Castro station is a Muni Metro station at the intersection of Market Street , Castro Street, and 17th Street in the Castro District of San Francisco, California . The underground station is served by the K Ingleside , M Ocean View , and S Shuttle lines. The F Market line serves the station on the street level at 17th and Castro .
86-783: The T Third Street is a Muni Metro light rail line in San Francisco, California . It runs along the east side of San Francisco from Sunnydale to Chinatown , traveling in the median of Third Street for most of its length before entering the Central Subway as it approaches downtown. The line serves 22 stations, all of which are accessible. Most of the surface portion of the line runs in dedicated median lanes, though two portions operate in mixed traffic. Limited service began in January 2007, with full service starting in April of
172-737: A CPUC regulatory inspection in early November 2017 and car #2006 was the first LRV to enter revenue service on November 17, 2017, following a ribbon-cutting ceremony at Duboce and Church . The first 68 cars were used to expand the Muni fleet to 219 cars and once the fleet reached that total in October 2019, Breda cars would be retired as new Siemens cars are accepted. It is expected that deliveries of cars will continue through 2028. Muni Metro runs from approximately 5 am to 1 am weekdays, with later start times of 7 am on Saturday and 8 am on Sunday. Owl service , or late-night service,
258-552: A Free Muni for Seniors program that provides low- and moderate-income seniors residing in San Francisco free access to all Muni transit services, including Muni's cable cars. Free Muni is open to all San Francisco senior Clipper card holders, ages 65 and over, with a gross annual family income at or below 100 percent of the Bay Area median income level (qualifying income levels are posted on the program's web page). Enrollment
344-443: A $ 212 million design and procurement contract and a $ 114 million ten-year support contract with Hitachi Rail in October 2024. The Muni Metro system consists of 71.5 miles (115.1 km) of standard gauge track, seven light rail lines (six regular lines and one peak-hour line), three tunnels, 12 subway stations, 25 surface stations, and 87 surface stops. The backbone of the system is formed by two interconnected subway tunnels,
430-692: A connection to Powell Street station as the line does not enter the Market Street subway . The line then tunnels underneath 4th Street to serve Yerba Buena/Moscone station in the SoMA district before surfacing south of the Interstate 80 bypass, where it serves a stop at the 4th and Brannan station . The T then crosses the existing N tracks at 4th and King and continues south to 3rd Street. Additional short turn service between Chinatown and Mission Bay Loop will be later added. The line runs south through
516-465: A long way towards resolving persistent crowding and scheduling issues. Nonetheless, Muni remains one of the slowest urban transport systems in the United States. In 1980, the M Ocean View was extended from Broad Street and Plymouth Avenue to its current terminus at Balboa Park . In 1991, the J Church was extended from Church and 30th Streets to its current terminus at Balboa Park. In 1998,
602-404: A lower speed limit of 30 mph (48 km/h), down from 50 mph (80 km/h), because the brakes were problematic. The ATC system was plagued by numerous glitches when first implemented, initially causing significantly more harm than good. Common occurrences included sending trains down the wrong tracks, and, more often, inappropriately applying emergency braking. Eventually the result
688-426: A multi-year reconstruction on the surface section of the line until it resumed train service on September 28, 2024. Service only ran until 9pm until October 2, 2021, when it was extended to 10pm on Sundays and midnight on other days to better align with BART's late-night service. J Church service resumed subway service on February 19, 2022. Several further expansions have been proposed. SFMTA has studied extending
774-424: A new train control system that utilizes communications-based train control and infrastructure improvements that would enable longer trains to run in the subway and on some surface lines with greater reliability. As of 2024, the train control system replacement was in the planning stages with a pilot implementation planned in 2025 and with the entire upgrade estimated to be completed in 2029. The SFMTA board approved
860-522: A result, these lines, running PCC streetcars , continued in operation. Original plans for the BART system drawn up in the 1950s envisioned a double-decked subway tunnel under Market Street (known as the Market Street subway) in downtown San Francisco; the lower deck would be dedicated to express trains, while the upper would be served by local trains whose routes would spread south and west through
946-594: A standalone Geary subway line, such as in the 2017 20-year Capital Plan, and the planning effort started in 2014 (called the Muni Subway Expansion Project) to extend the M Ocean View in a fully grade-separated right-of-way to better serve the 19th Avenue corridor that had begun preliminary engineering studies in 2018. The ConnectSF report also identified the need to modernize the Muni Metro system. Key improvements that are planned include
SECTION 10
#17327760388401032-514: A temperature of 72 °F (22 °C) inside the car. The Breda cars feature four doors per car, versus three for the Boeing (only the middle two doors of the Boeing cars were available while in the tunnels due to the cars' end curvature). The initial batch of 136 Breda cars were ordered on contracts exceeding US$ 320,000,000 (equivalent to $ 585,281,662 in 2023), for an average per-car cost of US$ 2,350,000 (equivalent to $ 4,298,162 in 2023);
1118-408: A transit-only lane, and a northbound turn lane at Berry (which shared space with the tracks) was removed. This change was found to decrease delays at the bridge by 60%. Service was re-extended to West Portal on May 15, again through-routed with the K Ingleside. As part of the January 2021 service change, Muni also added the 15 Bayview-Hunters Point Express bus route. The route makes local stops in
1204-486: Is located at Armstrong Avenue. The line crosses the U.S. Route 101 freeway, where Third Street becomes Bayshore Boulevard, and continues south in the median. The southern terminus of the line is at Sunnydale station in the Visitacion Valley neighborhood. The T Third operates seven days a week, beginning at 5 a.m. weekdays, 6 a.m. Saturdays and 8 a.m. Sundays, operating until 1 a.m. Service
1290-440: Is not automatic. To participate in the program, a qualified senior must have or obtain a Clipper card and submit an application either online or by mail. Like Muni buses, the Muni Metro operates on a proof-of-payment system; on paying a fare, the passenger will receive a ticket good for travel on any bus, historic streetcar, or Metro vehicle for 120 minutes. Payment methods depend on boarding location. On surface street sections in
1376-411: Is provided along much of the L and N lines by buses that bear the same route designation. The cash fare for Muni Metro, like Muni buses, effective January 1, 2020, is $ 3 for adults and $ 1.50 for seniors, and the disabled, and free for youths 5–19. Clipper and MuniMobile fares are lower than cash fares. Their fares are $ 2.50 for adults. For all people under 20 service is free. Muni currently operates
1462-403: Is provided by the 91 Owl overnight bus during the hours that rail service is not running. On weekends, T Third Street Bus service runs from 5am until the start of rail service. The bus line largely follows the rail line, but it uses surface streets to parallel sections where the rail line has dedicated rights-of-way. Third Street (and its extensions south) had streetcar service operated by
1548-593: Is the only line in the Muni Metro that does not enter the tunnel, instead going through the Central Subway . An additional tunnel, the Sunset Tunnel , is located near the Duboce portal and is served by the N. The interconnected tunnels contain nine subway stations. Three stations—West Portal, Forest Hill and the now-defunct Eureka Valley —were opened in 1918 as part of the Twin Peaks Tunnel, while
1634-539: The Market Street Railway until 1941, when repaving allowed the transit operator to replace the line with buses. The 15 Third Street bus was discontinued with the beginning of light rail service. Construction of the line was proposed in the late 1980s as plans for the redevelopment of the Mission Bay neighborhood were established. Construction took place in the mid-2000s. The line was constructed as
1720-600: The Market Street subway and Twin Peaks tunnels, resulting in a combined route from Balboa Park , through downtown, to the Visitacion Valley neighborhood. The Mission Bay Loop project, which added a short turn loop using 18th, Illinois, and 19th, was constructed to supplement the Central Subway project. The loop was originally designed in 1998 as part of the Third Street Light Rail project, but
1806-669: The Mission Bay neighborhood in a dedicated median, passing the Mission Bay Loop between 18th and 19th Streets, which is used to allow trains to turn around at Mission Bay or to hold special trains to serve events at Chase Center . The line continues south through Dogpatch and across Islais Creek into the Bayview and Hunters Point neighborhoods. It runs in mixed traffic for 1 ⁄ 2 mile (0.80 km) from Kirkwood Avenue to Shafter Avenue, then returns to dedicated lanes. A wye, occasionally used for short turning trains,
SECTION 20
#17327760388401892-464: The N Judah was extended from Embarcadero Station to the planned site of the new Pacific Bell Park and Caltrain Depot , The extension was briefly served between January and August of that year by the temporary E Embarcadero light rail shuttle (restored in 2015 as the E Embarcadero heritage streetcar line). In 2007, the T Third Street , running south from Caltrain Depot along Third Street to
1978-821: The San Francisco Railway Museum , but have since been scrapped; five were sold to the Greater Manchester Passenger Transport Authority for the modest price of US$ 200 (equivalent to $ 338.8 in 2023) to US$ 500 (equivalent to $ 846.99 in 2023) each; one was acquired by the Oregon Electric Railway Historical Society in 2001, but the Society declined to take any more Boeing cars after experiencing several breakdowns. Boeing car no. 1258 has been on exhibit at
2064-493: The Third Street Light Rail Project . Testing on the line took place in summer 2006, with limited service starting on January 13, 2007, and full service beginning on April 7, 2007. T Third Street service was initially operated between Castro station and Sunnydale station . Following service changes on June 30, 2007, the T Third Street and the K Ingleside lines were interlined through
2150-565: The Twin Peaks Tunnel between this station and the now-disused Eureka Valley station , just southwest. At both Castro and Church , there is only one entrance on each side of Market Street leading into the station. (All other stations on the Market Street subway have entrances spread out along the length of the station.) The southern entrance is located in Harvey Milk Plaza on the southwest corner of Market and Castro, and
2236-588: The Twin Peaks Tunnel shutdown . On August 25, 2018, at the conclusion of the shutdown, Muni began running permanently two-car trains on the K/T line (as had been used east of Castro during the shutdown). The line was shut down again, from January 22, 2019, until April 1, 2019, for construction of a new platform at UCSF/Mission Bay station . In April 2019, the SFMTA ended the use of unscheduled short turns . These had been used to provide more consistent service on
2322-620: The Western Railway Museum near Suisun City since its acquisition in 2002. The first of four prototypes of the new Breda cars was delivered in January 1995. After delivery of additional cars and training of operators, the cars began to enter service on December 10, 1996. They were the most expensive street railway vehicles built to-date, at a cost of US$ 2,000,000 (equivalent to $ 3,885,423 in 2023) each, and they were assembled at Pier 80. After suffering initial breakdowns and despite facing complaints of noise and vibrations,
2408-514: The 175 cars from the first two phases, 44 additional cars, and surplus 30 cars were contracted in 2021. Siemens has named the new Muni cars the S200 SF while the SFMTA refers to them as the LRV4. They operate at speeds of up to 50 miles per hour (80 km/h). The S200 SF is 75 feet (23 m) long, 8 feet 8.32 inches (2.65 m) wide, 11 feet 6 inches (3.51 m) high (with
2494-475: The Bayview–Hunters Point neighborhood east of Third Street and limited stops on Third Street paralleling the T. The second phase of the line was built as the Central Subway , which forms a crosstown link between South of Market (SoMa) and Chinatown via Union Square . Voters approved the Central Subway in 2003, and the alignment was selected in 2008. Construction began in 2012. After numerous delays,
2580-544: The Boeing LRVs they replaced) that some homeowners, claiming that the exceptional weight of the Breda cars damaged their foundations, sued the city of San Francisco. The Breda cars are longer and wider than the previous Boeing cars, necessitating the modification of subway stations and maintenance yards, as well as the rear view mirrors on the trains themselves. Furthermore, the Breda cars do not run in three car trains, like
2666-450: The Boeing cars used to, as doing so had, in some instances, physically damaged the overhead power wires. The Breda trains were so noisy that San Francisco budgeted over $ 15 million to quiet them down, while estimates range up to $ 1 million per car to remedy the excessive noise. To this day, the Breda cars are noisier than the PCC or Boeing cars. In 1998, federal inspectors mandated
T Third Street - Misplaced Pages Continue
2752-549: The Breda cars have been blamed for reduced train capacity, as multiple cars are not able to be coupled together as intended. Muni originally ordered 35 cars from Breda in 1991, and exercised options to add another 116 cars throughout the 1990s, including an option to purchase another 15 cars in 1999. The fleet had 151 LRVs in 2014, all made by Breda. The double-ended cars are 75 feet (23 m) long, 9 feet (2.7 m) wide, 11 feet (3.4 m) high, have graffiti-resistant windows, and contain an air-conditioning system to maintain
2838-562: The Bredas gradually replaced the Boeings, with the last Boeing car being retired in 2002. Residents along streetcar lines complained the new Breda cars would screech during acceleration and deceleration and their 80,000-pound (36,000 kg) weight, 10,000 pounds (4,500 kg) heavier than the Boeing cars, was blamed for vibration issues. At one point in 1998, 12 Breda cars were unavailable for service due to door problems. Faulty couplers on
2924-519: The Central Subway as an above-ground light rail line or subway through North Beach, and into the Marina district, with the possibility of eventually terminating in the Presidio. Starting in 2017, the SFMTA, in collaboration with other city agencies, began its ConnectSF process to plan its vision for future transit expansions that would follow its then under construction projects such as Van Ness BRT and
3010-513: The Central Subway opened on November 19, 2022, with a weekend-only shuttle service operating between Chinatown and 4th and Brannan . The T Third Street was rerouted to travel through the Central Subway for full service on January 7, 2023. Service runs every 10 minutes on weekdays and every 12 minutes on weekends. Shuttle trains signed "S Mission Bay" operate between Chinatown and UCSF/Chase Center for events at Chase Center. All stations along this line feature high platforms, eliminating
3096-542: The Central Subway. The final report on transit from the ConnectSF program was released in 2021 and identified two major corridors for Muni Metro expansion: a subway line along the Geary Boulevard and 19th Avenue corridor connecting to Daly City, and the extension of the Central Subway to Fisherman's Wharf that had already undergone preliminary analysis. The Geary/19th corridor would replace earlier efforts to plan
3182-491: The Central Subway; the next firm order of 151 cars would replace all of the Breda vehicles and an option to purchase up to 85 additional cars, funding permitting, to accommodate projected ridership growth through 2040. A grant of $ 41 million from the California Transportation Agency awarded on July 2, 2015, allowed Muni to purchase 40 additional Siemens light rail vehicles. Upon awarding
3268-601: The Embarcadero–Sunnydale portion of the T Third Street on January 23, 2021. N Judah and K Ingleside light rail service resumed on May 15, 2021, with the K and T again interlined, along with S Shuttle service now converted to supplementary. At that time, some stations were converted to new wayfinding signage based on international standards, with compass directions like "westbound" replacing older "inbound"/"outbound" directions. M Ocean View light rail service resumed on August 14, 2021. The L remained served by buses due to
3354-524: The Market Street subway and Twin Peaks Tunnel . Muni Metro operates a fleet of 151 Breda high-floor light rail vehicles (LRVs), which are currently being replaced by a fleet of 249 Siemens S200 LRVs. The system has 117 stations , of which 63 (54%) are accessible . Muni Metro is one of the surviving first-generation streetcar systems in North America . The San Francisco Municipal Railway
3440-695: The Market Street subway at peak periods, with all trains using the crossover west of Embarcadero station to reverse direction. To allow for high frequencies on the surface branches, eastbound trains were combined at West Portal and Duboce Portal, and westbound trains split at those locations. Two-car N Judah trains and one-car J Church trains (each 10TPH) combined at the Duboce Portal, while two-car L Taraval trains (10TPH) alternately combined with two-car M Ocean View and K Ingleside (each 5 TPH) trains at West Portal to form four-car trains. However, this provided suboptimal service; many inbound trains did not arrive at
3526-423: The Muni Metro subway began operating seven days a week. At the time, there were no firm plans to revive any service on the surface of Market Street or return PCCs to regular running. However, tracks were rehabilitated for the 1983 Historic Trolley Festival , and the inauguration of the F line , served by heritage streetcars , followed in 1995. By the late 1980s, Muni scheduled 20 trains per hour (TPH) through
T Third Street - Misplaced Pages Continue
3612-488: The Muni Metro was officially inaugurated, with weekday N line service in the subway. The Metro service was implemented in phases, and the subway was served only on weekdays until 1982. The K Ingleside line began using the entire Metro subway on weekdays on June 11, 1980, the L Taraval and M Ocean View lines on December 17, 1980, and lastly the J Church line on June 17, 1981. Meanwhile, weekend service on all five lines (J, K, L, M, N) continued to use PCC cars operating on
3698-487: The PCCs could not be used in them. Hence, a fleet of new light rail vehicles was ordered from Boeing-Vertol , but were not delivered until 1979–80, even though the tunnel was completed in 1978. The K and M lines were extended to Balboa Park during this time, providing further connections to BART. (The J line also saw an extension there in 1991, which provided yet another BART connection at Glen Park .) On February 18, 1980,
3784-758: The San Francisco Municipal Railway (Muni) was established. The first streetcar line, the A Geary, ran from Kearny and Market Streets in the Financial District to Fulton Street and 10th Avenue in the Richmond District . The system slowly expanded, opening the Twin Peaks Tunnel in 1917, allowing streetcars to run to the southwestern quadrant of the city. By 1921, the city was operating 304 miles (489 km) of electric trolley lines and 25 miles (40 km) of cable car lines. The last line to start service before 2007
3870-466: The city to Embarcadero Station in the heart of the Financial District . Three lines—the K Ingleside , the L Taraval , and the M Ocean View —feed into the tunnel at West Portal, while two lines, the J Church and N Judah , enter at a portal near Church Street and Duboce Avenue in the Duboce Triangle neighborhood. The N Judah enters and exits the tunnel at Embarcadero. The T Third Street
3956-409: The city. However, by 1961 these plans were altered; only a single BART route would travel through the city on the lower deck, while the upper deck would be served by the existing Muni streetcar routes. The new tunnel would be connected to the existing Twin Peaks Tunnel . The new underground stations would feature high platforms, and the older stations would be retrofitted with the same, which meant that
4042-560: The city. The Central Subway, with three new subway stations and one new surface station opened on November 19, 2022. The first street railroad in San Francisco was the San Francisco Market Street Railroad Company, which was incorporated in 1857 and began operating in 1860, with track along Market Street from California to Mission Dolores. Muni Metro descended from the municipally-owned traditional streetcar system started on December 28, 1912, when
4128-585: The contract, Muni officials cited several lessons learned from the prior Breda contract, including not buying enough cars, dictating too much of the design, lax reliability requirements and a failure to account for maintenance costs. The US$ 648,000,000 (equivalent to $ 834,001,687 in 2023) contract for 175 cars (the first two phases) was signed by Mayor Ed Lee in September 2014, making the cost of each car approximately US$ 3,700,000 (equivalent to $ 4,762,047 in 2023). Muni ultimately purchased 249 vehicles:
4214-593: The corner of Castro Street and Market Street. In 1985 it was dedicated to Harvey Milk, the slain SF supervisor and first openly gay elected official in California. In May 2016, the escalator in Harvey Milk Plaza was retrofitted with colored lights (to resemble the rainbow flag that flies above the plaza) after being rehabilitated. This test was considered a success; lights were added to 17 other escalators in
4300-441: The difficulty in running a hybrid streetcar and light rail system, with five lines merging into one, led to scheduling problems on the main trunk lines with long waits between arrivals and commuter-packed trains sometimes sitting motionless in tunnels for extended periods of time. Muni did take steps to address these problems. Newer, larger Breda cars were ordered, an extension of the system towards South Beach — where many of
4386-552: The existing T Third Street line at 4th and King station . Muni estimates that the Central Subway section of the T Third Street line will carry roughly 35,100 riders per day by 2030. Originally set to open in late 2018, the subway opened with weekend-only shuttle service on November 19, 2022. Full service as part of the T Third Street line began on January 7, 2023. Additional shuttle trains signed "S Chase Center" will operate between Chinatown and UCSF/Chase Center for events at Chase Center. On March 30, 2020, Muni Metro service
SECTION 50
#17327760388404472-543: The fleet; these 30 had been rejected by MBTA after suffering numerous breakdowns. In 1982, the Boeing cars averaged only 600 miles (970 km) between breakdowns; by 1988 this had improved to 1,800 to 2,000 miles (2,900 to 3,200 km) between breakdowns. In 1998, Rudy Nothenberg, president of the Public Transportation Commission, said the Boeing cars were "impossible to maintain and [...] have many, many design flaws;" that same year, Muni
4558-410: The initial 100-car order arrived in San Francisco in 1978; Boston had been running the cars since 1976 and by 1978, MBTA was already returning 35 cars for manufacturing defects. After receipt of the first cars, MBTA forced Boeing to make 70 to 80 modifications on each car. Boeing ended up paying US$ 40,000,000 (equivalent to $ 214,175,439 in 2023) in damages to Boston. The purchase price for each car
4644-635: The inner portion of the line, but had caused inconsistent and less frequent service in the Hunters Point-Bayview and Visitacion Valley neighborhoods. On March 30, 2020, Muni Metro service was replaced with buses due to the COVID-19 pandemic . Rail service returned on August 22, with the routes reconfigured to improve reliability in the subway. T Third Street and M Ocean View light rail lines were interlined, running between Sunnydale station and Balboa Park station. Light rail service
4730-805: The introduction of the T Third Street were implemented on June 30, 2007, when the K and T trains were interlined, or effectively merged into one single line with route designations changing at the entrances into the subway (T becomes K outbound at Embarcadero; K becomes T inbound at West Portal). The Central Subway runs between Chinatown station in Chinatown and a portal in South of Market (SoMa) , with intermediate stops at Union Square/Market Street station in Union Square and Yerba Buena/Moscone station in SoMa. A surface portion runs through SoMa to connect to
4816-711: The need for the raising and lowering of entrance and exit steps characteristic of other Muni Metro lines. [REDACTED] Media related to T Third Street at Wikimedia Commons Muni Metro Muni Metro is a semi-metro system (form of light rail ) serving San Francisco , California, United States. Operated by the San Francisco Municipal Railway (Muni), a part of the San Francisco Municipal Transportation Agency (SFMTA), Muni's light rail lines saw an average of 87,000 boardings per day as of
4902-457: The need to transfer at West Portal and Church stations. In November 2020, the SFMTA that announced some rail lines such as the N Judah and T Third would likely return in early 2021, followed by a gradual return to full operation. Kirschbaum said the agency was reconsidering its approach to maintenance after the botched attempt to reopen in August, and that it might take 5 to 8 years to fully address
4988-578: The new cars had a mean distance between failures (MDBF) of 3,300 mi (5,300 km) shortly after being delivered; by August 2019, the MDBF had improved to 8,000 mi (13,000 km). Siemens publicly unveiled a full-size mockup of the S200 SF in San Francisco on June 16, 2015. The first car was delivered from the Siemens plant in Sacramento to San Francisco on January 13, 2017. A test car passed
5074-482: The new dot-coms were headquartered — was built, and the underground section was switched to Automatic Train Operation (ATO). The Breda cars, however, came in noisy, overweight, oversized, under-braked, and over-budget (their price grew from US$ 2.2 million per car to nearly US$ 3 million over the course of their production). In fact, the new trains were so heavy (10,000 pounds (4,500 kg) more than
5160-468: The northern entrance and street elevator on the northwest corner of Market and 17th. The station was constructed by BART as part of the Market Street subway. The BART Board approved the name "Castro" in December 1965. It was designed by Howard Grant AIA of Reid & Tarics Associates and was completed in 1976. Service at the station began on June 11, 1980. Castro station features a transit plaza at
5246-410: The older Twin Peaks Tunnel and the newer Market Street subway, both controlled by automatic train operation systems to run trains with the operators closing the door to allow the train to pull out of a station. This ATO system was upgraded in 2015 to replace outdated software and relays . The tunnels, 5.5 miles (8.9 km) in total length, run from West Portal Station in the southwestern part of
SECTION 60
#17327760388405332-406: The option of 15 additional cars was exercised on a contract worth US$ 42,300,000 (equivalent to $ 77,366,920 in 2023), making the last batch of 15 cars US$ 2,600,000 (equivalent to $ 4,755,414 in 2023) each. By 2011, the fleet of Breda LRVs was only able to manage a mean distance between failures (MDBF) of 617 mi (993 km). With the Breda cars growing increasingly unreliable and
5418-525: The other seven— Castro Street , Church Street , Van Ness , Civic Center , Powell Street , Montgomery Street and Embarcadero—were opened in 1980 as part of the Market Street subway. Four stations, Civic Center, Powell Street, Montgomery Street, and Embarcadero, are shared with Bay Area Rapid Transit (BART), with Muni Metro on the upper level and BART on the lower one. Above ground, there are twenty-four surface platform stations. Two stations, Stonestown and San Francisco State University , are located at
5504-471: The pantograph locked down), and weighs 78,770 pounds (35,730 kg), making it comparable in size and weight to the existing Breda cars. The expected maximum capacity is 203 passengers per car. They are expected to have the same coupling device as the Breda cars; however, the new Siemens trains can couple up to five cars at a time. The new S200 SF vehicles are projected to be able to run 59,000 miles (95,000 km) between maintenance intervals. Initially,
5590-521: The platform area. Faregates closest to an unmanned Muni staff booth open automatically if a passenger has a valid pass or transfer that cannot be scanned. Muni's fare inspectors may board trains at any time to check for proof of payment from passengers. All cars are also equipped with Clipper card readers near each entrance, which riders may use to tag their cards to pay their fare. The cards themselves are then used as proof of payment; fare inspectors carry handheld card readers that can verify that payment
5676-469: The portals in time to combine into longer trains. In the mid- to late-1990s, San Francisco grew more prosperous and its population expanded with the advent of the dot-com boom , and the Metro system began to feel the strain of increased commuter demand. Muni criticism had been something of a feature of life in San Francisco, and not without reason. The Boeing trains were sub-par and grew crowded quickly. And
5762-404: The same year. The line was rerouted north of 4th and King to travel through the Central Subway to Chinatown on January 7, 2023. It was the first line added to the Muni Metro system since the N Judah in 1928. The T Third Street's northern terminus is Chinatown station inside the Central Subway . Trains operate south below Stockton Street to Union Square/Market Street station , which offers
5848-406: The south and west of the city, passengers must board at the front of the train and pay their fare to the train operator to receive their ticket; those who already have a ticket, or who have a daily, weekly, or monthly pass, can board at any door of the Metro streetcar. Subway stations have controlled entries via faregates , and passengers usually purchase or show Muni staff a ticket in order to enter
5934-479: The southern edge of the city, opened as part of the Third Street Light Rail Project . Limited weekend T line service began on January 13, 2007, while full service began on April 7, 2007. The line initially ran from the southern terminus at Bayshore Boulevard and Sunnydale Street to Castro Street Station in the north. The line ran into initial problems with breakdowns, bottlenecks, and power failures, creating massive delays. Service changes to address complaints with
6020-533: The southwestern part of the city, while the rest are located on the eastern side of the city, where the system underwent recent expansion as part of the Embarcadero extension and the Third Street Light Rail Project . However, many of the stops on the system are surface stops consisting of anything from a traffic island to a yellow-banded "Car Stop" sign painted on a utility pole. All subway and surface stations are accessible to people with disabilities. Because
6106-470: The surface of Market Street through to the Transbay Terminal , and the Muni Metro was closed on weekends. At the end of the service day September 19, 1982, streetcar operations on the surface of Market Street were discontinued entirely, the remaining PCC cars taken out of service, and weekend service on the five light rail lines was temporarily converted to buses. Finally, on November 20, 1982,
6192-433: The system expanding with the construction of the Central Subway , Muni requested bids for a new generation of light rail vehicles. Muni prequalified CAF , Kawasaki and Siemens to bid on the request while Breda was disqualified based on a ranking of potential bidders. The contract was awarded to Siemens for the purchase of up to 260 cars to be delivered in three phases: the initial firm order of 24 cars would accommodate
6278-609: The system uses high-floor vehicles, while operating as a streetcar, the vehicles are not accessible to people with disabilities that impact their mobility. A select number of stops, typically located near major intersections, are equipped with ramps or lifts , for people with disabilities. Muni Metro has two rail yards for storage and maintenance: Notes Muni Metro first operated Boeing Vertol -made US Standard Light Rail Vehicles (USSLRV), which were built for Muni Metro and Boston 's MBTA . Boeing had no experience in making LRVs, and has not made another since. The first cars of
6364-534: The system's vulnerabilities. Among the most urgent issues was replacing the track ballast in the Twin Peaks Tunnel , which was meant to be replaced during a maintenance project in 2018 but was instead reused at that time. City supervisors harshly criticized the mistake, which SFMTA director Jeffrey Tumlin blamed on a "culture of fear" he was working to correct since becoming the agency's leader in 2019. The surface-only (from Market Street to Balboa Park) J Church route resumed service on December 19, 2020, followed by
6450-470: The system, including the other three escalators at Castro, in 2018–19. Muni plans to construct accessibility improvements, including a second elevator, in Harvey Milk Plaza at the south entrance of the station. A 2020 determination that the plaza is eligible for inclusion on the California Register of Historical Resources was not expected to impact elevator construction, but could stall
6536-466: The third quarter of 2024 and a total of 24,324,600 boardings in 2023, making it the sixth-busiest light rail system in the United States . Five services – J Church , K Ingleside , L Taraval , M Ocean View , and N Judah run on separate surface alignments and merge into a single east–west tunnel, the Market Street subway . The T Third Street uses a north–south tunnel downtown, the Central Subway . The supplementary S Shuttle service operates within
6622-488: Was US$ 333,000 (equivalent to $ 1,555,586 in 2023). The federal government offered to provide 80% of the funds for design and production of the USSLRV in exchange for a commitment to keep the cars in service for at least 25 years, but the cars, as-delivered, were prone to jammed doors, defective brakes and motors, leaky roofs, mechanical breakdowns, and were involved in several accidents. Muni Metro added 30 more cars to
6708-553: Was a spectacular service crisis, widely referred to as the "Muni meltdown", in the summer of 1998. During this period, two reporters for the San Francisco Chronicle —one riding in the Muni Metro tunnel and one on foot on the surface—held a race through downtown, with the walking reporter emerging the winner. After initial problems with the ATC were fixed, substantial upgrades to the entire Muni transit systems have gone
6794-463: Was converted to light rail, with larger US Standard Light Rail Vehicles , in the late 1970s and early 1980s. This included the opening of the Market Street subway as well as an extension of three lines to Balboa Park station . An extension along The Embarcadero to the Caltrain terminal at 4th and King Street opened in 1998. The T Third Street line opened in 2007, serving the southeastern portion of
6880-559: Was created in 1909 and opened its first streetcar lines in 1912. Five of the current lines were added in the following decades: the J in 1917, the K (including the Twin Peaks Tunnel) in 1918, the L in 1919, the M in 1925, and the N in 1928. The other Municipal Railway streetcar lines, and those of the privately owned Market Street Railway , were converted to buses in the 1920s to 1950s, but these five lines were retained as streetcars because of their private rights of way. The system
6966-457: Was deferred due to insufficient funding. A $ 3.5 million construction contract was issued in 2014. Construction started in July 2016 and was completed in 2019. Another loop at 25th and Illinois is proposed to increase short-line service frequency between Downtown and Dogpatch. The underground section of the line was closed west of Castro station from June 25 to August 24, 2018, due to
7052-403: Was made. In subway stations, riders instead tag their cards on the faregates to gain access to the platforms. Castro station The station consists of two side platforms next to the tracks on the second level down with the concourse mezzanine level overlooking it. Uniquely among Muni Metro stations, the platforms are slightly curved due to the transition from the Market Street subway to
7138-505: Was only able to supply 66–72 working cars for rush-hour service instead of the required 99 cars, resulting in system delays. Despite the shortcomings of the USSLRV design, these cars constituted the entire light rail fleet until 1996, when new Breda -manufactured cars were put into service, replacing Boeing cars as they were accepted for service. By 1998, the 136-car Muni Metro fleet consisted of 57 Boeing Vertol cars and 79 Breda cars. Two Boeing cars were preserved for potential donation to
7224-439: Was re-replaced with buses on August 25 due to issues with malfunctioning overhead wire splices and the need to quarantine control center staff after a COVID-19 case. Rail service resumed on the Embarcadero–Sunnydale section of the T Third Street line on January 23, 2021. In preparation for the return of rail service, several temporary changes were made at the 4th Street bridge over China Basin: one southbound lane became
7310-491: Was replaced with buses due to the COVID-19 pandemic . The SFMTA reopened rail service on August 22, 2020, but returned to bus substitution three days later, citing malfunctioning overhead wire splices and the need to quarantine control center staff after a COVID-19 case. During this brief time, routes were reconfigured to improve reliability in the subway: Advocates with local nonprofit Senior and Disability Action criticized this route configuration, expressing concern over
7396-512: Was the N Judah , which started service after the Sunset Tunnel opened in 1928. In the 1940s and 1950s, as in many North American cities, public transit in San Francisco was consolidated under the aegis of a single municipal corporation, which then began phasing out much of the streetcar network in favor of buses. However, five heavily used streetcar lines traveled for at least part of their routes through tunnels or otherwise reserved right-of-way , and thus could not be converted to bus lines. As
#839160