Misplaced Pages

Dockyard Road railway station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#776223

68-757: Dockyard Road (station code: DKRD ) is a railway station on the Harbour Line of the Mumbai Suburban Railway . It is the stop closest to the Mazagon Dock Limited . This station gives access to Mazagaon area. There is a sales tax office within a ten-minute walk from this station. Dockyard Road is a part of Mazagaon. Attractions include the Joseph Baptista Gardens , Gaodevi Temple, Manakeshwar Temple and Bhaucha Dhakka (ferry wharf). This article about

136-558: A light bulb with a power rating of 100 W is turned on for one hour, the energy used is 100 watt hours (W·h), 0.1 kilowatt hour, or 360  kJ . This same amount of energy would light a 40-watt bulb for 2.5 hours, or a 50-watt bulb for 2 hours. Power stations are rated using units of power, typically megawatts or gigawatts (for example, the Three Gorges Dam in China is rated at approximately 22 gigawatts). This reflects

204-509: A 12-car or 15-car rake during peak hours, as against the rated carrying capacity of around 2,000. This has resulted in what is known as Super-Dense Crush Load of 14 to 16 standing passengers per square metre of floor space. On average, about 2,000 people are killed on the Mumbai Suburban Rail network; between 2002 and 2012, more than 36,152 people died and 36,688 people were injured. A record 17 people died every weekday on

272-461: A behaviour architecture firm deployed psychology -based interventions at the Wadala station, reducing fatalities by about 75%. In 2010, Western Railway has pledged that its trains will stop running if "even a single person" is seen travelling on the roof. In mid-2011, a viral video depicted a youth performing stunts while dangling from the compartment of a Harbour Line train. Following this,

340-527: A boy was killed while imitating the actions performed in the video. Megawatt The watt (symbol: W ) is the unit of power or radiant flux in the International System of Units (SI), equal to 1 joule per second or 1 kg⋅m ⋅s . It is used to quantify the rate of energy transfer . The watt is named in honor of James Watt (1736–1819), an 18th-century Scottish inventor , mechanical engineer , and chemist who improved

408-778: A branch line from Diva Junction – Vasai Road . There are EMU carsheds at Mumbai Central , Kandivali and Virar . The largest EMU car shed in Asia is located at Virar. A repair shop for EMUs is situated at Mahalaxmi . Western Railway's EMU fleet consists of EMUs completely powered by alternating current (25 kV) power. Rolling stock consists of a fleet of AC and alternating current new Bombardier EMUs. EMUs are 12 car or 15 car formations and are differentiated as slow and fast locals. Slow trains halt at all stations, while fast ones halt at Mumbai Central , Dadar , Bandra , Andheri , Borivali , Bhayandar , Vasai Road and Virar stations which are preferable over longer distances. The Harbour Line

476-484: A fleet of AC and alternating current new Bombardier and Siemens EMUs. The major car sheds on this line are at Kurla and Kalwa . There are both fast and slow locals. Slow locals halt at every station, while fast locals' halts vary between Byculla , Dadar , Kurla , Ghatkopar , Vikhroli , Bhandup , Mulund , Thane , Diva Junction , Dombivli and Kalyan Junction . All trains traveling beyond Kalyan run as slow trains and stop at every station. The Western Line follows

544-418: A maximum speed of 85 km/h (53 mph), MRVC Siemens Rakes which are capable of and 100 km/h (62 mph), ICF built Bombardier and Medha rakes capable of running at speeds of 120 km/h (75 mph) under light traffic conditions. The actual average speed of the rakes on the slow lines is about 35 km/h (22 mph), while rakes on fast lines average about 40–50 km/h (25–31 mph) on

612-576: A new Medha rake with 71xx series numbering was introduced in Western Railway. All BHEL Made AC Local Trains in both the networks have 70xx series numbering. The Mumbai Suburban Railway system is operated by Indian Railways two zonal divisions Western Railways (WR) and Central Railways (CR). The fast commuter rail corridors on Central Railway as well as Western Railway are shared with long-distance and freight trains, while inner suburban services operate on exclusive parallel tracks. WR operates

680-622: A railway station in the Indian state of Maharashtra is a stub . You can help Misplaced Pages by expanding it . Mumbai Suburban Railway Western Railways 585.9 kilometres (364.1 mi) including Vasai-Roha Line which currently has only MEMU service. The Mumbai Suburban Railway ( Marathi : मुंबई उपनगरीय रेल्वे , romanized:  Mumbaī Upanagarīya Relve ) (colloquially called local trains or simply locals ) consists of exclusive inner suburban railway lines augmented by commuter rail on main lines serving outlying suburbs to serve

748-539: A solution to this problem, the UTSOnMobile app was launched by railways minister Suresh Prabhu at Dadar railway station in December 2014. This app was launched initially for Android and Windows Phone , with the iOS version developed later. After signing up, the user has the option to load the prepaid RWallet built in the app, using credit/debit cards, net banking, IMPS or private mobile-based apps. After

SECTION 10

#1732780942777

816-541: A turbine, which generates 648 MW e (i.e. electricity). Other SI prefixes are sometimes used, for example gigawatt electrical (GW e ). The International Bureau of Weights and Measures , which maintains the SI-standard, states that further information about a quantity should not be attached to the unit symbol but instead to the quantity symbol (e.g., P th = 270 W rather than P = 270 W th ) and so these unit symbols are non-SI. In compliance with SI,

884-809: A typical run. The old BHEL non-AC rakes are on the verge of being scrapped. On 12 November 2007, the first of 129 new 12-coach rakes with upgraded facilities was inducted into the fleet of the Western Railways under the MUTP project. These rakes are popularly called Siemens rakes and have 1xxx and 2xxx numbering system. The coaches are built of stainless steel , and have non-cushioned seats, emergency fluorescent lights, bigger windows with polycarbonate panes, better suspension systems, roof-mounted forced ventilation to reduce carbon dioxide levels in packed trains, and GPS based passenger information systems in all coaches. The new rakes are much cooler and airy than

952-424: A unit of time, namely 1 J/s. In this new definition, 1 absolute watt = 1.00019 international watts. Texts written before 1948 are likely to be using the international watt, which implies caution when comparing numerical values from this period with the post-1948 watt. In 1960, the 11th General Conference on Weights and Measures adopted the absolute watt into the International System of Units (SI) as

1020-552: A valid ticket is an offence and if caught can result in a penalty. The penalty is steeper for passengers travelling in first class without a valid ticket. Tickets can be bought for a single journey (one way) or a return journey. A return ticket is valid till the next day on weekdays and till Monday if purchased on a Friday. The ticket counters usually have long queues. Tourist tickets are valid for one, three, or five days that can be purchased up to three days in advance. Platform tickets are required to be purchased by those members of

1088-502: Is elevated from Sandhurst Road to Cotton Green . The Trans-Harbour Line which is another part of Central Railway connects Navi Mumbai and Thane . It operates from two separate platforms at Thane to Nerul , where it joins the Harbour line till Panvel and a small branch line from Turbhe goes to Vashi as it runs parallel with the Harbour line. All services on the trans-harbour line are all-stop services. Freight trains share

1156-482: Is BHIM UPI QR CODE (Pay by Paytm) and the second one is BHIM UPI QR CODE (Pay by Freecharge). The process is very simple, we just have to select the destination station, where we want to go and then by selecting the QR CODE option, and the displayed QR CODE needs to be scanned through the passengers with the help of any of the payment application (like Gpay, Paytm, BharatPe, Phonepe, etc). and can further proceed by making

1224-407: Is also equipped with a new electrical system and software, automatic doors with emergency opening features, and GPS-based destination display on LED indicators. The old system of pulling a chain to halt the train was replaced by four intercoms per coach that enable commuters to communicate with the driver. Both CR and WR competed to acquire the rake, with WR even announcing a time table for operating

1292-542: Is available for regular commuters. Riders can choose the validity of these tickets from 1-month, three months to a year. Season Tickets are the most cost-effective and time-efficient option for regular commuters. In 2022, the ATVM added new payment methods. Initially, it has only the Railway Smart Card payment option. But with the new payment methods, ticketing has become much faster. It has two features, first one

1360-487: Is known for its open doors and windows. This is because there is no ventilation system on the trains and the train relies on natural air ventilation. This was introduced as a cost-saving measure, as an air-conditioning system would be rendered useless during rush hour. Leaving the doors open also allows for a fast boarding process and turnaround time, as the trains stop for only 10 seconds, and are at most 5 minutes apart, to combat overcrowding. Passengers often end up hanging off

1428-733: Is named after the Scottish inventor James Watt . The unit name was proposed by C. William Siemens in August 1882 in his President's Address to the Fifty-Second Congress of the British Association for the Advancement of Science . Noting that units in the practical system of units were named after leading physicists, Siemens proposed that watt might be an appropriate name for a unit of power. Siemens defined

SECTION 20

#1732780942777

1496-516: Is ongoing to extend the Western Line branch to Borivali . The Harbour Line has an interchange station with the mainline at Kurla , where it turns east towards Navi Mumbai . The Harbour Line further bifurcates at Vashi into two lines – one rejoins the main lines at Thane , while the other continues to Panvel . The shed for these trains is in Sanpada . A partial section of the Harbour Line

1564-539: Is part of the Central Railway, and runs from Chhatrapati Shivaji Maharaj Terminus (CSMT) to Goregaon and Panvel . All Harbour Line services operate as slow services. The line operates from two separate platforms at CSMT and the tracks cross over the mainline at Sandhurst Road to head towards stations along Mumbai's Eastern dock area. A branch line from Wadala Road joins the Western Line at Mahim Junction and continues towards Goregaon . Further construction

1632-631: Is pasted above the CVM. As of October 2012, there are approximately 575 CVMs on Mumbai Suburban Railway stations. The Central Railway network has 350 and the Western Line has 225. In early 2015, the authorities decided to discontinue CVMs w.e.f 1 April 2015. This decision was taken due to extensive duplication of the coupons, and the lack of transparency. The coupons were also lacking a way to trace them. There are also reloadable Smart Cards , and riders can use it to print tickets for themselves from an Automatic Ticket Vending Machine (ATVMs). A seasonal ticket

1700-712: Is the first suburban rail network in India. The Mumbai Suburban Railway is an offshoot of the first passenger railway to be built by the British East India Company , and is also the oldest railway system in Asia. The first train was run by the Great Indian Peninsula Railway (now Central Railway ) between Bori Bunder (now Chhatrapati Shivaji Maharaj Terminus ) and Thane , a distance of 34 km (21 mi), on 16 April 1853 at 15:35. The 14-coach train took 57 minutes to complete

1768-523: Is the rate at which electrical work is performed when a current of one ampere (A) flows across an electrical potential difference of one volt (V), meaning the watt is equivalent to the volt-ampere (the latter unit, however, is used for a different quantity from the real power of an electrical circuit). 1   W = 1   V ⋅ A . {\displaystyle \mathrm {1~W=1~V{\cdot }A} .} Two additional unit conversions for watt can be found using

1836-824: The Railways Act, 1989 . The GRP's responsibility is to observe law and order on all railway property. The force is under joint-control of the Indian Ministry of Railways and the Maharashtra Police . Its duties correspond to those of the District Police in the areas under their jurisdiction, such as patrolling , but only on railway property. It also aids and provides assistance to the Railway Protection Force The Mumbai Suburban Railway

1904-754: The Government Railway Police (GRP) are responsible for the Security of the Mumbai Suburban Railway. The RPF is a security force under the authority of the Indian Ministry of Railways established by the Railway Protection Force Act, 1957 has the power to search, arrest, investigate and prosecute, though the ultimate power rests in the hands of the GRP. The GRP is the main police force established by

1972-739: The Integral Coach Factory in Chennai , Tamil Nadu . All routes are electrified at 25 kV 50 Hz AC power supply from overhead lines . The Indian Railways plans to build a 700 MW gas-based plant in Thakurli to generate electricity to run the Mumbai trains. The current fleet of both the Western and Central railways features a very few old rakes built by BHEL and ICF ( Perambur , Chennai ) which are capable of

2040-660: The Konkan Railway . Currently this line is used for bypassing freight trains, Express and MEMU Passenger trains. And also construction of a separate Suburban Corridor on this route for more connectivity by the MRVC is going. The Nerul–Uran line, also known as the Port line, is another part of the Central Railway connects Navi Mumbai to Uran , which is also in Navi Mumbai, but at its southwestern part. It also operates from

2108-559: The Mumbai Metropolitan Region . Spread over 450 kilometres (280 mi), the suburban railway operates 2,342 train services and carries more than 7.5 million commuters daily. The daily commuters constitute around 40% of the daily commuters of Indian Railways. By annual ridership (2.64 billion), the Mumbai Suburban Railway is one of the busiest commuter rail systems in the world. Trains run from 04:00 until 01:00, and some trains also run up to 02:30 or 03:00. It

Dockyard Road railway station - Misplaced Pages Continue

2176-825: The Newcomen engine with his own steam engine in 1776. Watt's invention was fundamental for the Industrial Revolution . When an object's velocity is held constant at one meter per second against a constant opposing force of one newton , the rate at which work is done is one watt. 1   W = 1   J / s = 1   N ⋅ m / s = 1   k g ⋅ m 2 ⋅ s − 3 . {\displaystyle \mathrm {1~W=1~J{/}s=1~N{\cdot }m{/}s=1~kg{\cdot }m^{2}{\cdot }s^{-3}} .} In terms of electromagnetism , one watt

2244-466: The World Bank -funded Mumbai Urban Transport Project-2 built at the Integral Coach Factory (ICF) in Chennai started arriving into Mumbai by April 2014. They have 5xxx numbering system. The first of these trains, to be run on Western Railway, was flagged off by Railway Minister Suresh Prabhu at Lokmanya Tilak Terminus, Kurla on Central Railway on Sunday, 27 October 2013. However, a delay of two years

2312-905: The 10 lakh passenger mark within the first five months. The summer months of March and April saw over 3 lakh passengers take the AC local each month. The train, operated by Western Railway (WR), currently plies between Churchgate and Virar. It has a seating capacity of 1,028 seats and can carry 5,964 passengers. The monthly pass on the AC local train will cost (from Churchgate) between ₹ 570 (US$ 6.80) (till Mumbai Central) to ₹ 820 (US$ 9.80) (till Bandra) to ₹ 1,235 (US$ 15) (till Andheri) to ₹ 1,635 (US$ 20) (till Borivali) to ₹ 1,740 (US$ 21) (till Bhayander) to ₹ 1,970 (US$ 24) (till Vasai Road) to ₹ 2,035 (US$ 24) (till Virar). New halts were introduced after commuters demand at Marine Lines, Charni Road, Grant Road, Dahisar, Mira Road, Naigaon, Nallasopara. Data shows that among all stations between Churchgate and Virar. Borivali

2380-566: The 32 km journey, with a halt at Sion to refill the train's water tanks. The next major train was run between Virar and Churchgate by the Bombay, Baroda and Central India Railway (now Western Railway ), in April 1867. Colaba was also added as a station on this route, but later shut down. On 3 February 1925, the first EMU Service was started from Victoria Terminus (now Chhatrapati Shivaji Maharaj Terminus ) to Coorla Harbour (now Kurla ) on

2448-448: The 5533-5536 rake of Mumbai Suburban Railway, called Uttam rake which also manufactured by the ICF was introduced and ran on Western Line. Discussion on AC coaches first began in 2002 and was planned to be introduced in 2013. However, major delays in finalizing the rakes' design and procurement of material deferred the project. The first air-conditioned rake for use on the suburban system

2516-726: The Central line which was run on 1.5 kV DC traction and also started on the Western line from Churchgate to Borivali on 5 January 1928. By 2016, the entire network had been converted to 25 kV 50 Hz AC traction. The suburban services are run by electric multiple units (EMUs) in 191 rakes (train sets) of 12-car and 15-car composition. To alleviate the problems of overcrowding, the nine-car trains have been phased out and replaced with 12-car ones. 15-coach trains were introduced on 21 November 2009. However, these are few in number. Equipment makers include DMU(Direct Multiple Unit), Jessop, Siemens, Bombardier, and Medha. The trains are manufactured at

2584-544: The Integral Coach Factory, Chennai . It has several new facilities, such as connected vestibules and automatic doors. It runs from Virar to Churchgate and Kalyan to Chhatrapati Shivaji Terminus . AC trains include fast and slow locals and started their run from 25 December 2017 on WR and 2021 on Central Line. The Mumbai Suburban Railway uses a proof-of-payment fare collection system. Tickets can be purchased at every train station. Travelling without

2652-524: The RWallet is loaded, the app can be used to book tickets on the entire network. Alternatively, the user may book tickets directly using credit/debit cards, net banking, IMPS, UPI, or various digital wallets such as PayTM, MobiKwik etc. for payments within the app without having to load the prepaid RWallet. Initially, the ticket booked on the app had to be printed from the ATVMs. This step was found tedious by

2720-587: The Western Line and CR operates the Central Line, Harbour Line, Trans-Harbour Line, Vasai–Roha Line and Neral–Matheran & Panvel–Karjat line. The Central Line in Mumbai consists of three major corridors, which bifurcate as they run into suburban satellite towns. Two corridors (one local and the other through) of the Central Railway run from Chhatrapati Shivaji Maharaj Terminus (CSMT) to Kalyan Junction (53 km (33 mi)), where it bifurcates into two lines – one to Kasara (67 km (42 mi)) in

2788-466: The Western Railway northwards from Churchgate parallel to the west coast. Local services by electric multiple units (EMUs) ply between Churchgate and Dahanu Road (124 km (77 mi)) on exclusive parallel tracks up to Virar (60 km (37 mi)) while MEMUs service the section beyond Virar to Dahanu Road (64 km (40 mi)). On 16 April 2013 EMU has extended up to Dahanu Road . MEMUs also operate between Dahanu Road and Panvel via

Dockyard Road railway station - Misplaced Pages Continue

2856-470: The above equation and Ohm's law . 1   W = 1   V 2 / Ω = 1   A 2 ⋅ Ω , {\displaystyle \mathrm {1~W=1~V^{2}/\Omega =1~A^{2}{\cdot }\Omega } ,} where ohm ( Ω {\displaystyle \Omega } ) is the SI derived unit of electrical resistance . The watt

2924-444: The air-conditioned rake. Union Railway Minister Suresh Prabhu announced that the rake would be transferred to CR on 16 March 2016. However, at a height of 4.335 meters the rake exceeds the maximum clearance height of 4.270 meters for EMU coaches on the Central Line. In particular, the rake cannot clear some of the low-height British-era bridges between CSMT and Kurla. Then Central Railway general manager Sunil Kumar Sood insisted that CR

2992-524: The city's suburban railway network in 2008. Overcrowding is frequently blamed for the incidents. Another cause of death is passengers crossing the tracks on foot to avoid footbridges. Some passengers die when they sit on train roofs to avoid the crowds and are electrocuted by overhead electric cables, or fall while hanging from doors and window bars. Deaths declined in 2018. To reduce the risk of such fatalities, longer platforms, and more frequent trains are being implemented. Central Railways in association with

3060-488: The commuters and was criticized. Later, in July 2015, an update for the app was launched, which made e-tickets acceptable. The update also brought technical changes, like, the tickets could be booked only within a radius of 30m to 5 km of the origin station, and not from the platform. This move was well received by commuters, which resulted in over 50,000 downloads on the launch day. The Railway Protection Force (RPF) and

3128-415: The edge of the footboard, off door ledges, and during rush hour can lose balance and fall to their death. Teenagers and adults also attempt to perform stunts of the doorway and door ladders, thus risking their lives. Windows also have a wired grill on them, to prevent theft and chain snatching. However, passengers frequently spit paan , mava and gutka while hanging off doors, which ends up entering through

3196-515: The energy company Ørsted A/S uses the unit megawatt for produced electrical power and the equivalent unit megajoule per second for delivered heating power in a combined heat and power station such as Avedøre Power Station . When describing alternating current (AC) electricity, another distinction is made between the watt and the volt-ampere . While these units are equivalent for simple resistive circuits , they differ when loads exhibit electrical reactance . Radio stations usually report

3264-433: The entire train seats reserved for women passengers. A semi ladies special is a train with a few (e.g., three) coaches reserved for women. These designations can be combined with fast , slow , etc. with terms such as Slow Ladies Special . The Mumbai Suburban Railways are known for their open doors and windows. This is because there is no ventilation system on the trains, and the train relies on natural air ventilation. This

3332-460: The maximum power output it can achieve at any point in time. A power station's annual energy output, however, would be recorded using units of energy (not power), typically gigawatt hours. Major energy production or consumption is often expressed as terawatt hours for a given period; often a calendar year or financial year. One terawatt hour of energy is equal to a sustained power delivery of one terawatt for one hour, or approximately 114 megawatts for

3400-464: The non rush hours, though at times it is equally or more crowded than the general compartments during rush hour, due to most office employees having a first class transport pass provided by their employer. First class and Senior Citizen compartments also have cushioned seating, while the rest are typically plastic. There are following classes of travel: There are also women-only cars (termed ladies special ), and since 1992, Ladies Special trains with

3468-462: The north-east and the other to Khopoli (61 km (38 mi)) in the south-east. These two corridors constitute the 'Main' Central Line. There is also a 36 km (22 mi) corridor between Kurla and Kalyan Junction stations for exclusive use by outstation and cargo trains. The Central Line has two interchange stations with the Western Line, at Parel and Dadar and the Harbour line at Sandhurst Road and Kurla . Rolling stock consists of

SECTION 50

#1732780942777

3536-529: The old EMUs. The motors of the new rakes also make less noise than the older ones. Since 2010, the front of the EMUs is painted yellow so that the maintenance workers on the tracks can see the train easily. These rakes have been procured under the project at a total cost of ₹ 19 billion (US$ 431.0 million). Siemens 5 rakes that had to be delivered as part of the first phase were sent to the city in early January 2014. New EMUs with Bombardier Electrical procured under

3604-440: The open window grilles. There are also numerous records of people tripping and falling down every day while getting on and off the train, when the train is in motion, thus resulting in injury. Due to its extensive reach across the Mumbai Metropolitan Region , and its intensive use by the local urban population, the Mumbai Suburban Railway suffers from the most severe overcrowding in the world. Over 4,500 passengers are packed into

3672-539: The payment and getting the ticket in your hands. Smart cards can also be recharged similarly by placing the card on the slot and accessing the QR CODE for payment. And passengers are requested to make use of Digital QR CODE based payment facility in ATVMs installed at stations for hassle free cashless payments, saving time by avoiding queues at UTS counters. It may be noted that a discount of 0.5% can be availed on renewal of suburban season tickets using UPI QR CODE. The ticket counters usually have long queues. In order to bring

3740-488: The power of their transmitters in units of watts, referring to the effective radiated power . This refers to the power that a half-wave dipole antenna would need to radiate to match the intensity of the transmitter's main lobe . The terms power and energy are closely related but distinct physical quantities. Power is the rate at which energy is generated or consumed and hence is measured in units (e.g. watts) that represent energy per unit time . For example, when

3808-456: The public not boarding trains, but who wish to access the platforms at all stations, perhaps for the purpose of receiving or seeing off a passenger and also to use footbridges. These cost ₹ 10 (12¢ US). A person can be penalised for non-possession of this ticket. To save time, a Coupon Booklet can be purchased and the coupons can be punched for the designated fare at Coupon Validating Machines (CVMs) at every station. The ticket fares matrix

3876-558: The rake to WR. The rake was transferred to WR on 12 May 2017. WR General Manager Anil Kumar Gupta stated that rake would begin commercial operations on the Western Line after WR conducted its own tests and trial runs and receiving regulatory approvals. Although there are some clearance issues on the Western Line as well, Gupta stated that these could be rectified. The First AC EMU was Flagged off on 25 December 2017 in WR. The first AC local train in Mumbai began operation in December 2017 and crossed

3944-522: The tracks through a bypass from Airoli to Kopar Khairane , after which it goes to a siding in Turbhe for the APMC market godowns. The Vasai Road–Roha line is an Intersection chord rail bypass line of the Mumbai Suburban Railway which connects the Western line, Central line and Harbor line of the Western Railway zone and Central Railway zone. It runs from Vasai Road to Roha which also connects Panvel and

4012-527: The two separate platforms of Nerul and one separate platform of CBD Belapur to Uran, also making connectivity to JNPT in Navi Mumbai directly. Mumbai Suburban Railway services have trains with four main designations: The suburban fleet consists of 12 and 15-coach rakes. There are two main classes of travel; the First and Second classes. The first class fare is approximately 8 times more expensive than second class and therefore tends to be less crowded during

4080-569: The unit of power. In the electric power industry , megawatt electrical ( MWe or MW e ) refers by convention to the electric power produced by a generator, while megawatt thermal or thermal megawatt (MWt, MW t , or MWth, MW th ) refers to thermal power produced by the plant. For example, the Embalse nuclear power plant in Argentina uses a fission reactor to generate 2,109 MW t (i.e. heat), which creates steam to drive

4148-570: The unit within the existing system of practical units as "the power conveyed by a current of an Ampère through the difference of potential of a Volt". In October 1908, at the International Conference on Electric Units and Standards in London, so-called international definitions were established for practical electrical units. Siemens' definition was adopted as the international watt. (Also used: 1 A × 1 Ω.) The watt

SECTION 60

#1732780942777

4216-479: Was anticipated due to the demands of automatic sliding doors on the trains. Under the Make in India initiative, the first Indian made rake was made by Medha. They have 6xxx series numbering. 9 car trains have a capacity of 2,628 (876 seated and 1,752 standing). 12 car trains have a capacity of 3,504 (1,168 seated and 2,336 standing). In fall 2013, brand new 12 car rakes were introduced on the railway. On 6 November 2019,

4284-477: Was built by the Integral Coach Factory in Chennai–BHEL EMU at a cost of over ₹ 50 crore (US$ 6.0 million), and arrived in Mumbai on 5 April 2016. The rake has a seating capacity of 1,028 passengers, and standing room for up to 6,000 passengers. The 12 coach rake is configured as two sets of 6 interconnected bogies, meaning passengers can walk between coaches but only up to a maximum of 6 coaches. The train

4352-510: Was commissioned between Mumbai Chhatrapati Shivaji Maharaj Terminus and Kalyan on 17 December 2020. After a gap of 3 years, the first 12-coach fully-vestibuled AC Local Train made by Medha was commissioned on Western Railway on 19 December 2022. This has 8xxx series numbering. Under the MUTP-III and MUTP-IIIA project, Western Railway has decided to procure more AC local trains and convert the entire fleet into AC akin to Kolkata Metro. In 2023,

4420-535: Was conduct trials and operate the rake on the Harbour Line. After acquiring the rake, CR conducted tests, safety, and mobility checks, and trial runs under the supervision of the RDSO. However, following Sood's retirement, CR abandoned plans to operate the rake in December 2016. CR informed the Railway Board that it could not operate the rake due to the clearance issue, and the Railway Board directed them to transfer

4488-420: Was defined as equal to 10 units of power in the practical system of units. The "international units" were dominant from 1909 until 1948. After the 9th General Conference on Weights and Measures in 1948, the international watt was redefined from practical units to absolute units (i.e., using only length, mass, and time). Concretely, this meant that 1 watt was defined as the quantity of energy transferred in

4556-469: Was introduced as a cost-saving measure, as an air-conditioning system would be rendered useless during rush hour. Leaving the doors open also allows for a fast boarding process, as the trains stop for only 10 seconds, to combat overcrowding. In 2016, the Indian Railways manufactured its first AC local train for providing better journeys in the hot and humid summer season. This rake is manufactured at

4624-594: Was the highest earner for the AC train. The monthly earning of AC train is approximately ₹ 7,100,000 (US$ 85,000) per month after adding seven new halts. Two more AC local rakes were introduced and now, the services run all days of the week. The fourth air-conditioned rake on Mumbai Suburban Rail Network & first for Central Railway has been commissioned on Trans-harbour line from Thane to Panvel / Vashi from 30 January 2020. The fifth air-conditioned rake on Mumbai Suburban Rail Network & first for Central Railway Main Line

#776223