Misplaced Pages

Bangladesh Bridge Authority

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Bangladesh Bridge Authority (BBA) is a statutory government body responsible for the construction and maintenance of bridges, tunnels, flyovers (elevated roads), overpasses, causeways , and subways in Bangladesh. It is headquartered in Dhaka , Bangladesh. The authority operates under the purview of the Bridges Division within the Ministry of Road Transport and Bridges .

#267732

18-938: In 1985, the Jamuna Multipurpose Bridge Authority was established by a presidential ordinance to construct the Jamuna Multipurpose Bridge (now Bangabandhu Bridge). On 19 December 2007, the organization underwent a name change and became known as the Bangladesh Bridge Authority. According to the Bangladesh Bridge Authority Act of 2016, the authority is tasked with the implementation and maintenance of various infrastructure projects, including bridges spanning 1,500 meters or more, toll roads, flyovers, expressways, tunnels, causeways, ring roads, and other similar structures. The agency

36-412: A central reservation (North American English: median). A local-express lane system (also called collector-express or collector-distributor) has more than two roadways, typically two sets of 'local lanes' or 'collector lanes' and also two sets of 'express lanes'. "Cars only" lanes may be physically separated from those open to mixed traffic including trucks and buses. The New Jersey Turnpike ( I-95 ) in

54-627: A dual broad and metre gauge railway track . It also carries pylons for a powerline . The extension of the bridge cost $ 134 million extra later on. Within a decade of inauguration, cracks were detected on the bridge prompting the authorities to impose limits on the number of vehicles allowed to cross at any given time. By early 2008, the government announced its intention to sue the South Korean conglomerate Hyundai for flawed design. During March 2006-June 2006, Bangladesh University of Engineering and Technology experts worked to identify

72-461: A bridge over the Jamuna River was felt, especially by the people living in northwestern Bangladesh, for a long time. This perceived need did not go unnoticed by the policy makers. Jamuna Multipurpose Bridge was constructed by Hyundai Heavy Industries at a cost of $ 696 million. But the whole bridge project cost $ 1.24 billion for unknown reason. The cost was shared by IDA , ADB , OECD , and

90-668: A width of road on which a vehicle is not restricted by any physical barriers or separation to move laterally. A carriageway generally consists of a number of traffic lanes together with any associated shoulder , but may be a sole lane in width (for example, a highway offramp ). A single carriageway road (North American English: undivided highway) has one carriageway with 1, 2 or more lanes together with any associated footways (North American English: sidewalk) and road verges (North American English: tree belt, parkway, or other regional variants). A dual carriageway road (North American English: divided highway) has two roadways separated by

108-717: Is a bridge opened in Bangladesh in June 1998. It connects Bhuapur on the Jamuna River 's east bank to Sirajganj on its west bank. 90% of this bridge in under Tangail district and 10% under Sirajganj district. So it's mainly located in Tangail District.It was the 11th longest bridge in the world when constructed in 1998 and at present is the 6th longest bridge in South Asia . The Jamuna River, which it spans,

126-498: Is along the north side of the deck. On the main bridge, electrical interconnector pylons are positioned on brackets cantilevered from the north side of the deck. Telecommunication ducts run through the box girder deck and the gas pipeline is under the south cantilever of the box section. The bridge has been built by Hyundai Engineering and Construction ( Korea ) as a 'design and build' contract. TY Lin Assoc. of San Francisco carried out

144-500: Is one of the three major rivers of Bangladesh, and is fifth largest in the world in discharge volume. The river Jamuna ( Brahmaputra ), along with the lower stretch of the Padma ( Ganges ) divides Bangladesh into nearly two equal halves. Until now all road and rail communication between the two parts of the country has had to rely on time-consuming ferry services that were often disrupted because of navigability problems. The need for

162-743: Is responsible for the implementation of the Padma Bridge . In the mid-2010s, it was involved in the Padma Bridge Corruption Scandal . However, the charges was later dismissed by both the Canadian court and Bangladesh Anti-Corruption Commission . This article about a Bangladeshi organisation is a stub . You can help Misplaced Pages by expanding it . Jamuna Bridge Jamuna Multi-purpose Bridge ( Bengali : যমুনা বহুমুখী সেতু , romanized :  Jamuna Bahumukhee Setu ), also known as Bangabandhu Bridge ,

180-411: The bridge deck is 18.5 metres. The river crossing was designed to carry a dual two-lane carriageway , a dual gauge ( broad and metre ) railway , a high voltage (230 kV) electrical interconnector , telecommunication cables and a 750 mm diameter high pressure natural gas pipeline . The carriageways are 6.315 metres wide separated by a 0.57 metre width central barrier; the rail track

198-738: The United States, uses this design from the Pennsylvania Turnpike to its northern terminus at the George Washington Bridge in Fort Lee . High-occupancy vehicle lanes may also be physically separated from the remainder of the general traffic lanes as a distinct roadway. Some cities such as Pittsburgh, Pennsylvania , have many bus-only roadways to alleviate congestion related to public transit buses, despite its very challenging topography which severely limits

SECTION 10

#1732780038268

216-485: The causes of extensive cracking of prestressed concrete deck, web and pear head units of almost all segments of the Bridge. The cracks were identified primarily on the longitudinal direction of the bridge deck with some secondary crackings also in the transverse direction. In the analytical investigation, three dimensional model of the bridge was developed in finite elements methods. Repair and strengthening effort included

234-496: The design as a sub-contractor for Hyundai. The approach roads were constructed by Samwhan Corporation ( Korea ). The bridge is supported on tubular steel piles , driven into the river bed . Sand was removed from within the piles by airlifting and replaced with concrete . Out of the 50 piers , 21 piers are supported on groups of three piles (each of 2.5 m diameter) and 29 piers on groups of two piles (each of 3.15 diameter). The driving of 121 piles started on 15 October 1995 and

252-500: The government of Bangladesh. Of the total, IDA, ADB and OECD supplied $ 200 million each through a loan with 1% nominal interest, and the remaining $ 96 million was borne by Bangladesh. The main bridge is 4.98 kilometres (3.09 mi) long with 49 main spans of approximately 99 metres and two end spans of approximately 65 metres. Connected to the bridge are east and west approach viaducts each with 12 spans of 10 metre length and transition spans of 8 metres. The total width of

270-426: The piers to 3.25 metres at mid-span. An expansion joint is provided every 7 spans by means of a hinge segment at approximately quarter span. The segments were precast and erected using a two-span erection gantry .The erection gantry was designed by Butterley Engineering Ltd. from Ripley, Derbyshire, UK and at 200m long was thought to be one of the largest in the world at that time. The Bangabandhu Bridge carries

288-594: The replacement of modular expansion joints, strengthening the deck with carbon fiber reinforced polymer strips, web-deck connection improvement by carbon fiber reinforced fabrics and also sealing of non-structural cracks. These were conducted in phases. After repair and strengthening, performance of the bridge monitored. Health monitoring campaign was conducted by Bangladesh University of Engineering and Technology for first few years to take reference measurements. Carriageways A carriageway ( British English ) or roadway ( North American English ) consists of

306-432: The structure and minimise damage. The main bridge deck is a multi-span precast prestressed concrete segmental structure, constructed by the balanced cantilever method. Each cantilever has 12 segments (each 4 m long), joined to a pierhead unit (2 m long) at each pier and by an in-situ stitch at mid span. The deck is internally prestressed and of single box section. The depth of the box varies between 6.5 metres at

324-464: Was completed in July 1996. The pier stems are founded on concrete pilecaps , whose shells were precast and infilled with in-situ reinforced concrete . The reinforced concrete pier stems support pierheads which contain bearings and seismic devices . These allow movement of the deck under normal loading conditions but lock in the event of an earthquake to limit overall seismic loads through

#267732