Misplaced Pages

Wind farm

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

A regional transmission organization ( RTO ) in the United States is an electric power transmission system operator (TSO) that coordinates, controls, and monitors a multi-state electric grid . The transfer of electricity between states is considered interstate commerce, and electric grids spanning multiple states are therefore regulated by the Federal Energy Regulatory Commission (FERC). The voluntary creation of RTOs was initiated by FERC in December 1999. The purpose of the RTO is to promote economic efficiency, reliability, and non-discriminatory practices while reducing government oversight.

#681318

120-532: A wind farm or wind park , or wind power plant , is a group of wind turbines in the same location used to produce electricity . Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore . Many of the largest operational onshore wind farms are located in China, India, and the United States. For example,

240-573: A US-based ISO. Within the United States one ISO, and its participating utilities, does not fall under FERC authority: The Electric Reliability Council of Texas (ERCOT) . ERCOT falls under the authority of NERC and operates a reliability function, separate from its market function, in order to comply with NERC requirements. ISOs act as a marketplace operator in wholesale power, resulting from FERC order No. 888. Most are set up as nonprofit corporations using governance models approved by FERC and/or regional or local commissions. There are regions of

360-402: A blade length up to 80 meters (260 ft). Designs with 10 to 12 MW were in preparation in 2018, and a "15 MW+" prototype with three 118-metre (387 ft) blades is planned to be constructed in 2022. The average hub height of horizontal axis wind turbines is 90 meters. Vertical-axis wind turbines (or VAWTs) have the main rotor shaft arranged vertically. One advantage of this arrangement

480-408: A diverse membership including public power. Wider membership contributes to the establishment of an entity with the size necessary to function as an RTO. In the 1990s, as states and regions in the United States established wholesale competition for electricity, groups of utilities and their federal and state regulators began forming independent transmission operators that would ensure equal access to

600-470: A drop in tourism. Some critics claim that wind farms have adverse health effects, but most researchers consider these claims to be pseudoscience (see wind turbine syndrome ). Wind farms can interfere with radar, although in most cases, according to the US Department of Energy, "siting and other mitigations have resolved conflicts and allowed wind projects to co-exist effectively with radar". Location

720-492: A full replacement by carbon fiber would save 80% of weight but increase costs by 150%, while a 30% replacement would save 50% of weight and increase costs by 90%. Hybrid reinforcement materials include E-glass/carbon, E-glass/aramid. The current longest blade by LM Wind Power is made of carbon/glass hybrid composites. More research is needed about the optimal composition of materials. Regional transmission organization (North America) An independent system operator ( ISO )

840-441: A gearbox, which turns the slow rotation of the blades into a quicker rotation that is more suitable to drive an electrical generator. Some turbines use a different type of generator suited to slower rotational speed input. These don't need a gearbox and are called direct-drive, meaning they couple the rotor directly to the generator with no gearbox in between. While permanent magnet direct-drive generators can be more costly due to

960-412: A greater friction moment and thus a lower power coefficient. The air velocity is the major contributor to the turbine efficiency. This is the reason for the importance of choosing the right location. The wind velocity will be high near the shore because of the temperature difference between the land and the ocean. Another option is to place turbines on mountain ridges. The higher the wind turbine will be,

1080-466: A list of capable areas is constructed, the list is refined based on long term wind measurements, among other environmental or technical limiting factors such as proximity to load and land procurement. Many independent system operators (ISOs) in the United States such as the California ISO and Midcontinent ISO use interconnection request queues to allow developers to propose a new generation for

1200-474: A lower blade speed ratio, which lowers blade bending stresses. Straight, V, or curved blades may be used. These are drag-type devices with two (or more) scoops that are used in anemometers, Flettner vents (commonly seen on bus and van roofs), and in some high-reliability low-efficiency power turbines. They are always self-starting if there are at least three scoops. Twisted Savonius is a modified savonius, with long helical scoops to provide smooth torque. This

1320-481: A maximum capacity of 1.65 MW, for a total of 24.75 MW. The 15 on-shore turbines are spaced 326 metres (1,070 ft) apart, each 70 metres (230 ft) high, with 41 metres (135 ft) long blades, with a rotor diameter of 82 metres (269 ft) and a wind swept area of 5,281 square metres (56,840 sq ft). Phase II was completed in August 2008, and added 5 more wind turbines with the same capacity, and brought

SECTION 10

#1732772179682

1440-427: A minimum of 3.5 times the turbine's rotor diameter of clear space between each adjacent turbine's respective spatial envelope. Closer spacing is possible depending on the turbine model, the conditions at the site, and how the site will be operated. Airflows slow as they approach an obstacle, known as the 'blockage effect', reducing available wind power by 2% for the turbines in front of other turbines. The capacity of

1560-469: A nonprofit corporation, is not a regional transmission organization (RTO) and has no plans to become one, but instead seeks to achieve many of the benefits of an RTO through incremental additions to its functions. ColumbiaGrid was formed after some of its members chose not to continue in efforts to form Grid West, a Northwest evolutionary structure with the ability to add functions and to move toward independent grid management. The ColumbiaGrid members, including

1680-584: A series of batteries . The batteries powered various electrical tools and lamps, as well as a threshing machine. Friedländer's windmill and its accessories were prominently installed at the north entrance to the main exhibition hall (" Rotunde ") in the Vienna Prater . In July 1887, Scottish academic James Blyth installed a battery-charging machine to light his holiday home in Marykirk , Scotland. Some months later, American inventor Charles F. Brush

1800-498: A single wind turbine for testing purposes have been built. One such installation is Østerild Wind Turbine Test Field . Airborne wind farms have been envisaged. Such wind farms are a group of airborne wind energy systems located close to each other connected to the grid at the same point. Wind farms consisting of diverse wind turbines have been proposed in order to efficiently use wider ranges of wind speeds. Such wind farms are proposed to be projected under two criteria: maximization of

1920-458: A specific given area and grid interconnection. These request queues have both deposit costs at the time of request and ongoing costs for the studies the ISO will make for up to years after the request was submitted to ascertain the viability of the interconnection due to factors such as ATC. Larger corporations who can afford to bid the most queues will most likely have market power as to which sites with

2040-417: A stable environment. Different materials have varying effects on the efficiency of wind turbines. In an Ege University experiment, three wind turbines, each with three blades with a diameter of one meter, were constructed with blades made of different materials: A glass and glass/carbon epoxy , glass/carbon, and glass/polyester. When tested, the results showed that the materials with higher overall masses had

2160-464: A total capacity of 539 MW. An important limiting factor of wind power is variable power generated by wind farms. In most locations the wind blows only part of the time, which means that there has to be back-up capacity of dispatchable generation capacity to cover periods that the wind is not blowing. To address this issue it has been proposed to create a " supergrid " to connect national grids together across western Europe , ranging from Denmark across

2280-647: A tunnel like pass towards areas of lower pressure and flatter land. Passes used for wind farms like the San Gorgonio Pass and Altamont Pass are known for their abundant wind resource capacity and capability for large-scale wind farms. These types of passes were the first places in the 1980s to have heavily invested large-scale wind farms after approval for wind energy development by the U.S. Bureau of Land Management. From these wind farms, developers learned much about turbulence and crowding effects of large-scale wind projects, which were previously unresearched, in

2400-419: Is a major drawback. Vertical turbine designs have much lower efficiency than standard horizontal designs. The key disadvantages include the relatively low rotational speed with the consequential higher torque and hence higher cost of the drive train, the inherently lower power coefficient , the 360-degree rotation of the aerofoil within the wind flow during each cycle and hence the highly dynamic loading on

2520-431: Is approximately 50% of the building height it is near the optimum for maximum wind energy and minimum wind turbulence. While wind speeds within the built environment are generally much lower than at exposed rural sites, noise may be a concern and an existing structure may not adequately resist the additional stress. Subtypes of the vertical axis design include: "Eggbeater" turbines, or Darrieus turbines, were named after

SECTION 20

#1732772179682

2640-416: Is commonplace, and rules or recommendations introduced by FERC often are voluntarily accepted by NERC members outside of FERC's jurisdiction. Therefore, one Canadian Province is a member of a U.S.-based RTO, while two others function as an Electric System Operator (ESO), an organization essentially equal to a U.S.-based ISO. Some ISOs and RTOs also act as a marketplace in wholesale power, especially since

2760-415: Is critical to the overall success of a wind farm. Additional conditions contributing to a successful wind farm location include: wind conditions, access to electric transmission, physical access, and local electricity prices. The faster the average wind speed, the more electricity the wind turbine will generate, so faster winds are generally economically better for wind farm developments. The balancing factor

2880-405: Is crucial to determining site potential in order to finance the project. Local winds are often monitored for a year or more, detailed wind maps are constructed, along with rigorous grid capability studies conducted, before any wind generators are installed. The wind blows faster at higher altitudes because of the reduced influence of drag. The increase in velocity with altitude is most dramatic near

3000-570: Is currently developing wind power plants in Jhimpir and Mirpur Sakro (District Thatta). The government of Pakistan decided to develop wind power energy sources due to problems supplying energy to the southern coastal regions of Sindh and Balochistan. The Zorlu Energy Putin Power Plant is the first wind power plant in Pakistan. The wind farm is being developed in Jhimpir, by Zorlu Energy Pakistan

3120-623: Is determined by the stiffness of fibers and their volume content. Typically, E-glass fibers are used as main reinforcement in the composites. Typically, the glass/epoxy composites for wind turbine blades contain up to 75% glass by weight. This increases the stiffness, tensile and compression strength. A promising composite material is glass fiber with modified compositions like S-glass, R-glass etc. Other glass fibers developed by Owens Corning are ECRGLAS, Advantex and WindStrand. Carbon fiber has more tensile strength, higher stiffness and lower density than glass fiber. An ideal candidate for these properties

3240-448: Is finding areas with adequate available transfer capability (ATC). ATC is the measure of the remaining capacity in a transmission system available for further integration of two interconnected areas without significant upgrades to existing transmission lines and substations. Significant equipment upgrades have substantial costs, potentially undermining the viability of a project within a location, regardless of wind resource availability. Once

3360-757: Is more efficient than providing them on a smaller-scale, utility by utility. Today's power industry is far more than a collection of power plants and transmission lines. Maintaining an effective grid requires management of three different but related sets of flows – the flow of energy across the grid; the exchange of information about power flows and the equipment it moves across; and the flow of money between producers, marketers, transmission owners, buyers and others. ISO/RTOs play an essential role in managing and enhancing all three of these flows. As of 2023 there are ten ISO/RTOs operating in North America: Non-RTO transmission organizations: ColumbiaGrid,

3480-707: Is mostly facilitated through bilateral contracts and power purchase agreements . There are nine ISOs within North America: The New Brunswick System Operator ( NBSO ) was dissolved when New Brunswick's new Electricity Act went into effect in October 2013. An RTO is an organization formed at the approval of the Federal Energy Regulatory Commission (FERC). In the areas where an RTO is established, it coordinates, controls and monitors

3600-432: Is often cited as the "Deregulation" of the electric industry. Deregulation, however, is not an accurate term. In actuality, the electricity industry is still regulated, depending on the region, by a series of federal, state, and local agencies and various public commissions. Order No. 888 is substantial in scope. Relative to this article, however, it defined two key elements: In addressing #1 above, Order No. 888 defined

3720-574: Is often used as a rooftop wind turbine and has even been adapted for ships . Airborne wind turbines consist of wings or a small aircraft tethered to the ground. They are useful for reaching faster winds above which traditional turbines can operate. There are prototypes in operation in east Africa. These are offshore wind turbines that are supported by a floating platform. By having them float, they are able to be installed in deeper water allowing more of them. This also allows them to be further out of sight from land and therefore less public concern about

Wind farm - Misplaced Pages Continue

3840-593: Is pursuing several proposed locations in the Great Lakes , including the suspended Trillium Power Wind 1 approximately 20 km from shore and over 400 MW in size. Other Canadian projects include one on the Pacific west coast. In 2010, there were no offshore wind farms in the United States, but projects were under development in wind-rich areas of the East Coast, Great Lakes, and Pacific coast; and in late 2016

3960-442: Is similarly an organization formed at the recommendation of FERC. In the areas where an ISO is established, it coordinates, controls, and monitors the operation of the electrical power system, usually within a single US state, but sometimes encompassing multiple states. RTOs typically perform the same functions as ISOs, but cover a larger geographic area. The two are similar, with an RTO being more clearly defined and born out of

4080-465: Is that strong gusts and high turbulence require stronger more expensive turbines, otherwise there is a risk of damage. The average power in the wind is not proportional to the average wind speed. For this reason, the ideal wind conditions would be strong but consistent winds with low turbulence coming from a single direction. Mountain passes are ideal locations for wind farms under these conditions. Mountain passes channel wind, blocked by mountains, through

4200-520: Is that the turbine does not need to be pointed into the wind to be effective, which is an advantage on a site where the wind direction is highly variable. It is also an advantage when the turbine is integrated into a building because it is inherently less steerable. Also, the generator and gearbox can be placed near the ground, using a direct drive from the rotor assembly to the ground-based gearbox, improving accessibility for maintenance. However, these designs produce much less energy averaged over time, which

4320-448: Is the spar cap, a structural element of a blade that experiences high tensile loading. A 100-metre (330 ft) glass fiber blade could weigh up to 50 tonnes (110,000 lb), while using carbon fiber in the spar saves 20% to 30% weight, about 15 tonnes (33,000 lb). Instead of making wind turbine blade reinforcements from pure glass or pure carbon, hybrid designs trade weight for cost. For example, for an 8-metre (26 ft) blade,

4440-478: The Block Island Wind Farm was commissioned. Installation and service / maintenance of off-shore wind farms are a challenge for technology and economic operation of a wind farm. As of 2015, there are 20 jackup vessels for lifting components, but few can lift sizes above 5 MW. Service vessels have to be operated nearly 24/7 (availability higher than 80% of time) to get sufficient amortisation from

4560-648: The Bonneville Power Administration , several Washington State public utilities and two investor-owned utilities, wanted an organization with more limited functions and no independent ability to change. ColumbiaGrid performs single-utility transmission planning and expansion via an open and transparent process and is also establishing a multi-system OASIS portal. The former Grid West participants who had argued for an eventual RTO, mainly investor-owned utilities and state representatives from Oregon , Idaho , Montana , Wyoming and Utah , formed

4680-553: The London Array (630 MW) also in the UK. Offshore wind turbines are less obtrusive than turbines on land, as their apparent size and noise is mitigated by distance. Because water has less surface roughness than land (especially deeper water), the average wind speed is usually considerably higher over open water. Capacity factors (utilisation rates) are considerably higher than for onshore locations. The province of Ontario, Canada

4800-502: The Open Access Same-time Information System (OASIS) (formerly real-time information networks) and prescribed standards of conduct for its use and access. Subsequent orders provided clarifications, standards and protocols. Where as Order No. 888 provided for an entity (an ISO) to facilitate open access, it was not written with the intent to establish one. FERC Order No. 2000 was: Issued by

4920-749: The Western Cape region. These include the 100 MW Sere Wind Farm and the 138 MW Gouda Wind Facility . Most future wind farms in South Africa are earmarked for locations along the Eastern Cape coastline. Eskom has constructed one small scale prototype windfarm at Klipheuwel in the Western Cape and another demonstrator site is near Darling with phase 1 completed. The first commercial wind farm, Coega Wind Farm in Port Elisabeth,

Wind farm - Misplaced Pages Continue

5040-498: The electricity market restructuring of the late 1990s. Most are set up as nonprofit corporations using governance models developed by FERC. FERC Orders 888 and 889 defined how independent power producers (IPPs) and power marketers would be allowed fair access to transmission systems, and mandated the implementation of the Open Access Same-Time Information System (OASIS) to facilitate

5160-465: The largest wind farm in the world , Gansu Wind Farm in China had a capacity of over 6,000  MW by 2012, with a goal of 20,000 MW by 2020. As of December 2020, the 1218 MW Hornsea Wind Farm in the UK is the largest offshore wind farm in the world . Individual wind turbine designs continue to increase in power , resulting in fewer turbines being needed for the same total output. Because they require no fuel, wind farms have less impact on

5280-405: The vertically integrated electric utility with a transmission system designed to serve its own customers worked extremely well for decades. As dependence on a reliable supply of electricity grew and electricity was transported over increasingly greater distances, power pools were formed and interconnections developed. Transactions were relatively few and generally planned well in advance. In

5400-428: The "lowest relative greenhouse gas emissions, the least water consumption demands and the most favorable social impacts" compared to photovoltaic , hydro , geothermal , coal and gas energy sources. Smaller wind turbines are used for applications such as battery charging and remote devices such as traffic warning signs. Larger turbines can contribute to a domestic power supply while selling unused power back to

5520-501: The 11th and 12th centuries; there are reports of German crusaders taking their windmill-making skills to Syria around 1190. By the 14th century, Dutch windmills were in use to drain areas of the Rhine delta. Advanced wind turbines were described by Croatian inventor Fausto Veranzio in his book Machinae Novae (1595). He described vertical axis wind turbines with curved or V-shaped blades. The first electricity-generating wind turbine

5640-617: The 7th century. These " Panemone " were vertical axle windmills, which had long vertical drive shafts with rectangular blades. Made of six to twelve sails covered in reed matting or cloth material, these windmills were used to grind grain or draw up water, and were used in the gristmilling and sugarcane industries. Wind power first appeared in Europe during the Middle Ages . The first historical records of their use in England date to

5760-592: The Asian Development Bank amounting to $ 300 million to invest in renewable energies. From this funding as well as $ 80 million from the Sri Lankan Government and $ 60 million from France's Agence Française de Développement, Sri Lanka was expected to build two 100MW wind farms from 2017 due to be completed by late 2020 in northern Sri Lanka. As of September 2015, a number of sizable wind farms have been constructed in South Africa mostly in

5880-521: The Betz limit of power extractable from the wind, at rated operating speed. Efficiency can decrease slightly over time, one of the main reasons being dust and insect carcasses on the blades, which alter the aerodynamic profile and essentially reduce the lift to drag ratio of the airfoil . Analysis of 3128 wind turbines older than 10 years in Denmark showed that half of the turbines had no decrease, while

6000-555: The Chinese wind industry appeared unaffected by the financial crisis of 2007–2008 , according to industry observers. According to the Global Wind Energy Council , the development of wind energy in China, in terms of scale and rhythm, is unparalleled in the world. The National People's Congress permanent committee passed a law that requires the Chinese energy companies to purchase all the electricity produced by

6120-638: The FERC for approval, and meet 4 minimum characteristics and 8 minimum functions: Only electric utilities that are located within the United States fall under FERC authority, but a larger organization called the North American Electric Reliability Corporation (NERC) overlays the entire FERC footprint and also includes a Mexican utility and several Canadian utilities. As such, international reciprocity

SECTION 50

#1732772179682

6240-455: The FERC on December 29, 1999, Order No. 2000 codified what it means to be an RTO including its minimum characteristics, functions and ratemaking policy. The order also stated its commitment toward open architecture with a stated goal that an RTO "...be designed so that they can evolve over time." The order still, however, does not mandate that a new entity called an RTO be created, nor does it mandate that an entity call itself an RTO to comply with

6360-520: The FERC's order. An ISO is an organization formed at the direction or recommendation of the Federal Energy Regulatory Commission (FERC) . In the areas where an ISO is established, it coordinates, controls and monitors the operation of the electrical power system, usually within a single US State, but sometimes encompassing multiple states. Similar to an RTO, the primary difference is that ISOs either do not meet

6480-413: The FERC, for the right to establish designs of independent system operations. Through negotiation, collaboration and legal challenges, the first ISOs to emerge included California ISO, PJM Interconnection, New York ISO and New England ISO. Each proposed a slightly different market design according to their collaborative results. In order to facilitate competitive wholesale markets, Order No. 888 specified

6600-470: The French inventor, Georges Darrieus. They have good efficiency, but produce large torque ripple and cyclical stress on the tower, which contributes to poor reliability. They also generally require some external power source, or an additional Savonius rotor to start turning, because the starting torque is very low. The torque ripple is reduced by using three or more blades, which results in greater solidity of

6720-547: The Gharo wind corridor, two wind farms (Foundation Energy 1 & II each 49.5 MW) are operational while two wind farms Tenaga Generasi Limited 49.5 MW and HydroChina Dawood Power Pvt. Limited 49.5 are under construction and expected to achieve COD in 2017. According to a USAID report, Pakistan has the potential of producing 150,000 megawatts of wind energy, of which the Sindh corridor can produce 40,000 megawatts. The Philippines has

6840-556: The Netherlands, Norway, Sweden and the United Kingdom, with a combined operating capacity of 2,396 MW. More than 100 GW (or 100,000 MW) of offshore projects are proposed or under development in Europe. The European Wind Energy Association set a target of 40 GW installed by 2020 and 150 GW by 2030. As of 2017, The Walney Wind Farm in the United Kingdom is the largest offshore wind farm in the world at 659 MW , followed by

6960-467: The U.S. due to the lack of operational wind farms large enough to conduct these types of studies. Usually sites are screened on the basis of a wind atlas , and validated with on-site wind measurements via long term or permanent meteorological-tower data using anemometers and wind vanes . Meteorological wind data alone is usually not sufficient for accurate siting of a large wind power project. Collection of site specific data for wind speed and direction

7080-414: The United States from 5 kilowatts (kW) to 25 kW. Around the time of World War I, American windmill makers were producing 100,000 farm windmills each year, mostly for water-pumping. By the 1930s, use of wind turbines in rural areas was declining as the distribution system extended to those areas. A forerunner of modern horizontal-axis wind generators was in service at Yalta , USSR, in 1931. This

7200-484: The United States where ISOs do not exist. Consequently, the utilities do not engage in wholesale power markets. The Pacific Northwest, and states east of California and west of the Dakotas, Nebraska, Kansas and Texas largely do not participate. The majority of Southeastern states do not participate in wholesale markets. While these regions must conform to open access as mandated by FERC, the power exchanges between utilities

7320-443: The air arrives at the turbine. The maximum theoretical power output of a wind machine is thus 16 ⁄ 27 times the rate at which kinetic energy of the air arrives at the effective disk area of the machine. If the effective area of the disk is A, and the wind velocity v, the maximum theoretical power output P is: where ρ is the air density . Wind-to-rotor efficiency (including rotor blade friction and drag ) are among

SECTION 60

#1732772179682

7440-430: The blade, the pulsating torque generated by some rotor designs on the drive train, and the difficulty of modelling the wind flow accurately and hence the challenges of analysing and designing the rotor prior to fabricating a prototype. When a turbine is mounted on a rooftop the building generally redirects wind over the roof and this can double the wind speed at the turbine. If the height of a rooftop mounted turbine tower

7560-532: The blades snapped off. The unit was not repaired, because of a shortage of materials during the war. The first utility grid-connected wind turbine to operate in the UK was built by John Brown & Company in 1951 in the Orkney Islands . In the early 1970s, however, anti-nuclear protests in Denmark spurred artisan mechanics to develop microturbines of 22 kW despite declines in the industry. Organizing owners into associations and co-operatives led to

7680-414: The blades upwind of the tower ( i.e.   blades facing the incoming wind) produce the overwhelming majority of wind power in the world today. These turbines have the main rotor shaft and electrical generator at the top of a tower and must be pointed into the wind. Small turbines are pointed by a simple wind vane , while large turbines generally use a wind sensor coupled with a yaw system. Most have

7800-460: The concept of electrical grid reliability . The delineation between an ISO and an RTO is subtle to some and quite specific to others, as the similarities in the table below illustrate: In short, an ISO operates a region's electricity grid, administers the region's wholesale electricity markets, and provides reliability planning for the region's bulk electricity system. Today's RTOs do the same thing with an added component of greater responsibility for

7920-470: The continued reliability of a system unequaled anywhere else, and 3) multiple transmission charges that will not negate the savings to the end-use customer. Critics of RTOs counter that the wholesale electricity market as operated through the RTOs is in fact raising prices beyond what would obtain in a truly competitive situation, and that the organizations themselves add a needless layer of bureaucracy. While

8040-573: The country's power. In Japan's electricity sector , wind power generates a small proportion of the country's electricity. It has been estimated that Japan has the potential for 144 gigawatts (GW) for onshore wind and 608 GW of offshore wind capacity. As of 2023, the country had a total installed capacity of 5.2 GW. As of 2018, government targets for wind power deployment were relatively low when compared to other countries, at 1.7% of electricity production by 2030. The 117 MW Tafila Wind Farm in Jordan

8160-478: The end of 2008, at least 15 Chinese companies were commercially producing wind turbines and several dozen more were producing components. Turbine sizes of 1.5 MW to 3 MW became common. Leading wind power companies in China were Goldwind , Dongfang Electric , and Sinovel along with most major foreign wind turbine manufacturers. China also increased production of small-scale wind turbines to about 80,000 turbines (80 MW) in 2008. Through all these developments,

8280-564: The end of 2011. However, the rapid growth outpaced China's infrastructure and new construction slowed significantly in 2012. At the end of 2009, wind power in China accounted for 25.1  gigawatts (GW) of electricity generating capacity, and China has identified wind power as a key growth component of the country's economy. With its large land mass and long coastline, China has exceptional wind resources. Researchers from Harvard and Tsinghua University have found that China could meet all of their electricity demands from wind power by 2030. By

8400-414: The energy converted to electrical energy. Since outgoing wind will still possess some kinetic energy, there must be a maximum proportion of the input energy that is available to be converted to electrical energy. Accordingly, Betz's law gives the maximal achievable extraction of wind power by a wind turbine, known as Betz's coefficient, as 16 ⁄ 27 (59.3%) of the rate at which the kinetic energy of

8520-469: The energy produced by the farm and minimization of its costs. The Australian Greens have been significant supporters of Australian wind farms, however the party's previous leader Bob Brown and former leader Richard Di Natale have now both expressed concerns about environmental aspects of wind turbines, particularly the potential danger they impose for birds. In July 2022 Brazil reached 22 GW of installed wind power in about 750 wind farms In 2021 Brazil

8640-433: The entire FERC footprint and includes a Mexican utility and several Canadian utilities. As such, international reciprocity is commonplace, and rules or recommendations introduced by FERC often are voluntarily accepted by NERC members outside of FERC's jurisdiction. Therefore, one Canadian Province is a member of a US-based RTO, while two others function as an Electric System Operator (ESO), an organization essentially equal to

8760-889: The entire generation, transmission, and distribution assets. Because these companies controlled the retail delivery of the energy from generation through their own power lines, consumers had little to no choice regarding whose electricity they were buying. In economic terms, this structure constituted an impediment for new providers who would want to generate power, move energy, or provide retail electricity to individual consumers. Order No. 888 addressed "Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities." and Order No. 889 added and amended existing rules "...establishing and governing an Open Access Same-time Information System (OASIS) (formerly real-time information networks) and prescribing standards of conduct." Order No. 888

8880-412: The environment than many other forms of power generation and are often referred to as a good source of green energy . Wind farms have, however, been criticised for their visual impact and impact on the landscape. Typically they need to be spread over more land than other power stations and need to be built in wild and rural areas, which can lead to "industrialization of the countryside", habitat loss , and

9000-453: The factors affecting the final price of wind power. Further inefficiencies, such as gearbox , generator, and converter losses, reduce the power delivered by a wind turbine. To protect components from undue wear, extracted power is held constant above the rated operating speed as theoretical power increases as the cube of wind speed, further reducing theoretical efficiency. In 2001, commercial utility-connected turbines delivered 75% to 80% of

9120-485: The fair handling of transactions between electric power transmission suppliers and their customers. TSOs in Europe cross state and provincial borders like RTOs. RTOs were created by the Federal Energy Regulatory Commission (FERC) as a way to handle the challenges associated with the operation of multiple interconnected independent power supply companies. FERC describes this as a voluntary system. The traditional model of

9240-741: The first windfarm in Southeast Asia. Located in the northern part of the country's biggest island, Luzon, alongside the seashore of Bangui , Ilocos Norte . The wind farm uses 20 units of 70-metre (230 ft) high Vestas V82 1.65 MW wind turbines, arranged on a single row stretching along a nine-kilometre shoreline off Bangui Bay, facing the South China Sea . Phase I of the NorthWind power project in Bangui Bay consists of 15 wind turbines, each capable of producing electricity up to

9360-459: The fundamental purpose of an ISO to "…operate the transmission systems of public utilities in a manner that is independent of any business interest in sales or purchases of electric power by those utilities." The order did not mandate or require the establishment of ISOs. Rather, in an attempt to comply with the FERC's order, groups of participants (or "Power Pools" composed of generators, transmission providers and utilities) partnered, and proposed to

9480-998: The generator, is 15.24 meters (50.0 ft) and weighs around 300 tons. Due to data transmission problems, structural health monitoring of wind turbines is usually performed using several accelerometers and strain gages attached to the nacelle to monitor the gearbox and equipment. Currently, digital image correlation and stereophotogrammetry are used to measure dynamics of wind turbine blades. These methods usually measure displacement and strain to identify location of defects. Dynamic characteristics of non-rotating wind turbines have been measured using digital image correlation and photogrammetry. Three dimensional point tracking has also been used to measure rotating dynamics of wind turbines. Generally, efficiency increases along with turbine blade lengths. The blades must be stiff, strong, durable, light and resistant to fatigue. Materials with these properties include composites such as polyester and epoxy, while glass fiber and carbon fiber have been used for

9600-411: The higher the wind velocity on average. A windbreak can also increase the wind velocity near the turbine. Wind turbines can rotate about either a horizontal or a vertical axis, the former being both older and more common. They can also include blades or be bladeless. Household-size vertical designs produce less power and are less common. Large three-bladed horizontal-axis wind turbines (HAWT) with

9720-579: The highest European wind power production with 43 TWh compared to Germany's 35 TWh. In addition to the ' London Array ', an off-shore wind farm in the Thames Estuary in the United Kingdom , with a capacity of 630 MW (the world's largest off-shore wind farm when built), other large wind farms in Europe include Fântânele-Cogealac Wind Farm near Constanța , Romania with 600 MW capacity, and Whitelee Wind Farm near Glasgow , Scotland which has

9840-492: The importance on remedying what it terms as "undue discrimination" at the forefront. It is important to note that Order No. 888 was not met without objection among the public, academics and industry participants. Requests for rehearing and/or clarification were filed by 137 entities after the order's issuance. The majority agreed with the FERC's assertion for the need to harness the benefits of competitive electricity markets. Order No. 889 amended rules establishing and governing

9960-574: The last decade of the 20th century, some policy makers and academics projected that the electrical power industry would ultimately experience deregulation . RTOs were conceived as a way to handle the vastly increased number of transactions that take place in a competitive environment. About a dozen states decided to deregulate, but some pulled back following the California electricity crisis of 2000 and 2001. RTOs ensure three key free marketer drivers: 1) open access and non-discriminatory services, 2)

10080-524: The load instantaneously to keep supply and demand for electricity in balance. The grid operators forecast load and schedule generation to assure that sufficient generation and back-up power is available in case demand rises or a power plant or power line is lost. They also operate wholesale electricity markets that enable participants to buy and sell electricity on a day-ahead or a real-time spot market basis. These markets provide electricity suppliers with more options for meeting consumer needs for power at

10200-813: The lobbying of the government and utilities and provided incentives for larger turbines throughout the 1980s and later. Local activists in Germany, nascent turbine manufacturers in Spain, and large investors in the United States in the early 1990s then lobbied for policies that stimulated the industry in those countries. It has been argued that expanding the use of wind power will lead to increasing geopolitical competition over critical materials for wind turbines, such as rare earth elements neodymium , praseodymium , and dysprosium . However, this perspective has been critically dismissed for failing to relay how most wind turbines do not use permanent magnets and for underestimating

10320-408: The local subsidiary of a Turkish company. The total cost of the project is $ 136 million.[3] Completed in 2012, it has a total capacity of around 56MW. Fauji Fertilizer Company Energy Limited, has built a 49.5 MW wind Energy Farm at Jhimpir. Contract of supply of mechanical design was awarded to Nordex and Descon Engineering Limited. Nordex is a German wind turbine manufacturer. In the end of 2011 49.6 MW

10440-432: The lowest possible cost. ISO/RTOs provide non-discriminatory transmission access, facilitating competition among wholesale suppliers to improve transmission service and provide fair electricity prices. Across large regions, they schedule the use of transmission lines; manage the interconnection of new generation and monitor the markets to ensure fairness and neutrality for all participants. Providing these services regionally

10560-463: The minimum requirements specified by FERC to hold the designation of RTO or that the ISO has not petitioned FERC for the status. Electric utilities that are located within the United States and engage in interstate commerce fall under FERC authority. Not all utilities are members of ISOs. All utilities and ISOs are responsible to meet the compliance of a larger organization called the North American Electric Reliability Corporation (NERC) , which overlays

10680-445: The most resource and opportunity are eventually developed. After the deadline to request a place in the queue has passed, many firms will withdraw their requests after gauging the competition in order to make back some of the deposit for each request that is determined too risky in comparison to other larger firms' requests. A major factor in wind-farm design is the spacing between the turbines, both laterally and axially (with respect to

10800-475: The operation of the electrical power system, usually within a single US State, but sometimes encompassing multiple states. The official definition for an RTO: "An entity that is independent from all generation and power marketing interests and has exclusive responsibility for grid operations, short-term reliability, and transmission service within a region." The designation of an RTO is largely one of scope. An organization wanting to achieve RTO status must petition

10920-460: The original intention was for the RTOs to remain an independent, non-profit organization and were given nearly autonomous control of their service area. The primary committees, and a majority of participant committees are almost entirely represented by investor owned utilities and have eroded States power and Federal authority. The RTO concept provides for separation of generation and transmission and elimination of pancaked rates, and it encourages

11040-562: The other half saw a production decrease of 1.2% per year. In general, more stable and constant weather conditions (most notably wind speed) result in an average of 15% greater efficiency than that of a wind turbine in unstable weather conditions, thus allowing up to a 7% increase in wind speed under stable conditions. This is due to a faster recovery wake and greater flow entrainment that occur in conditions of higher atmospheric stability. However, wind turbine wakes have been found to recover faster under unstable atmospheric conditions as opposed to

11160-508: The power grid for non-utility firms, enhance the reliability of the transmission system and operate wholesale electricity markets. Today, seven of these grid operators, either independent system operators (ISOs) or RTOs, coordinate the power grid to ensure the reliable delivery of two-thirds of the electricity used in the United States to two-thirds of its population. Most are overseen by FERC. ISOs and RTOs coordinate generation and transmission across wide geographic regions, matching generation to

11280-439: The power of economic incentives for the expanded production of these minerals. Wind Power Density (WPD) is a quantitative measure of wind energy available at any location. It is the mean annual power available per square meter of swept area of a turbine, and is calculated for different heights above ground. Calculation of wind power density includes the effect of wind velocity and air density. Wind turbines are classified by

11400-409: The prevailing winds). The closer the turbines are together, the more the upwind turbines block wind from their rear neighbors (wake effect). However, spacing turbines far apart increases the costs of roads and power cables, and raises the amount of land needed to install a specific capacity of turbines. As a result of these factors, turbine spacing varies by site. Generally speaking, manufacturers require

11520-469: The rare earth materials required, these gearless turbines are sometimes preferred over gearbox generators because they "eliminate the gear-speed increaser, which is susceptible to significant accumulated fatigue torque loading, related reliability issues, and maintenance costs". There is also the pseudo direct drive mechanism, which has some advantages over the permanent magnet direct drive mechanism. Most horizontal axis turbines have their rotors upwind of

11640-435: The reinforcing. Construction may involve manual layup or injection molding. Retrofitting existing turbines with larger blades reduces the task and risks of redesign. As of 2021, the longest blade was 115.5 m (379 ft), producing 15 MW. Blades usually last around 20 years, the typical lifespan of a wind turbine. Materials commonly used in wind turbine blades are described below. The stiffness of composites

11760-595: The renewable energy sector. In 2011 the European Union had a total installed wind capacity of 93,957 MW. Germany had the third-largest capacity in the world (after China and the United States), with an installed capacity of 29,060 MW at the end of 2011. Spain had 21,674 MW, and Italy and France each had between 6,000 and 7,000 MW. By January 2014, the UK installed capacity was 10,495 MW. But energy production can be different from capacity – in 2010, Spain had

11880-436: The rotor. Solidity is measured by the blade area divided by the rotor area. A subtype of Darrieus turbine with straight, as opposed to curved, blades. The cycloturbine variety has variable pitch to reduce the torque pulsation and is self-starting. The advantages of variable pitch are high starting torque; a wide, relatively flat torque curve; a higher coefficient of performance ; more efficient operation in turbulent winds; and

12000-588: The southern North Sea to England and the Celtic Sea to Ireland, and further south to France and Spain especially in Higueruela which was for some time the biggest wind farm in the world. The idea is that by the time a low pressure area has moved away from Denmark to the Baltic Sea the next low appears off the coast of Ireland. Therefore, while it is true that the wind is not blowing everywhere all of

12120-420: The supporting tower. Downwind machines have been built, because they don't need an additional mechanism for keeping them in line with the wind. In high winds, downwind blades can also be designed to bend more than upwind ones, which reduces their swept area and thus their wind resistance, mitigating risk during gales. Despite these advantages, upwind designs are preferred, because the pulsing change in loading from

12240-409: The surface and is affected by topography, surface roughness, and upwind obstacles such as trees or buildings. At altitudes of thousands of feet/hundreds of metres above sea level, the power in the wind decreases proportional to the decrease in air density. Often in heavily saturated energy markets, the first step in site selection for large-scale wind projects, before wind resource data collection,

12360-681: The time, it will tend to be blowing somewhere. In July 2022, Seagreen , the world's deepest fixed-bottom wind farm, became operative. Located 26 miles off the Angus coastline, in Scotland, it has 114 turbines that generate 1.1 gigawatts (GW) of electricity. India has the fifth largest installed wind power capacity in the world. As of 31 March 2014, the installed capacity of wind power was 21136.3 MW mainly spread across Tamil Nadu state (7253 MW). Wind power accounts nearly 8.5% of India's total installed power generation capacity, and it generates 1.6% of

12480-729: The total capacity to 33 MW. All 20 turbines describes a graceful arc reflecting the shoreline of Bangui Bay. Adjacent municipalities of Burgos and Pagudpud followed with 50 and 27 wind turbines with a capacity of 3 MW each for a Total of 150 MW and 81 MW respectively. Two other wind farms were built outside of Ilocos Norte, the Pililla Wind Farm in Rizal and the Mindoro Wind Farm near Puerto Galera in Oriental Mindoro . Sri Lanka has received funding from

12600-497: The transmission network, as established by the FERC. In April 1996, the Federal Energy Regulatory Commission (FERC) issued two orders that changed the landscape of how electricity is generated, transmitted, and distributed throughout the North America. Prior to these rulings, generated power and the subsequent energy provided to customers by local service providers was owned and controlled by single entities who often owned

12720-460: The unbundling of a utility's operations separating generation and transmission and distribution. In addressing #2 above, the original order (and subsequent clarification by the FERC) allows utilities, under certain defined circumstances, to seek extra-contractual recovery of stranded costs. The FERC continues to receive rehearing petitions regarding stranded cost recovery as it has clearly placed

12840-490: The utility supplier via the electrical grid . Wind turbines are manufactured in a wide range of sizes, with either horizontal or vertical axes, though horizontal is most common. The windwheel of Hero of Alexandria (10–70 CE) marks one of the first recorded instances of wind powering a machine. However, the first known practical wind power plants were built in Sistan , an Eastern province of Persia (now Iran), from

12960-491: The visual appeal. Wind turbine design is a careful balance of cost, energy output, and fatigue life. Wind turbines convert wind energy to electrical energy for distribution. Conventional horizontal axis turbines can be divided into three components: A 1.5 ( MW ) wind turbine of a type frequently seen in the United States has a tower 80 meters (260 ft) high. The rotor assembly (blades and hub) measures about 80 meters (260 ft) in diameter. The nacelle , which contains

13080-557: The wind accelerates over a ridge. The additional wind speeds gained in this way can increase energy produced because more wind goes through the turbines. The exact position of each turbine matters, because a difference of 30 metres could potentially double output. This careful placement is referred to as 'micro-siting'. Europe is the leader in offshore wind energy, with the first offshore wind farm (Vindeby) being installed in Denmark in 1991. As of 2010, there were 39 offshore wind farms in waters off Belgium, Denmark, Finland, Germany, Ireland,

13200-514: The wind as each blade passes behind the supporting tower can cause damage to the turbine. Turbines used in wind farms for commercial production of electric power are usually three-bladed. These have low torque ripple , which contributes to good reliability. The blades are usually colored white for daytime visibility by aircraft and range in length from 20 to 80 meters (66 to 262 ft). The size and height of turbines increase year by year. Offshore wind turbines are built up to 8 MW today and have

13320-406: The wind speed they are designed for, from class I to class III, with A to C referring to the turbulence intensity of the wind. Conservation of mass requires that the mass of air entering and exiting a turbine must be equal. Likewise, the conservation of energy requires the energy given to the turbine from incoming wind to be equal to that of the combination of the energy in the outgoing wind and

13440-456: The wind turbines. Therefore, special fast service vehicles for installation (like Wind Turbine Shuttle) as well as for maintenance (including heave compensation and heave compensated working platforms to allow the service staff to enter the wind turbine also at difficult weather conditions) are required. So-called inertial and optical based Ship Stabilization and Motion Control systems (iSSMC) are used for that. Experimental wind farms consisting of

13560-465: The world's first wind farm was 0.6 MW, produced by 20 wind turbines rated at 30 kilowatts each, installed on the shoulder of Crotched Mountain in southern New Hampshire in December 1980. Onshore turbine installations in hilly or mountainous regions tend to be on ridges generally three kilometres or more inland from the nearest shoreline. This is done to exploit the topographic acceleration as

13680-471: Was a 100 kW generator on a 30-meter (98 ft) tower, connected to the local 6.3 kV distribution system. It was reported to have an annual capacity factor of 32 percent, not much different from current wind machines. In the autumn of 1941, the first megawatt-class wind turbine was synchronized to a utility grid in Vermont . The Smith–Putnam wind turbine only ran for about five years before one of

13800-794: Was able to build the first automatically operated wind turbine after consulting local University professors and his colleagues Jacob S. Gibbs and Brinsley Coleberd and successfully getting the blueprints peer-reviewed for electricity production. Although Blyth's turbine was considered uneconomical in the United Kingdom, electricity generation by wind turbines was more cost effective in countries with widely scattered populations. In Denmark by 1900, there were about 2500 windmills for mechanical loads such as pumps and mills, producing an estimated combined peak power of about 30 megawatts (MW). The largest machines were on 24-metre (79 ft) towers with four-bladed 23-metre (75 ft) diameter rotors. By 1908, there were 72 wind-driven electric generators operating in

13920-629: Was developed by the Belgian company Electrawinds. Wind turbine A wind turbine is a device that converts the kinetic energy of wind into electrical energy . As of 2020 , hundreds of thousands of large turbines , in installations known as wind farms , were generating over 650 gigawatts of power, with 60 GW added each year. Wind turbines are an increasingly important source of intermittent renewable energy , and are used in many countries to lower energy costs and reduce reliance on fossil fuels . One study claimed that, as of 2009, wind had

14040-737: Was expected to be completed. The Pakistani government also issued a Letter Of Interest in a 100 MW Wind power plant to FFCEL. The Pakistani government had plans to achieve electric power generation of up to 2500 MW by the end of 2015 from wind energy to bring down an energy shortage. Currently four wind farms are operational (Fauji Fertilizer 49.5 MW (subsidiary of Fauji Foundation), Three Gorges 49.5 MW, Zorlu Energy Pakistan 56 MW, Sapphire Wind Power Company Limited 52.6 MW) and six are under construction phase ( Master Wind Energy Limited 52.6 MW, Sachal Energy Development Limited 49.5 MW, Yunus Energy Limited 49.5 MW, Gul Energy 49.5 MW, Metro Energy 49.5 MW, Tapal Energy) and were expected to achieve COD in 2017. In

14160-566: Was inaugurated in December 2015, and is the first large scale wind farm project in the region. Morocco has undertaken a vast wind energy program, to support the development of renewable energy and energy efficiency in the country. The Moroccan Integrated Wind Energy Project, spanning over a period of 10 years with a total investment estimated at $ 3.25 billion, will enable the country to bring the installed capacity, from wind energy, from 280 MW in 2010 to 2000 MW in 2020. Pakistan has wind corridors in Jhimpir, Gharo and Keti Bundar in Sindh province and

14280-579: Was installed by the Austrian Josef Friedländer at the Vienna International Electrical Exhibition in 1883. It was a Halladay windmill for driving a dynamo . Friedländer's 6.6 m (22 ft) diameter Halladay "wind motor" was supplied by U.S. Wind Engine & Pump Co. of Batavia , Illinois . The 3.7 kW (5 hp) windmill drove a dynamo at ground level that fed electricity into

14400-599: Was the 7th country in the world in terms of installed wind power (21 GW), and the 4th largest producer of wind energy in the world (72 TWh), behind China, USA and Germany. The largest wind farm in the country is the Complexo eólico Lagoa dos Ventos in the State of Piauí , onshore with a current capacity of 1,000 MW being expanded to 1,500 MW. In just five years, China leapfrogged the rest of the world in wind energy production, going from 2,599 MW of capacity in 2006 to 62,733 MW at

#681318