The Baltimore Convention Center is a convention and exhibition hall located in downtown Baltimore, Maryland . The center is a municipal building owned and operated by the City of Baltimore.

#196803

93-525: The facility was constructed in two separate phases: the original center, with 425,000 square feet (39,500 m) of exhibition and meeting space, opened in August 1979 at a cost of $ 51.4 million. A $ 151 million expansion, which increased the center's total size to 1,225,000 square feet (113,800 m) was completed in April 1997. The 752-room, city-owned Hilton Baltimore hotel opened in August 2008, connected to

186-517: A Baltimore Sun article revealed that Otakon wasn't the only large convention that Baltimore City lost due to the current size of the Baltimore Convention Center. The article reports that as of the fiscal year that ended on June 30, 2016, Visit Baltimore hosted 415 total event with a combined estimated economic impact of $ 180 million, the city usually hosts 20 to 30 large conventions annually however city officials are now stating

279-479: A Hilton Hotel built directly adjacent to the Baltimore Convention Center. The hotel officially opened in August 2008 with a direct connection to the Baltimore Convention Center via elevated skybridge crossing Howard Street. In 2009, BACVA made a decision at its annual meeting to change its name from the Baltimore Area Convention and Visitors Association to Visit Baltimore to make it easier for

372-506: A July 18 news conference that an 18% increase in room night bookings in Baltimore's hotels through 2017, as of the fiscal year ending June 30, 2008, compared to the previous year's, confirmed the city's decision to move forward with the hotel development project as a means of bolstering Baltimore's convention business. The hotel lost money for the third consecutive year. Due to continued difficulty in attracting conventions to Baltimore,

465-422: A bid evaluating team for future Otakons "that construction could affect those events" however Visit Baltimore's CEO, Tom Noonan told The Baltimore Sun that "there's no set plan and that we're not near that point" in regards to potential construction and that a future study "will be to figure out how" the Baltimore Convention Center will "operate during construction." On August 12, 2013 WBAL reported that Donald Fry of

558-642: A combination arena-hotel-convention center the size of the proposed project in Baltimore. On June 2, 2011, the Baltimore Sun reported that Mayor Stephanie Rawlings-Blake and Governor Martin O'Malley wanted the Maryland Stadium Authority to pay for the estimated $ 150,000 feasibility study that will determine the "estimate of taxes that the project would generate" and if the study found the project to be viable, O'Malley and Rawlings-Blake wanted "an analysis of potential financing options and

651-508: A convention center expansion and having a combined expanded convention center attached to a new arena and hotel, the study will look at the environmental, community and traffic impacts of the two proposals and what types of events the new facility will be able to attract, this study will also determine exactly how large the expanded convention center is supposed to be. The new complex will be bounded by Pratt, Charles and Conway Streets. This study will not include construction and budget plans as this

744-774: A detailed explanation of how this project would be funded, how much of the $ 400 million would be shared between the State of Maryland and the City of Baltimore and exactly who would operate the new arena. The proponent of this project and CEO of the Greater Baltimore Committee, Donald Fry, stated in an interview with the Baltimore Business Journal that the approval of initial design funds by the Maryland General Assembly gives

837-408: A group led by local business magnate Willard Hackerman)" however the Maryland General Assembly's budget committees added a prerequisite before they will approve the release of the $ 2.5 million. The prerequisite required that the State of Maryland, the City of Baltimore and the private financiers of the project submit a memorandum of understanding to the Maryland General Assembly's budget committees with

930-494: A new "Headquarters" hotel is necessary to guarantee enough rooms for group meetings. Opponents of the hotel project have either questioned the necessity of a new hotel altogether or objected to the use of public dollars to finance the project. The Baltimore Convention Center hotel, named Hilton Baltimore, broke ground in February 2006 and opened in August 2008. It has 752 rooms and is the city's largest hotel, connected directly to

1023-515: A new 500-room Sheraton hotel and stores and restaurants facing Pratt, Charles and Conway Streets. At the time, the $ 900 million price tag was the only obstacle with the proposal. However, on May 25, 2011, at the annual meeting for the Greater Baltimore Committee, the owner of the Sheraton Inner Harbor hotel, local business and construction magnate, Willard Hackerman , made an offer that he would be willing to finance more than half of

SECTION 10

#1732764665197

1116-601: A non-profit organization to develop, own, and operate the hotel. Legislation was introduced in the Baltimore City Council for insurance of $ 305 million in city revenue bonds for the project. On May 6, 2005, the Baltimore Planning Commission unanimously approved bills to create a property tax district for the hotel project, along with authorization of the revenue bond sales for the hotel project, and approval of street closures for

1209-400: A positive reception from both Baltimore City Mayor Stephanie Rawlings-Blake and Maryland Governor Martin O'Malley who both have submitted requests to the Maryland Stadium Authority to conduct a feasibility study on the project that is due by the end of 2011. Visit Baltimore, the architects involved and others have said that this project is unique in that no other cities in the nation would have

1302-578: A potential convention choice." Nearby cities have or are in the process of expanding convention and hotel space, such as Washington D.C. (opened the Walter E. Washington Convention Center in 2003 with plans to open a 1,175-room Marriott Marquis hotel with 100,000 square feet (9,300 m) of convention and meeting space in 2013) and Philadelphia (expanded its Pennsylvania Convention Center in 2011 of over 700,000 square feet (65,000 m) of meeting and convention space). Visit Baltimore proposes an expansion of

1395-441: A private investor on terms more favorable than the proposal for the publicly financed project submitted to the city council for approval. Some on the city council said that public financing would enable Baltimore to share in the profits that the hotel would generate and if it was privately funded, the city would not receive anything. The City Council also considered amendments regarding minimum wages for hotel workers and also subject

1488-469: A stand-alone convention center as well as a hybrid facility inclusive of a hotel and/or arena. Hilton Baltimore The Hilton Baltimore , also known as Hilton Baltimore Inner Harbor , is a 757–room hotel located on West Pratt Street in Baltimore, Maryland , United States . Initially proposed in 2003, actual construction of the city-owned venture took place between 2006 and 2008 as part of

1581-525: A strategy for moving the work forward." On June 14, 2011, the MSA unanimously approved the feasibility request with a 7–0 vote; however, the MSA wanted the city of Baltimore to pay for part of the $ 150,000 cost for the feasibility study. On July 18, 2011, the Baltimore Sun reported that the Baltimore Convention & Tourism Board approved to take $ 50,000 out of Visit Baltimore's budget to pay for

1674-687: A total of $ 626,667 coming from the State of Maryland and $ 30,000 each from local groups the Downtown Partnership of Baltimore and the Greater Baltimore Committee). Jeff Pilas, the CFO of the Baltimore Development Corp. told the Baltimore Business Journal that if the study recommends an expansion to the Baltimore Convention Center, a second phase for the study would commence involving design. The study

1767-628: Is also a 50-seat theater that shows an 11-minute film on Baltimore and Maryland . In 2005, BACVA made a joint effort with the Baltimore Development Corporation (BDC) to pitch a controversial $ 305 million, 752-room Hilton Hotel to the Baltimore City Council in an attempt to bring in more conventions to the Baltimore Convention Center . In 2006, BACVA succeeded in its joint effort with the BDC to have

1860-543: Is also viewed as important to the recent development on Baltimore's West Side. According to Ronald M. Kreitner, executive director of West Side Renaissance Inc., the "Convention Center will help contribute to the success of the theaters and the retail," referring to the development of the France-Merrick Performing Arts Center/Hippodrome Theatre, as well as new retail ventures in the area. (Renaissance, 2003) By 2013,

1953-457: Is charged with bringing in tourists and conventions into the city of Baltimore , Maryland, but does not manage the actual convention venues, hotels, or museums in the city. In 2004, BACVA launched a totally redesigned website. A major event for BACVA in 2004 occurred in May when it officially opened a totally new Baltimore Visitor Center. This was radically different from the old visitor center, which

SECTION 20

#1732764665197

2046-472: Is dead and not expected to be revived because the Rawlings-Blake administration is looking into renovating Royal Farms Arena instead of building a new arena. The State of Maryland has begun exploring the possibility of a $ 600 million expansion (see below). On March 8, 2016, it was revealed by the Baltimore Business Journal that the State of Maryland is exploring constructing a $ 600 million expansion to

2139-473: Is just Phase 1, if the state and city elects to move forward after reviewing the results of this study, that second study will put together just partial plans to obtain a cost estimate. In November 2016, the Maryland Stadium Authority's feasibility study that was approved in August 2016 got full funding after the Baltimore City Board of Estimates approved to commit to $ 313,000 of funding towards

2232-553: Is now supporting an estimated $ 900 million proposal floated by the Greater Baltimore Committee and local businessman and the current owner of the Sheraton Inner Harbor hotel in early 2011 that would build a brand-new 18,500-seat arena to replace the 1st Mariner Arena , a brand-new 500-room hotel to replace the Sheraton and demolish and rebuild the east half of the Baltimore Convention Center as an expansion of

2325-487: Is part of an ongoing discussion about expanding the Baltimore Convention Center which has been a focus of the current 2016 legislative session within the Maryland General Assembly. This new proposal by the State of Maryland and the focus of expanding the Baltimore Convention Center within the Maryland General Assembly comes about in the final year [2016] that Baltimore's largest convention, Otakon, will be held in Baltimore. In 2017, Otakon will no longer be held in Baltimore and

2418-438: Is relocating to Washington, D.C., at the larger Walter E. Washington Convention Center. As of 12:00 AM EDT, April 12, 2016, the official end of the 2016 Maryland legislative session within the Maryland General Assembly, no bill was introduced in either the state Senate or House of Delegates that requested the $ 3 million in seed money to launch a study for expanding the Baltimore Convention Center. It's currently unknown why no bill

2511-481: Is taken. Also, on April 11, 2012, the Baltimore Business Journal published an article stating that the Maryland General Assembly in approved $ 2.5 million for the convention center project allocated for "initial design [of the] $ 400 million expansion of the convention center (slated to be funded using public money from the State of Maryland and the City of Baltimore), as well as a $ 500 million, 18,500-seat arena and hotel project (slated to be funded using private funding from

2604-457: The Baltimore Convention Center . A month before the hotel's scheduled opening in August 2008, Baltimore Mayor Sheila Dixon said that an 18% increase in room night bookings through 2017, as of the fiscal year ending June 30, 2008, compared to the previous year's, confirmed the city's decision to move forward with the hotel development project as a means of bolstering Baltimore's convention business. The massive hotel has been criticized for blocking

2697-486: The Baltimore Orioles ' home games. The hotel will be built on two vacant blocks that are north of Oriole Park at Camden Yards and west of the Baltimore Convention Center where currently a parking lot is located and the hotel will have an all-weather walkway connected to the Baltimore Convention Center . Critics at the time questioned whether the property would be better suited for possible future expansion of

2790-555: The Baltimore Sun reported that the hotel project was met with skepticism by the Baltimore City Council, with many Council members questioning the need for the hotel project and the necessity for it to be publicly financed. On July 11, the Baltimore City Council delayed a vote on the hotel project because only three out of the fifteen city council members supported the project, eight members were either opposing it or leaning towards opposing it, and three were undecided. The Sun said

2883-499: The $ 1 million feasibility study. This comes approximately a week after the Baltimore Development Corp., the city's economic development agency's board approved to commit to $ 250,000 of funding towards the $ 1 million feasibility study (the remainder of the study costs are being funded through the state and two private groups: $ 126,667 from the Maryland Stadium Authority, $ 500,000 from the Maryland Department of Commerce with

Baltimore Convention Center - Misplaced Pages Continue

2976-422: The $ 150,000 feasibility study that the Maryland Stadium Authority approved on June 14, 2011. As of October 10, 2011, the Maryland Stadium Authority had posted on its website the feasibility study that was approved on June 14, 2011. The project is expected to include "a market and economic study of the convention center expansion and incremental tax benefits for all three venues, and a funding strategy." According to

3069-447: The Baltimore Business Journal that the interested parties in having the Baltimore Convention Center expanded are having "ongoing conversations" into what the next steps for a study would be but stated he couldn't state specifics. Visit Baltimore's CEO Noonan revealed that at least 30% of interested citywide conventions, conventions defined as requiring at least 1,200 hotel rooms at its peak night, skip over Baltimore for other cities due to

3162-455: The Baltimore Convention Center that would double the existing floor space of the convention center and build a new hotel as well. State officials are going to request in Spring 2016 from Governor Larry Hogan and the Maryland General Assembly $ 3 million in seed money to launch a study for expanding the convention center. This study will allow engineers and architects to figure out where to place

3255-404: The Baltimore Convention Center. Visit Baltimore CEO Tom Noonan, a longtime advocate for expanding the Baltimore Convention Center stated he was "disappointed" that the funding wasn't in place at the end of the 2016 Maryland legislative session, the executive director of the convention center, Peggy Daidakis could not have been reached for comment. Maryland's Secretary of Commerce, Mike Gill, told

3348-461: The Baltimore Convention Center. Also debated was whether 750 rooms is sufficient to help attract more business to the Baltimore Convention Center. On November 13, the Baltimore Sun said that Mayor Martin O' Malley approved the 750-room Hilton Hotel RLJ proposal, granting RLJ Development a six-month exclusive negotiating priority to build the $ 200 million hotel, subject to negotiation of financing and room blocking for convention business. The city

3441-448: The Baltimore Sun has reported that Phase 1 of the Baltimore Convention Center expansion feasibility study is moving along. On May 3, 2017, the Maryland Stadium Authority approved a team for the study that includes Baltimore design firm Ayers Saint Gross, Seattle architectural firm LMN Architects, Kansas City firm Populous, and New York design firm Perkins Eastman. The Baltimore Sun reports that the study amount has significantly decreased from

3534-519: The Convention Center via sky bridge. Baltimore City used public revenue bonds to cover the $ 301.7 million cost of building the hotel. When the 1996 expansion to the Baltimore Convention Center opened, the convention center was ranked 28th largest in the nation in terms of exhibition and meeting space. By 2011, the convention center plummeted to 73rd largest and, as a result, Baltimore is losing convention business. Visit Baltimore reports that

3627-559: The Convention Center was intended to be a catalyst for tourism, an important part of the city's post-manufacturing economic development plans. An Abell Foundation report in June 2005 describes the Convention Center as having been "built as an economic development tool to attract to Baltimore conventions, trade shows, and meetings that would leave in the city millions of dollars spent on lodging, food, entertainment, and other services." (Controversy, 2005, p. 3) A report on economic development in

3720-584: The Convention Center will make it a more appealing site for conventions. The completion of the Walter E. Washington Convention Center in Washington, D.C. , and the National Harbor project in Prince George's County intensified the debate. In general, supporters of a convention hotel say that for the Convention Center to be viable in the future, and compete with other cities for conventions,

3813-551: The Greater Baltimore Committee proposed spending approximately $ 450 million more for a convention center expansion. 39°17′8.3″N 76°37′16.9″W  /  39.285639°N 76.621361°W  / 39.285639; -76.621361 Visit Baltimore Visit Baltimore , formerly the Baltimore Area Convention & Visitors Association (BACVA) , is a quasi-public organization started in 1980 by then-Baltimore Mayor William Donald Schaefer . The agency

Baltimore Convention Center - Misplaced Pages Continue

3906-476: The Greater Baltimore Committee told WBAL that he hoped that the GBC would be able to "present the mayor with some sort of financial concept within the next 30 to 60 days." On February 10, 2014, the Greater Baltimore Committee proposal to build an expanded convention Center and new arena hit a major roadblock: the owner of the Sheraton Inner Harbor and the person who was spearheading the efforts to raise private funds for

3999-569: The Greater Baltimore Committee, a local influential business group, proposed an estimated $ 900 million project that would demolish the 1979 wing of the Baltimore Convention Center east of Sharp Street, plus the Sheraton Inner Harbor Hotel on the same block, and replace the buildings with a four-story, 760,000 square feet (71,000 m) convention center expansion, an 18,500-seat arena that will replace Baltimore's existing 1st Mariner Arena over two levels of underground parking,

4092-560: The Hilton Baltimore Convention Center Hotel that opened in August 2008 is helping, but since the opening of the Hilton the city has lost over 700,000 hotel-night bookings due to the convention center being too small to meet the needs of a group or the dates the group wanted was not available. It has been argued that if Baltimore does not expand its convention center, the city could "fall off the map as

4185-418: The MSA page, "The study is expected to be complete by winter [2011–2012]." On March 5, 2012, the feasibility report was published and made public jointly by the Maryland Stadium Authority and Baltimore City which strongly makes the recommendation for expanding the Baltimore Convention Center and replacing 1st Mariner Arena, reiterating that Baltimore's tourism industry will be harmed in the long run if no action

4278-469: The Maryland Stadium Authority ($ 126,667), the State of Maryland (an additional $ 500,000 is available immediately to fund this study), the Downtown Partnership of Baltimore ($ 30,000), the Greater Baltimore Committee ($ 30,000), and the City of Baltimore ($ 313,333). The study will take approximately a year to complete and is expected to be completed and released in Fall 2017. The study will look at having either just

4371-539: The Maryland Stadium Authority to activate the $ 2.5 million and determine the feasibility and costs of the project. Construction, however, is not expected to begin until at least 2016. In the Summer of 2013, the Greater Baltimore Committee proposal to build an expanded Baltimore Convention Center and a new arena came up in the Baltimore media due to the announcement that the largest event for Baltimore City, Otakon, would be departing Baltimore in 2017 to Washington, D.C., due to

4464-638: The October 2024 labor contract, issues plaguing the Hilton Baltimore would remain ongoing. The Baltimore Sun reported on April 10, 2003, that three proposals were submitted to the Baltimore Development Corporation : The group also proposed developing the hotel along with a new 19,000-seat arena, offices and the headquarters for Catholic Relief Services, which has asked the city to use the parcel for its new offices. The proposal would be paid for with tax-exempt bonds that require public ownership of

4557-402: The State of Maryland. Based upon the final recommendations of this study, the Baltimore Sun reports that a Phase 2 study "may be authorized later." As of September 2017, Phase 1 of the Baltimore Convention Center expansion study is underway. According to an LMN Architects press release, the study will be examining 4 "alternative development options": The Baltimore Business Journal reported that

4650-508: The amount allocated to Phase 1 is indeed $ 1 million and a recommendation from this study is expected by the end of 2017. The official study summary according to the Maryland Stadium Authority is: MSA's Board has approved a request by the Mayor of Baltimore to conduct various program and construction related analysis to determine the program and technical feasibility for a proposed Baltimore Convention Center expansion. The Study will consider both

4743-426: The amount being "up to $ 1 million" to now the study total costs is "not to exceed $ 460,000." The study is to "assess what combination of elements is feasible—a convention center expansion, hotel and new venue to replace Royal Farms Arena—and how they might fit together." and is expected to be completed by the end of 2017. Funding for the $ 460,000 is still coming from public and private sources including Baltimore City and

SECTION 50

#1732764665197

4836-811: The area, entitled Subsidizing the Low Road: Economic Development in Baltimore , states that "public and non-profit facilities such as the Maryland Science Center, the World Trade Center , the Convention Center, and the National Aquarium" ( Subsidizing , 2002, p. 11) were part of then-mayor Schaefer's "focus on real estate, retailing and tourism sectors" (p. 10), as areas for growth, as well as his utilization of "'public/private partnerships' to pursue economic development" (p. 11). During

4929-627: The center in its first year of operation booked 422 hotel rooms, worth $ 48,296, and bought 14,942 tickets worth about $ 223,286. Inside the Baltimore Visitor Center are racks of brochures with information ranging from Baltimore's neighborhoods to major attractions, including the Maryland Science Center , the National Aquarium in Baltimore , Power Plant Live! , and Camden Yards Sports Complex . There

5022-452: The center was playing a major role in the city's tourism growth, with conventions, seminars, conferences and exhibitions helping boost visitor numbers that year to 23.9 million, and expenditure by visitors to $ 5.15 billion. Visit Baltimore President Tom Noonan noted in July 2014 Baltimore was leading other cities in terms of future convention center bookings, through until 2021. In early 2017,

5115-506: The city's skyline are now blocked from most sections of Oriole Park at Camden Yard's grandstand. The Baltimore Sun said on April 21, 2008, "There's just a glimpse of the Bromo Seltzer Tower 's crenellated top just to the right of the new Hilton Baltimore Convention Center hotel ... something's drastically different at Oriole Park this year ... the sweeping view of downtown Baltimore that fans have enjoyed for

5208-501: The continuing growth and redevelopment in the area, the expanded Convention Center has not met expectations with respect to the number of conventions and people it attracts each year. Irene E. Van Sant, then-manager of the Convention Center Hotel Project for the Baltimore Development Corporation , Baltimore's former Mayor Sheila Dixon , and Governor of Maryland Martin O'Malley —feel that a hotel adjacent to

5301-489: The convention center being either too small or is already booked on the dates the interested conventions want reserved in Baltimore. The Baltimore Business Journal reports that when the Baltimore Convention Center opened in 1979, it was "one of the premier convention spaces in the country" but the stature of the convention center has fallen over time with upgrades to other convention centers in cities such as Philadelphia, Washington, D.C., and Atlanta. Now, as of April 14, 2016,

5394-400: The convention center by an enclosed skywalk bridge. In March 2016, the State of Maryland announced it was going to explore expanding the Baltimore Convention Center for an estimated cost of $ 600 million and build a new hotel attached to the expansion. As of August 2016, the proposal also included building a new arena. On February 4, 2020, it was reported by the Baltimore Business Journal that

5487-599: The convention center is too small to be competitive with other cities. The article also reports that at least 10 large conventions have left Baltimore due to outgrowing the convention center and these conventions were held at the convention center during the previous 10 years and the total of 10 large conventions includes Otakon which as of 2017 will be held at the much larger Walter E. Washington Convention Center in Washington, D.C. The article also reports that future conventions are at risk of leaving Baltimore as well. Despite

5580-555: The convention center was Otakon , a convention that focuses on anime and other facets of East Asian culture. The convention had resided in the Baltimore Convention Center between 1999 and 2016. In 2013, the convention attracted 34,211 people. However, organizers of that convention announced at the close of the 2013 event plans to move to the Walter E. Washington Convention Center in Washington, D.C., for at least five years starting in 2017. Convention officials cited space concerns, along with

5673-400: The convention center, reasoning that it would allow the city to accommodate multiple large meetings or conventions at a time. Additionally, the Greater Baltimore Committee estimates that with the proposed arena-hotel-convention center, Baltimore could accommodate as many as 300 new convention groups that cannot utilize Baltimore currently due to the size of the convention center. In fall 2010,

SECTION 60

#1732764665197

5766-557: The convention quickly running out of room at the Baltimore Convention Center. According to The Baltimore Sun on August 11, 2013, the proposal "was not close to becoming a reality" and that according to GBC's spokesman Gene Bracken, financing for the proposal "hasn't been worked out at all." On August 16, 2013, The Baltimore Sun reported that little progress has been made on the Greater Baltimore Committee's proposal, reporting that since April 2012, city and state officials have been negotiating with Willard Hackerman regarding exactly how to pay for

5859-452: The development, or through sale of tax-exempt bonds, depending on the city's preference. The RLJ proposal also included 1,000 parking spaces and 75,000 sq ft (7,000 sq meters) of meeting and ballroom space. A second phase would add 400 hotel rooms and a 200,000 sq ft (19,000 m ) hotel-office-residential building. On October 24, 2003, the Baltimore Development Corporation chose the 750-room Hilton Hotel RLJ proposal, announcing that

5952-468: The expansion. Maryland's Commerce Secretary, Mike Gill said that the CEO of Visit Baltimore recently met with the Maryland Department of Commerce to request seed money to study the expansion of the convention center. One possible location is demolishing the existing Sheraton Inner Harbor hotel and locating the expansion there and building the new hotel at the southwest corner of Pratt and Charles. All of this

6045-516: The green light to both the Greater Baltimore Committee and Willard Hackerman to enter into serious negotiations with private investors regarding "naming rights or concession agreements for the arena" and he feels that this is a good sign that the Maryland General Assembly will, in fact, provide even more state funding towards this project in the future. On October 22, 2012, Tom Noonan, President and CEO of Visit Baltimore, voiced his support of this proposal. A series of studies would need to be conducted by

6138-488: The hotel to bring in $ 4.4 million yearly with taxes and other revenue and provide 461 jobs by the fourth year of operation. On November 24, the Baltimore Sun said that development officials of Baltimore City will be requesting an estimated $ 290 million for the hotel project, making it one of Baltimore City's most costliest public works project in its history, and that City of Baltimore will also set up

6231-444: The hotel will have 1,000 underground parking spaces and will have a 20,000 sq ft (2,000 sq meters) grand ballroom and nearly 62,000 sq ft (6,000 sq meters) of meeting space that can be utilized by the Baltimore Convention Center. The hotel is going to be about 24 stories high and cost approximately $ 200 million to build and will have shops and restaurants that will be designed to function with Oriole Park at Camden Yards during

6324-491: The hotel's board to Maryland's "open meetings" law. On August 15 the Baltimore City Council approved the Convention Center Hotel bill by a 9 to 6 vote, supported by then-City Council President Sheila Dixon , Vice President Stephanie C. Rawlings Blake , Paula Johnson Branch, Robert W. Curran , Kenneth N. Harris Sr., Helen L. Holton, Edward L. Reisinger, Rochelle "Rikki" Spector and Agnes Welch. Opponents of

6417-429: The hotel's construction. The Baltimore Sun said that the hotel will be connected to the Baltimore Convention Center via a second-story skywalk and that the Baltimore Area Convention & Visitors Association's statistics showed that the lack of a convention center hotel caused Baltimore to lose approximately 120,000 room bookings, approximating $ 100 million in lost revenue, in the past three years. On June 23,

6510-520: The hotel. The plan was presented by Atlanta -based Portman Holdings LP, one of the nation's largest developers of convention hotels. The team also includes Treyball Development Inc., a company based in Beverly Hills , Calif., that is owned by the actor Will Smith and his brother, Harry. No brand name was included in the proposal. The project would be paid for with private financing, tax-increment financing, which dedicates future tax receipts to

6603-410: The interested parties for an expanded convention center will either have to wait until 2017's legislative session or search for alternative funding. As of August 2, 2016, the proposed project of constructing an expanded convention center attached to a new arena and hotel has been revived and a $ 1 million feasibility study has in fact been approved (see below). On August 2, 2016, it's been revealed that

6696-453: The measure were Mary Pat Clarke , Belinda Conaway, Nicholas C. D'Adamo Jr., James B. Kraft, Keiffer J. Mitchell, Jr. and Bernard C. "Jack" Young. A second, largely formal 9-5 final vote approving the hotel project occurred on September 19. Ground was broken for the hotel's construction on February 17, 2006. The targeted completion date was June 30, 2008. With substantial completion of construction in 2008, there were complaints that views of

6789-429: The newer, 1996 half. The hotel and arena would be funded by private-sector money while the convention center expansion would be funded by public money; it is unknown what the breakdown of costs will be as that will be determined by a second study to be conducted soon that will continue to see if construction of the entire project is feasible and exactly how much the project would cost the city and state potentially and what

6882-508: The next two decades, due in part to the success of the Convention Center and the other attractions, Oriole Park at Camden Yards , Sports Legends Museum at Camden Yards, M&T Bank Stadium , Power Plant Live! , and the Reginald F. Lewis Museum of Maryland African-American History, have joined the area, creating a ten-block plus entertainment and cultural destination at Baltimore's Inner Harbor , further increasing tourist dollars flowing into

6975-649: The once-celebrated views of Baltimore's skyline from the Oriole Park at Camden Yards grandstand, however. The hotel has underperformed projections, losing money in its first three years of operation. On September 2, 2024, The Hilton Baltimore was the site of the first hotel worker strike in 54 years. Members of the Unite Here Local 7 went on a one-day Labor Day strike for better pay and better working conditions. A new four year labor contract calling for significant wage increases and increased funding for

7068-498: The past 16 seasons has changed considerably..." Sportswriter Peter Schmuck complained, "the big, antiseptic convention hotel ... looms over Camden Yards ... [and] has blocked out the best part of the Baltimore skyline". A Washington Post columnist called it a "cruel cubist joke on a previously perfect ballpark", although others said they were pleased with new construction downtown as indicative of urban revitalization. Baltimore Mayor Sheila Dixon said at

7161-458: The pension and health care plans of Hilton Baltimore employees would later be ratified on October 22, 2024. Collective bargaining for a new contract would then end on October 27, 2024 when Hilton Baltimore employees would again approve the now ratified contract. Despite baring the Hilton name, the Hilton Baltimore remains owned by the city of Baltimore. It has also been reported that in spite of

7254-466: The project continue after his death in case if he died. As of November 27, 2015, no new news has been released regarding the uncertain future of the Greater Baltimore Committee proposal. It's currently unknown if the proposal will have political support after Martin O'Malley stepped down as Governor of Maryland due to term limits and Stephanie Rawlings-Blake announced she would not be seeking reelection as Baltimore Mayor. As of March 8, 2016, this proposal

7347-410: The project, Willard Hackerman died. The Baltimore Business Journal reported on February 11, 2014, that the death of Willard Hackerman the day prior has thrown the future of the proposal into question. Kaliope Parthemos, Baltimore City's then-Deputy Mayor of Economic and Neighborhood Development told the Baltimore Business Journal that the City of Baltimore was in active discussions with Mr. Hackerman about

7440-451: The proposal up until December 2013 and stated that Mr. Hackerman was actively involved and wanted this proposal to move forward however he was "frustrated" that he could not have privately funded the entire cost by himself. Ms. Parthemos revealed that financing the estimated $ 900 million project "remained a significant hurdle up until Hackerman's death." Ms. Parthemos also stated that she was uncertain whether Mr. Hackerman made any plans to have

7533-399: The proposed $ 900 million price tag and would be willing to build the hotel and the arena which is estimated to cost $ 500 million and the remainder, $ 400 million for the convention center expansion would need to be financed by the State of Maryland and Baltimore City, the offer is contingent on whether the city and state can move the convention center expansion project forward. The offer received

7626-438: The proposed expansion will not occur as a revised cost estimate for just expanding the convention center is more than $ 1.5 billion so the proposal has been scaled back significantly to only modernize the convention center, not expand it as previously proposed. As was the case with Harborplace , which opened in 1980; the Maryland Science Center , which opened in 1976; and the National Aquarium in Baltimore , which opened in 1981,

7719-402: The proposed project of constructing a combined expanded convention center attached to an arena and hotel has been revived and that a $ 1 million feasibility study for a combined arena, hotel and expanded convention center was requested by Baltimore Mayor Stephanie Rawlings-Blake from the Maryland Stadium Authority and that the Maryland Stadium Authority has approved the study. Funding is coming from

7812-486: The public to recognize Baltimore's tourism agency and that it followed an industry standard at the time of having tourism agencies have a name that reflect their mission. The 2005–2008 efforts to bring in more conventions by having the Hilton Baltimore built at a cost of $ 305 million – the most expensive public works project in city history – were basically a failure and the city is still losing convention business and struggling to find more business. Visit Baltimore

7905-596: The region. A June 2005 Greater Baltimore Committee report on tourism in Baltimore illustrates the importance of tourism in the current Baltimore region's economy: Hospitality and tourism and the convention industry are vital components of the region's economy. According to the Baltimore Area Convention and Visitors Association (BACVA), spending from domestic travelers in 2002 was $ 8.476 billion statewide; $ 2.8 billion in Baltimore alone. This spending supported $ 719 million in state and local taxes while providing over 44,000 regional jobs. (Voices, 2005) One major convention held in

7998-475: The total $ 900 million projected amount for the proposal and that if the city, state and Mr. Hackerman can come up with a funding plan, the state will release $ 2.5 million "to pay for an expanded study of the project." The Baltimore Sun in the same article reported that the uncertainty surrounding the proposal to expand the Baltimore Convention Center "played a part in Otakon's departure" where Visit Baltimore "warned"

8091-430: The two major objections voiced by city council members is that development officials had not tried hard enough to find a private developer and whether Baltimore needed a convention center hotel. The Baltimore Development Corporation and Baltimore Mayor Martin J. O'Malley said the city needed the 752 room Hilton to remain competitive in the convention industry and that the Baltimore Development Corporation could not secure

8184-439: The uncertainty of construction plans for the convention center and a new arena. According to WBAL-TV, Baltimore's local NBC news affiliate, due to the pending departure of Otakon in 2017 to Washington, D.C., concerns were mounting regarding Baltimore's economic future when it came to tourism. In 2016, Otakon's final year in Baltimore, 29,113 people attended, a decline from its peak attendance of 34,211 in 2013. The Convention Center

8277-492: Was inside an antiquated modified construction trailer. The new 8,000-square-foot (740 m ) Baltimore Visitor Center is located next to the Light Street Pavilion of Harborplace and has a unique design. It cost $ 4.5 million to construct. In its first year of operation (May 7, 2004 – May 7, 2005), the center attracted nearly 390,000 visitors, which exceeded BACVA's original estimate of 250,000. Visitors to

8370-556: Was introduced in the 2016 legislative session when it was reported in March 2016 that there would be a request for $ 3 million, it's unknown if the request will be made within the 2017 Maryland legislative session that will begin on Wednesday, January 11, 2017, at 12:00 PM EST. On Thursday, April 14, 2016, the Baltimore Business Journal reported that the $ 3 million for a study to expand the Baltimore Convention Center

8463-421: Was reported to be desirous of minimizing the project's financial impact on Baltimore taxpayers. The Baltimore Area Convention and Visitors Association (BACVA) was said to want 60% of the 750 rooms would be available to BACVA at any given time. The proposal offered 600 rooms available to BACVA, with a final decision to be made between the Hilton and the city when the hotel nears opening. O'Malley projected

8556-414: Was requested by Baltimore Mayor Stephanie Rawlings-Blake and is expected to begin sometime in early 2017 and final completion is expected to be sometime later in 2017. In April 2017, Baltimore Mayor Catherine Pugh, the successor to former Baltimore Mayor Stephanie Rawlings-Blake, stated that she does not agree with building a hotel as part of an expansion to the Baltimore Convention Center. On May 4, 2017,

8649-490: Was supposed to be part of one of three supplemental budgets that the Maryland Governor has but according to Karen Glen Hood, a spokeswoman for the Maryland Department of Commerce told the Baltimore Business Journal that a formal request for $ 3 million was never submitted to Maryland Governor Larry Hogan and did not explain why the request was not made, instead deferring the question of why to local officials closer to