The Badger State Trail is a 40-mile (64 km) rail trail in south central Wisconsin . The trail leads from the Wisconsin – Illinois state line to Madison passing through, from south to north, Monroe , Monticello , Belleville and Fitchburg . Near Monticello, the trail passes through the 1,200-foot (370 m) long, unlit Stewart Tunnel constructed in 1887. The trail was officially opened July 8, 2007.
18-655: The main route of the trail follows a former rail line that was originally built by the Chicago, Madison and Northern Railroad and opened in 1887, with the first official train traveling the full route in February 1888. The line eventually came under the control of the Illinois Central Gulf Railroad . In the latter 20th century, it was operated by Wisconsin and Calumet Railroad then last saw regular Wisconsin and Southern Railroad freight service in
36-467: A single company, still called the Chicago, Madison and Northern Railroad, on April 16, 1887. That company and the two Freeport, Dodgeville and Northern Railroad companies were consolidated into a single company, also still called the Chicago, Madison and Northern Railroad, on March 12, 1888. The Addison Railroad was conveyed to the Chicago, Madison and Northern Railroad on January 5, 1892. Construction of
54-620: A spending measure to pave the northern section in September 2008. Finally on November 18, 2009, the Building Commission unanimously approved funding to complete the section in Fitchburg, allowing $ 497,000 to be borrowed in stewardship. In April 2010, the city of Fitchburg accepted bids to pave the trail and repair bridges and level crossings within the city. In 2014, the northern end of the trail, where it intersects with both
72-683: Is required to bicycle or ski the trail, and the path is patrolled by Wisconsin Department of Natural Resources rangers. The trail is closed nightly from 11:00pm to 6:00am by state law. The Badger State Trail connects to the Capital City Trail in Madison, and the Jane Addams Trail at the state line (leading to Freeport, Illinois ) which will connect to the proposed 500-mile (800 km) Grand Illinois Trail System . Along
90-748: The South West Bike Path and the Cannonball Trail, was rebuilt to make the first bicycle roundabout in the Madison area. The roundabout has come to be known as the Velo UnderRound. Strong thunderstorms caused flooding and tree damage along the trail in 2017, forcing closures until the damage could be repaired. In 2019, the DNR closed the Stewart Tunnel for safety reasons, due to "sections of loose and falling rocks from
108-593: The 6-mile long (9.7 km) section through Fitchburg wouldn't be paved on the trail's opening, in its first year of use as a recreational trail, the Wisconsin Department of Natural Resources estimated that, despite a temporary closure in August due to flooding, it was used by 31,000 people between July 1 and December 31, 2007, with 6,000 snowmobilers in December. State and local representatives approved
126-501: The DNR spending and stewardship in 2003 but were unable to block the $ 499,000 allocated for improvements to the trail. In October 2003, the Wisconsin Building Commission approved spending $ 303,000 toward restoration of the Stewart Tunnel; repairs to the tunnel began in 2005. The Wisconsin DNR held a vote for final approvals of the trail in February 2006. Fitchburg had requested $ 1 million in funding to pave
144-765: The Illinois Central used the tracks of the Chicago, Burlington and Quincy Railroad . To eliminate these costs the Illinois Central decided to build its own route between Chicago and Freeport. The Illinois Central's plan included a new line between Chicago and Madison, Wisconsin , via Freeport, a branch to Dodgeville, Wisconsin , and a short branch from South Addison, Illinois , to Addison, Illinois . It established five companies for this purpose, three in Illinois and two in Wisconsin : The two Chicago, Madison and Northern Railroad companies were consolidated into
162-479: The ceiling and side walls." The tunnel remains closed to this day. In summer 2020, a short section of the trail in Fitchburg, where it crosses McKee Road, was temporarily closed. The closure was to allow crews to rebuild the street and to install a bridge for the trail over the road. In August 2022, a cord was tied across a bridge. The suspect was convicted of two counts of second-degree recklessly endangering safety. Although snowmobiles and ATVs had been allowed on
180-524: The company was merged into the Illinois Central in 1903. The Freeport Subdivision between Chicago and Freeport, Illinois , remains in operation. In the 1880s the network of the Illinois Central Railroad resembled a wishbone, centered on Centralia, Illinois . From there, lines ran north to Freeport, Illinois , northeast to Chicago , and south to New Orleans . For direct east–west service between Chicago and Freeport and point west,
198-658: The early 1980s. Feasibility studies for the trail began in December 1976. Approval for the trail came in 1997. Some objections were raised in 1999 when both the Green County Board and the South Central Wisconsin Rail Transit Commission passed votes for the rail trail conversion. In 2000, the state Natural Resources Board purchased the right-of-way to develop the trail. Portions of the trail were opened for winter activities. Republican state legislators raised objections to
SECTION 10
#1732775704524216-542: The new line began in 1886 and was completed under the unified company in 1888. Trains did not begin using the St. Charles Air Line to reach Great Central Station (and later Central Station ) until 1891. The Addison Railroad completed its 2-mile (3.2 km) branch to Addison prior to the 1892 conveyance. Always under the control of the Illinois Central Railroad, the Chicago, Madison and Northern Railroad
234-594: The trail goes through the Capital Springs State Recreation Area and a state trail pass is required to bicycle, skate or roller-ski this segment. The trail will eventually connect to the Glacial Drumlin State Trail . The eastern end of the trail is at Cottage Grove Rd in Madison ( 43°02′32″N 89°21′52″W / 43.04222°N 89.36444°W / 43.04222; -89.36444 ). The western end
252-589: The trail has led to historic designations and rebuilding of structures along the line, such as the former station in Belleville. Chicago, Madison and Northern Railroad (1886%E2%80%931903) The Chicago, Madison, and Northern Railroad was a railroad company in the United States . It was established by the Illinois Central Railroad in 1886 to construct a new direct railroad line from Chicago to Madison, Wisconsin . The line opened in 1888 and
270-564: The trail in its first year, many bicyclists objected to the use of motorized vehicles on the trail saying that they were degrading the trail's limestone surface. The Bicycle Federation of Wisconsin sponsored three candidates in November 2007 for open seats on the Badger State Trail Friends Group, and all three were elected. Horse-riding enthusiasts also pressed for permission to use the trail. A state trail pass
288-605: The trail within the city in 2006 and again in 2008, and was denied funding for a connection to the Cannonball Trail (an extension of the Military Ridge State Trail ); the city was also denied funding for a service hub at the junction of the Badger State, Capitol City and Cannonball trails. The trail was officially opened with a ribbon cutting ceremony in Belleville on July 8, 2007. Although
306-795: The way, the Badger State Trail crosses the Sugar River Trail in Monticello and connects with the Cheese Country Trail in Monroe. Proposals have been made to also connect it to the Oregon Rotary Trail . The trail had long been seen as a draw for tourism and plans had been made to connect not only to other trails but also to state parks and other commercial ventures along the route. The success of
324-496: Was merged on February 1, 1903. The Chicago, Madison and Northern Railroad owned 233 miles (375 km) of track in the states of Illinois and Wisconsin: Capital City State Trail The Capital City State Trail is a 17-mile (27 km) paved recreation trail in and around Madison , Wisconsin , with connections to the Military Ridge State Trail and the Badger State Trail . A 9-mile (14 km) segment of