Misplaced Pages

Anderson Regional Transportation Center

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Anderson Regional Transportation Center (RTC) (noted on MBTA schedules and maps as Anderson/Woburn , and on Amtrak schedules and maps as Woburn–Anderson ) is a train and bus station located at 100 Atlantic Avenue, off Commerce Way, in Woburn, Massachusetts , a suburb of Boston . It can be accessed from Exit 30 off Interstate 93 or Exit 54 (Washington Street) from southbound Interstate 95 / Route 128 .

#811188

118-527: It opened on April 28, 2001, replacing nearby Mishawum as Woburn's main Amtrak and MBTA station. It was named in memory of James R. "Jimmy" Anderson (1968–1981), whose death led to the Woburn Wells court case ( Anderson v. Cryovac ) chronicled in the book, and film, A Civil Action . A station at South Wilmington was open until June 14, 1959. The station and the surrounding commercial-industrial area

236-531: A private station serving an industrial park. By that time, a new station to serve Woburn was under development. In July 1978, the MBTA purchased an industrial site on the south side of Mishawum Road for a reported $ 560,000 for use as a park and ride station. Contamination from improperly dumped industrial waste was an issue at many sites in Woburn ; 187 55-gallon drums of polyurethane resin were discovered at

354-534: A below-ground garage in January 2007. Although local opinion favored a smaller residential building, 210 units was considered the minimum number to bring restoration of Mishawum as a full-time station into consideration. Environmental approval was granted two months later. Construction of the office building also included a large ramp structure leading to the inbound platform to replace the old ramp. The office building, garage, and ramp were completed around 2010, but

472-576: A cost of $ 203 million, with deliveries to begin in mid-2026. An $ 165 million option for 39 additional coaches (29 trailers and 10 cab cars), which would allow the retirement of all remaining single-level equipment, was exercised in November 2024 with deliveries to begin in 2027. As the MBTA assumed control of the commuter rail during the 1970s, it inherited various equipment from predecessor railroads. The 1976 purchase of B&M and Penn Central equipment included 94 Budd Rail Diesel Cars (RDCs) – 86 from

590-892: A freight-only track between Providence and Central Falls. No freight operates on the Needham Line, the Northeast Corridor between Readville and Back Bay, the Old Colony mainline between Boston and the Greenbush Line junction in Braintree, the Plymouth/Kingston Line, and most of the Greenbush Line. CSX also operates on most northside lines; prior to its 2022 purchase by CSX, Pan Am Railways operated over these lines. The Berkshire and Eastern Railroad (formerly Pan Am Southern ) operates over

708-476: A large increase was expected. Since it owned the tracks and equipment, the MBTA bid out the operating contract, which was won by the B&;M. The B&M began operating the southside lines on March 15, 1977; for the first time, all Boston commuter service was operated by one entity. Although all operation was subsidized by this time, a small number of cuts took place. The lightly used Lexington Branch closed after

826-645: A local train in the same direction). Portions of the Fitchburg, Haverhill, and Newburyport/Rockport lines operate under NORAC rule 251, which allow trains to run only in a single direction on each track. Most lines are either double track , or single track with passing sidings; portions of the Northeast Corridor have three or four tracks. Freight service is operated over most of the MBTA Commuter Rail system by several private railroads. CSX Transportation operates freight on most southside lines, of which

944-430: A number of freight-only or abandoned lines. This also marked the start of a five-year contract for the B&M to operate the service, replacing a series of one-year contracts. After acquiring the B&M and Penn Central rolling stock, the MBTA painted it with purple, yellow, silver, and black to create a visual identity. Federal subsidies allowed MBTA subsidies to Penn Central to remain the same until March 1977, when

1062-598: A planned apartment complex was not built. The station has been closed since December 14, 2020, when reduced schedules were introduced during the COVID-19 pandemic. Mishawum station is located in the north part of Woburn, just north of the Route 128 / I-95 beltway. The station has two side platforms serving the two tracks of the New Hampshire Main Line . The platforms, located in a cut, run north from near

1180-404: A renewal of the commuter rail operating contract, which expired at the end of 1986. Amtrak won the contract for commuter rail operations and took over the system on January 1, 1987. Gardner service was cut back to Fitchburg at that time due to a dispute between Amtrak, Guilford, and the MBTA. The late 1980s saw the beginning of substantial expansion of the system. The Southwest Corridor project

1298-675: A seasonal weekend-only service to Cape Cod , operates using MBTA equipment over the Middleborough/Lakeville Line plus the Cape Main Line (which is not otherwise used by the MBTA). Special express service to Foxboro station is operated during New England Patriots home games and some other events at Gillette Stadium . It runs from South Station via the Franklin/Foxboro Line, and from Providence via

SECTION 10

#1732782805812

1416-524: A series of experiments to determine how fares and service levels affected ridership. This included a trial on the MTA bus network, as well as a $ 4 million test from January 1963 to March 1964 on New Haven and B&M lines. (The NYC, uninterested in its commuter service, declined to participate.) The MTC found that higher frequency was most important to attract additional ridership; lower fares would attract additional riders, while even higher fares would not result in

1534-481: A single weekend. As with other MBTA services, discounted fares and passes are available for several groups including disabled passengers, passengers over age 65, and students attending certain schools. Foxboro special event services and the CapeFlyer have separate fares; regular MBTA fares and passes are not valid. Fares are collected by train conductors; while fare evasion is explicitly illegal under state law, it

1652-428: A single zone to $ 7.25 for travel between Zone 1 and Zone 10. Fares can be purchased on the MBTA mTicket app, at automatic vending machines located at major stations, from businesses near some stations, or from conductors on board trains. Discounted passes include monthly passes (with or without free transfer to other MBTA services), "flex passes" valid for five 24-hour periods, and $ 10 passes offering unlimited travel on

1770-538: A snowstorm on January 10, 1977. Declining subsidies from Rhode Island resulted in off-peak Providence service being cut back to Attleboro in April 1979, with peak service cut on February 20, 1981. Woburn Branch service ended on January 30, 1981, amid state budget cuts. However, the energy crises of the 1970s and the formation of regional transit authorities prompted some expansions and improvements. $ 70 million in reconstruction work (equivalent to 582 million in 2023) on

1888-402: A strategy to expand Manchester's visibility as a less crowded alternative to Logan Airport, was replaced with a non-free private shuttle to downtown Boston at the end of June 2008. There are separate parking lots for overnight parking and for commuter rail (day-only) parking. The overnight lot is intended for airport and Amtrak customers and is more expensive. The Massport lot has 875 spaces and

2006-776: Is signalled and operates with Positive Train Control using the Advanced Civil Speed Enforcement System . The southside lines have cab signals for automatic train control ; cab signals will be placed in service on the northside lines in 2023. The MBTA is a member of the Northeast Operating Rules Advisory Committee (NORAC) and uses its operating rules. Most portions of the system operate under NORAC rules 261 and 562, which allow bidirectional train movements on every track (such as an express train passing

2124-485: Is standard in the northeastern United States . Some accessible stations have full-length high platforms for accessible boarding on all cars; others only have "mini-high" platforms about 40 feet (12 m) long – which allow for level boarding on two cars – with the rest of the platform length not accessible. As of December 2022 , the MBTA is designing a temporary accessible platform that can be added to stations pending full reconstructions. The MBTA Commuter Rail system

2242-679: Is about 5 miles, with most outer terminals in zones 6 through 8. Only two stations use further zones: T.F. Green Airport in Zone 9, and Wickford Junction in Zone 10. Zone 1A fares are identical to MBTA subway fares (though subway passes on CharlieCards are not accepted, except for Fairmount Line stations that have CharlieCard validator machines). As of 2024 , one-way fares within Zone 1A are $ 2.40, while fares between further zones and Zone 1A range from $ 6.50 for Zone 1 to $ 13.25 for Zone 10. Trips that do not enter Zone 1A have less expensive interzone fares; as of 2024 , these range from $ 2.75 for travel within

2360-474: Is further from the commercial and residential center of Woburn, and local officials and business owners desired to retain the stop. After pressure from local politicians, the MBTA agreed to keep Mishawum open as a limited-service reverse commute stop for workers who live in Boston. A bill in the state legislature to study reestablishing Mishawum as a full-time stop died in committee in 2002 and 2003. During

2478-904: Is not criminal. Faregates have also been installed at North Station, with plans for installation at Back Bay and South Station. The second-generation MBTA fare collection system, planned for completion in 2025, will standardize fare media across modes and allow uses of CharlieCards for all commuter rail trips. Eight intercity mainlines radiating from Boston opened between 1834 and 1855: the Boston and Worcester Railroad (B&W) in 1834–35, Boston and Providence Railroad (B&P) in 1834–35, Boston and Lowell Railroad (B&L) in 1835, Eastern Railroad in 1838–1840, Fitchburg Railroad in 1843–45, Boston and Maine Railroad (B&M) in 1845, Old Colony Railroad and Fall River Railroad in 1845–46, and Norfolk County Railroad in 1849–55. Commuter rail service allowing suburban residents to work in Boston began with

SECTION 20

#1732782805812

2596-527: Is one of the least busy stations on the commuter rail system. The Boston and Lowell Railroad opened in 1835, with a North Woburn station opened by midcentury. It was renamed Mishawum around 1885 when the Woburn Loop opened with its own North Woburn station. Served by only a handful of daily trains during the 20th century, the station closed around 1950. The Massachusetts Bay Transportation Authority (MBTA), which took over Boston commuter rail service in

2714-588: Is operated by Keolis Commuter Services – a subsidiary of French company Keolis – under contract to the MBTA. The MBTA owns all passenger equipment and most stations. Most trackage is also owned by the MBTA. The Massachusetts Department of Transportation (parent agency of the MBTA) owns several portions of the Framingham/Worcester Line as well as the Grand Junction Branch , which is used for non-revenue equipment moves between

2832-478: Is provided by push-pull trains powered by diesel locomotives with a cab car on the opposite end. The locomotive is usually on the end facing away from Boston so that diesel exhaust does not enter the passenger concourses at North Station and South Station. Trains typically have four to eight coaches (with six the most common) and seat between 400 and 1,400 passengers. Approximately 62 trainsets are needed for weekday service. The primary heavy maintenance facility

2950-708: Is the MBTA Commuter Rail Maintenance Facility , located in the Inner Belt District in Somerville . It is also used for midday and overnight storage of trains on the northside lines. Southampton Street Yard and the Readville Interim Layover facility are used for light maintenance and layover service. Various other layover facilities are used for midday and overnight storage; most are located near

3068-470: The 2004 Democratic National Convention held at the Fleet Center , commuter rail service was not operated into North Station due to security concerns about North Station's location under the arena. Lowell Line service operated only to West Medford , with bus service operated from several stations to downtown Boston The parking area at Mishawum was reopened for one week, with express buses (numbered as

3186-587: The Anderson Regional Transportation Center (RTC) had 2,400 parking spaces to replace the 600 at Mishawum. Located 1 mile (1.6 km) north of Mishawum, it had direct access to I-93 via the new interchange and a larger station building for bus and train passengers. Logan Express service shifted to Anderson RTC effective April 8, 2001; full commuter rail service followed on April 28. The MBTA originally intended to close Mishawum after Anderson RTC opened. However, Anderson RTC

3304-469: The Boston and Lowell Railroad (B&L) opened in 1835, passenger service operated express between its two endpoints. Over the next several decades, a number of local stops were opened – often several in each town. North Woburn station was opened at Middle Street in the village of New Boston by the 1850s. On November 30, 1885, the Woburn Branch was extended north from Woburn to reconnect with

3422-632: The CapeFLYER . The agency issued a $ 279 million contract (total project cost of $ 345 million) for 80 additional Rotem bilevel coaches in September 2019, with delivery expected from September 2022 to June 2024. The contract was later modified to 83 coaches, of which 43 are cab cars. The first four of the 83 bilevel cars arrived in June 2022 and entered service in 2023. In May 2024, the MBTA exercised an option order for 41 additional trailer coaches at

3540-529: The Old Colony Lines and Greenbush Line , which have full-length high-level platforms at all stops. All BTC-3, CTC-3, BTC-4C, and BTC-4D coaches have restrooms. During winter months, a Ski Train serving Wachusett Mountain runs on the Fitchburg Line , using a coach car which is equipped for carrying bicycles or skis. Three converted coaches – a bike car and two cafe cars – are reserved for

3658-775: The Riverside –Framingham portion of the Worcester Main Line. (The inner section of that line was already owned by the Massachusetts Turnpike Authority .) The purchase also included several freight-only or abandoned lines, including the Old Colony mainline between Braintree and Brockton. Subsidies began for the Framingham Line in January 1973, for Canton Junction and Sharon stations in June 1973, and all Providence/Stoughton Line service on September 28, 1976. The MBTA purchased

Anderson Regional Transportation Center - Misplaced Pages Continue

3776-485: The Route 128 / I-95 and I-93 expressways. By June 1985, the MBTA planned to add 500 additional spaces; this was soon scaled down to 250 additional spaces. The station was not originally accessible . With the pending passage of the Americans with Disabilities Act , the MBTA announced a $ 1.1 million renovation of the station on September 29, 1989. The project, which included mini-high platforms for accessibility and

3894-723: The commuter rail arm of the Massachusetts Bay Transportation Authority 's (MBTA's) transportation coverage of Greater Boston in the United States . Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis , which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR). In 2023, the system had a ridership of 26,190,500, or about 109,300 per weekday as of

4012-404: The 128/95 overpass and pass under Mishawum Road. At the north end of the platform are mini-high platforms ; they are missing their platform edges, so the station is not accessible . A pedestrian level crossing connects the two platforms. A switchback ramp structure leads from the west (inbound) platform to an at-grade parking lot, which primarily serves an adjacent commercial development. When

4130-641: The 1920s. Service levels declined more significantly during the 1930s; the 88 stations case resulted in the New Haven closing dozens of suburban stations and several lines in 1938. The BRB&L ceased all operations in 1940. Ridership increased during World War II but decreased soon afterwards, prompting further cuts. The railroads converted from steam to diesel in the 1950s. All three purchased substantial fleets of Budd Rail Diesel Cars , which lowered operating costs – but not enough to save most branch lines. A 1945–47 state report proposed suburban extensions of

4248-425: The 1960s, opened a park and ride station at Mishawum in 1984. A 1989–1991 renovation made the station accessible, and Logan Express bus service began in 1992. It was replaced by Anderson Regional Transportation Center in 2001 and service was reduced to three daily round trips; the station has not been accessible since around 2007. An adjacent office building opened as transit-oriented development around 2010, but

4366-408: The 1980s, but several infill stations were opened, including Shirley in 1981, West Natick in 1982, Mishawum in 1984, and Chelsea in 1985. The MBTA also began replacing the aging Rail Diesel Cars and other equipment; 18 EMD F40PH diesel locomotives and 60 passenger cars arrived between 1978 and 1980. Several major disruptions occurred in the mid-1980s. On January 20, 1984, a fire destroyed

4484-524: The 2008-built network. The MBTA would not pay for the new network; the company would have a two-tier model with a fee for higher bandwidth. The MBTA canceled the plan in August 2017 due to local opposition to the erection of 320 monopoles , each 70-foot (21 m) tall, as well as the need to focus on more critical projects like the Green Line Extension . By that time, the 2008-built system

4602-440: The 2020s. A new midday layover yard at the former Beacon Park Yard is planned to be constructed by 2032 as part of the realignment of I-90. A large midday and overnight layover yard, which would support expanded service including regional rail and electrification , is planned at Widett Circle near South Station. The MBTA also plans to construct a southside maintenance and layover facility at Readville in 2023–2028, replacing

4720-492: The 250-space parking lot expansion, was completed on May 17, 1991. On November 16, 1992, Peter Pan Bus Lines began operating Logan Express bus service from Mishawum to Logan Airport via I-93 under contract to Massport , following the success of similar services running from Braintree and Shopper's World in Framingham. A waiting room and expanded parking lot were soon built for Logan Express passengers. The route

4838-575: The B&A was reduced from four to two tracks in 1959 for construction of the Massachusetts Turnpike , with several inner stations closed; all local stops west of Framingham were closed in 1960. The New Haven filed for bankruptcy for the last time in 1961. Faced with the imminent threat of losing what service remained, public opinion began to support subsidies for commuter rail. The state Mass Transportation Commission (MTC), formed in 1959 to coordinate transportation and land use, held

Anderson Regional Transportation Center - Misplaced Pages Continue

4956-479: The B&M Western Route between Somerville and Wilmington Junction in September 1973 for construction of the Haymarket North Extension . From 1967 to 1973, a series of state appropriations covered 90–100% of outside-of-district subsidy. This was reduced to 50% in January 1974, substantially increasing the cost of these municipalities. This resulted in several cuts as municipalities refused

5074-434: The B&M and eight from Penn Central – plus 116 Penn Central coaches and 25 Penn Central E8 and GP9 diesel locomotives. Although the MBTA purchased some new equipment in 1978–1980, large locomotive and coach fleets were not purchased until the late 1980s, so the first decade of combined operations used a variety of secondhand equipment in addition to that acquired in 1976: Most of the secondhand and inherited equipment

5192-677: The B&M discontinued the Concord trip; the Dover trip was cut back to Haverhill with local subsidies. In 1969, the B&M averaged 24,000 weekday passengers, with a yearly deficit of $ 3.2 million (equivalent to 27 million in 2023). The single daily trip on the Central Mass Branch ended on January 26, 1971. On July 28, 1965, the MBTA signed an agreement with the New Haven Railroad to purchase 11 miles (18 km) of

5310-415: The B&M in 1983. This did not initially affect commuter rail operations. Guilford's attempts to regain profitability, which included reducing employee headcount and pay, soon soured labor relations. This resulted in two strikes by Guilford employees; the first shut down the commuter rail system from March 21 to May 12, 1986. Local media was critical of Guilford during the strike; the company did not bid for

5428-630: The B&W in 1834; by the 1860s, commuting was possible on the eight mainlines and a number of branch lines. Mergers prior to the 1880s were primarily acquisitions of branch lines and consolidations with connecting lines: the B&A merged with the Western Railroad in 1874 to become the Boston and Albany Railroad (B&A), the Fall River Railroad and several other lines merged into the Old Colony Railroad, and

5546-608: The Boston terminal areas, with several exceptions. The Providence/Stoughton Line and Franklin/Foxboro Line both use the Northeast Corridor between Readville and South Station, with the Needham Line also sharing the tracks between Forest Hills and South Station. The Old Colony Lines and the Greenbush Line all use the Old Colony mainline between South Station and Braintree . The Haverhill Line and Newburyport/Rockport Line share tracks between North Station and near Sullivan Square . A small number of Haverhill Line trains use

5664-466: The COVID-19 pandemic. Six additional stations are under construction as part of the South Coast Rail project; several other stations are planned. South Station, North Station, and Back Bay all have MBTA subway and Amtrak connections; nine other stations have subway connections, and six others have Amtrak connections. Stations range in size from small platforms like North Wilmington to

5782-506: The December 14 vote went into place, with no weekend service on seven lines. Service changes on April 5, 2021, increased midday service on most lines as part of a transition to a regional rail model. Weekend service on the seven lines resumed on July 3, 2021. Ridership dropped substantially during the COVID-19 pandemic, with daily boardings just 12,800 during the first quarter of 2021. Ridership rose to 47,100 average weekday boardings in

5900-565: The Eastern in 1883, the B&L in 1887, and the Fitchburg in 1900, giving it a near-monopoly on rail service north of Boston. North Union Station was built in 1893 to provide a union station for northside service; it was replaced by North Station in 1928. The Old Colony obtained control of the B&P in 1888; the New York, New Haven and Hartford Railroad acquired the Old Colony in 1893 to obtain access to Boston. The New Haven also acquired

6018-673: The Fitchburg Line west of Ayer. Their combined Freight Main Line between Mechanicville, New York , and Mattawamkeag, Maine , shares tracks with sections of the Fitchburg, Lowell, and Haverhill lines. No freight service is operated over the Newburyport/Rockport Line north of Salem . Weight limits and loading gauge vary across the system. The full Framingham/Worcester line is rated for car weights of 315,000 pounds (143,000 kg), sections of lines that are part of

SECTION 50

#1732782805812

6136-718: The Franklin Line and several northside lines, partially funded by the Urban Mass Transportation Administration , began in 1977 under the Commuter Rail Improvement Program. Service to Haverhill resumed on December 17, 1979, and to Fitchburg and Gardner on January 13, 1980. Federally-funded experimental service to Nashua , Manchester , and Concord, New Hampshire ran from January 28, 1980, to March 1, 1981. Little-used stations continued to be closed until

6254-570: The Freight Main Line for 286,000 pounds (130,000 kg), and other lines for lower weights. The western portion of the Framingham/Worcester Line and the southern section of the Providence/Stoughton line can accommodate cars up to 20 feet 8 inches (6.30 m) ( AAR Plate H or Plate K ). The Fitchburg Line west of Ayer can accommodate cars up to 19 feet 0 inches (5.79 m) (AAR Plate J), while most of

6372-534: The Lowell and Haverhill lines. Private companies also operate freight service over much of the system (see § Freight service ). As of November 2024 , there are 137 active stations – 55 northside and 82 southside. One additional station, Haverhill , is temporarily closed due to reconstruction of an adjacent bridge. Five additional stations ( Prides Crossing , Mishawum , Hastings , Plimptonville , and Plymouth ) are indefinitely closed due to service cuts during

6490-411: The MBTA awarded Keolis the contract for $ 2.68 billion over eight years, with the possibility of two two-year extensions that could bring the total price to $ 4.3 billion. Keolis took over the operations on July 1, 2014. Keolis lost $ 29.3 million in its first year of operation. In June 2020, the MBTA extended the contract through at least 2025. Free Wi-Fi internet service was piloted in January 2008 on

6608-575: The MBTA clashed with state regulators: several stations including West Natick and Chelsea were built without accessible platforms despite state rules; the latter resulted in fines from the Massachusetts Architectural Access Board (MAAB). The opening of South Attleboro was delayed by the MAAB because of the MBTA's refusal to build full-length high-level platforms. However, the MBTA did slowly increase accessibility of

6726-509: The MBTA lot has 1,500 spaces. Mishawum station Mishawum station is an indefinitely-closed MBTA Commuter Rail Lowell Line station located in the north part of Woburn, Massachusetts just north of the Route 128 / I-95 beltway. The station has two side platforms serving the line's two tracks. Mishawum is a limited-service flag stop intended for reverse commuting to the adjacent office park, with no weekend service. With just 32 boardings on an average weekday in 2018, Mishawum

6844-493: The MBTA owned 552 coaches. Of these, 448 were in active service, three being repaired or overhauled, and 101 stored pending disposition or reuse. Coaches whose designations start with BTC (Blind Trailer Coach) are conventional coaches, while those starting with CTC (Control Trailer Coach) are cab cars . Coaches acquired before 1990 were single-level cars with 88 to 127 seats; those since are bilevel cars with 173 to 185 seats. Some coaches are equipped with electronic doors for use on

6962-463: The MBTA proposed to close six low-ridership stations. On December 14, the MBTA Board voted to enact a more limited set of cuts, including indefinitely closing five stations. That day, temporary reduced schedules were again put into place, with four of the five stations ( Hastings , Silver Hill , Prides Crossing , and Plimptonville ) not served. On January 23, 2021, reduced schedules based on

7080-498: The MBTA's financial state, leaving Mishawum with no remaining bus connections. The abandoned Logan Express building was demolished in 2014 for the construction of a Dave and Busters , which opened in 2015. With just 32 boardings on an average weekday in 2018, Mishawum is one of the least busy stations on the commuter rail system. Prior to the COVID-19 pandemic , weekday service to Mishawum consisted of three outbound trains during

7198-506: The MTA service area were closed; three more branches closed in 1959. The New Haven experimentally increased Old Colony Division service for several years in the 1950s, but new management soon sought to reduce costs. Service to Fall River and New Bedford was cut in 1958; a one-year state subsidy was given for the remaining Old Colony service, which ended in 1959 after the Southeast Expressway opened. The inner portion of

SECTION 60

#1732782805812

7316-728: The New England Railroad (successor to the NY&;NE) in 1898. South Station opened in 1899 as a union station for the southside lines (New Haven and B&A). The New York Central and Hudson River Railroad – which later became the New York Central) (NYC) – leased the B&A in 1900; this brought all Boston commuter service save the BRB&;L under the control of three large multi-state railroads. The three railroads all planned electrification of some suburban lines in

7434-555: The New Haven had Interstate Commerce Commission (ICC) permission to discontinue them otherwise. Three out-of-district stations were cut, while Franklin subsidized its station. The Millis and Dedham lines were discontinued on April 21, 1967. The NYC and the Pennsylvania Railroad merged to form Penn Central on February 1, 1968; the New Haven joined at the end of the year. Penn Central declared bankruptcy in 1970. Amtrak took over most intercity passenger service in

7552-557: The Norfolk County Railroad eventually became part of the New York and New England Railroad (NY&NE). The narrow gauge Boston, Revere Beach and Lynn Railroad (BRB&L) opened in 1875, competing with the inner portion of the Eastern Railroad. Unlike the other lines, it never built rails into downtown Boston, and instead relied on a ferry connection from East Boston . The B&M obtained control of

7670-469: The Old Colony Lines. The lines vary in length from the 9.2-mile (14.8 km) Fairmount Line to the 62.9-mile (101.2 km) Providence/Stoughton Line, with typical lengths in the 25–40-mile (40–64 km) range. The system has 394 miles (630 km) of revenue trackage and covers roughly the eastern third of Massachusetts plus central Rhode Island. Most lines do not share trackage outside

7788-545: The Providence/Stoughton Line has 37. Running times vary from 30 minutes on the Fairmount Line to nearly 120 minutes for some Providence/Stoughton Line trips, with 60–75 minutes typical. Most trains stop at all stations on the line; some stations have limited service, and peak-hour express trains operate on several lines. Several lines additionally have some short turn service. The CapeFlyer ,

7906-456: The Providence/Stoughton Line. During the winter, one "ski train" round trip of the Fitchburg Line operates with a bicycle car on weekends and Wednesday evenings, with a shuttle bus to Wachusett Mountain . All MBTA commuter rail service is provided by push-pull trains powered by diesel locomotives (see § Rolling stock ). Maximum speed for trains is 79 miles per hour (127 km/h), though some lines have lower limits. The entire system

8024-618: The Route 128 Business Council ran a "Metro North Shuttle" from the station to Lahey Hospital & Medical Center and a business center in Woburn. The service was discontinued in July 2006 due to poor ridership and a loss of state funding. In November 2006, the Manchester-Boston Regional Airport began a shuttle service between the airport and Anderson station, free to ticketed airline passengers. The shuttle, part of

8142-724: The Southwest Corridor, a shuttle service was retained as the Fairmount Line . Peak-hour service to Providence resumed in 1988 (with off-peak and weekend service later added); South Attleboro was added in 1990 as a park-and-ride station to replace Pawtucket–​Central Falls . The Franklin Line was extended to Forge Park/495 in 1988; infill stations in that era included Yawkey in 1988 to serve Boston Red Sox games at Fenway Park , and Dedham Corporate Center in 1990. Massachusetts had state accessibility laws since 1977 – prior to 1990 federal legislation . At times,

8260-405: The US on May 1, 1971, including New York–Boston trains. The state agreed in December 1971 to purchase 145 miles (233 km) of Penn Central rights of way to prevent them being sold off in bankruptcy. The MBTA purchased the lines effective January 27, 1973. They included almost all the lines with passenger service: the Attleboro Line and Stoughton Branch , Franklin Branch , Needham Branch , and

8378-401: The Woburn Loop, including North Woburn station, closed on June 14, 1959. The Massachusetts Bay Transportation Authority (MBTA) was formed in 1964 to subsidize suburban commuter rail service, with the ex-B&L becoming its Lowell Line . The MBTA ended remaining Woburn Branch service on January 30, 1981. This left Woburn without any commuter rail stations save for Lechmere Warehouse station ,

8496-557: The Worcester Line, where 45 coaches were fitted with routers which connected to cellular data networks. This was the first Wi-Fi available on a commuter rail service in the United States. The program was considered successful; in December 2008, the MBTA announced that Wi-Fi would be available on all trains by mid-2009. In July 2014, the MBTA announced that a private company would be building a new network by 2016 to replace

8614-401: The apartment complex was delayed and ultimately never built. However, the outbound stairs and the south ends of the platform were never renovated and are closed off. The mini-high platform edges that were removed around 2007 to repair another station were not replaced, making the station no longer accessible. Bus route 355 was discontinued in July 2012 as part of general service cutbacks due to

8732-406: The capping technique, in which an impermeable layer seals the top of the hazardous waste site, preventing further pollution. The station was originally to be called MetroNorth Center after the surrounding development. A groundbreaking ceremony for the station was held in April 2000. In October 2006, the MBTA added four short turn round trips that terminated at Anderson RTC. By 2012, the parking lot

8850-506: The early 20th century. The New Haven tested electrification on small parts of the Old Colony system, but never followed through on its plans to electrify South Station and the inner section of the ex-B&P. Despite a study to electrify the mainline to Framingham plus the Highland branch , the NYC only electrified the short Lower Falls Branch. Quadruple-tracking and electrification of part of

8968-545: The ex-Eastern Railroad was planned by the B&M around 1910 when it was briefly under control of the New Haven, but this fell through when they separated. Service levels on the three major railroads peaked around 1910 and began to decline from streetcar and later auto competition in the 1910s. The independent BRB&L electrified its mainline and single branch line in 1928 and increased service to near- rapid transit levels. Two Old Colony branches were converted to an extension of Boston Elevated Railway (BERy) rapid transit in

9086-636: The existing layover yard there, as the Grand Junction Branch will be closed for several years during the I-90 project. As of October 2024 , the MBTA owned 109 locomotives. Of these, 87 were in active passenger service. Eleven were undergoing rebuild, six awaiting repairs, and five retired or out of service. All passenger locomotives are equipped with head end power . Rebuilding of 37 F40PH-2C and F40PHM-2C locomotives to F40PH-3C class by MotivePower (MPI) began in 2017; other older locomotives are also being rebuilt by MPI or in-house. As of October 2024 ,

9204-609: The first quarter of 2022, and 85,000 (69% of 2018 ridership) in October 2022. Limited Foxboro service resumed in May 2022; full pilot service began that September. The service was made permanent effective October 2, 2023. In April 2024, the MBTA extended the Keolis contract by one year to June 30, 2027, at which time a successor contract will take effect. Silver Hill station reopened on November 18, 2024. All MBTA commuter rail service

9322-533: The former Old Colony mainline from Fort Point Channel to South Braintree in order to construct a new rapid transit line along the corridor. The line was expected to be completed within two years. The agreement also provided for the MBTA to subsidize commuter service on the railroad's remaining commuter rail lines for $ 1.2 million (equivalent to 10 million in 2023) annually. Subsidies for the Needham , Millis , Dedham , and Franklin lines began on April 24, 1966, as

9440-418: The funding district; those outlying municipalities were expected to reach their own subsidy agreements with the railroads. On December 14, 1964, the MBTA reached a subsidy agreement with the B&M. The agreement only covered in-district services; on January 5, 1965, the B&M discontinued interstate service except for single commuter round trips from Dover and Concord, New Hampshire ; Portsmouth service

9558-640: The higher subsidies: Ayer service was cut to South Acton on March 1, 1975; the single Newburyport trip ended on April 1, 1976; and the single Haverhill trip ended on April 2, 1976 (North Andover and Andover having previously ended subsidies.) The single round trip to Worcester , never subsidized, was cut to Framingham on October 27, 1975. Amtrak began running the Lake Shore Limited over that route four days later, restoring rail service to Worcester. State subsidies were increased back to 75% in June 1976 to prevent further cuts. Rapid transit extension

9676-581: The inner Lowell Line and the Wildcat Branch , while some Franklin/Foxboro Line trains (including all weekend trains) use the Fairmount Line rather than the Northeast Corridor. Several Amtrak intercity routes run on MBTA tracks: the Acela and Northeast Regional over the Providence/Stoughton Line, the Lake Shore Limited over the Framingham/Worcester Line, and the Downeaster over portions of

9794-682: The inner part of the Haverhill Line. The diverted trains stopped at Anderson/Woburn, with connecting shuttle buses operating to Reading . Beginning May 20, 2024, weekday midday inbound Haverhill Line trains were again temporarily routed over the Wildcat Branch during construction work, again stopping only at Anderson/Woburn. In June 2022, the MBTA indicated it was considering improvements to a siding in Woburn, which would allow 30-minute headways between Boston and Anderson/Woburn by 2024. Massport operates Logan Express bus service from

9912-492: The mainline at North Woburn Junction in South Wilmington. This new Woburn Loop had its own North Woburn station in the village center. Middle Street and the mainline station were soon renamed Mishawum , after the native name for what is now Charlestown (of which Woburn was originally part). The B&L was acquired by the rival Boston and Maine Railroad (B&M) in 1887. Most local trains were rerouted over

10030-402: The manufacture of glue were relocated on-site from buried pits to piles near swampy areas on the property. Many of the animal hide piles and lagoons on-site were leaching toxic metals into the environment. In the 1980s, the site contained streams and ponds, a warehouse and office buildings, remnant manufacturing buildings, and hide waste deposits buried on the site. The site was cleaned up using

10148-653: The morning rush hour and three inbound trains during the evening rush hour, with no weekend service. This was the same level of service the station had since 2001. Temporary reduced schedules based on existing Saturday schedules were in effect from March 16 to June 23, 2020. These schedules did not include Mishawum and five other limited-service stations not normally served on Saturdays. Temporary reduced schedules again went into effect on December 14, 2020, with Mishawum and four other stations not served. MBTA Commuter Rail [REDACTED] [REDACTED] The MBTA Commuter Rail ( reporting mark MBTX ) system serves as

10266-420: The new Woburn Loop. Mishawum station was a flag stop served by just three northbound and five southbound trains by 1917. It was served by one northbound and three southbound trains in 1929; by that time, only a small wooden shelter was available for passengers. Service to Mishawum was further reduced to one trip in each direction by 1946, and the station was abandoned entirely by 1952. The northern part of

10384-413: The normally unused route 53) running directly to South Station . The MBTA began planning for transit-oriented development around Mishawum station even before its 1984 opening. In 2004, the MBTA proposed a mixed-use development on the former parking lot with a fire station, residential units, and a hotel, but zoning for the plan was rejected by Woburn City Council due to concerns about high density in

10502-637: The northside and southside lines. Pan Am Southern owns the section of the Fitchburg Line between Fitchburg and Wachusett, while Amtrak owns the section of the Northeast Corridor (used by the Providence/Stoughton Line) in Rhode Island. Most lines operate on regular headways , though some have additional service at peak hours. Service levels vary by lines: the Greenbush and Kingston lines have 13 round trips on weekdays, while

10620-557: The other northside lines can accommodate up to 17 feet 0 inches (5.18 m) (AAR Plate F). The inner Fitchburg and Newburyport/Rockport Lines, and the southside except for the outer Framingham/Worcester Line, have height restrictions smaller than Plate F. MBTA Commuter Rail uses a zone fare system , with fares increasing with distance. Zone 1A includes the downtown terminals and other inner core stations up to about 5 miles (8.0 km) from downtown. Ten additional zones, numbered 1 through 10, extend outwards from Boston. Each zone

10738-557: The outer ends of the lines. Some maintenance and storage of MBTA equipment is contracted out to the Seaview Transportation Company in North Kingstown, Rhode Island . Several additional yards are under construction or planned. Two layovers are under construction for South Coast Rail, with service planned for mid-2025, and the Haverhill Line layover at Bradford is proposed for relocation later in

10856-489: The outer portion of the Worcester Line has the most freight traffic. Massachusetts Coastal Railroad operates south of Middleborough on the Middleborough/Lakeville Line, as well as on future South Coast Rail trackage. The Fore River Railroad operates between Braintree Yard and East Braintree on the Old Colony mainline and the Greenbush Line. The Providence and Worcester Railroad shares tracks with Providence/Stoughton Line trains between Providence and Wickford Junction; it uses

10974-483: The primarily suburban city. In July 2005, two developers bought the 7-acre site from the MBTA for $ 7.2 million. In August 2006, the City Council approved the parcel as a "transit oriented development overlay district" allowing the construction of apartment buildings up to 7 stories high, in addition to other possible uses. The Council approved a 210-apartment building and a 50,000 square foot office building with

11092-467: The rapid transit lines. MBTA maps began showing the B&M and Penn Central lines as a single system. Penn Central became Conrail on April 1, 1976; the MBTA purchased most of their commuter rolling stock at that time. After delays due to the B&M bankruptcy, the MBTA purchased the B&M commuter equipment, maintenance facility , and 250 miles (400 km) of right of way on December 27, 1976. This included all lines with passenger service, as well as

11210-745: The rapid transit system, largely using railroad rights-of-way, with the expectation that most commuter rail service would be cut back to the rapid transit terminals or abandoned entirely. Prompted by the report, part of the BRB&L was reactivated as rapid transit in 1952–54 by BERy successor Metropolitan Transit Authority (MTA), and the Highland branch was converted to a rapid streetcar line in 1958–59. The three railroads all made major cuts to suburban service in 1958–1960 as commuters began using new expressways. The B&M became unprofitable in 1958 and moved to shed its money-losing passenger operations. Four branch lines were cut that May, and most stations in

11328-449: The services becoming profitable. At the recommendation of the MTC, the Massachusetts Bay Transportation Authority (MBTA) was created on August 3, 1964, with a 78-municipality funding and service district. The MBTA was to build rapid transit extensions (as planned in 1947) along some lines, with the others to be subsidized or allowed to be discontinued. Most remaining lines ran to points outside

11446-556: The sprawling downtown terminals. Most stations outside downtown Boston have one or two side platforms or a single island platform . Standard MBTA platforms are about 800 feet (240 m) long – enough for a nine-car train – and a minimum of 12 feet (3.7 m) wide for side platforms and 22 feet (6.7 m) wide for island platforms. 110 active stations are accessible , including all terminals and all stations with rapid transit connections; 26 are not. The MBTA uses 48-inch (1,200 mm)-high platforms for accessible level boarding, as

11564-716: The state agreed to build a set of transit projects as part of the settlement of a lawsuit by the Conservation Law Foundation (CLF) over auto emissions from the Central Artery/Tunnel Project ( Big Dig ). Among these project were extensions of the Framingham Line to Worcester and the Ipswich/Rockport Line to Newburyport, restoration of the Old Colony Lines , and addition of 20,000 park and ride spaces outside

11682-399: The station directly to Logan Airport terminals, with service on hourly or half-hourly headways except late at night. Logan Express service moved from Mishawum to Anderson RTC on April 8, 2001, three weeks ahead of rail service. The move doubled Logan Express parking available in Woburn from 450 spaces to 900. Several other connecting services have previously been run. Beginning in June 2005,

11800-428: The station site during construction in 1979. The station appeared under several names on systems maps prior to opening: "Mishawum Park" in 1978, and "Mishawum Park-128" in 1980. Mishawum station ultimately opened on September 24, 1984 – the first new station on the system since West Natick station , which opened in 1982. A 250-space parking lot on the west side of the station served Woburn residents and drivers from

11918-508: The system to have Positive Train Control activated was the inner Worcester Line on August 15, 2020. Most of the southside lines already had cab signals for automatic train control (ATC) prior to PTC implementation, but the northside lines did not. Cab signals on the southside were completed in 2020; cab signals on the northside will be completed in 2023. Temporary bus replacements for several lines took place between 2017 and 2022 during PTC and ATC construction and testing. Weekday service

12036-407: The system. Most Ipswich/Rockport line stations were made accessible during the 1984–85 closure, and renovations followed at other stations. South Station was made accessible in the late 1980s, Back Bay during the Southwest Corridor project, and North Station in the early 1990s, providing accessibility at the main downtown Boston stations. By 1992, 44 commuter rail stations were accessible. In 1991,

12154-602: The third quarter of 2024, making it the fifth-busiest commuter rail system in the U.S. , behind the three New York-area systems and the Chicago-area system . The line's characteristic purple-trimmed coaches operate as far south as North Kingstown, Rhode Island , and as far north as Newburyport and as far west as Fitchburg , both in Massachusetts . Trains originate at two major terminals in Boston – South Station and North Station . The only connection between

12272-614: The two halves of the system is the non-revenue Grand Junction Branch . The North–South Rail Link is a proposed tunnel between North Station and South Station to allow through-running service. The system consists of twelve lines – four of which have branches – radiating from downtown Boston . Eight "southside" lines terminate at South Station , with four (Framingham/Worcester, Needham, Franklin/Foxboro, and Providence/Stoughton) also running through Back Bay station . Four "northside" lines terminate at North Station . The Kingston Line and Middleborough/Lakeville Line are often grouped together as

12390-410: The urban core. Peak-hour service to Worcester began in 1994, followed by off-peak and weekend service; four intermediate stations were added in 2000 and 2002. Service on the Old Colony Lines (Middleborough/Lakeville Line and Kingston/Plymouth Line) began in 1997. Newburyport and Rowley opened in 1998. The MBTA Commuter Rail Maintenance Facility , which replaced the ex-B&M Boston Engine Terminal,

12508-620: The wooden approach trestles to the North Station drawbridges . The four northside lines used temporary terminals with rapid transit connections while the trestles were rebuilt. Another bridge fire between Beverly and Salem on November 16, 1984, isolated part of the Ipswich/Rockport Line from the rest of the system. Service to North Station resumed on April 20, 1985; service to Ipswich and Rockport resumed on December 1, 1985. Guilford Transportation Industries purchased

12626-499: Was also used to manufacture glue from raw animal hide and chrome-tanned hide wastes from 1934 to 1969. The by-products and residues from these industries caused the soils within the site to become contaminated with elevated levels of metals, such as arsenic, lead, and chrome. During the 1970s, the site was redeveloped for industrial use. Excavations uncovered and mixed industrial by-products and wastes accumulated over 130 years. During this period, residues from animal hide wastes used in

12744-472: Was completed in 1987 with a new below-ground alignment for commuter rail, Amtrak, and Orange Line trains. Back Bay and Forest Hills stations were completely rebuilt as transfer stations, and Ruggles opened to serve the growing Longwood Medical Area . The Needham Line, closed since 1979 for construction, was reopened. The Attleboro and Franklin lines had been diverted over the previously freight-only Dorchester Branch during construction; after they returned to

12862-453: Was completed in 1998. Two tenders were submitted in 2003, one from GTI and another from the newly formed Massachusetts Bay Commuter Railroad Company (MBCR), a partnership between Connex (later Veolia), Bombardier Transportation and Alternate Concepts, Inc. MBCR won the contract, and took over the MBTA Commuter Rail operation from Amtrak in July 2003. The MBCR contract originally expired in July 2008 but had an additional five-year option; it

12980-491: Was cut back to a single Newburyport round trip. Subsidies began for six lines on January 18; all out-of-district service to Fitchburg , Lowell , Haverhill , Ipswich , and Rockport was discontinued except for three single round trips. Agreements were reached to restore most out-of-district service; after delays due to a lawsuit by the competing Eastern Massachusetts Street Railway , full service returned to Ayer , Lowell, Ipswich, and Rockport on June 28. On June 30, 1967,

13098-416: Was largely unusable to the decommissioning of 3G networks . Mobile ticketing was introduced on the northside lines on November 12, 2012, and on the southside lines on November 28. Positive Train Control was implemented on the entire system per a federal mandate, which required installation by the end of 2018 with the possibility of a two-year extension. Construction began in 2017. The final segment of

13216-418: Was later extended three years to July 2011 and then another two to July 2013. After concerns about on-time performance, the 2011 extension increased the fine for late trains from $ 100 to $ 300. The MBTA considered running the service directly rather than contracting it out, but this "public option" was rejected in 2012. In August 2012, MBCR and Keolis were the two bidders for the contract. On January 8, 2014,

13334-505: Was redeveloped from the Industri-Plex Superfund site. The site is a former chemical and glue manufacturing facility. Industri-Plex was used for manufacturing chemicals such as lead-arsenic insecticides, acetic acid, and sulfuric acid for local textile, leather, and paper manufacturing industries from 1853 to 1931. Chemicals manufactured by other industries at the site include phenol, benzene, and toluene. Industri-Plex

13452-411: Was retired between 1979 and 1989. 33 ex-B&M RDCs were converted to locomotive-hauled coaches (designated BTC-2 and CTC-2) in 1980 and 1982; they were retired by 1989. This left all MBTA service operated by locomotives and coaches purchased new by the MBTA. At several points since, the MBTA or its contract operator has temporarily leased locomotives when needed. Some passenger equipment acquired new by

13570-483: Was slower than expected; by 1971, the only extension in service was the first portion of the Red Line Braintree Branch on the Old Colony mainline. In 1972, as part of a funding shift from highways to transit, Governor Francis Sargent initiated a Commuter Rail Improvement Program. On October 8, 1974, the MBTA began using purple to represent the commuter rail system, as had been done in 1965 with

13688-407: Was still underused. Until December 2020, a small number of Haverhill Line trains ran via the Wildcat Branch and the inner Lowell Line, making stops including Anderson/Woburn.This routing was resumed in April 2021, with the trains no longer making the intermediate stops. From September 9 to November 5, 2023, all outer Haverhill Line service was routed over the Wildcat Branch during signal work on

13806-408: Was substantially cut on March 17, 2020, due to reduced ridership during the COVID-19 pandemic . On June 22, service was increased to 85% of normal weekday levels. Changes effective November 2 reduced peak service and increased off-peak service, providing more consistent midday headways on some lines; Foxboro pilot service was suspended. In November 2020, as part of service cuts during the pandemic,

13924-587: Was taken over by Paul Revere Transportation in November 1995. In September 1998, the MBTA introduced route 355 MBTA bus service, with two daily round trips between Mishawum and downtown Boston. In the late 1990s, the city of Woburn began redevelopment of the Industri-Plex Superfund site north of Mishawum Road. The redevelopment included an office park, an interchange with I-93, and a regional transportation center. Built to serve MBTA Commuter Rail, Logan Express, and Amtrak Downeaster service,

#811188