The Prince Edward Island Railway ( PEIR ) was a historic Canadian railway in Prince Edward Island (PEI). The railway ran tip-to-tip on the island, from Tignish in the west to Elmira in the east, with major spurs serving Borden-Carleton 's train ferry dock, the capital in Charlottetown , Montague and Georgetown and the original eastern terminus at Souris . A major spur from Charlottetown served Murray Harbour on the south coast.

#277722

43-501: Construction began in 1871 but costs almost bankrupted the government by the next year, a problem that helped pave PEI's entrance into Confederation. The work was picked up by the Canadian Government Railways and largely completed by the mid-1880s. The PEIR saw heavy use, especially during World War II , but like many railways saw declining use through the 1970s. The line officially closed on 31 December 1989 and

86-613: A fixed link in 1985–1986, following aborted attempts at building a highway/railway causeway across Abegweit Passage in 1957 and 1965–1969, saw CN accelerate its attempts to withdraw railway service on Prince Edward Island. In 1975 the railway station in Elmira was re-opened to become the Island's first railway museum. The museum is housed in the actual Elmira railway station. The museum originally included two former Canadian National Railway passenger cars: one former wood sided baggage car and

129-481: A former IRC bridge over the Miramichi River at Newcastle, New Brunswick . Branches were also constructed at this time off PEIR lines to Vernon Bridge , Montague , and Elmira . From 1915 to 1918, PEIR and IRC would come to be known collectively as the Canadian Government Railways (CGR), although each company would maintain its separate corporate identity and management. The most revolutionary change to

172-648: A new line was built connecting the Charlottetown-Summerside main line at Emerald Junction with another Northumberland Strait port at Cape Traverse . From Cape Traverse, iceboats would cross the Abegweit Passage to Cape Tormentine, New Brunswick during the winter months. Another new line was built east from Charlottetown to Murray Harbour , part of which included building the Hillsborough River Bridge , using

215-465: A result, CN increasingly began to avoid investing capital into improving railway infrastructure in the province. In a classic "demarketing" strategy, CN's deteriorating track conditions resulted in further loss of service to trucks. By the early 1980s CN made it clear the days of its railway operations on Prince Edward Island were numbered, but Island politicians at the provincial and federal level managed to dissuade CN from abandoning. The renewed talk of

258-411: A steel railway post office (RPO) car. In the 1990s arson claimed the baggage car. Approximately a decade later, RPO was scrapped having succumbed to age and a lack of preservation activities. The trucks from the baggage car are still on the property. Several railway cars were on display at the provincially operated railway museum at Elmira until the mid-2000s but have since been scrapped due to neglect on

301-543: A vital role in Canada's wartime effort, moving vast numbers of troops and supplies. A notable role was the relief and reconstruction in Halifax after the 1917 Halifax Explosion and one CGR employee, Vince Coleman became a celebrated hero in the explosion. The first system to be taken over was the bankrupt Canadian Northern Railway (CNoR) on September 6, 1918, whereby the government-appointed Board of Management for CNoR

344-658: Is located adjacent to a replica railway station. Both can be seen from the Confederation Bridge . Two former railway tank cars reside beside the railway on the property of Island Construction on the Sherwood Road in Charlottetown. Both tank cars are adjacent to the railway trail can be easily seen and photographed from the trail. These tank cars are 36' long each. During the final years of railway operation on PEI these tank cars could be seen parked in

387-538: Is now used as the Elmira Railway Museum. Located wholly within the province of Prince Edward Island , construction of the PEIR started in 1871, eventually financed by Canada . The line was initially built to 3 ft 6 in ( 1,067 mm ) gauge, under the supervision of Chief Engineer John Edward Boyd a native of Saint John, New Brunswick who first advocated the use of narrow gauge for

430-627: The Charlottetown Conference a decade earlier. The railway construction debts pushed the colony into reconsidering Confederation, and following further negotiations, Prince Edward Island became a province of Canada on July 1, 1873. The understated provision in the Prince Edward Island Terms of Union reads as follows: That the railways under contract and in course of construction for the Government of

473-653: The New Brunswick Railway in the 1860s, and was responsible for the first surveys of the Toronto, Grey and Bruce Railway and the Toronto and Nipissing Railway in Ontario . The PEIR was frequently criticized for its meandering path, reputedly caused by construction contractors who were paid by the mile; this may also be accounted for in economies taken by reducing the amount of grading and trenching required by going around hills and obstacles. At one point there

SECTION 10

#1732772752278

516-631: The Prince Edward Island Railway (PEIR), and the Hudson Bay Railway (HBR). There were also several minor branch railways in the province of New Brunswick that were acquired by CGR during this time. The deepening financial crisis in Canada's railway industry toward the end of the First World War saw the majority of major railways across the country nationalized by the federal government. The CGR played

559-573: The Borden railway yard and were used to store fuel oil for the ferry boats. Both tank cars are painted a light blue colour (the same paint scheme they featured during their railway service). The western end of the PEIR starts in Tignish, abutting Church Street which forms the downtown axis. A wye-junction just west of the end serves as a turnaround, running north to Maple Street. The line initially runs west-southwest out of town but soon turns south towards

602-756: The CGR, although in many regions, such as the Maritimes, the public continued to refer to its trains and facilities by their old name of the Intercolonial. The CGR moniker ceased to be used after 1918, but the CGR itself existed on paper until the late 20th century, largely due to real estate leases and other agreements. A Privy Council order dated July 22, 1993, authorized the sale of CGR to the Crown corporation CN for one Canadian dollar . Hillsborough River Bridge Too Many Requests If you report this error to

645-640: The CNR fold on July 12, 1920. GTPR's parent company, the bankrupt Grand Trunk Railway (GTR) was nationalized on May 21, 1920, and was absorbed into the CNR on January 30, 1923. Although the CGR only existed for a short period of time before evolving into the Canadian National Railway, it was a very visible Canadian railway in World War One due to the large scale of wartime railway operation. Large amounts of rolling stock were lettered for

688-680: The Island, shall be the property of Canada; Thus the Government of Canada came to inherit the PEIR in 1874 at the same time as construction was progressing on the Intercolonial Railway (IRC), which would link the strategic winter ports of the Canadian Maritimes with Central Canada . New locomotives were purchased from the United Kingdom and from Canadian manufacturers along with new rail cars. In 1885,

731-588: The Murray Harbour Line continues eastward a short distance before turning south at Hermitage, and then eastward again when it meets the Belle River on the south coast, running the remaining distance to Murray Harbour. A spur was later added in the Belle River area to Wood Islands . This collection of spurs on the PEIR is the only area that has not been fully converted to rail trail use, with several sections currently undeveloped. Like many lines of

774-641: The Northumberland Strait ferry service: * denotes combination train ferry / ferry Canadian Government Railways Canadian Government Railways ( reporting marks CGR , IRC ) was the legal name used between 1915–1918 for all federal government-owned railways in Canada . The principal component companies were the Intercolonial Railway of Canada (IRC), the National Transcontinental Railway (NTR),

817-473: The PEIR occurred in 1915 when a new icebreaking railcar ferry called Prince Edward Island was ordered by the federal government, arriving from the United Kingdom with a capacity of 12 rail cars, however it would not be until 1917 that the port facilities at Port Borden and Cape Tormentine would be ready to handle the vessel. In the meantime, the Prince Edward Island continued to operate

860-497: The PEIR was a completely captive system, having no need for interchange with mainland North American railways. Following the start of railcar service in 1917, the lines to Charlottetown and Summerside from Borden were dual-gauged , capable of handling mainland cars with the standard gauge of 1,435 mm ( 4 ft  8 + 1 ⁄ 2  in ) and the PEIR's narrow gauge of 3 ft 6 in ( 1,067 mm ). In September 1918, management of CGR (including PEIR)

903-495: The eastern side of the airport. The line continues eastward out of Summerside to the New Annan area, where several large potato processing factories were built. Today this is the site of major factories for Cavendish Farms , which runs two dozen factories in this area. The line runs through Kensington and then turns south to Emerald Junction , where a wye junction splits off a spur leading southwest to Borden-Carleton, serving

SECTION 20

#1732772752278

946-401: The era, small whistle-stop towns sprang up all along the line, typically where the railway crossed an existing road. These often bear the terms "Junction", "Crossing" or "Station" as part of their names. Many of these exist only as names on a map today, the dwellings long since gone. Due to its relatively recent abandonment, and especially due to maintenance as part of the rail trail conversion,

989-452: The extension was added. The line continues westward, avoiding Cascumpec Bay , which extends inland to the west for some distance. This takes the line through Elmsdale and O'Leary , where it starts bending back toward the east and south, running through Wellington (and forming Wellington Station). Here it turns east to Summerside . Just west of Summerside a wye was built to provide a spur line to service Summerside Airport , running along

1032-411: The former ferry docks. The line continues east from the junction, running east and south to Royalty Junction, just north of Charlottetown. Here a wye formed a spur serving the downtown area. The line continues away from Charlottetown running east-northeast to Mount Stewart , where it splits in a wye just west of town. The mainline continues northeast, while a major spur bends south and then southwest for

1075-620: The northeast through Bunbury. From here it runs roughly eastward to Lake Verde, where a wye provides a spur running south a short distance to a large turning loop at Vernon Bridge . With the closing of the Hillsborough bridge, a second wye was added just to the east of the first, spurring off the Short Line that runs northward to meet the Montague/Georgetown spur just south of Mount Stewart, near Maple Hill. The mainline of

1118-412: The northern edge of the original western terminus of the line at Alberton . Here the line folds back on itself, leaving town west-northwest almost parallel to the incoming line, an artifact of its later extension. The line originally bent south to run through town to the docks at Northport . The line to Northport was turned into a spur by building a large wye junction at the sharp curve that developed when

1161-515: The part of the PEI Museum & Heritage Foundation. An ex-CN caboose 78431 was acquired and moved to museum in 2009. In 1990, a diesel locomotive (class MLW RSC-14 number 1767) donated to Summerside several years earlier, needed to be moved to nearby Kensington . Although now abandoned, the railway's tracks were still intact between both locations, except for several grade crossings at local roads where rails had been removed. The locomotive

1204-470: The rails removed between 1990 and 1992, with the provincial government receiving a one-time payment of $ 200 million to upgrade the road network in exchange for not opposing the closure. The provincial government purchased the properties in 1994, and 75 per cent of the route now forms the basis of the Confederation Trail rail trail system. The station in Elmira at the eastern end of the line

1247-699: The railway was pressed into service to supply a radar base in Tignish, as well as a flight training school in Mount Pleasant , midway between Summerside and Tignish. Increased use of diesel locomotives in North America during and after the Second World War saw CNR completely dieselize its operations on Prince Edward Island by the late 1940s as a means to save money on hauling bulk coal to the province. This meant that Prince Edward Island rail lines had diesel locomotives fully one decade before

1290-568: The rest of Canada saw the last of steam , giving the province a prominent place in Canadian railway history as one of the first regional dieselization projects. The rising popularity of automobiles travelling on government-funded all-weather highways saw passenger rail traffic decline sharply during the 1950s and into the 1960s. The last passenger train on Prince Edward Island operated in 1968, being replaced by buses thereafter. CN (name change to Canadian National Railway or acronym CN in 1960)

1333-528: The route of PEIR remains easily visible in aerial and satellite photos. Steven Boyko notes on his blog Side note: RDC D302 was tested on PEI in March 1958 but "it proved unsuitable because of difficulties it encountered crossing the ferry ramp, and negotiating the sharp turns between Borden and Charlottetown". The following vessels were owned and operated by CNR/CN (1918–1977), CN Marine (CN subsidiary, 1977–1986) or by successor Marine Atlantic (post-1986) on

Prince Edward Island Railway - Misplaced Pages Continue

1376-439: The run to Montague Junction. Here a wye forms a spur running southwest to Montague and southeast and Georgetown. The mainline continues out of Mount Stewart and passes through Morell , and, on the eastern side of town, begins to parallel the northern coast of the island as far as Saint Peter's Bay. Here it leaves the coast and continues eastward to a wye at Harmony Junction, where it originally looped back westward and then south for

1419-506: The service to the port of Pictou, Nova Scotia from Georgetown and Charlottetown for the next two years. The new ferry port at Borden required the Cape Traverse-Emerald Junction line be modified, and a line was constructed to Borden, along with marshalling yards and other facilities. The Cape Traverse line would only last a few more years before being abandoned following the move to Borden. Up until this point,

1462-480: The short run to Souris. The Harmony wye made the Souris line a spur, with the mainline continuing east to its ultimate end in Elmira. Like the western end, a wye junction and spur just west of Elmira allowed the trains to turn around. The Murray Harbour Line started at the end of the mainline spur in Charlottetown, crossing the Hillsborough River Bridge (the original pilings can still be seen) before bending sharply to

1505-412: The use of icebreakers , some of which were the largest of their kind in the world at one time. Trucks soon began to take traffic away from freight operations on Prince Edward Island, particularly as CNR improved the ferry system to accept more road vehicles. By the 1970s, critical agricultural cargo such as the potato harvests were increasingly transferring to trucks with each successive season. As

1548-568: Was a major presence in Prince Edward Island's economy, from operating the freight and passenger railway (and later bus) services, to a large fleet of company owned and operated ferries. The ferry system was noteworthy by the fact that it was mandated by Prince Edward Island's "Terms of Union" under the British North America Act of Canadian Confederation , to provide "efficient steamship service." This required

1591-540: Was completed from Tignish to Charlottetown by 1924, and remaining lines in the east end of the province were completed by 1926 except for the Murray Harbour line which was standard gauged by September 1930. The last significant railway construction on Prince Edward Island occurred during the early 1930s when the Hillsborough River Bridge carrying the Murray Harbour line over the Hillsborough River

1634-609: Was instructed to take responsibility for all CGR operations as well. Later that year, the federal government created the Canadian National Railways (CNR) as a means to simplify the funding and administration of the nationalized railway system, which was formally brought about by an order issued on December 20, 1918, by the Privy Council . The Grand Trunk Pacific Railway (GTPR) was nationalized after defaulting on loan payments March 7, 1919, and entered

1677-569: Was on average one railway station for every 2.5 miles (4 km) of track. The main line connected the northwestern port of Alberton (later extended to Tignish ) with the Northumberland Strait ports of Summerside , Charlottetown , Georgetown , and Souris . By 1872, construction debts threatened to bankrupt the colony. The United Kingdom had consistently encouraged the small colony to enter into Canadian Confederation , something which it had been avoiding since playing host to

1720-532: Was removed and trains trying to reach Southport on the opposite side of Charlottetown Harbour would have to run over 30 miles (48.3 km) via Mount Stewart Junction and the Short Line . CNR was busy on Prince Edward Island during the Second World War when a 2-mile (3.2 km) spur line was built from St. Eleanors , west of Summerside, to service a new air force base ( CFB Summerside ), and

1763-407: Was towed by construction machinery across temporary tracks built over these roads to its new location, where it remains on display as part of a community-operated railway museum. The former Kensington Railway Station was designated a National Historic Site of Canada . Another railway car is currently undergoing preservation at Borden-Carleton . This car is a plywood sided, former CNR, caboose and

Prince Edward Island Railway - Misplaced Pages Continue

1806-468: Was transferred to the newly nationalized Canadian Northern Railway (CNoR). These companies were assumed by a new Crown corporation established by the federal government in December 1918, called Canadian National Railways (CNR). By 1923 all corporate entities ceased to exist under CNR. Soon after CNR took over, it was decided to standard gauge all narrow gauge trackage on Prince Edward Island. This

1849-472: Was unable to handle the heavier standard gauge cars, thus a 10-mile (16.1 km) connecting track called the Short Line was built from a point at Maple Hill Junction on the Mount Stewart Jct.-Georgetown line, to connect with the Murray Harbour track at Lake Verde Junction . In 1951, the Hillsborough River bridge was deemed too weak to carry even the lightest engines and cars, thus the trackage