Misplaced Pages

British Electricity Authority

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The British Electricity Authority (BEA) was established as the central British electricity authority in 1948 under the nationalisation of Great Britain 's electricity supply industry enacted by the Electricity Act 1947 . The BEA was responsible for the generation, transmission and sale of electricity to area electricity boards, and the development and maintenance of an efficient, coordinated and economical system of electricity supply.

#142857

44-617: The authority took over the operations of over 600 small public supply power companies, municipal authority electricity departments and the Central Electricity Board to form the BEA, which comprised a central authority and 14 area boards. Its scope did not include control of the North of Scotland Hydro-Electric Board , which had been founded in 1943 and remained independent of the BEA. The appointment of chairmen and members of

88-533: A SCADA solution developed in partnership by RWE npower (a descendant company of CEGB) and Thales UK . APMS itself has since become obsolete. However, Eggborough was the last station, particularly unit 2; fully operated using APMS until its decommissioning in 2017. In contrast, PowerGen , later taken over by E.ON (which further split to form Uniper ), undertook a programme to port the entire system to current hardware. The most current version of Cutlass, 'PT-Cutlass Kit 9', runs on Motorola PPC-based hardware, with

132-501: A director-general, a director of generation, a director of operational planning, a director of transmission, a financial controller, a controller of scientific services and a personnel manager. Regional headquarters: Haslucks Green Road, Shirley, Solihull , West Midlands. The Midlands Region was responsible for the operation of 38 power stations, over 170 sub-stations and nearly 2,000 miles of grid transmission line in an area that covered 11,000 square miles. The region produced more than

176-562: A quarter of the electricity used in England and Wales and had a major share of the industrial construction programme mounted by the CEGB during the 1960s. In 1948 the total generating capacity of all the power stations in the region was 2,016 MW only a little more than a modern 2,000 MW station. By 1957 the region's capacity was up to 4,000 MW, doubling to 8,000 MW by 1966 and rising to 14,000 MW in 1969 and 16,000 MW by 1971. Previous chairmen of

220-837: A result of the Electricity Reorganisation (Scotland) Act 1954 , the British Electricity Authority was replaced on 1 April 1955 by the Central Electricity Authority (CEA) for England and Wales. At the same time, the two South of Scotland Area Boards and the associated electricity generation and distribution plant were merged into the South of Scotland Electricity Board (SSEB) to form an integrated electricity board responsible for generation, distribution and electricity supply in southern and central Scotland. Soon afterwards,

264-659: A significant increase in unit size and had many teething problems, most of which were solved to result in reliable service and gave good experience towards the design of the 660 MW units. In the 1970s and 1980s, for the real-time control of power stations the R&;D team developed the Cutlass programming language and application system. After privatisation, CUTLASS systems in National Power were phased out and replaced largely with Advanced Plant Management System (APMS) –

308-455: A total of 131,178 employees in the electricity supply industry 1989, composed as follows: The CEGB spent more on industrial construction than any other organisation in the UK. In 1958 about 40 power stations were being planned or constructed at a capital cost of £800 million. Those public supply power stations that were in operation at any time between 1958 and 1990 were owned and operated by

352-1002: Is demonstrated in the following table. In 1981–2 there was a total of 203 substations operating at 275/400 kV, these sub-stations included 570 transformers operating at 275/400 kV. At the centre of operations was the National Control Centre of the National Grid in London, which was part of the control hierarchy for the system. The National Control Centre was based in Bankside House from 1962. There were also both area and district Grid Control Areas, which were originally at Newcastle upon Tyne , Leeds , Manchester, Nottingham , Birmingham, St Albans , East Grinstead and Bristol . The shift control engineers who worked in these control centres would cost, schedule and load-dispatch an economic commitment of generation to

396-595: The area electricity boards for distribution. It also had power to supply bulk electricity to the Scottish boards or electricity undertakings outside Great Britain. The organisation was unusual in that most of its senior staff were professional engineers, supported in financial and risk-management areas. In 1954, six years after nationalisation, the Government appointed the Herbert Committee to examine

440-670: The state . Municipalities may have the right to tax individuals and corporations with income tax , property tax , and corporate income tax , but may also receive substantial funding from the state. In some European countries, such as Germany, municipalities have the constitutional right to supply public services through municipally-owned public utility companies . Terms cognate with "municipality", mostly referring to territory or political structure, are Spanish municipio (Spain) and municipalidad (Chile), Catalan municipi , Portuguese município . In many countries, terms cognate with "commune" are used, referring to

484-586: The BEA and the area boards were made in August 1947 and the BEA was formally established on 15 August 1947. The 14 area boards were formally established on 1 January 1948, and Vesting Day, when the BEA and area boards became responsible for electricity supply, was on 1 April 1948. The London headquarters were initially at British Electricity House, Great Portland Street, W1, then British Electricity House, Trafalgar Buildings, Strand, SW1, and British Electricity House, Winsley Street, W1. The British Electricity Authority

SECTION 10

#1732771771143

528-402: The CEGB. In 1971–1972 there were 183 power stations on 156 sites, with an installed capacity of 58,880.051 MW, and supplied 190,525 GWh. By 1981–1982 there were 108 power stations with a capacity of 55,185 MW and supplied 210,289 GWh. At its inception the CEGB operated 2,763 circuit km of high-tension 275 kV supergrid. The growth of the high voltage National Grid over the lifetime of the CEGB

572-757: The Electricity Act 1957 dissolved the Central Electricity Authority, which it replaced with the Central Electricity Generating Board (CEGB) and the Electricity Council . Municipal A municipality is usually a single administrative division having corporate status and powers of self-government or jurisdiction as granted by national and regional laws to which it is subordinate. The term municipality may also mean

616-678: The Electricity Council to oversee the industry and the CEGB with responsibility for generation and transmission. The CEGB was established by section 2 of the Electricity Act 1957 . It consisted of a Generating Board comprising a chairman and seven to nine full-time or part-time members, appointed by the Minister of Power , who had experience or capacity in "the generation or supply of electricity, industrial, commercial or financial matters, applied science, administration, or

660-692: The Midlands Region were Arthur Hawkins , Gilbert Blackman, and R. L. Batley. Prior to 1968 the Midlands Region was divided into the West Midlands Division and the East Midlands Division. The number of power stations, installed capacity and electricity supplied in the Midlands Region was: Regional Headquarters: Merrion Centre, Leeds (1971). Beckwith Knowle, Otley Road, Harrogate . Extending through Northumberland , Durham , Yorkshire and North Lincolnshire

704-478: The Minister of Fuel and Power after consultation with the central authority; and one member holding the office of chairman of the consultative council. The new area boards were: Section 7 of the Electricity Act 1947 established a consultative council for each of the area electricity boards. These councils had the duty of considering matters affecting the distribution of electricity in the area, including tariffs and

748-553: The Minister of Power in May 1962), Marchwood Engineering Laboratory (MEL), and Berkeley Nuclear Laboratories (BNL). There were also five regional facilities and four project groups, North, South, Midlands and the Transmission Project Group. These scientific service departments (SSD) had a base in each region. A major SSD role was solving engineering problems with the several designs of 500 MW units. These were

792-771: The North Eastern Region was divided into the Northern Division and the Yorkshire Division.The number of power stations, installed capacity and electricity supplied in the North Eastern Region was: Regional Headquarters: 825 Wilmslow Road, Manchester, M20 (1971). Europa House, Bird Hall Lane, Cheadle Heath, Stockport . Previous chairman of the North Western Region were J.L. Ashworth and G.B. Jackson. The number of power stations, installed capacity and electricity supplied in

836-574: The North Eastern Region was responsible for the operation of 32 power stations capable of producing 8,000 MW of electricity. 108 substations and over 1,200 route miles of overhead lines transmitted the electricity to the Yorkshire Electricity Board and the North Eastern Electricity Board for passing onto the customer. A previous chairman of the North Eastern Region was P.J. Squire. Prior to 1968

880-768: The North Western Region was: Regional Headquarters: Bankside House, Summer Street, London. Past chairman of the South Eastern Region were G.N. Stone, H.J. Bennett and F.W. Skelcher. Prior to 1968 the South Eastern Region was divided into the North Thames Division and the South Thames Division. The number of power stations, installed capacity and electricity supplied in the South Eastern Region was: Regional Headquarters: 15–23 Oakfield Grove, Clifton, Bristol (1971). Bedminster Down, Bridgwater Road, Bristol. Previous chairman of

924-602: The Roman state (granting Roman citizenship to the inhabitants) while permitting the communities to retain their own local governments (a limited autonomy). A municipality can be any political jurisdiction , from a sovereign state such as the Principality of Monaco , to a small village such as West Hampton Dunes, New York . The territory over which a municipality has jurisdiction may encompass: Powers of municipalities range from virtual autonomy to complete subordination to

SECTION 20

#1732771771143

968-818: The South Western Region were Douglas Pask , Roy Beatt, A.C. Thirtle and R.H. Coates. Prior to 1968 the South Western Region was divided into the Southern Division, the Western Division and the South Wales Division. The number of power stations, installed capacity and electricity supplied in the South Western Region was: The supplies of electricity from the CEGB Regions to the area electricity boards in 1971–2 and 1981–2 were as follows. The average charge in 1971–2

1012-579: The Spanish term ayuntamiento , referring to a municipality's administration building, is extended via synecdoche to denote the municipality itself. In Moldova and Romania , both municipalities ( municipiu ; urban administrative units) and communes ( comună ; rural units) exist, and a commune may be part of a municipality. In many countries, comparable entities may exist with various names. Central Electricity Generating Board The Central Electricity Generating Board ( CEGB )

1056-764: The Transmission Division had been restructured as the Transmission and Technical Services Division based in Guildford, and a Technology Planning and Research Division based in London, the latter was formed from the Research Division System Technical and Generation Studies Branches. A Corporate Strategy Department was formed in 1981 from some of the Planning Department. A Nuclear Operations Support Group

1100-624: The board plus the chairmen of the area boards were members of the Electricity Council. The design, construction and development functions associated with power stations and transmission was undertaken by two divisions: the Generation Development and Construction Division based in Cheltenham and then Barnwood Gloucester, and the Transmission Development and Construction Division based in Guildford. In 1979

1144-449: The board was taken by Josiah Eccles as deputy chairman with effect from January 1954. Appointments by rotation with effect from 1 January 1954 were H. J. Randall (London), W. S. Lewis (Midlands), D. Bellamy (Yorkshire), and Sir John Hallsworth (North Western). The headquarters organisation had seven main departments. The Chief Contracts Officer (F. W. Smith) was responsible to both of the deputy chairmen. A board member (E. W. Bussey)

1188-546: The chairman of the South Eastern (Norman R. Elliott), East Midlands (C. R. King), South Wales (L. Howes) and South East Scotland Electricity Board (Sir Norman Duke) were appointed members of the BEA from 1 January 1950. Their terms expired on 31 December 1951 and were succeeded by the appointment of C. T. Melling (Eastern Electricity Board), H. H. Mullens (North Eastern), H. Nimmo (Southern), and S. F. Steward (South Western). Sir John Hacking retired in 1953 and his place on

1232-534: The community living in the area and the common interest. These include terms: The same terms "Gemeente" (Dutch) or "Gemeinde" (German) may be used for church congregations or parishes, for example, in the German and Dutch Protestant churches. In Greece, the word Δήμος ( demos ) is used, also meaning 'community'; the word is known in English from the compound democracy (rule of the people). In some countries,

1276-775: The coordinating and policy-making body for the British electricity supply industry. The CEGB was responsible for electricity generation, transmission and bulk sales in England and Wales , whilst in Scotland electricity generation was carried out by the South of Scotland Electricity Board and the North of Scotland Hydro-Electric Board . The CEGB's duty was to develop and maintain an efficient, coordinated and economical system of supply of electricity in bulk for England and Wales, and for that purpose to generate or acquire supplies of electricity and to provide bulk supplies of electricity for

1320-437: The efficiency and organisation of the electricity industry. The committee found that the British Electricity Authority's dual roles of electricity generation and supervision had led to central concentration of responsibility and to duplication between headquarters and divisional staff which led to delays in the commissioning of new stations. The Committee's recommendations were enacted by the Electricity Act 1957 which established

1364-477: The engineering workstation and administrative functions provided by a standard Microsoft Windows PC. It is fully compatible (with a few minor exceptions) with the DEC PDP-11 version (kit 1) released by PowerGen and has a high level of compatibility with the final version of kit 1 formerly used at National Power. It is used at three UK power stations: Ratcliffe-on-Soar , Cottam , and Fiddlers Ferry . The CEGB

British Electricity Authority - Misplaced Pages Continue

1408-461: The general interests of consumers of electricity in the area. The chairman of each consultative council was a member of the area electricity board. The electricity generated, supplied and sold, in GWh, over the establishment of the BEA was as follows: A summary of the BEA's financial results is as follows: There were a total of 169,000 employees in the electricity supply industry 1952, comprising: As

1452-561: The governing body of a given municipality. A municipality is a general-purpose administrative subdivision, as opposed to a special-purpose district . The English word is derived from French municipalité , which in turn derives from the Latin municipalis , based on the word for social contract ( municipium ), referring originally to the Latin communities that supplied Rome with troops in exchange for their own incorporation into

1496-487: The main interconnected system (the 400/275/132kV network) at an adequate level of security. They also had information about the running costs and availability of every power producing plant in England and Wales. They constantly anticipated demand, monitored and instructed power stations to increase, reduce or stop electricity production. They used the " merit order ", a ranking of each generator in power stations based upon how much they cost to produce electricity. The objective

1540-544: The organisation of workers". The power of appointment later devolved to the Minister of Technology , then to the Secretary of State for Trade and Industry . There were six chairmen of the CEGB: The executive comprised the chairman and the full-time board members. The Headquarters Operations Department provided a service to the board and executive and could supply specialist staff. The chairman and two other members of

1584-508: The provision of new or improved services, following representations by consumers or other persons requiring supplies; they could also consider any matter referred to them by the area board. They were to notify their conclusions to the board. The councils consisted of between twenty and thirty persons appointed by the minister. Not less than half nor more than three-fifths were appointed from a panel of members of local authorities. The remainder represented agriculture, commerce, industry, labour and

1628-417: Was 0.6519 pence/kWh, in 1981–2 the charge was 3.0615 pence/kWh. During the lifetime of the CEGB peak demand had more than doubled from 19,311 MW in 1958 to 47,925 MW in 1987. Sales of electricity had increased from 79.7 TWh in 1958 to 240 TWh in 1988. The CEGB had an extensive R&D section with its three principal laboratories at Leatherhead (Central Electricity Research Laboratories, CERL) (opened by

1672-678: Was also formed in 1981 to provide expert support. The sculpture "Power in Trust" from the CEGB logo was made by Norman Sillman to represent a hand made from boiler pipes and a turbine, it was commissioned in the 1961 for the opening of Staythorpe B Power Station . When first constituted the CEGB's London headquarters was at the former Central Electricity Authority's building in Winsley Street W1, there were also offices in Buchanan House, 24/30 Holborn, London, EC1. There were

1716-504: Was as follows: Note: imports are bulk supplies from the South of Scotland and France and from private sources, exports are bulk supplies to the South of Scotland and France. A summary of the income and expenditure of the CEGB (in £ million) is as follows: Detailed control of operational matters such planning, electricity generation, transmission and maintenance were delegated to five geographical regions. From January 1971 each region had

1760-443: Was established by Section 2 of the Electricity Act 1947 . It comprised a chairman and four to six other members appointed by the Minister of Fuel and Power; four members, also appointed by the minister, who were chairmen of an area electricity board (in rotation); and one other member who was chairman of the North of Scotland Hydro-Electric Board . The first appointments to the board were: Subsequent appointments were, by rotation,

1804-490: Was responsible for Labour Relations and Welfare. Under the Deputy Chairman for Administration (Sir Henry Self) were: Under the Deputy Chairman for Operations (Sir John Hacking) was: Area electricity boards were established by Section 3 of the Electricity Act 1947. They were responsible for the distribution of electricity and sales to customers. They comprised a chairman and five to seven other members appointed by

British Electricity Authority - Misplaced Pages Continue

1848-565: Was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 January 1958 to assume the functions of the Central Electricity Authority (1955–1957), which had in turn replaced the British Electricity Authority (1948–1955). The Electricity Council was also established in January 1958, as

1892-587: Was subject to examination from external bodies and formed policies and strategies to meet its responsibilities. A 1978 government white paper Re-organisation of the Electricity Supply in England and Wales proposed the creation of an Electricity Corporation to unify the fragmented structure of the industry. Parliamentary constraints prevented its enactment. A report by the Monopolies and Mergers Commission , Central Electricity Generating Board:

1936-400: Was to ensure that electricity production and transmission was achieved at the lowest possible cost. In 1981 the three-tier corporate transmission structure: National Control, area control rooms in the regions, and district control rooms (areas) was changed to a two-tier structure by merging the area and district control rooms. The electricity generated, supplied and sold by the CEGB, in GWh,

#142857