80-545: The Blackpool branch lines are two railway lines running from the West Coast Main Line at Preston to Blackpool . The main branch, which is double-tracked and electrified , runs to Blackpool North station via Poulton-le-Fylde . A second branch, which is single-tracked and non-electrified, diverges from the main branch at Kirkham and Wesham junction, running on a southerly route to Blackpool South station via Lytham . The Preston–to–Blackpool North route
160-418: A London–Glasgow time of 4 hours 8 minutes. Some projects that were removed from the modernisation as a result of the de-scoping, such as a flyover at Norton Bridge station, were later restarted. A £250 million project to grade-separate the tracks at Norton Bridge that allowed for increased service frequency as well as improved line-speeds was completed in spring 2016. Other projects such as
240-461: A branch line extended from Poulton-le-Fylde to Blackpool , boosting its growth as a resort town. Blackpool Central railway station opened in 1863, with a line connecting Lytham to Kirkham in 1874, enabling through-trains from Preston. The line from Kirkham to Blackpool South was reduced to a single track in the early 1980s, limiting its capacity. The branch ran further north into Blackpool until 1964. The Preston to Blackpool North route
320-470: A mixture of intercity rail , regional rail , commuter rail and rail freight traffic. The core route of the WCML runs from London to Glasgow for 400 miles (644 km) and was opened from 1837 to 1881. With additional lines deviating to Northampton , Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects
400-410: A reappraisal of the plans, while the cost of the upgrade soared. Following fears that cost overruns on the project would push the final price tag to £13 billion, the plans were scaled down, bringing the cost down to between £8 billion and £10 billion, to be ready by 2008, with a maximum speed for tilting trains of a more modest 125 mph (201 km/h) – equalling the speeds available on
480-680: A single route, but was built as a patchwork of local lines which were linked together, built by various companies, the largest of which amalgamated in 1846 to create the London and North Western Railway (LNWR), which then gradually absorbed most of the others; the exceptions were the Caledonian Railway in Scotland, and the North Staffordshire Railway (NSR) which both remained independent until 1923. The core route
560-471: A track realignment scheme to raise speeds on the WCML; a proposed project called InterCity 250 , which entailed realigning parts of the line in order to increase curve radii and smooth gradients in order to facilitate higher-speed running. The scheme, which would have seen the introduction of new rolling stock derived from that developed for the East Coast electrification, was scrapped in 1992. As part of
640-527: A useful alternative route to Manchester, however poor relations between the LNWR and the NSR meant that through trains did not run until 1867. The route to Scotland was marketed by the LNWR as 'The Premier Line'. Because the cross-border trains ran over the LNWR and Caledonian Railway, through trains consisted of jointly owned "West Coast Joint Stock" to simplify operations. The first direct London to Glasgow trains in
720-499: Is 399 miles (642 km) long, with principal InterCity stations at Watford Junction , Milton Keynes Central , Rugby , Stafford , Crewe , Warrington Bank Quay , Wigan North Western , Preston , Lancaster , Oxenholme Lake District , Penrith and Carlisle . The spine has bypasses serving the major towns and cities of Northampton , Coventry , Birmingham and Wolverhampton . Spurs serve Stoke-on-Trent , Macclesfield , Stockport , Manchester, Runcorn and Liverpool . There
800-632: Is a ministerial department of the Government of the United Kingdom . It is responsible for the English transport network and a limited number of transport matters in Scotland, Wales, and Northern Ireland that have not been devolved . The department is run by the Secretary of State for Transport , currently (since 5 July 2024) Louise Haigh . The expenditure, administration, and policy of
880-442: Is a short double track stretch through the 777-yard (710 m) Shugborough Tunnel. The line is then quadruple track most of the way to Acton Bridge railway station, except for a double track section between Winsford and Hartford. The line is double track from Acton Bridge railway station to Weaver Junction (where a double track spur to Liverpool branches off). The line is double track from Weaver Junction to Warrington Bank Quay, but
SECTION 10
#1732783973531960-562: Is also a branch to Edinburgh , at Carstairs in Scotland which is not the most direct route between London and Edinburgh. It provides a direct connection between the WCML and the East Coast Main Line . Originally, the lines between Rugby , Birmingham and Stafford were part of the main spine, until the Trent Valley Line was built in 1847. This line formed a direct connection between Rugby and Stafford becoming
1040-564: Is entirely electrified – this situation is, however, changing since the expansion of the Pendolino fleet; from 2013 onward Class 390 sets have been routinely deployed on Edinburgh/Glasgow–Birmingham services. By 2012, the WCML Pendolino fleet was strengthened by the addition of two coaches to 31 of the 52 existing sets, thus turning them into 11-car trains. Four brand new 11-car sets are also part of this order, one of which replaced
1120-546: Is the loss of through services between Liverpool and Scotland; however these were restored by TransPennine Express in 2019. British Rail introduced the Advanced Passenger Train APT project, which proved that London–Glasgow WCML journey times of less than 4 hours were achievable and paved the way for the later tilting Virgin Pendolino trains. In the late 1980s, British Rail put forward
1200-598: Is the principal rail freight corridor linking the European mainland (via the Channel Tunnel ) through London and South East England to the West Midlands, North West England and Scotland. The line has been declared a strategic European route and designated a priority Trans-European Networks (TENS) route. A number of railway writers refer to it as "The Premier line". The WCML was not originally conceived as
1280-487: The Birmingham branch , and the routes to Manchester via Stoke-on-Trent was completed on 6 March 1967, allowing electric services to commence to those destinations. In March 1970 the government approved electrification of the northern half of the WCML, between Weaver Junction (where the branch to Liverpool diverges) and Glasgow, and this was completed on 6 May 1974. The announcement, after five years of uncertainty,
1360-770: The Design Manual for Roads and Bridges and Transport Analysis Guidance (TAG, formerly WebTAG). The DfT maintains datasets including the National Trip End Model and traffic counts on major roads. The devolution of transport policy varies around the UK; most aspects in Great Britain are decided at Westminster. Key reserved transport matters (i.e., not devolved) are as follows: Scotland Reserved matters: Scotland's comparability factor (the proportion of spending in this area devolved to
1440-577: The London and Birmingham Railway was completed, connecting to the capital via Coventry , Rugby and the Watford Gap . The Grand Junction and London and Birmingham railways shared a Birmingham terminus at Curzon Street station , so that it was now possible to travel by train between London, Birmingham, Manchester and Liverpool. These lines, together with the Trent Valley Railway (between Rugby and Stafford, avoiding Birmingham) and
1520-584: The Manchester and Birmingham Railway (Crewe–Manchester), amalgamated operations in 1846 to form the London and North Western Railway (LNWR). Three other companies, the North Union Railway ( Parkside –Wigan–Preston), the Lancaster and Preston Junction Railway and the Lancaster and Carlisle Railway , completed a through route to Carlisle by the end of 1846, these were later absorbed by
1600-488: The Mark 2 and from 1974 the fully integral , air-conditioned Mark 3 design. These remained the mainstay of express services until the early 2000s. Line speeds were raised to a maximum 110 mph (180 km/h), and these trains, hauled by Class 86 and Class 87 electric locomotives, came to be seen as BR's flagship passenger service. Passenger traffic on the WCML doubled between 1962 and 1975. The modernisation also saw
1680-649: The Quintinshill rail disaster , occurred on the WCML during World War I , on 22 May 1915, between Glasgow Central and Carlisle, in which 227 were killed and 246 injured. The entire route came under the control of the London, Midland and Scottish Railway (LMS) on 1 January 1923 when the railway companies were grouped , under the Railways Act 1921 . The LMS competed fiercely with the rival LNER 's East Coast Main Line for London to Scotland traffic (see Race to
SECTION 20
#17327839735311760-454: The death of Queen Elizabeth II , locomotive hauled services returned briefly to the WCML once more when incumbent operator Avanti West Coast employed a rake of Mark 3 coaches (hauled by a Class 90 locomotive) to provide additional services to Euston for those wishing to travel to London for the Queen's lying-in-state and subsequent funeral. The following table lists the rolling stock which forms
1840-570: The early railway era was for companies to promote individual lines between two destinations, rather than to plan grand networks of lines, as it was considered easier to obtain backing from investors. The first stretch of what is now the WCML was the Grand Junction Railway connecting the Liverpool and Manchester Railway to Birmingham , via Warrington , Crewe , Stafford and Wolverhampton , opening in 1837. The following year
1920-598: The privatisation of British Rail in the 1990s, the infrastructure was taken over in 1994 by the private company Railtrack , which later collapsed in 2002, and was replaced by the not-for-profit company Network Rail . WCML's InterCity services became part of the InterCity West Coast franchise , which was won by Virgin Trains who took over in 1997. In 2019, Avanti West Coast won the new West Coast Partnership franchise, taking over from Virgin Trains. By
2000-536: The 1850s took 12.5 hours to complete the 400-mile (640 km) journey. The final sections of what is now the WCML were put in place over the following decades. A direct branch to Liverpool , bypassing the earlier Liverpool and Manchester line, was opened in 1869, from Weaver Junction north of Crewe to Ditton Junction via the Runcorn Railway Bridge over the River Mersey . At
2080-445: The 1980s; an ill-fated high speed train which used tilting technology , which was required to allow faster speeds on the curving route, and the abortive InterCity 250 project in the early-1990s. Further modernisation of the route finally occurred during the 2000s in the period of privatisation , which saw speeds raised further to 125 mph (201 km/h) and the introduction of tilting Class 390 Pendolino trains. As much of
2160-567: The 20 May 2018 timetable change using Class 319 and Class 390 electric multiple units . West Coast Main Line The West Coast Main Line ( WCML ) is one of the most important railway corridors in the United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham , Manchester , Liverpool and Edinburgh . It is one of the busiest mixed-traffic railway routes in Europe, carrying
2240-598: The 2010-2017 timeframe. The Wigan North Western to Lostock Parkway branch is also in the process of being electrified. The majority of stock used on the West Coast Main Line is new-build, part of Virgin's initial franchise agreement having been a commitment to introduce a brand-new fleet of tilting Class 390 "Pendolino" trains for long-distance high-speed WCML services. The 53-strong Pendolino fleet, plus three tilting SuperVoyager diesel sets, were bought for use on these InterCity services. One Pendolino
2320-615: The Crewe–Manchester line via Wilmslow was completed in summer 2006. In September 2006, a new speed record was set on the WCML ;– a Pendolino train completed the 401-mile (645 km) Glasgow Central – London Euston run in a record 3 hours 55 minutes, beating the APT's record of 4 hours 15 minutes, although the APT still holds the overall record on the northbound run. The decade-long modernisation project
2400-531: The Department of Transport are scrutinised by the Transport Committee . The Department for Transport has six strategic objectives: The department "creates the strategic framework" for transport services, which are delivered through a wide range of public and private sector bodies including its own executive agencies. The DfT sponsors the following public bodies: DfT publications include
2480-488: The East Coast route, but some way short of the original target, and even further behind BR's original vision of 155 mph (250 km/h) speeds planned and achieved with the APT. The first phase of the upgrade, south of Manchester, opened on 27 September 2004 with journey times of 1 hour 21 minutes for London to Birmingham and 2 hours 6 minutes for London to Manchester. The final phase, introducing 125 mph (201 km/h) running along most of
Blackpool branch lines - Misplaced Pages Continue
2560-610: The LNWR. North of Carlisle, the Caledonian Railway remained independent, and opened its main line from Carlisle to Beattock on 10 September 1847, connecting to Edinburgh in February 1848, and to Glasgow in November 1849. Another important section, the North Staffordshire Railway (NSR), which opened its route in 1848 from Macclesfield (connecting with the LNWR from Manchester) to Stafford and Colwich Junction via Stoke-on-Trent , also remained independent. The NSR provided
2640-829: The Manchester-to-Blackpool North route was announced in December 2009 and completed in May 2018. Avanti West Coast runs direct services between Blackpool North and London Euston using Class 390 Pendolinos , Class 221 Super Voyagers and Class 805 Everos which will be supplemented by the Class 807 Hitachi AT300 by 2024. Northern Trains operate frequent services on the line, using British Rail Class 331s . First TransPennine Express formerly ran hourly services to Manchester Airport using Class 185 diesel multiple units , but responsibility for these passed to
2720-750: The Midlands and this area has been called the " Golden Triangle of Logistics ". Nearly all of the WCML is electrified with overhead line equipment at 25 kV AC . Several of the formerly unelectrified branches of the WCML in the North West have recently been electrified such as the Preston to Blackpool North Line on which electric service commenced in May 2018 along with the Preston – Manchester Piccadilly line which saw electric service commence in February 2019. Wigan to Liverpool via St Helens Shaw Street and St Helens Junction were also electrified in
2800-462: The North ). Attempts were made to minimise end-to-end journey times for a small number of powerful lightweight trains that could be marketed as glamorous premium crack expresses, especially between London and Glasgow, such as the 1937–39 Coronation Scot , hauled by streamlined Princess Coronation Class locomotives, which made the journey in 6 hours 30 minutes, making it competitive with
2880-837: The Scottish Government) was 91.7% for 2021/22. Northern Ireland Reserved matters: The department's devolved counterparts in Northern Ireland are: Northern Ireland's comparability factor (the proportion of spending in this area devolved to the Northern Ireland Executive) was 95.4% for 2021/22. Wales Reserved matters: The department's devolved counterpart in Wales is the Minister for Climate Change. Wales' comparability factor (the proportion of spending in this area devolved to
2960-479: The UK, BR carried out an extensive programme of modernisation of it between the late 1950s and early 1970s, which included full overhead electrification of the route, and the introduction of modern intercity passenger services at speeds of up to 110 mph (177 km/h). Further abortive modernisation schemes were proposed, including the introduction of the Advanced Passenger Train (APT) in
3040-548: The WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line . Several sections of the WCML form part of the suburban railway systems in London, Coventry , Birmingham, Manchester, Liverpool and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns. It is one of the busiest freight routes in Europe, carrying 40% of all UK rail freight traffic. The line
3120-692: The WCML) were given 30 new "Desiro" Class 350s , originally ordered for services in the south-east. Following Govia 's successful bid for the West Midlands franchise in 2007, another 37 Class 350 units were ordered to replace its older fleet of Class 321s . The older BR-vintage locomotive-hauled passenger rolling stock still has a limited role on the WCML, with the overnight Caledonian Sleeper services between London Euston and Scotland using Mark 3 and Mark 2 coaches until their replacement with Mark 5 stock in October 2019. Virgin also retained and refurbished one of
3200-754: The Welsh Government) was 36.6% for 2021/22. This represents a significant reduction (e.g. it was 80.9% in 2015) due to the controversial classification of HS2 as an 'England and Wales' project. The Ministry of Transport was established by the Ministry of Transport Act 1919 ( 9 & 10 Geo. 5 . c. 50) which provided for the transfer to the new ministry of powers and duties of any government department in respect of railways , light railways , tramways , canals and inland waterways , roads , bridges and ferries , and vehicles and traffic thereon, harbours , docks and piers . In September 1919, all
3280-602: The a part of the spine. South of Rugby, there is a bypass loop that serves Northampton . There is a spur at Weaver Junction north of Crewe to Liverpool . Weaver Junction on this branch is the oldest flyover-type junction in Britain. A spur branches off from Crewe to serve Manchester . There is also a spur between Colwich Junction in the Trent Valley, south of Stafford to Stoke-on-Trent, with another spur north of Stafford, also to Stoke-on-Trent. The geography of
Blackpool branch lines - Misplaced Pages Continue
3360-712: The core passenger service pattern on the WCML serving its principal termini; it is not exhaustive as many other types use small sections of the WCML as part of other routes. Department for Transport King Charles III [REDACTED] William, Prince of Wales [REDACTED] Charles III ( King-in-Council ) [REDACTED] Starmer ministry ( L ) Keir Starmer ( L ) Angela Rayner ( L ) ( King-in-Parliament ) [REDACTED] Charles III [REDACTED] [REDACTED] [REDACTED] The Lord Reed The Lord Hodge Andrew Bailey Monetary Policy Committee The Department for Transport ( DfT )
3440-786: The dawn of the 1990s, it was clear that further modernisation was required. Initially this took the form of the InterCity 250 project. The modernisation plan unveiled by Virgin and the new infrastructure owner Railtrack involved the upgrade and renewal of the line to allow the use of tilting Pendolino trains with a maximum line speed of 140 mph (225 km/h), in place of the previous maximum of 110 mph (177 km/h). Railtrack estimated that this upgrade would cost £2 billion, be ready by 2005, and cut journey times to 1 hour for London to Birmingham and 1 hr 45 mins for London to Manchester. However, these plans proved too ambitious and were subsequently scaled back. The upgrade
3520-463: The demolition and redevelopment of several of the key stations on the line: BR was keen to symbolise the coming of the "electric age" by replacing the Victorian-era buildings with new structures built from glass and concrete. Notable examples were Birmingham New Street , Manchester Piccadilly , Stafford , Coventry and London Euston . To enable the latter, the famous Doric Arch portal into
3600-659: The department was reorganised into three major sections: Secretarial, Finance and Roads. The ministry's functions were exercised initially throughout the United Kingdom. An Irish Branch was established in 1920, but then was taken over by the government of the Irish Free State on the transfer of functions in 1922. The department took over transport functions of Scottish departments in the same year, though certain functions relating to local government, loan sanction, byelaws and housing were excepted. In May 1937, power to make provisional orders for harbour, pier and ferry works
3680-453: The economic climate of the time. The early history of the WCML is complex, as it was not originally conceived as a single trunk route, but was built as a patchwork of separate lines by different companies, mostly during the 1830s and 1840s, but some parts were opened as late as the 1880s. After the completion of the pioneering Liverpool and Manchester Railway in 1830, schemes were mooted to build more inter-city lines. The business practice of
3760-504: The frequency of the current hourly service. It also proposed that the line be used as a 'test bed' for affordable electrification of secondary railway lines. As well as the line via Blackpool South, a flyover junction at Kirkham and Wesham provided direct access to Blackpool Central station. Blackpool Central station closed in 1964 and its site is now where the Central Car Park stands; the trackbed and embankment has been used for
3840-468: The line has a maximum speed of 125 mph (201 km/h), it meets the European Union 's definition of an upgraded high-speed line , although only Class 390 Pendolinos and Class 221 Super Voyagers with tilting mechanisms operated by Avanti West Coast travel at that speed. Non-tilting trains are limited to 110 mph (177 km/h). The spine between London Euston and Glasgow Central
3920-473: The line is quadruple track between Warrington Bank Quay to Wigan North Western. At Newton-le-Willows, the slow tracks join the Liverpool to Manchester line to pass through the centre of the town, while the fast tracks take the direct route via the Golborne cut-off. There are two more stretches of quadruple track, otherwise the line is double track to Scotland. The first is from Euxton Balshaw Lane to Preston, and
4000-487: The line, was announced as opening on 12 December 2005, bringing the fastest journey between London and Glasgow to 4 hours 25 mins (down from 5 hours 10 minutes). However, considerable work remained, such as the quadrupling of the track in the Trent Valley, upgrading the slow lines, the second phase of remodelling Nuneaton, and the remodelling of Stafford, Rugby, Milton Keynes and Coventry stations, and these were completed in late 2008. The upgrading of
4080-693: The new Northern franchise as from the beginning of April 2016. Known as the South Fylde Line, this branch serves Lytham , St Annes and Blackpool Pleasure Beach , each with their own station. It follows the Preston to Blackpool North line as far as Kirkham Junction. Currently, one service per hour runs along this branch, with most trains running beyond Preston to Colne via the East Lancashire line (though only advertised as through-running on Sundays). The line from Kirkham to Blackpool South
SECTION 50
#17327839735314160-631: The northern end, the Caledonian replaced its original Southside terminus in Glasgow, with the much larger and better located Glasgow Central in 1879. To expand capacity, the line between London and Rugby was widened to four tracks in the 1870s. As part of this work, a new line, the Northampton Loop , was built, opening in 1881, connecting Northampton before rejoining the main line at Rugby. The worst-ever rail accident in UK history,
4240-853: The original Philip Hardwick -designed terminus was demolished in 1962 amid much public outcry. Electrification of the Edinburgh branch was carried out in the late 1980s as part of the East Coast Main Line electrification project in order to allow InterCity 225 sets to access Glasgow via Carstairs Junction. Modernisation brought great improvements in speed and frequency. However some locations and lines were no longer served by through trains or through coaches from London, such as: Windermere ; Barrow-in-Furness , Whitehaven and Workington ; Huddersfield , Bradford Interchange , Leeds and Halifax (via Stockport); Blackpool South ; Colne (via Stockport); Morecambe and Heysham ; Southport (via Edge Hill ); Blackburn and Stranraer Harbour. Notable also
4320-444: The original Mark 3 rakes with a Driving Van Trailer and a Class 90 locomotive as a standby set to cover for Pendolino breakdowns. This set was retired from service on 25 October with a rail tour the following day. In November 2014, the "Pretendolino" was transferred to Norwich Crown Point depot to enter service with Abellio Greater Anglia having come to the end of its agreed lease to Virgin Trains. In September 2022, following
4400-552: The other main line between London and Scotland. The principal solution has been the adoption of tilting trains , initially with British Rail 's APT and latterly the Class 390 Pendolino trains constructed by Alstom and introduced by Virgin Trains in 2003. A 'conventional' attempt to raise line speeds as part of the InterCity 250 upgrade in the 1990s would have relaxed maximum cant levels on curves and seen some track realignments; this scheme faltered for lack of funding in
4480-580: The powers of the Road Board, the Ministry of Health, and the Board of Trade in respect of transport, were transferred to the new ministry. Initially, the department was organised to carry out supervisory, development and executive functions, but the end of railway and canal control by 1921, and the settlement of financial agreements relating to the wartime operations of the railways reduced its role. In 1923,
4560-799: The replacement of a weak bridge in Watford allowed line-speeds to be increased from 90 mph (145 km/h) to 125 mph (201 km/h), decreasing journey times. The main spine of the WCML is quadruple track almost all of the route from London to south of Winsford . At Hanslope Junction (near Milton Keynes ), the line divides with one pair going direct to Rugby and the other pair diverting via Northampton to rejoin at Rugby. The spine continues north in quadruple track until Brinklow, where it reduces to triple track. The line between Brinklow and Nuneaton has three tracks, with one northbound track and fast and slow southbound tracks. The line then reverts to quadruple track at Nuneaton. North of Rugeley, there
4640-469: The responsibility of: The name "Ministry of Transport" lives on in the annual MOT test , a test of vehicle safety , roadworthiness , and exhaust emissions , which most vehicles used on public roads in the UK are required to pass annually once they reach three years old (four years for vehicles in Northern Ireland ). Following a series of strikes, poor performance, concerns over access for
4720-433: The rival East Coast Flying Scotsman (British Railways in the 1950s could not match this, but did achieve a London-Glasgow timing of 7 hours 15 minutes in the 1959–60 timetable by strictly limiting the number of coaches to eight and not stopping between London and Carlisle. ) In 1948, following nationalisation , the line came under the control of British Railways ' London Midland and Scottish Regions , when
4800-573: The road Yeadon Way (built in the 1980s), which provides direct access from the M55 . The first two miles of the M55 also occupy the former trackbed, until the Blackpool North line travels under the motorway at the point where the lines used to merge. The Fleetwood Branch Line diverged at Poulton-le-Fylde . This served the industrial areas and ports around Fleetwood and carried passenger traffic to
4880-550: The route was determined by avoiding large estates and hilly areas, such as the Chilterns ( Tring Cutting ); the Watford Gap and Northampton uplands, followed by the Trent Valley; the mountains of Cumbria , with a summit at Shap ; and Beattock Summit in South Lanarkshire . This legacy means the WCML has limitations as a long-distance main line, with lower maximum speeds than the East Coast Main Line (ECML) route,
SECTION 60
#17327839735314960-435: The route with overhead line equipment. The first stretch to be upgraded and electrified was Crewe to Manchester, completed on 12 September 1960. This was followed by Crewe to Liverpool, completed on 1 January 1962. Electrification was then extended south to London. The first electric trains from London ran on 12 November 1965, with a full public service to Manchester and Liverpool launched on 18 April 1966. Electrification of both
5040-529: The second is a busy section around Glasgow. The WCML is noted for the diversity of branches served from the spine, notably those to/from the West Midlands and North Wales , Greater Manchester , and Liverpool. These are detailed in the route diagram . The complete route has been cleared for W10 loading gauge freight traffic, allowing use of higher 9 ft 6 in (2,896 mm) hi-cube shipping containers . The route passes through Nuneaton and
5120-500: The set lost in the Grayrigg derailment. Although the new stock was supplied in Virgin livery, it was not expected to enter traffic before 31 March 2012, when the InterCity West Coast franchise was due to be re-let, though the date for the new franchise was later put back to December 2012, and any effect of this on the timetable for introducing the new coaches remains unclear. Previous franchisees Central Trains and Silverlink (operating local and regional services partly over sections of
5200-405: The technical viability and cost of implementing moving block prior to promising the speed increase to Virgin and the government. By 1999, with little headway on the modernisation project made, it became apparent to engineers that the technology was not mature enough to be used on the line. The bankruptcy of Railtrack in 2001 and its replacement by Network Rail following the Hatfield crash brought
5280-409: The term "West Coast Main Line" came into use officially, although it had been used informally since at least 1912. As part of the 1955 modernisation plan , British Rail carried out a large programme of modernisation of the WCML in stages between 1959 and 1974; the modernisation involved upgrading the track and signaling to allow higher speeds, rebuilding a number of stations, and electrification of
5360-405: The town until 1970. With the exception of two small sections, the line is still in place from Poulton-le-Fylde to Jameson Road, Fleetwood, where the trackbed was used to build the A585 Amounderness Way. The junction between the branch and the mainline to Blackpool was removed in 2017. Proposals exist to reopen the line, and volunteers of the Poulton & Wyre Railway Society have begun to clear
5440-418: The track layout at Blackpool North and Kirkham to be remodelled and a third platform at Kirkham and Wesham station to be constructed. Additionally, both lines were re-signalled and overhead line installation took place on the Preston–to–Blackpool North section. Services to Blackpool South resumed on 29 January 2018, and the line to Blackpool North re-opened on 16 April 2018, with electric trains operating from
5520-455: The vegetation with which it was previously overgrown. The electrification of the Manchester–to–Blackpool North route was announced in December 2009. The main work to accomplish this commenced in early 2017. Bridgeworks along the route to raise and rebuild those that had insufficient clearance for overhead wires was completed first. Services over both the Blackpool South and Blackpool North branches temporarily ceased on 11 November 2017, to allow
5600-419: Was described as "a classic example of disastrous project management". Central to the implementation of the plan was the adoption of moving block signalling , which had never been proven on anything more than simple metro lines and light rail systems – not on a complex high-speed heavy-rail network such as the WCML. Despite this, Railtrack made what would prove to be the fatal mistake of not properly assessing
5680-483: Was electrified between 2009 and 2018, enhancing service connectivity, including direct services to London Euston . In 2021, a proposal was made to introduce a new passing loop on the South Fylde Line to double the current hourly service frequency and test affordable electrification methods. The route is used by the bulk of Blackpool's passenger trains, providing services to Manchester , Liverpool and Leeds , as well as other destinations. The planned electrification of
5760-426: Was finally completed in December 2008. This allowed Virgin's VHF (very high frequency) timetable to be progressively introduced through early 2009, the highlights of which are a three-trains-per-hour service to both Birmingham and Manchester during off-peak periods, and nearly all London-Scottish timings brought under the 4 hours 30 minutes barrier – with one service (calling only at Preston) achieving
5840-399: Was later dropped) and offering journey times as London to Birmingham in 1 hour 35 minutes, and London to Manchester or Liverpool in 2 hours 40 minutes (and even 2 hours 30 minutes for the twice-daily Manchester Pullman ). This represented a big improvement on the 3 hours 30 minutes to Manchester and Liverpool of the fastest steam service. A new feature
5920-479: Was made 48 hours before the writ was issued for a by-election in South Ayrshire . The Observer commented that, if the £25 million decision was politically rather than financially motivated, it would have the makings of a major political scandal. A new set of high-speed long-distance services was introduced in 1966, launching British Rail's highly successful " Inter-City " brand (the hyphen
6000-445: Was mostly built between the 1830s and 1850s, but several cut-off routes and branches were built in later decades. In 1923, the entire route came under the ownership of the London, Midland and Scottish Railway (LMS) when the railway companies were grouped under the Railways Act 1921 . The LMS itself was nationalised in 1947 to form part of British Railways (BR). As the WCML is the most important long-distance railway trunk route in
6080-461: Was reduced from double to single track in the early 1980s. As there are no intermediate passing loops , only one train can use the branch at a time, meaning the route has limited capacity. Until 1964, it ran further north into Blackpool to serve Blackpool Central station. In 2021, Fylde Council submitted a report to the Department for Transport , proposing a new passing loop which could double
6160-425: Was resignalled and electrified with overhead wires at 25kV AC ; electric trains ran from the May 2018 timetable change. Previously, there was also a central branch running from Kirkham to Blackpool Central station; this was closed in the 1960s and the route became a road linking from the M55 known as Yeadon Way . Rail connectivity to Blackpool began in the 1840s with the Preston and Wyre Joint Railway. By 1846,
6240-479: Was that these fast trains were offered on a regular-interval service throughout the day: initially hourly to Birmingham, two-hourly to Manchester, and so on. The service proved to be so popular that in 1972 these InterCity service frequencies were doubled to deal with increased demand. With the completion of the northern electrification in 1974, London to Glasgow journey times were reduced from 6 hours to 5. Along with electrification came modern coaches such as
6320-490: Was transferred to the Secretary of State for Scotland. The growth of road transport increased the responsibilities of the ministry, and in the 1930s, and especially with defence preparations preceding the outbreak of war, government responsibilities for all means of transport increased significantly. Government control of transport and diverse associated matters has been reorganised a number of times in modern history, being
6400-693: Was written off in 2007 following the Grayrigg derailment . After the 2007 franchise "shake-up" in the Midlands, more SuperVoyagers were transferred to Virgin West Coast, instead of going to the new CrossCountry franchise. The SuperVoyagers are used on London–Chester and Holyhead services because the Chester/North Wales line is not electrified, so they run "under the wires" between London and Crewe. SuperVoyagers were also used on Virgin's London-Scotland via Birmingham services, even though this route
#530469