ceinture 'La Rapée-Bercy' station, and Est-Ceinture re-opened from 15 May 1878. The Paris-Vincennes line added a second arc of rail to the first one at Bel-Air that allowed trains to travel to and from Bastille in both directions from 1878, and

2937-604: The Est-owned 'Paris-Vincennes' line (to its place de la Bastille terminus) added a 'Bel-Air-Paris' station just below the Syndicate 'Bel-Air-Ceinture' station. The Ceinture-Syndicate-owned passenger cars were two-level 'Impériales' pulled by two 030 'Mammouth' locomotives, and service was one train in each direction every two hours. Extra trains were added on holidays, and from 1866, to serve local factories, reduced-price morning and evening 'worker trains' as well. Meanwhile,

3026-563: The Grande Ceinture made remedying this problem possible, and from 1886, with service reduced to one rail in many places, City engineers and Ceinture Syndicate workers built bridges, dug trenches, re-landscaped, and rebuilt stations, all in time for the 1889 universal exposition . The Ouest's Ceinture Rive Gauche northwards antenna would serve the Exposition once again, but this time as the head of their 'ligne des Moulineaux' railway line that, finally built between 1886 and 1889, crossed

3115-520: The Grande Ceinture the same year. In another effort to ease its freight-traffic overload, the Ceinture Syndicate purchased its first and only Diesel engine in 1932: an 800-horsepower ' Sulzer ' machine numbered 'D1', it would aid the composition of freight wagons before they were attached to a steam engine for Ceinture transit. The number of passengers on the Syndicate Ceinture had dropped to 10,247,533 by 1920, and to 9,440,524 by 1922. In

3204-537: The Left Bank Champ de Mars . In earlier state-rail-company negotiations, the state had obtained the possibility of buying the Auteuil line back from the Ouest company, and they used this as leverage to get the company to agree to signing a Ceinture Rive Gauche concession convention on 31 May 1865. In this agreement, the state would return the Auteuil-line concession to the Ouest company, would complete

3293-625: The North company stopped its Nord-Nord circular service between 1907 and 1908, replacing its access to the Nord main station through a 'shuttle' service between it and La Chapelle-Saint-Denis). The Ceinture syndicate, most likely because of its 1907–1908 loss of 3 million passengers (from 28 million), refused to fill the void, and instead reorganised its then Ceinture-Syndicate-only Courcelles-Ceinture/Courcelles-Ceinture passenger service to two trains an hour in evenings, three an hour in 'daytime' periods, and six an hour during rush-hour periods. Freight, on

3382-475: The Ouest company rebuilt a new antenna to the Champ de Mars (replacing the one dismantled in 1869), but this time permanently as the head of a still-unauthorised 'Paris-Moulineaux' suburban railway line that was to have its terminus at the Pont de l'Alma . The Paris-Auteuil line also built a new station for the exposition, 'Avenue du Trocadéro'. With the temporary addition of the Est company's Paris-Vincennes trains to

3471-422: The Ouest company's passenger-only Paris-Auteuil line had been running trains every half hour in the mornings, and every twenty minutes in the afternoon, between its Saint-Lazare terminus, 'Batignolles-Clichy', 'Courcelles-Levallois', Neuilly-Porte Maillot', 'Avenue de l'Impératrice' (later 'avenue Foch'), 'Passy' and 'Auteuil' (terminus) stations since its 1854 opening. From 1866, in preparation for its connection to

3560-484: The Ouest company) railway companies in a decree on 23 October 1934. The future of the Paris-Auteuil passenger line, now owned by the État (state) company, had been a subject of debate since the French State (as the État company) bought the line ten years before: first proposed as an addition to the still-growing Métropolitan underground railway network, the state also imagined extending its electrified service along

3649-402: The Petite Ceinture's trenches and infrastructure have been rehabilitated and renovated for the inter-urban RER C passenger transport service, and some of its former stations have been sold to local commerce and services. The future of the remaining stretches of Petite Ceinture has always been, and still is, the source of much debate. France's first steam-locomotive-driven passenger rail service

Gare de l'Est - Misplaced Pages Continue

3738-659: The Versailles Rive Gauche lines (leading to today's Gare Montparnasse ) joined to its Versailles-Rive Droite counterpart through a junction at Viroflay (in the suburbs to the southwest of Paris), the Rouen, Nord, Strasbourg, Orléans (then bankrupt, but state-sponsored) and Lyon companies signed participation, and the project was transformed into a decree-proposition that the Prince-President signed into law on 10 December 1851. In this agreement, against

3827-403: The agreement, would lay the rail, provide all the buildings, and execute and maintain rail service; for the Exposition, the Ouest agreed to lay a 'temporary' antenna from its 'Grenelle' station north to the Champ de Mars, and make the required modifications to their Auteuil line that would allow it to be used by freight trains. The Ceinture Rive Gauche line began service on 25 February 1867, and

3916-450: The already-underway landscaping and bridges needed for the line, as well work an 'eventual' additional concession for a rail connection between their Auteuil line and the Ceinture Rive Droite at Batignolles; the state reserved, all the same, an eight-year delay during which it reserved the right to purchase some or all of the concession in case ongoing plans for a ' métropolitan ' railway line went through. The Ouest company, on their side of

4005-528: The capital when its third Ceinture Rive Gauche section was built in 1867. Although the Syndicate-owned portion of the line was freight-only in its first years, after the creation of a passenger service from 1862, the Chemin de fer de Ceinture became Paris's first metro-like urban transport, and even more so after the 'Ceinture Rive Gauche' passenger-and-freight section began. The line's passenger service

4094-451: The cause of a few under-tunnel-and-bridge deaths and a few suicides over the years, and, under pressure from the state, began to replace them progressively with new single-level cars, profiting also from the occasion to replace Ouest material (that they were still using since the Ceinture Syndicate merger) with cars owned by the Syndicate itself. By 1897, there were only a few open-top-deck cars in circulation. Correspondence with transport to

4183-632: The ceinture was through the Boulainvilliers antenna (electrified since 1919), but this service, little used by passengers, ended from 1924. The Auteuil line was joined to the Ceinture only through its Auteuil terminus from then; the two lines would become further distinct when the Auteuil line, with the Boulanvilliers antenna, was electrified one year later. Meanwhile, the Syndicate Petite Ceinture's passenger traffic

4272-416: The city centre improved as well, with, from 1893, a twin junction to the Nord lines and additional quays to the Chapelle-Saint-Denis station that not only allowed passengers a shorter transfer time, but eased the passing of between-main-station trains that had to use the off-Ceinture La Chapelle freight-yard junction until then. From its completion, the Nord company, in exchange for giving 40% of profits made to

4361-472: The city tax walls, each run by separate companies : Paris- Rouen (later Ouest, near today's gare Saint-Lazare , Nord (at today's gare du Nord ), Paris- Strasbourg (later Est, at today's gare de l'Est ), Paris- Lyon (at today's gare de Lyon ) and Paris- Orléans (at today's gare d'Austerlitz ). Since the rail barons of the time were persuaded that direct connection to a competing line would endanger their control over their respective region monopolies, there

4450-513: The city's 1784 Fermiers-Généraux tax wall that followed almost exactly today's Métro lines 6 and 2 ). From 1841, Paris dotted itself with a ring of defences a few kilometres outside these: completed in 1845, the Thiers wall fortifications enclosed land that was mostly countryside, save for a few ' faubourgs ' extending for a distance along the roadways from its city gates. In that year, Paris had five major rail stations, all located just inside

4539-685: The city's rail company freight yards, and trains were composed of company-owned freight cars. Most often, freight, travelling the Ceinture in the wagons belonging to the company that brought it to the capital, once arriving at the freight-yard of the company taking it elsewhere in France, was transferred to that company's wagons, an onerous process. The Ceinture service was at first reserved for only 'main station' companies, but from 1 September 1855 opened to local merchants receiving goods, and two freight stations, 'Ceinture de Charonne' and 'La Petite Villette', opened in 1855 and 1856, respectively. Service at first

SECTION 50

#1732797228239

4628-415: The companies opened five hastily built passenger stations in 1862: 'Batignolles-Clichy', 'Belleville-Villette' (near the "La Petite Villette" freight station), 'Ménilmontant', and 'Charonne' (in the existing Charonne freight yard), and 'La Rapée-Bercy'. Two others, 'La Chapelle-Saint-Denis' and 'Bel Air', opened before two years later; the latter would be the line's first 'correspondence' point from 1863 when

4717-437: The companies to transfer their freight traffic to the outer ring and dedicate the inner ring to passenger and Parisian-commerce-destined freight traffic. In exchange for its participation, the Ouest offered its Ceinture Rive Gauche and Courcelles bifurcation concessions, but demanded that its Paris-Auteuil line be exempt from it: this agreement was approved by decree on 11 November 1881, and effective from April 1883. Although it

4806-429: The conflict's end, at first only in sections with trains every hour, Ceinture service returned to its half-hour cadence, begun just before the war, from 16 July 1871. The Chemin de fer de Ceinture Rive Gauche was still a passenger only line, but from 1874 a junction between the Ouest lines near the Ceinture 'Vaugirard' station allowed freight trains a shortcut from the bifurcation at Viroflay. The Ouest company had opened

4895-714: The departure of these soldiers for the Western front. The SNCF started LGV Est Européenne services from the Gare de l'Est on 10 June 2007, with TGV and Intercity-Express (ICE) services to Northeastern France, Luxembourg, Southern Germany and Switzerland. Trains are initially planned to run at 320 km/h (198 mph), with the potential to run at 350 km/h (217 mph), cutting travel times by up to 2 hours. The following services currently call at Paris-Est: [REDACTED] Media related to Gare de Paris-Est at Wikimedia Commons List of Paris railway stations Below

4984-440: The entire line ran alternating Ceinture Syndicate and Ouest trains between the Ceinture line's then 'Avenue de Clichy' (formerly 'Batignolles-Clichy') and 'Auteuil' terminus at a rate of one train an hour in each direction, and at a rate of one every half-hour on Sundays and holidays. The entire 33-kilometre trip, with its 21 stops, took, at best, 1h50 then. While planning to replace Paris several intra muros slaughterhouses with

5073-480: The existing line: below the 'Avenue Henri Martin' station, the new lines entered curving tunnels to pass below the Paris-Auteuil lines to emerge at a new entrenched 'Boulanvilliers' station before, after passing through another tunnel, emerging on the river-crossing viaduct that curved left to meet the path of the Moulineaux line rails towards the Champ de Mars and Invalides terminus. Several other improvements as

5162-557: The final agreement signed by the Minister 28 February 1934, the Ceinture Syndicate was authorised to end its passenger service from 1 April that year. The end of the Petite Ceinture's passenger service also saw the dissolution of the Grande-Ceinture-Petite-Ceinture Syndicate, and the concession obligations were divided between the Est, Nord and État (the state-owned entity that had since bought

5251-481: The first departure of the Orient Express for Istanbul . The Gare de l'Est is the terminus of a strategic railway network extending towards the eastern part of France, and it saw large mobilizations of French troops, most notably in 1914, at the beginning of World War I . In the main-line train hall, a monumental painting by Albert Herter , Le Départ des poilus, août 1914 dating from 1926, illustrates

5340-416: The following year, the Paris-Auteuil section topped its service as well; in all, the Ceinture had a passenger-service frequency of 4-8 trains an hour in each direction, but this cadence required a total suppression of freight traffic at certain times at certain points along the Ceinture Rive Droite line. The Ceinture Rive Gauche's freight service was still insufficient for local commerce, though, and this led to

5429-557: The former Ceinture Rive Gauche line, but in the end service continued as before with the only change being, from 1935, a tarification modification to a single-class 'Metro type' ticket and fee. The Nord company alone ran the remaining Rive Gauche, Rive Droite, and Courcelles portions of the Petite Ceinture from 1935, which meant the closing of the Ceinture Syndicate-owned La Chapelle-Saint-Denis engine hangars. Discussions about re-opening

SECTION 60

#1732797228239

5518-438: The freight-only Ceinture line, but the government indicated in the concession agreement that the line was to be "an extension of the Chemin de fer de Ceinture". Leaving the Gare Saint-Lazare rails just to the north of the station, the 'Paris-Auteuil' line arced west, passed through the town of Batignolles, then arced south with several stops before its terminus in the town of Auteuil . In an effort to avoid blocking traffic (like

5607-534: The funds necessary to purchase the lands and lay rail for the line even before Napoleon III's declaration, and had from 1863 begun the landscaping and bridge work needed for a Chemin de fer de Ceinture Rive Gauche: bridges because, unlike the Rive Droite Ceinture line, the Rive Gauche wouldn't block traffic, but pass over and under streets over bridges, below underpasses and through tunnels. It

5696-473: The latter would be the last steam engines ever ordered by the Ceinture Syndicate. After a slight increase because of the Metro's immobilisation because of the 1910 floods, the Ceinture passenger traffic continued its decline, with 17 million passengers for 1911. The Ceinture syndicate reduced train frequency again that year, with only four trains an hour in each direction at peak hours, and two trains an hour for

5785-519: The nation's railways through a Right Bank portion of the inner-fortification rails. The government of the time was too financially burdened to undertake building and managing a railway on its own, so it depended upon France's major rail companies for financial support and management. The post-1848-revolution government was not in an any better position to negotiate and all the Second Republic government 's coercive manoeuvring managed to achieve

5874-402: The new technology as a means to quickly move troops, machinery, ammunition and provisions between points along the circular wall. An initial 1842 study resulted in three projects for railways to the inside of the fortifications, another between the forts outside them, and another ring in a still larger diameter outside the city, but by 1845 the government's increasingly urgent priority was joining

5963-433: The next year. The platform corresponds today with the hall for main-line trains. Designed by architect François Duquesnay, it was renamed the "Gare de l'Est" in 1854, after the expansion of service to Mulhouse . Renovations followed in 1885 and 1900, as part of Haussmann's renovation of Paris . In 1931, it was doubled in size, with the new part of the station built symmetrically with the old part. This transformation changed

6052-423: The opening of a new 'Glacière-Gentilly' freight yard from 1882. Line congestion was already a problem then, and a plan to build a ' Chemin de fer de Grande Ceinture ' extra-muros railway ring had already been underway since 1875. The company least concerned with freight matters, the Ouest, had abstained from the agreement, but in 1880 proposed merging the two Ceinture syndicates (Petite and Grande): this would allow

6141-557: The other hand, was even increasing: Between 1905 and 1911, it added new Ceinture-access junctions to its Aubervilliers freight yard (to the Nord-Est junction and to the Ceinture line by its Pont de Flandre station), added direct-access junctions to the northern and southern junctions of the Belleville-Villette freight yard, and expanded its Gobelins freight yard. From 1909, the Ceinture had 13 new Nord 3.800-type engines ( numbered 81 to 93 ), and three new 0-8-0T engines (numbered 14 to 16);

6230-525: The other side of the drawbridged canal, 'Paris Abattoirs' in the slaughterhouse complex itself. The antenna and stations were open to service from 18 October 1867, three days before the inauguration of the slaughterhouses themselves. The completion of the Courcelles underpass and its 'Courcelles-Ceinture' station for the 1867 Universal Exposition meant that trains could travel in a full circle around Paris, but passengers still had to change trains: although

6319-416: The rest of the day. The onset of World War I slowed the passenger exodus somewhat, but because of a lack of workers and the price of combustibles then, the Ceinture Syndicate stopped its service to the Paris-Auteuil from December 1915, from when the Ceinture's terminuses became Auteuil and Courcelles-Ceinture. The Auteuil line's 1854 'Batignolles' station was destroyed during the renovation and enlargement of

6408-577: The river Seine, 'Grenelle' (where passengers could transfer to a shuttle to the Champ de Mars ), Ouest-Ceinture (a transfer point with the Ouest lines to their 'Paris-Versailles Rive Gauche' station), 'Montrouge', 'Gentilly' (correspondence with the 'Paris-Sceaux' line to its Denfert-Rochereau terminus), 'Maison Blanche', and 'Orléans-Ceinture' (correspondence with the Orléans line to today's Gare d'Austerlitz ). From its 1866 opening to passenger-only service,

6497-518: The same period, the Auteuil line had 9 million passengers in 1920, a drastic drop to 6 million one year later, and by 1930 had only 4,109,000 passengers. From 4 May 1931, several letters and meetings about the situation with the Minister of Public Works resulted in a plan end passenger service for the line, and to replace it with a 'PC' bus service that would run along the Boulevards Maréchaux between Courcelles-Ceinture and Auteuil: in

6586-494: The scene of many a skirmish. An agreement earlier that year granted the Ceinture rail between its Champ de Mars freight yard and the east of its Avenue de Clichy station to the 'Region Ouest' (former 'État') company-member of the SNCF formed in 1938; this length of rail would later become part of the future RER C through Paris. The Courcelles embranchement, practically unused and reduced to one track since 1934, disappeared underneath

6675-399: The surrounding neighbourhood significantly. At the top of the west facade of the Gare de l'Est is a statue by the sculptor Philippe Joseph Henri Lemaire , representing the city of Strasbourg , while the east end of the station is crowned by a statue personifying Verdun , by Varenne. These two cities are important destinations serviced by Gare de l'Est. On 4 October 1883, the Gare de l'Est saw

6764-432: The tempo of their trains during rush-hour periods. The Ouest company, perhaps already predicting the inevitable, withdrew its engines and cars from Ceinture circulation after its 'Boulainvilliers' service began from 1901; the Ceinture Syndicate replaced these with material of its own and adjusted its train schedules to fill in the slack: fifteen new passenger-train engines, Nord 230Ts, arriving between 1902 and 1903, reduced

6853-426: The time it took for a full-circle trip by ten minutes. Contrary to these measures, the Ceinture Syndicate reversed its stance on freight traffic, and returned to its pre-Exposition Petite Ceinture freight itineraries in 1902. One year later, they compensated the Ceinture Rive Gauche's freight insufficiency with the opening of a new freight-yard that had been in the works since 1879, 'Paris-Gobelins', in 1903. Just to

6942-505: The west of there the same year, the Ceinture opened a 'Paris-Brancion' livestock station below the still-expanding 'Vaugirard' slaughterhouses, and the Charonne-Marchandises freight-station expanded in 1904. The number of passengers had already begun to drop by then, with a 4.55% drop between 1902 and 1903. The Ceinture reduced its minimum train cadence from six an hour in each direction to four from 1 April that year, and

7031-421: Was a circular railway built as a means to supply the city's fortification walls, and as a means of transporting merchandise and passengers between Paris ' major rail-company stations. Beginning as two distinct 'Ceinture Syndicate' freight and 'Paris-Auteuil' passenger lines from 1851, these lines formed an arc that surrounded the northern two thirds of Paris, an arc that would become a full circle of rail around

7120-414: Was a popular means of public transport until its 1900 Universal Exposition peak-traffic year. Paris's first Metro line opened that year: from then, the numbers of those using the Petite Ceinture passenger service dropped steadily until its closure in 1934. Although maintained as a freight line, even this use of the Petite Ceinture had come to a practical standstill by the 1980s. Since then, sections of

7209-539: Was fully functional after its second rail was delivered in May 1854. The Pereire-owned Ouest company requested and obtained the government railway concession that 'extended the ceinture railway through Batignolles and Auteuil' in 1852. This line was planned as a passenger-only service created mainly for the Parisian bourgeoisie destined for their country homes to the south-west of the city, and had nothing at all to do with

7298-544: Was inaugurated on 2 May 1854. From 1852 the state had continued, non-officially, their own plan-study for the Left Bank arc of rail that would complete their original fortification-provision goals, and from 1857 this became an official pre-project that Napoleon III declared 'of public interest' in 1861. As all of the Ceinture Syndicate company lines were already connected between them, they saw no commercial interest in this. The state, intent in their aims, had begun procuring

7387-436: Was isolated in the suburban countryside in the year of its inauguration, the now-named 'Petite Ceinture' that year was an integral part of the city. Although the Paris-Auteuil and Ceinture Rive Droite section plans had accounted for this eventuality, the Ceinture Rive Droite had many countryside-style road-crossings, a hindrance that became more important as Paris's population grew. The Syndicate's shifting its freight transport to

7476-405: Was its 1837 Paris-Saint-Germain railway that ran to an 'embarcadère' ancestor of today's Gare Saint-Lazare . In the years following, new railways appeared in many regions across the country, but in all, its early 19th-century rail technology expansion was far behind that of its western European rivals. The Louis-Philippe government-monarchy planned to close this gap with their 1842 "Legrand Star",

7565-513: Was losing about one million passengers every two years, and had dropped below 8 million by 1926. When the city began demolishing its fortifications from 1919, the Ceinture saw an opportunity to relieve their over-encumbered Charonne-Marchandises freight station by expanding it yet further onto the land freed, but the City refused their request, a setback that may have been behind the Syndicate decision to return all its from-main-line freight traffic to

7654-423: Was no company inter-station service of any kind: freight and passengers travelling between regions of France had no choice but to commute from station to station by road through the congested capital. The idea for Paris's Chemin de Fer de Petite Ceinture originated with its fortifications: rail transport was still relatively new when Paris's city fortifications were completed in 1845, and France's Generals saw

7743-485: Was only during daytime hours, but from 1857, after a telegraph service was installed, ran at night as well. From 1861, the North company took over providing locomotion with seven new 040 T (numbered 551–557), engines that would become the signature Ceinture locomotive. The Ceinture Rive Droite concession agreement stipulated that the railway should have a passenger service, but the companies were content with their freight-only line. After increasingly hostile state pressure,

7832-469: Was requisitioned by the state for the 1870 Prussian war and siege of Paris . The Ceinture Rive Droite was only slightly damaged from Prussian bombardments from the north, but the Auteuil and Ceinture Rive Gauche lines were heavily damaged in the 1870-71 Commune civil war that followed: the 'Neuilly-Porte Maillot' station was completely destroyed, the Auteuil terminus mostly destroyed, and the Auteuil viaduct and 'Grenelle' station were heavily damaged. After

7921-539: Was the rail companies making freight-exchange deals and mergers amongst themselves. Napoleon III 's coup d'État on 2 December 1851 meant a new government with more grandiose visions for France's railway future. Re-opening the negotiations based on a pre- Second Empire project to connect all of Paris's railway stations through an arc of rail between the Rouen-Versailles Rive Droite ( Gare-St-Lazare ) and Orléans ( Gare d'Austerlitz ) lines, with

#238761