An electrical grid (or electricity network ) is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations , electrical substations to step voltage up or down, electric power transmission to carry power over long distances, and finally electric power distribution to customers. In that last step, voltage is stepped down again to the required service voltage. Power stations are typically built close to energy sources and far from densely populated areas. Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids , wide area synchronous grids , and super grids . The combined transmission and distribution network is part of electricity delivery, known as the power grid .
95-613: Red Eléctrica de España ( Spanish pronunciation: [reð eˈleɣtɾika ðe esˈpaɲa] ; REE ) is a partly state-owned and public limited Spanish corporation which operates the national electricity grid in Spain , where it operates the national power transmission system . It also holds assets in Peru, Chile and Brazil. The company was created in 1985 by the State-owned holding company Instituto Nacional de Industria (INI) to provide
190-745: A greenhouse gas . According to the World Commission on Dams report, where the reservoir is large compared to the generating capacity (less than 100 watts per square metre of surface area) and no clearing of the forests in the area was undertaken prior to impoundment of the reservoir, greenhouse gas emissions from the reservoir may be higher than those of a conventional oil-fired thermal generation plant. In boreal reservoirs of Canada and Northern Europe, however, greenhouse gas emissions are typically only 2% to 8% of any kind of conventional fossil-fuel thermal generation. A new class of underwater logging operation that targets drowned forests can mitigate
285-463: A low-head hydro power plant with hydrostatic head of few meters to few tens of meters can be classified either as an SHP or an LHP. The other distinction between SHP and LHP is the degree of the water flow regulation: a typical SHP primarily uses the natural water discharge with very little regulation in comparison to an LHP. Therefore, the term SHP is frequently used as a synonym for the run-of-the-river power plant . The largest power producers in
380-433: A power outage , known as a blackout . A power outage (also called a power cut , a power out , a power blackout , power failure or a blackout ) is a loss of the electric power to a particular area. Hydroelectric Hydroelectricity , or hydroelectric power , is electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity , almost 4,210 TWh in 2023, which
475-516: A strategic alliance . TDE was said to have been acquired for 92 million euros for over 99% of the company from Union Fenosa in 2002. TDE contributed approximately some 1.5% of Red Electrica's total revenues and EBITDA. On 13 November 2014, Bolivia's government agreed to pay $ 36.5 million to Red Electrica in compensation for the nationalisation of TDE. The company owns 100% of Peruvian utility company REDESUR (Red Eléctrica del SUR) in south of Perú. REE reached 100% in this firm in 2017, after acquiring
570-459: A company that previously was ours." The Spanish Ambassador Ramon Santos said that the move was "sending a negative message that generates distrust." Following the measure, soldiers took over the corporate headquarters in Cochabamba peacefully and raised Bolivian flags. It also follows the partial nationalisation of the electric grid in 2010, including hydroelectric plants. However, in the past
665-497: A controlled flow of energy while also functionally isolating the independent AC frequencies of each side. The benefits of synchronous zones include pooling of generation, resulting in lower generation costs; pooling of load, resulting in significant equalizing effects; common provisioning of reserves, resulting in cheaper primary and secondary reserve power costs; opening of the market, resulting in possibility of long-term contracts and short term power exchanges; and mutual assistance in
760-465: A different region to ensure continuing, reliable power and diversify their loads. Interconnection also allows regions to have access to cheap bulk energy by receiving power from different sources. For example, one region may be producing cheap hydro power during high water seasons, but in low water seasons, another area may be producing cheaper power through wind, allowing both regions to access cheaper energy sources from one another during different times of
855-421: A flood and fail. Changes in the amount of river flow will correlate with the amount of energy produced by a dam. Lower river flows will reduce the amount of live storage in a reservoir therefore reducing the amount of water that can be used for hydroelectricity. The result of diminished river flow can be power shortages in areas that depend heavily on hydroelectric power. The risk of flow shortage may increase as
950-494: A hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel -powered energy plants. However, when constructed in lowland rainforest areas, where part of the forest is inundated, substantial amounts of greenhouse gases may be emitted. Construction of a hydroelectric complex can have significant environmental impact, principally in loss of arable land and population displacement. They also disrupt
1045-809: A large natural height difference between two waterways, such as a waterfall or mountain lake. A tunnel is constructed to take water from the high reservoir to the generating hall built in a cavern near the lowest point of the water tunnel and a horizontal tailrace taking water away to the lower outlet waterway. A simple formula for approximating electric power production at a hydroelectric station is: P = − η ( m ˙ g Δ h ) = − η ( ( ρ V ˙ ) g Δ h ) {\displaystyle P=-\eta \ ({\dot {m}}g\ \Delta h)=-\eta \ ((\rho {\dot {V}})\ g\ \Delta h)} where Efficiency
SECTION 10
#17327809497141140-437: A large scale within an electrical power grid . Electrical energy is stored during times when electricity is plentiful and inexpensive (especially from intermittent power sources such as renewable electricity from wind power , tidal power and solar power ) or when demand is low, and later returned to the grid when demand is high, and electricity prices tend to be higher. As of 2020 , the largest form of grid energy storage
1235-451: A larger amount of methane than those in temperate areas. Like other non-fossil fuel sources, hydropower also has no emissions of sulfur dioxide, nitrogen oxides, or other particulates. Reservoirs created by hydroelectric schemes often provide facilities for water sports , and become tourist attractions themselves. In some countries, aquaculture in reservoirs is common. Multi-use dams installed for irrigation support agriculture with
1330-428: A local power grid, it will cause safety issue like burning out. Grids are designed to supply electricity to their customers at largely constant voltages. This has to be achieved with varying demand, variable reactive loads, and even nonlinear loads, with electricity provided by generators and distribution and transmission equipment that are not perfectly reliable. Often grids use tap changers on transformers near to
1425-521: A loss of generation capacity for customers, or excess demand. This will often cause the frequency to reduce, and the remaining generators will react and together attempt to stabilize above the minimum. If that is not possible then a number of scenarios can occur. A large failure in one part of the grid — unless quickly compensated for — can cause current to re-route itself to flow from the remaining generators to consumers over transmission lines of insufficient capacity, causing further failures. One downside to
1520-569: A matter of discussing a fair price, while in Argentina they didn't even want to meet with us." The vice president of the Spanish business confederation CEOE , Arturo Fernandez, said that "Spain seems to be the film bad guy as other foreign investors aren't going through a similar situation in the region. [The Spanish government] needs to take serious measures, as these moves could be contagious and spread to other countries." de Guindos also said this
1615-592: A positive risk adjusted return, unless appropriate risk management measures are put in place. While many hydroelectric projects supply public electricity networks, some are created to serve specific industrial enterprises. Dedicated hydroelectric projects are often built to provide the substantial amounts of electricity needed for aluminium electrolytic plants, for example. The Grand Coulee Dam switched to support Alcoa aluminium in Bellingham, Washington , United States for American World War II airplanes before it
1710-548: A relatively constant water supply. Large hydro dams can control floods, which would otherwise affect people living downstream of the project. Managing dams which are also used for other purposes, such as irrigation , is complicated. In 2021 the IEA called for "robust sustainability standards for all hydropower development with streamlined rules and regulations". Large reservoirs associated with traditional hydroelectric power stations result in submersion of extensive areas upstream of
1805-540: A result of climate change . One study from the Colorado River in the United States suggest that modest climate changes, such as an increase in temperature in 2 degree Celsius resulting in a 10% decline in precipitation, might reduce river run-off by up to 40%. Brazil in particular is vulnerable due to its heavy reliance on hydroelectricity, as increasing temperatures, lower water flow and alterations in
1900-448: A small TV/radio). Even smaller turbines of 200–300 W may power a few homes in a developing country with a drop of only 1 m (3 ft). A Pico-hydro setup is typically run-of-the-river , meaning that dams are not used, but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before returning it to the stream. An underground power station is generally used at large facilities and makes use of
1995-455: A source of low-cost renewable energy. Alternatively, small hydro projects may be built in isolated areas that would be uneconomic to serve from a grid, or in areas where there is no national electrical distribution network. Since small hydro projects usually have minimal reservoirs and civil construction work, they are seen as having a relatively low environmental impact compared to large hydro. This decreased environmental impact depends strongly on
SECTION 20
#17327809497142090-414: A start-up time of the order of a few minutes. Although battery power is quicker its capacity is tiny compared to hydro. It takes less than 10 minutes to bring most hydro units from cold start-up to full load; this is quicker than nuclear and almost all fossil fuel power. Power generation can also be decreased quickly when there is a surplus power generation. Hence the limited capacity of hydropower units
2185-413: A strong concern for their impact on the environment, as they are extremely cautious about keeping in line with strict environmental standards. Concepts they have adapted are both respect for the natural environment, and conservation of biodiversity. The Bolivian Government has invested a lot of time and money into the nationalization of this expansive Spanish company, and is working towards improvements on
2280-581: A total of 1,500 terawatt-hours (TWh) of electrical energy in one full cycle" which was "about 170 times more energy than the global fleet of pumped storage hydropower plants". Battery storage capacity is not expected to overtake pumped storage during the 2020s. When used as peak power to meet demand, hydroelectricity has a higher value than baseload power and a much higher value compared to intermittent energy sources such as wind and solar. Hydroelectric stations have long economic lives, with some plants still in service after 50–100 years. Operating labor cost
2375-597: A unified national power grid. Up to 20% of Red Eléctrica is controlled by the state-owned holding company Sociedad Estatal de Participaciones Industriales (SEPI), with the remainder being free float on the Bolsa de Madrid . The firm was also formerly active in telecommunications, but in 2005 sold its unit Albura (and with it access to a 7,500 km network of optical fibre ) to Deutsche Telekom unit T-Online for €61.5 million. The company owns 5% of Portuguese counterpart Redes Energéticas Nacionais , with which it holds
2470-682: A widely connected grid is thus the possibility of cascading failure and widespread power outage . A central authority is usually designated to facilitate communication and develop protocols to maintain a stable grid. For example, the North American Electric Reliability Corporation gained binding powers in the United States in 2006, and has advisory powers in the applicable parts of Canada and Mexico. The U.S. government has also designated National Interest Electric Transmission Corridors , where it believes transmission bottlenecks have developed. A brownout
2565-452: Is hydroelectric power on a scale serving a small community or industrial plant. The definition of a small hydro project varies but a generating capacity of up to 10 megawatts (MW) is generally accepted as the upper limit. This may be stretched to 25 MW and 30 MW in Canada and the United States. Small hydro stations may be connected to conventional electrical distribution networks as
2660-524: Is three-phase . Three phase, compared to single phase, can deliver much more power for a given amount of wire, since the neutral and ground wires are shared. Further, three-phase generators and motors are more efficient than their single-phase counterparts. However, for conventional conductors one of the main losses are resistive losses which are a square law on current, and depend on distance. High voltage AC transmission lines can lose 1-4% per hundred miles. However, high-voltage direct current can have half
2755-511: Is a local grid that is usually part of the regional wide-area synchronous grid but which can disconnect and operate autonomously. It might do this in times when the main grid is affected by outages. This is known as islanding , and it might run indefinitely on its own resources. Compared to larger grids, microgrids typically use a lower voltage distribution network and distributed generators. Microgrids may not only be more resilient, but may be cheaper to implement in isolated areas. A design goal
2850-885: Is a wide-area transmission network that is intended to make possible the trade of high volumes of electricity across great distances. It is sometimes also referred to as a mega grid . Super grids can support a global energy transition by smoothing local fluctuations of wind energy and solar energy . In this context they are considered as a key technology to mitigate global warming . Super grids typically use High-voltage direct current (HVDC) to transmit electricity long distances. The latest generation of HVDC power lines can transmit energy with losses of only 1.6% per 1000 km. Electric utilities between regions are many times interconnected for improved economy and reliability. Electrical interconnectors allow for economies of scale, allowing energy to be purchased from large, efficient sources. Utilities can draw power from generator reserves from
2945-635: Is also usually low, as plants are automated and have few personnel on site during normal operation. Where a dam serves multiple purposes, a hydroelectric station may be added with relatively low construction cost, providing a useful revenue stream to offset the costs of dam operation. It has been calculated that the sale of electricity from the Three Gorges Dam will cover the construction costs after 5 to 8 years of full generation. However, some data shows that in most countries large hydropower dams will be too costly and take too long to build to deliver
Red Eléctrica de España - Misplaced Pages Continue
3040-498: Is an intentional or unintentional drop in voltage in an electrical power supply system. Intentional brownouts are used for load reduction in an emergency. The reduction lasts for minutes or hours, as opposed to short-term voltage sag (or dip). The term brownout comes from the dimming experienced by incandescent lighting when the voltage sags. A voltage reduction may be an effect of disruption of an electrical grid, or may occasionally be imposed in an effort to reduce load and prevent
3135-422: Is dammed hydroelectricity , with both conventional hydroelectric generation as well as pumped storage hydroelectricity . Developments in battery storage have enabled commercially viable projects to store energy during peak production and release during peak demand, and for use when production unexpectedly falls giving time for slower responding resources to be brought online. Two alternatives to grid storage are
3230-470: Is highest in the winter when solar energy is at a minimum. Pico hydro is hydroelectric power generation of under 5 kW . It is useful in small, remote communities that require only a small amount of electricity. For example, the 1.1 kW Intermediate Technology Development Group Pico Hydro Project in Kenya supplies 57 homes with very small electric loads (e.g., a couple of lights and a phone charger, or
3325-445: Is initially produced during construction of the project, and some methane is given off annually by reservoirs, hydro has one of the lowest lifecycle greenhouse gas emissions for electricity generation. The low greenhouse gas impact of hydroelectricity is found especially in temperate climates . Greater greenhouse gas emission impacts are found in the tropical regions because the reservoirs of power stations in tropical regions produce
3420-471: Is more than all other renewable sources combined and also more than nuclear power . Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has a dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once
3515-462: Is not an energy source, and appears as a negative number in listings. Run-of-the-river hydroelectric stations are those with small or no reservoir capacity, so that only the water coming from upstream is available for generation at that moment, and any oversupply must pass unused. A constant supply of water from a lake or existing reservoir upstream is a significant advantage in choosing sites for run-of-the-river. A tidal power station makes use of
3610-452: Is not generally used to produce base power except for vacating the flood pool or meeting downstream needs. Instead, it can serve as backup for non-hydro generators. The major advantage of conventional hydroelectric dams with reservoirs is their ability to store water at low cost for dispatch later as high value clean electricity. In 2021, the IEA estimated that the "reservoirs of all existing conventional hydropower plants combined can store
3705-410: Is often higher (that is, closer to 1) with larger and more modern turbines. Annual electric energy production depends on the available water supply. In some installations, the water flow rate can vary by a factor of 10:1 over the course of a year. Hydropower is a flexible source of electricity since stations can be ramped up and down very quickly to adapt to changing energy demands. Hydro turbines have
3800-417: Is simply rerouted while repairs are done. Because the power is often generated far from where it is consumed, the transmission system can cover great distances. For a given amount of power, transmission efficiency is greater at higher voltages and lower currents. Therefore, voltages are stepped up at the generating station, and stepped down at local substations for distribution to customers. Most transmission
3895-411: Is stored in the immediate short term by the rotational kinetic energy of the generators. Although the speed is kept largely constant, small deviations from the nominal system frequency are very important in regulating individual generators and are used as a way of assessing the equilibrium of the grid as a whole. When the grid is lightly loaded the grid frequency runs above the nominal frequency, and this
Red Eléctrica de España - Misplaced Pages Continue
3990-408: Is taken as an indication by Automatic Generation Control systems across the network that generators should reduce their output. Conversely, when the grid is heavily loaded, the frequency naturally slows, and governors adjust their generators so that more power is output ( droop speed control ). When generators have identical droop speed control settings it ensures that multiple parallel generators with
4085-632: Is that a local area produces all of the energy it uses. Example implementations include: A wide area synchronous grid , also known as an "interconnection" in North America, directly connects many generators delivering AC power with the same relative frequency to many consumers. For example, there are four major interconnections in North America (the Western Interconnection , the Eastern Interconnection ,
4180-570: Is the final stage in the delivery of power; it carries electricity from the transmission system to individual consumers. Substations connect to the transmission system and lower the transmission voltage to medium voltage ranging between 2 kV and 35 kV . But the voltage levels varies very much between different countries, in Sweden medium voltage are normally 10 kV between 20 kV . Primary distribution lines carry this medium voltage power to distribution transformers located near
4275-584: Is the maximum power output on a grid that is immediately available over a given time period, and is a far more useful figure. Most grid codes specify that the load is shared between the generators in merit order according to their marginal cost (i.e. cheapest first) and sometimes their environmental impact. Thus cheap electricity providers tend to be run flat out almost all the time, and the more expensive producers are only run when necessary. Failures are usually associated with generators or power transmission lines tripping circuit breakers due to faults leading to
4370-406: Is the process of generating electric power from sources of primary energy typically at power stations . Usually this is done with electromechanical generators driven by heat engines or the kinetic energy of water or wind. Other energy sources include solar photovoltaics , nuclear power , and geothermal power . The sum of the power outputs of generators on the grid is the production of
4465-679: The Bonneville Dam in 1937 and being recognized by the Flood Control Act of 1936 as the premier federal flood control agency. Hydroelectric power stations continued to become larger throughout the 20th century. Hydropower was referred to as "white coal". Hoover Dam 's initial 1,345 MW power station was the world's largest hydroelectric power station in 1936; it was eclipsed by the 6,809 MW Grand Coulee Dam in 1942. The Itaipu Dam opened in 1984 in South America as
4560-559: The European Energy Exchange (EEX). Each of the interconnects in North America are run at a nominal 60 Hz, while those of Europe run at 50 Hz. Neighbouring interconnections with the same frequency and standards can be synchronized and directly connected to form a larger interconnection, or they may share power without synchronization via high-voltage direct current power transmission lines ( DC ties ), or with variable-frequency transformers (VFTs), which permit
4655-806: The International Exhibition of Hydropower and Tourism , with over one million visitors 1925. By 1920, when 40% of the power produced in the United States was hydroelectric, the Federal Power Act was enacted into law. The Act created the Federal Power Commission to regulate hydroelectric power stations on federal land and water. As the power stations became larger, their associated dams developed additional purposes, including flood control , irrigation and navigation . Federal funding became necessary for large-scale development, and federally owned corporations, such as
4750-621: The Quebec Interconnection and the Texas Interconnection ). In Europe one large grid connects most of Western Europe . A wide area synchronous grid (also called an "interconnection" in North America) is an electrical grid at a regional scale or greater that operates at a synchronized frequency and is electrically tied together during normal system conditions. These are also known as synchronous zones,
4845-633: The Tennessee Valley Authority (1933) and the Bonneville Power Administration (1937) were created. Additionally, the Bureau of Reclamation which had begun a series of western US irrigation projects in the early 20th century, was now constructing large hydroelectric projects such as the 1928 Hoover Dam . The United States Army Corps of Engineers was also involved in hydroelectric development, completing
SECTION 50
#17327809497144940-583: The Vulcan Street Plant , began operating September 30, 1882, in Appleton, Wisconsin , with an output of about 12.5 kilowatts. By 1886 there were 45 hydroelectric power stations in the United States and Canada; and by 1889 there were 200 in the United States alone. At the beginning of the 20th century, many small hydroelectric power stations were being constructed by commercial companies in mountains near metropolitan areas. Grenoble , France held
5035-506: The potential energy of dammed water driving a water turbine and generator . The power extracted from the water depends on the volume and on the difference in height between the source and the water's outflow. This height difference is called the head . A large pipe (the " penstock ") delivers water from the reservoir to the turbine. This method produces electricity to supply high peak demands by moving water between reservoirs at different elevations. At times of low electrical demand,
5130-463: The IEA released a main-case forecast of 141 GW generated by hydropower over 2022–2027, which is slightly lower than deployment achieved from 2017–2022. Because environmental permitting and construction times are long, they estimate hydropower potential will remain limited, with only an additional 40 GW deemed possible in the accelerated case. In 2021 the IEA said that major modernisation refurbishments are required. Most hydroelectric power comes from
5225-530: The Minister of Hydrocarbons and Energy, to negotiate the compensation from which the nationalization of TDE. Since the company had been bought, a large 74+ million dollar investment had been made in the maintenance, and additional projects that this company has broken through. In collaboration with Empresa Nacional de Electricidad (ENDE) , they ensure that advances in the quality of the electrical grid have been made and there are no current problems. They display
5320-487: The World's population, had no access to grid electricity in 2017, down from 1.2 billion in 2010. Electrical grids can be prone to malicious intrusion or attack; thus, there is a need for electric grid security . Also as electric grids modernize and introduce computer technology, cyber threats start to become a security risk. Particular concerns relate to the more complex computer systems needed to manage grids. A microgrid
5415-464: The ability to transport particles heavier than itself downstream. This has a negative effect on dams and subsequently their power stations, particularly those on rivers or within catchment areas with high siltation. Siltation can fill a reservoir and reduce its capacity to control floods along with causing additional horizontal pressure on the upstream portion of the dam. Eventually, some reservoirs can become full of sediment and useless or over-top during
5510-463: The area, connecting the electricity generators with consumers. Grids can enable more efficient electricity markets . Although electrical grids are widespread, as of 2016 , 1.4 billion people worldwide were not connected to an electricity grid. As electrification increases, the number of people with access to grid electricity is growing. About 840 million people (mostly in Africa), which is ca. 11% of
5605-595: The balance between stream flow and power production. Micro hydro means hydroelectric power installations that typically produce up to 100 kW of power. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without purchase of fuel. Micro hydro systems complement photovoltaic solar energy systems because in many areas water flow, and thus available hydro power,
5700-622: The business and investment climate in Bolivia. We trust the Bolivian authorities will fully uphold their investment agreements with Spain and ensure prompt and adequate compensation for this expropriation." Spanish Finance Minister Luis de Guindos added that "the Spanish government does not like these sorts of decisions as we believe it's fundamental to maintain legal security when investing in countries like Bolivia." REE shares also fell 3.6% in early trading, though they recovered slightly later in
5795-611: The compensation with France's GDF Suez and the United Kingdom's Rurelec PLC has not yet been accomplished. Rurelec also took the case for compensation to the Permanent Court of Arbitration . Reactions include one from the European Commission, which said that it was "concerned by the Bolivian government's decision. Actions like this one necessarily send a negative signal to international investors over
SECTION 60
#17327809497145890-467: The consumers to adjust the voltage and keep it within specification. In a synchronous grid all the generators must run at the same frequency, and must stay very nearly in phase with each other and the grid. Generation and consumption must be balanced across the entire grid, because energy is consumed as it is produced. For rotating generators, a local governor regulates the driving torque, maintaining almost constant rotation speed as loading changes. Energy
5985-429: The course of a whole 24 hour period. An entire synchronous grid runs at the same frequency, neighbouring grids would not be synchronised even if they run at the same nominal frequency. High-voltage direct current lines or variable-frequency transformers can be used to connect two alternating current interconnection networks which are not synchronized with each other. This provides the benefit of interconnection without
6080-456: The customer's premises. Distribution transformers again lower the voltage to the utilization voltage . Customers demanding a much larger amount of power may be connected directly to the primary distribution level or the subtransmission level. Distribution networks are divided into two types, radial or network. In cities and towns of North America, the grid tends to follow the classic radially fed design. A substation receives its power from
6175-404: The daily rise and fall of ocean water due to tides; such sources are highly predictable, and if conditions permit construction of reservoirs, can also be dispatchable to generate power during high demand periods. Less common types of hydro schemes use water's kinetic energy or undammed sources such as undershot water wheels . Tidal power is viable in a relatively small number of locations around
6270-505: The dams, sometimes destroying biologically rich and productive lowland and riverine valley forests, marshland and grasslands. Damming interrupts the flow of rivers and can harm local ecosystems, and building large dams and reservoirs often involves displacing people and wildlife. The loss of land is often exacerbated by habitat fragmentation of surrounding areas caused by the reservoir. Hydroelectric projects can be disruptive to surrounding aquatic ecosystems both upstream and downstream of
6365-705: The effect of forest decay. Another disadvantage of hydroelectric dams is the need to relocate the people living where the reservoirs are planned. In 2000, the World Commission on Dams estimated that dams had physically displaced 40–80 million people worldwide. Because large conventional dammed-hydro facilities hold back large volumes of water, a failure due to poor construction, natural disasters or sabotage can be catastrophic to downriver settlements and infrastructure. During Typhoon Nina in 1975 Banqiao Dam in Southern China failed when more than
6460-508: The event of disturbances. One disadvantage of a wide-area synchronous grid is that problems in one part can have repercussions across the whole grid. For example, in 2018 Kosovo used more power than it generated due to a dispute with Serbia , leading to the phase across the whole synchronous grid of Continental Europe lagging behind what it should have been. The frequency dropped to 49.996 Hz. This caused certain kinds of clocks to become six minutes slow. A super grid or supergrid
6555-399: The excess generation capacity is used to pump water into the higher reservoir, thus providing demand side response . When the demand becomes greater, water is released back into the lower reservoir through a turbine. In 2021 pumped-storage schemes provided almost 85% of the world's 190 GW of grid energy storage and improve the daily capacity factor of the generation system. Pumped storage
6650-482: The final 45%. Redesur operates the electricity system of southern Peru, and controls 100% of Transmisora Eléctrica del Sur (Tesur) and 75% of Transmisora Eléctrica del Sur 2 (Tesur2). REE owned-grid covers 74% of Bolivian electrical use, and the Bolivian government is making attempts to nationalize REE's subordinate company, Transportadora de Electricidad (TDE). Chairman José Folgado arrived in La Paz with Juan José Sosa,
6745-494: The grid, typically measured in gigawatts (GW). Electric power transmission is the bulk movement of electrical energy from a generating site, via a web of interconnected lines, to an electrical substation , from which is connected to the distribution system. This networked system of connections is distinct from the local wiring between high-voltage substations and customers. Transmission networks are complex with redundant pathways. Redundancy allows line failures to occur and power
6840-453: The hands of the state before these privatisations. Foreign investment can come to different areas. All we're expecting is that they comply with the rules of the country." Grid (electricity) Grids are nearly always synchronous, meaning all distribution areas operate with three phase alternating current (AC) frequencies synchronized (so that voltage swings occur at almost the same time). This allows transmission of AC power throughout
6935-501: The largest amount for the region since 1990. Meanwhile, globally, hydropower generation increased by 70 TWh (up 2%) in 2022 and remains the largest renewable energy source, surpassing all other technologies combined. Hydropower has been used since ancient times to grind flour and perform other tasks. In the late 18th century hydraulic power provided the energy source needed for the start of the Industrial Revolution . In
7030-518: The largest of which is the synchronous grid of Continental Europe (ENTSO-E) with 667 gigawatts (GW) of generation, and the widest region served being that of the IPS/UPS system serving countries of the former Soviet Union. Synchronous grids with ample capacity facilitate electricity market trading across wide areas. In the ENTSO-E in 2008, over 350,000 megawatt hours were sold per day on
7125-750: The largest, producing 14 GW , but was surpassed in 2008 by the Three Gorges Dam in China at 22.5 GW . Hydroelectricity would eventually supply some countries, including Norway , Democratic Republic of the Congo , Paraguay and Brazil , with over 85% of their electricity. In 2021 the International Energy Agency (IEA) said that more efforts are needed to help limit climate change . Some countries have highly developed their hydropower potential and have very little room for growth: Switzerland produces 88% of its potential and Mexico 80%. In 2022,
7220-616: The late 19th century, the electrical generator was developed and could now be coupled with hydraulics. The growing demand arising from the Industrial Revolution would drive development as well. In 1878, the world's first hydroelectric power scheme was developed at Cragside in Northumberland , England, by William Armstrong . It was used to power a single arc lamp in his art gallery. The old Schoelkopf Power Station No. 1 , US, near Niagara Falls , began to produce electricity in 1881. The first Edison hydroelectric power station,
7315-542: The losses of AC. Over very long distances, these efficiencies can offset the additional cost of the required AC/DC converter stations at each end. Substations may perform many different functions but usually transform voltage from low to high (step up) and from high to low (step down). Between the generator and the final consumer, the voltage may be transformed several times. The three main types of substations, by function, are: Aside from transformers, other major components or functions of substations include: Distribution
7410-488: The mid-1700s, French engineer Bernard Forest de Bélidor published Architecture Hydraulique , which described vertical- and horizontal-axis hydraulic machines, and in 1771 Richard Arkwright 's combination of water power , the water frame , and continuous production played a significant part in the development of the factory system, with modern employment practices. In the 1840s, hydraulic power networks were developed to generate and transmit hydro power to end users. By
7505-651: The natural ecology of the river involved, affecting habitats and ecosystems, and siltation and erosion patterns. While dams can ameliorate the risks of flooding, dam failure can be catastrophic. In 2021, global installed hydropower electrical capacity reached almost 1,400 GW, the highest among all renewable energy technologies. Hydroelectricity plays a leading role in countries like Brazil, Norway and China. but there are geographical limits and environmental issues. Tidal power can be used in coastal regions. China added 24 GW in 2022, accounting for nearly three-quarters of global hydropower capacity additions. Europe added 2 GW,
7600-694: The need to synchronize an even wider area. For example, compare the wide area synchronous grid map of Europe with the map of HVDC lines. The sum of the maximum power outputs ( nameplate capacity ) of the generators attached to an electrical grid might be considered to be the capacity of the grid. However, in practice, they are never run flat out simultaneously. Typically, some generators are kept running at lower output powers ( spinning reserve ) to deal with failures as well as variation in demand. In addition generators can be off-line for maintenance or other reasons, such as availability of energy inputs (fuel, water, wind, sun etc.) or pollution constraints. Firm capacity
7695-633: The plant site. Generation of hydroelectric power changes the downstream river environment. Water exiting a turbine usually contains very little suspended sediment, which can lead to scouring of river beds and loss of riverbanks. The turbines also will kill large portions of the fauna passing through, for instance 70% of the eel passing a turbine will perish immediately. Since turbine gates are often opened intermittently, rapid or even daily fluctuations in river flow are observed. Drought and seasonal changes in rainfall can severely limit hydropower. Water may also be lost by evaporation. When water flows it has
7790-450: The rainfall regime, could reduce total energy production by 7% annually by the end of the century. Lower positive impacts are found in the tropical regions. In lowland rainforest areas, where inundation of a part of the forest is necessary, it has been noted that the reservoirs of power plants produce substantial amounts of methane . This is due to plant material in flooded areas decaying in an anaerobic environment and forming methane,
7885-502: The rest is controlled by smaller companies in the eastern lowlands which are not attached to the national grid. President Evo Morales said though REE would be compensated, it had invested US$ 81 million since the grid's privatisation in 1997 and the government had "invested $ 220m in generation and others profited. For that reason, brothers and sisters, we have decided to nationalise electricity transmission. Just to make it clear to national and international public opinion, we are nationalising
7980-515: The same settings share load in proportion to their rating. In addition, there's often central control, which can change the parameters of the AGC systems over timescales of a minute or longer to further adjust the regional network flows and the operating frequency of the grid. For timekeeping purposes, the nominal frequency will be allowed to vary in the short term, but is adjusted to prevent line-operated clocks from gaining or losing significant time over
8075-490: The subsidiary, as long with compensation as well. Efforts are still being made to nationalize this company, along with all other subsidiary companies affiliated with REE. On 1 May 2012, the Bolivian government announced its plans to nationalise REE's subsidiary in the country, Transportadora de Electricidad (TDE). The electric grid covers 74% of Bolivia's total grid, or 2,772 kilometres (1,722 mi) of transmission lines;
8170-404: The substation, but for reliability reasons, usually contains at least one unused backup connection to a nearby substation. This connection can be enabled in case of an emergency, so that a portion of a substation's service territory can be alternatively fed by another substation. Grid energy storage (also called large-scale energy storage ) is a collection of methods used for energy storage on
8265-447: The trading session. Though parallels were made in the media with Argentina's nationalisation of YPF from Spain's Repsol , sources in the Bolivian government were reported to have told Repsol chairman Antonio Brufau that their investment on a new gas plant of about 100 million euros was safe. An anonymous Spanish diplomat said that the reaction was much more muted than with Argentina as "the diplomatic channels are open here, and it's all
8360-433: The transmission network, the power is stepped down with a transformer and sent to a bus from which feeders fan out in all directions across the countryside. These feeders carry three-phase power, and tend to follow the major streets near the substation. As the distance from the substation grows, the fanout continues as smaller laterals spread out to cover areas missed by the feeders. This tree-like structure grows outward from
8455-414: The use of peaking power plants to fill in supply gaps and demand response to shift load to other times. The demand, or load on an electrical grid is the total electrical power being removed by the users of the grid. The graph of the demand over time is called the demand curve . Baseload is the minimum load on the grid over any given period, peak demand is the maximum load. Historically, baseload
8550-524: The world are hydroelectric power stations, with some hydroelectric facilities capable of generating more than double the installed capacities of the current largest nuclear power stations . Although no official definition exists for the capacity range of large hydroelectric power stations, facilities from over a few hundred megawatts are generally considered large hydroelectric facilities. Currently, only seven facilities over 10 GW ( 10,000 MW ) are in operation worldwide, see table below. Small hydro
8645-539: The world. The classification of hydropower plants starts with two top-level categories: The classification of a plant as an SHP or LHP is primarily based on its nameplate capacity , the threshold varies by the country, but in any case a plant with the capacity of 50 MW or more is considered an LHP. As an example, for China, SHP power is below 25 MW, for India - below 15 MW, most of Europe - below 10 MW. The SHP and LHP categories are further subdivided into many subcategories that are not mutually exclusive. For example,
8740-485: The year. Neighboring utilities also help others to maintain the overall system frequency and also help manage tie transfers between utility regions. Electricity Interconnection Level (EIL) of a grid is the ratio of the total interconnector power to the grid divided by the installed production capacity of the grid. Within the EU, it has set a target of national grids reaching 10% by 2020, and 15% by 2030. Electricity generation
8835-586: Was allowed to provide irrigation and power to citizens (in addition to aluminium power) after the war. In Suriname , the Brokopondo Reservoir was constructed to provide electricity for the Alcoa aluminium industry. New Zealand 's Manapouri Power Station was constructed to supply electricity to the aluminium smelter at Tiwai Point . Since hydroelectric dams do not use fuel, power generation does not produce carbon dioxide . While carbon dioxide
8930-404: Was commonly met by equipment that was relatively cheap to run, that ran continuously for weeks or months at a time, but globally this is becoming less common. The extra peak demand requirements are sometimes produced by expensive peaking plants that are generators optimised to come on-line quickly but these too are becoming less common. However, if the demand of electricity exceed the capacity of
9025-450: Was less damaging than YPF's re-nationalisation as the investment was less and that the moves in both countries "have medium-term implications in terms of these countries' economic development and for the security of investments, which are vital." For its part, Bolivian Vice President Álvaro García Linera said, on a visit to the U.K., that "we're just fulfilling the promise we made when we were elected, to recover all these areas that were in