118-727: Dutton Viaduct is on the West Coast Main Line where it crosses the River Weaver and the Weaver Navigation between the villages of Dutton and Acton Bridge in Cheshire , England ( grid reference SJ581764 ), not far from Dutton Horse Bridge . It is recorded in the National Heritage List for England as a Grade II* listed building . The viaduct was constructed during 1836, and

236-470: A "public sector body". To cope with rapidly increasing passenger numbers , (as of 2021 ) Network Rail has been undertaking a £38 billion programme of upgrades to the network, including Crossrail , electrification of lines and upgrading Thameslink . In May 2021, the Government announced its intent to replace Network Rail in 2023 with a new public body called Great British Railways . In 2022 it

354-409: A 'near miss' incident was recorded when line-side contractors carrying out a structural inspection crossed the tracks between the obsolete refuges in breach of the red zone regulations. Because of limited trackside clearance, Dutton Viaduct was designated a 'red zone prohibited area' during the previous decade, meaning that workers are not permitted on the line when trains are running unless separated by

472-418: A London–Glasgow time of 4   hours 8   minutes. Some projects that were removed from the modernisation as a result of the de-scoping, such as a flyover at Norton Bridge station, were later restarted. A £250   million project to grade-separate the tracks at Norton Bridge that allowed for increased service frequency as well as improved line-speeds was completed in spring 2016. Other projects such as

590-430: A briefing to contractors was released ahead of an invitation to tender for Midland Mainline Electrification project work to extend electrification to Nottingham and Sheffield. This scheme is expected to cost £1.3 billion. Network Rail has undertaken numerous schemes to develop its own renewable electrical generation footprint, which is used in part to power the operational railway. In January 2014, Network Rail opened

708-654: A central street, accommodating more than 3,000 people. Various divisions, including engineering, logistics, operations (including timetable planning), IT, procurement, planning and finance departments, and Route Services Supply Chain operations have been transferred to the Quadrant. In 2009, allegations appeared in the media from the Transport Salaried Staffs' Association concerning treatment of Network Rail employees. Former chief executive Iain Coucher

826-496: A fibre optic and copper cable network that is located mainly within trackside troughing routes on the former British Rail Telecommunications network. (It is the largest private telecoms network in the UK). Network Rail operates several analogue radio networks that support mobile communication applications for drivers and lineside workers which consist of base stations, antenna systems and control equipment. The National Radio Network (NRN)

944-544: A litany of problems in the areas she was responsible for. Michelle Handforth resigned after infrastructure problems left hundreds of passengers stranded in carriages in London, one of the latest issues with the lines outside Paddington Station . The Office of Rail and Road was already investigating poor reliability and punctuality in the Wales and Western region. During February 2011, it was announced that Network Rail had begun

1062-582: A net debt of approximately £8 billion by 2003. During May 2001, Railtrack announced that, despite making a pre-tax profit before exceptional expenses of £199m, the £733m of costs and compensation paid out over the Hatfield crash had plunged Railtrack from profit into a loss of £534m, and it approached the government for funding, which it controversially used to pay a £137m dividend to its shareholders in May 2001. Months later, Railtrack sought another bailout from

1180-485: A permanent fence. In early 2020, Network Rail applied for permission for repairs to compromised stonework in one of the arches; the remedial work was described as being sympathetic to the bridge's historic construction and designed to blend in with the original materials used. West Coast Main Line The West Coast Main Line ( WCML ) is one of the most important railway corridors in

1298-410: A reappraisal of the plans, while the cost of the upgrade soared. Following fears that cost overruns on the project would push the final price tag to £13 billion, the plans were scaled down, bringing the cost down to between £8 billion and £10 billion, to be ready by 2008, with a maximum speed for tilting trains of a more modest 125 mph (201 km/h) – equalling the speeds available on

SECTION 10

#1732797520879

1416-439: A small amount of income from commercial property estate. In February 2019 Network Rail sold its commercial property business consisting of 5,200 properties, mainly railway arches, to a consortium of Telereal Trillium and Blackstone Property Partners for £1.46bn. Network Rail works in five-year funding cycles called "Control Periods" (CP for short). The government specifies what is needed from Network Rail and sets out how much

1534-522: A track realignment scheme to raise speeds on the WCML; a proposed project called InterCity 250 , which entailed realigning parts of the line in order to increase curve radii and smooth gradients in order to facilitate higher-speed running. The scheme, which would have seen the introduction of new rolling stock derived from that developed for the East Coast electrification, was scrapped in 1992. As part of

1652-527: A useful alternative route to Manchester, however poor relations between the LNWR and the NSR meant that through trains did not run until 1867. The route to Scotland was marketed by the LNWR as 'The Premier Line'. Because the cross-border trains ran over the LNWR and Caledonian Railway, through trains consisted of jointly owned "West Coast Joint Stock" to simplify operations. The first direct London to Glasgow trains in

1770-499: Is 399 miles (642 km) long, with principal InterCity stations at Watford Junction , Milton Keynes Central , Rugby , Stafford , Crewe , Warrington Bank Quay , Wigan North Western , Preston , Lancaster , Oxenholme Lake District , Penrith and Carlisle . The spine has bypasses serving the major towns and cities of Northampton , Coventry , Birmingham and Wolverhampton . Spurs serve Stoke-on-Trent , Macclesfield , Stockport , Manchester, Runcorn and Liverpool . There

1888-502: Is a non-departmental public body of the Department for Transport with no shareholders, which reinvests its income in the railways. Network Rail's main customers are the private train operating companies (TOCs), responsible for passenger transport, and freight operating companies (FOCs), who provide train services on the infrastructure that the company owns and maintains. Since 1 September 2014, Network Rail has been classified as

2006-442: Is a short double track stretch through the 777-yard (710 m) Shugborough Tunnel. The line is then quadruple track most of the way to Acton Bridge railway station, except for a double track section between Winsford and Hartford. The line is double track from Acton Bridge railway station to Weaver Junction (where a double track spur to Liverpool branches off). The line is double track from Weaver Junction to Warrington Bank Quay, but

2124-618: Is also a branch to Edinburgh , at Carstairs in Scotland which is not the most direct route between London and Edinburgh. It provides a direct connection between the WCML and the East Coast Main Line . Originally, the lines between Rugby , Birmingham and Stafford were part of the main spine, until the Trent Valley Line was built in 1847. This line formed a direct connection between Rugby and Stafford becoming

2242-593: Is carried out mostly by the principal train operating company serving that station; however, in a few cases the train operating company does not serve the station. For example, Hinckley is served by CrossCountry , but it is managed by East Midlands Railway . As of April 2018 , Network Rail manages 20 stations directly, with Clapham Junction and Guildford becoming managed stations on 1 April 2018. The stations Network Rail operate are: National London stations Glasgow Central and Liverpool Lime Street stations are divided into high and low-level stations –

2360-399: Is currently undertaking a £38 billion programme of upgrades to the network, including Crossrail , electrification of lines , in-cab signalling , new inter-city trains , upgrading Thameslink , and a new high-speed line . For investment projects, as opposed to routine maintenance, Network Rail has developed an eight-stage process designed to minimise and mitigate risks. This is known as

2478-564: Is entirely electrified – this situation is, however, changing since the expansion of the Pendolino fleet; from 2013 onward Class 390 sets have been routinely deployed on Edinburgh/Glasgow–Birmingham services. By 2012, the WCML Pendolino fleet was strengthened by the addition of two coaches to 31 of the 52 existing sets, thus turning them into 11-car trains. Four brand new 11-car sets are also part of this order, one of which replaced

SECTION 20

#1732797520879

2596-626: Is not part of the Network Rail network, such as the line between Harrow-on-the-Hill and Amersham being owned by London Underground. Following an initial period in which Network Rail established itself and demonstrated its competence in addressing the principal challenges of improving asset condition, reducing unit costs and tackling delay, the Government's Rail Review in 2004 said that Network Rail should be given responsibility for whole-industry performance reporting, timetable development, specification of small and medium network enhancements, and

2714-723: Is one of the busiest freight routes in Europe, carrying 40% of all UK rail freight traffic. The line is the principal rail freight corridor linking the European mainland (via the Channel Tunnel ) through London and South East England to the West Midlands, North West England and Scotland. The line has been declared a strategic European route and designated a priority Trans-European Networks (TENS) route. A number of railway writers refer to it as "The Premier line". The WCML

2832-418: Is operated by Colas Rail, primarily using locomotives from Colas' and Network Rail's own fleets, but have also used locomotives hired from other companies such as Direct Rail Services , GB Railfreight and Europhoenix as required. From 1997 to 2014 (inclusive), passenger numbers have more than doubled, following little growth in the previous decades. To cope with the increasing passenger numbers, Network Rail

2950-665: Is operated by Network Rail. A line closure for engineering or renewal works is known as a possession. Network Rail has an internal infrastructure database known as GEOGIS. The system uses codes for four-digit Track IDs to identify which line at any location is referred to. The first number refers to track direction, with values of 1 (Up), 2 (Down), 3 (Reversible/Bi-directional), or 4 (Merry Go Round Loop). The second number refers to track use, which can be 1 (Main or Fast), 2 (Slow, Local or Relief), 3 (Goods), 4 (Single line), 5 (Loop), 6 (Terminal or Bay), 7 (Crossover), 8 (Other or Engine), or 9 (Single Siding). The third and fourth numbers refer to

3068-546: Is the loss of through services between Liverpool and Scotland; however these were restored by TransPennine Express in 2019. British Rail introduced the Advanced Passenger Train APT project, which proved that London–Glasgow WCML journey times of less than 4   hours were achievable and paved the way for the later tilting Virgin Pendolino trains. In the late 1980s, British Rail put forward

3186-487: The Birmingham branch , and the routes to Manchester via Stoke-on-Trent was completed on 6 March 1967, allowing electric services to commence to those destinations. In March 1970 the government approved electrification of the northern half of the WCML, between Weaver Junction (where the branch to Liverpool diverges) and Glasgow, and this was completed on 6 May 1974. The announcement, after five years of uncertainty,

3304-629: The London and Birmingham Railway was completed, connecting to the capital via Coventry , Rugby and the Watford Gap . The Grand Junction and London and Birmingham railways shared a Birmingham terminus at Curzon Street station , so that it was now possible to travel by train between London, Birmingham, Manchester and Liverpool. These lines, together with the Trent Valley Railway (between Rugby and Stafford, avoiding Birmingham) and

3422-584: The Manchester and Birmingham Railway (Crewe–Manchester), amalgamated operations in 1846 to form the London and North Western Railway (LNWR). Three other companies, the North Union Railway ( Parkside –Wigan–Preston), the Lancaster and Preston Junction Railway and the Lancaster and Carlisle Railway , completed a through route to Carlisle by the end of 1846, these were later absorbed by

3540-488: The Mark 2 and from 1974 the fully integral , air-conditioned Mark 3 design. These remained the mainstay of express services until the early 2000s. Line speeds were raised to a maximum 110 mph (180 km/h), and these trains, hauled by Class 86 and Class 87 electric locomotives, came to be seen as BR's flagship passenger service. Passenger traffic on the WCML doubled between 1962 and 1975. The modernisation also saw

3658-759: The Northern Hub . However as of September 2017 the two Manchester stations remained under the operatorship of Arriva Rail North . There are a small number of stations on the National Rail network that are not owned by Network Rail. As of 2022 these are: Network Rail has several training and development sites around Britain. These include sites in York, Peterborough, Derby, Leeds, Walsall and Larbert which provide refresher courses, and train staff in new equipment. Advanced Apprentice Scheme trainees are trained at Network Rail's Westwood training centre for

Dutton Viaduct - Misplaced Pages Continue

3776-649: The Quintinshill rail disaster , occurred on the WCML during World War I , on 22 May 1915, between Glasgow Central and Carlisle, in which 227 were killed and 246 injured. The entire route came under the control of the London, Midland and Scottish Railway (LMS) on 1 January 1923 when the railway companies were grouped , under the Railways Act 1921 . The LMS competed fiercely with the rival LNER 's East Coast Main Line for London to Scotland traffic (see Race to

3894-454: The death of Queen Elizabeth II , locomotive hauled services returned briefly to the WCML once more when incumbent operator Avanti West Coast employed a rake of Mark 3 coaches (hauled by a Class 90 locomotive) to provide additional services to Euston for those wishing to travel to London for the Queen's lying-in-state and subsequent funeral. The following table lists the rolling stock which forms

4012-570: The early railway era was for companies to promote individual lines between two destinations, rather than to plan grand networks of lines, as it was considered easier to obtain backing from investors. The first stretch of what is now the WCML was the Grand Junction Railway connecting the Liverpool and Manchester Railway to Birmingham , via Warrington , Crewe , Stafford and Wolverhampton , opening in 1837. The following year

4130-598: The privatisation of British Rail in the 1990s, the infrastructure was taken over in 1994 by the private company Railtrack , which later collapsed in 2002, and was replaced by the not-for-profit company Network Rail . WCML's InterCity services became part of the InterCity West Coast franchise , which was won by Virgin Trains who took over in 1997. In 2019, Avanti West Coast won the new West Coast Partnership franchise, taking over from Virgin Trains. By

4248-536: The 1850s took 12.5   hours to complete the 400-mile (640 km) journey. The final sections of what is now the WCML were put in place over the following decades. A direct branch to Liverpool , bypassing the earlier Liverpool and Manchester line, was opened in 1869, from Weaver Junction north of Crewe to Ditton Junction via the Runcorn Railway Bridge over the River Mersey . At

4366-445: The 1960s, the line was electrified overhead lines and supporting metalwork were installed across its length and its line speed was increased to 125 mph (200 km/h) in the West Coast Main Line route modernisation programme. It became a listed structure in the early 1990s. Dutton Viaduct was constructed for the Grand Junction Railway (GJR), one of the world's first major railways. Joseph Locke and George Stephenson designed

4484-445: The 1980s; an ill-fated high speed train which used tilting technology , which was required to allow faster speeds on the curving route, and the abortive InterCity 250 project in the early-1990s. Further modernisation of the route finally occurred during the 2000s in the period of privatisation , which saw speeds raised further to 125 mph (201 km/h) and the introduction of tilting Class 390 Pendolino trains. As much of

4602-598: The 2010-2017 timeframe. The Wigan North Western to Lostock Parkway branch is also in the process of being electrified. The majority of stock used on the West Coast Main Line is new-build, part of Virgin's initial franchise agreement having been a commitment to introduce a brand-new fleet of tilting Class 390 "Pendolino" trains for long-distance high-speed WCML services. The 53-strong Pendolino fleet, plus three tilting SuperVoyager diesel sets, were bought for use on these InterCity services. One Pendolino

4720-615: The Crewe–Manchester line via Wilmslow was completed in summer 2006. In September 2006, a new speed record was set on the WCML ;– a Pendolino train completed the 401-mile (645 km) Glasgow Central – London Euston run in a record 3   hours 55   minutes, beating the APT's record of 4   hours 15   minutes, although the APT still holds the overall record on the northbound run. The decade-long modernisation project

4838-488: The East Coast route, but some way short of the original target, and even further behind BR's original vision of 155 mph (250 km/h) speeds planned and achieved with the APT. The first phase of the upgrade, south of Manchester, opened on 27 September 2004 with journey times of 1   hour 21   minutes for London to Birmingham and 2   hours 6   minutes for London to Manchester. The final phase, introducing 125 mph (201 km/h) running along most of

Dutton Viaduct - Misplaced Pages Continue

4956-624: The Governance for Railway Investment Projects (GRIP), previously known as “Guide to Rail Investment Projects”. The stages are as follows: Each stage delivers an agreed set of outputs to defined quality criteria. The process has been criticised as cumbersome by some and it is proposed to replace it with a new process with the acronym PACE- Project Acceleration in a Controlled Environment. For financial and other planning purposes, Network Rail works within 5-year "Control Periods", each one beginning on 1 April and ending on 31 March to coincide with

5074-758: The LNWR. North of Carlisle, the Caledonian Railway remained independent, and opened its main line from Carlisle to Beattock on 10 September 1847, connecting to Edinburgh in February 1848, and to Glasgow in November 1849. Another important section, the North Staffordshire Railway (NSR), which opened its route in 1848 from Macclesfield (connecting with the LNWR from Manchester) to Stafford and Colwich Junction via Stoke-on-Trent , also remained independent. The NSR provided

5192-750: The Midlands and this area has been called the " Golden Triangle of Logistics ". Nearly all of the WCML is electrified with overhead line equipment at 25 kV AC . Several of the formerly unelectrified branches of the WCML in the North West have recently been electrified such as the Preston to Blackpool North Line on which electric service commenced in May 2018 along with the Preston – Manchester Piccadilly line which saw electric service commence in February 2019. Wigan to Liverpool via St Helens Shaw Street and St Helens Junction were also electrified in

5310-462: The North ). Attempts were made to minimise end-to-end journey times for a small number of powerful lightweight trains that could be marketed as glamorous premium crack expresses, especially between London and Glasgow, such as the 1937–39 Coronation Scot , hauled by streamlined Princess Coronation Class locomotives, which made the journey in 6   hours 30   minutes, making it competitive with

5428-647: The Train Operating Companies. During March 2011, the British government announced that the Great Western Main Line would be electrified as far as Bristol Temple Meads. Within four years, this programme, which was headed by Network Rail, was beset by poor planning and cost overruns, leading to the shortcomings being scrutinised by Parliament. Specifically, the projected cost had increased from £1.2 billion to £2.8 billion by

5546-527: The UK, BR carried out an extensive programme of modernisation of it between the late 1950s and early 1970s, which included full overhead electrification of the route, and the introduction of modern intercity passenger services at speeds of up to 110 mph (177 km/h). Further abortive modernisation schemes were proposed, including the introduction of the Advanced Passenger Train (APT) in

5664-477: The UK, as of March 2014, Network Rail is well underway in the UK implementation of GSM-R to replace its legacy National Radio Network (NRN) and Cab Secure Radio (CSR) systems currently in use. Network Rail operates a large variety of DMUs, locomotives and rolling stock to perform safety checks and maintenance (this fleet is not to be confused with the combined rolling stock assets of Rail Delivery Group members who work in combination as National Rail ). As well as

5782-464: The United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham , Manchester , Liverpool and Edinburgh . It is one of the busiest mixed-traffic railway routes in Europe, carrying a mixture of intercity rail , regional rail , commuter rail and rail freight traffic. The core route of the WCML runs from London to Glasgow for 400 miles (644 km) and

5900-692: The WCML) were given 30 new "Desiro" Class 350s , originally ordered for services in the south-east. Following Govia 's successful bid for the West Midlands franchise in 2007, another 37 Class 350 units were ordered to replace its older fleet of Class 321s . The older BR-vintage locomotive-hauled passenger rolling stock still has a limited role on the WCML, with the overnight Caledonian Sleeper services between London Euston and Scotland using Mark 3 and Mark 2 coaches until their replacement with Mark 5 stock in October 2019. Virgin also retained and refurbished one of

6018-602: The a part of the spine. South of Rugby, there is a bypass loop that serves Northampton . There is a spur at Weaver Junction north of Crewe to Liverpool . Weaver Junction on this branch is the oldest flyover-type junction in Britain. A spur branches off from Crewe to serve Manchester . There is also a spur between Colwich Junction in the Trent Valley, south of Stafford to Stoke-on-Trent, with another spur north of Stafford, also to Stoke-on-Trent. The geography of

SECTION 50

#1732797520879

6136-407: The company and EDF was signed to provide more solar energy. In May 2021, the Government announced that Network Rail is to superseded by a new body, Great British Railways , in 2023. Network Rail is a not-for-profit organisation . The majority of funding comes from a mix of direct grants and borrowing from the UK and Scottish Governments, payments from train and freight operators and previously

6254-452: The company have any way of assessing the consequence of the speed restrictions it was ordering. These restrictions brought the railway network to an almost total standstill and drew significant public ire. According to railway historian Christian Wolmar , Railtrack's board panicked in the wake of Hatfield. Railtrack's first chief executive, John Edmonds, had pursued a deliberate strategy of outsourcing engineers' work wherever possible with

6372-493: The core passenger service pattern on the WCML serving its principal termini; it is not exhaustive as many other types use small sections of the WCML as part of other routes. Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain . Network Rail

6490-786: The dawn of the 1990s, it was clear that further modernisation was required. Initially this took the form of the InterCity 250 project. The modernisation plan unveiled by Virgin and the new infrastructure owner Railtrack involved the upgrade and renewal of the line to allow the use of tilting Pendolino trains with a maximum line speed of 140 mph (225 km/h), in place of the previous maximum of 110 mph (177 km/h). Railtrack estimated that this upgrade would cost £2 billion, be ready by 2005, and cut journey times to 1 hour for London to Birmingham and 1 hr 45 mins for London to Manchester. However, these plans proved too ambitious and were subsequently scaled back. The upgrade

6608-490: The delivery of route-specific utilisation strategies (RUS). Some of these are functions which Network Rail already had; others – such as the obligation to devise route utilisation strategies – were transferred to Network Rail from the Strategic Rail Authority , a non-departmental public body, part of the UK government. The SRA was abolished in November 2006. Network Rail initially sub-contracted much of

6726-463: The demolition and redevelopment of several of the key stations on the line: BR was keen to symbolise the coming of the "electric age" by replacing the Victorian-era buildings with new structures built from glass and concrete. Notable examples were Birmingham New Street , Manchester Piccadilly , Stafford , Coventry and London Euston . To enable the latter, the famous Doric Arch portal into

6844-502: The early 1990s, Dutton Viaduct was listed under the Planning (Listed Buildings and Conservation Areas) Act 1990 for its special architectural or historic interest. During the 2000s, work completed for the West Coast Main Line route modernisation permitted the line speed across the viaduct to be raised to 125 mph (200 km/h) and the refuges across the structure for use by trackside workers fell out of use. During September 2017,

6962-453: The economic climate of the time. The early history of the WCML is complex, as it was not originally conceived as a single trunk route, but was built as a patchwork of separate lines by different companies, mostly during the 1830s and 1840s, but some parts were opened as late as the 1880s. After the completion of the pioneering Liverpool and Manchester Railway in 1830, schemes were mooted to build more inter-city lines. The business practice of

7080-585: The electrification of other lines, including Bristol Parkway to Temple Meads and Didcot to Oxford, was also postponed. During 2011, work commenced to extend the electrification of the Midland Main Line , including to both Corby and Nottingham. In July 2017, it was announced the then-Secretary of State for Transport Chris Grayling that the electrification scheme north of Kettering to Derby, Nottingham and Sheffield had been cancelled and that bi-mode trains would be used instead. However, in May 2022,

7198-624: The end of 2015, while the project's timetable was also delayed to the extent that the government had to request Hitachi to retrofit the new high speed trainsets procured under the Intercity Express Programme with diesel engines as well as electric traction. In July 2017, the government announced that, in response to the programme's continued difficulties, the scope of the electrification scheme had been decreased; specifically, it would only be completed as far as Thingley Junction, two miles (3.2 km) west of Chippenham, while

SECTION 60

#1732797520879

7316-549: The first GJR trains carried passengers across the viaduct before regular operations started. By the 1880s, the Dutton Viaduct was regarded as perhaps one of George Stephenson's finest viaducts. Victorian authors praised its aesthetic qualities. During the 1960s, the West Coast Mainline was electrified; to facilitate the installation of overhead lines, steel pylons were installed across the viaduct. During

7434-511: The first five months of their apprenticeship and then are trained further at HMS  Sultan in Gosport over seven 2-week periods or five 3-week periods (throughout their second and third year) of their apprenticeship, using a combination of Royal Navy facilities and a specially installed training centre. All courses are taught by VT Flagship (part of Babcock International ) in the first year but apprentices are trained by Network Rail staff in

7552-729: The goal of reducing costs. Various major schemes being undertaken by Railtrack had also gone awry. The modernisation of the West Coast Main Line had suffered from spiralling costs, rising from an estimated £2 billion to roughly £10 billion. This programme suffered failures that were technical as well as managerial, such as the moving block signalling apparatus being immature for such a busy mixed-traffic mainline. In 2000, reports emerged that Railtrack may not be able to go through with its planned commitment to purchase section 2 of High Speed 1 , resulting in disruption and uncertainty for that programme as well. In February 2001, Steve Marshall, Railtrack's chairman, warned that Railtrack could have

7670-450: The government can afford to contribute. The Office of Rail and Road (ORR) then sets the level of fixed income that Network Rail is allowed to charge and assesses the amount of money needed by Network Rail to run efficiently. The last Control Period ran from 2014 to 2019; 1 April 2019 was the start of Control Period 6 . In 2019, government funding for train operating companies amounted to £4.1 billion, paying access charges to use

7788-559: The government. On 7 October 2001, Railtrack plc was placed into railway administration under the Railways Act 1993, following an application to the High Court by the then Transport Secretary , Stephen Byers . Network Rail Ltd. was created with the express purpose of taking over Britain's railway infrastructure control; this was achieved via its purchase of Railtrack plc from Railtrack Group plc for £500 million; Railtrack plc

7906-467: The high-level stations are all termini used primarily by the main inter-city services to those stations. The low-level stations are through routes on local commuter networks that are largely separate from other routes to the main station; these platforms are not managed by Network Rail, but instead by the rail operator that primarily uses them, ScotRail and Merseyrail respectively. Network Rail operated Gatwick Airport station until January 2012 when it

8024-634: The infrastructure was owned and operated by Railtrack , a privately-owned company. A spate of accidents, including the Southall rail crash in 1997 and the Ladbroke Grove rail crash in 1999 called into question the negative consequences that the fragmentation of the railway network had introduced to both safety and maintenance procedures. Railtrack was severely criticised for both its performance for infrastructure improvement and for its safety record. The Hatfield train crash on 17 October 2000

8142-431: The infrastructure work to private maintenance companies, such as Carillion and First Engineering ; other sub-contractors perform specialist work or additional labour, such as Prima Services Group, Sky Blue, Balfour Beatty, Laboursite, BCL, Atkins (Atkins Rail) and McGinleys. In October 2003, Network Rail announced that it would take over all infrastructure maintenance work from private contractors, following concerns about

8260-554: The latter is a brand rather than an organisation, used to inform and promote a nationwide network of passenger railway services. The majority of Network Rail lines also carry freight traffic; some lines are freight only. A few lines that carry passenger traffic are not part of the National Rail network (such as the Tyne and Wear Metro and the London Underground ). Conversely, a few National Rail services operate over track which

8378-468: The line has a maximum speed of 125 mph (201 km/h), it meets the European Union 's definition of an upgraded high-speed line , although only Class 390 Pendolinos and Class 221 Super Voyagers with tilting mechanisms operated by Avanti West Coast travel at that speed. Non-tilting trains are limited to 110 mph (177 km/h). The spine between London Euston and Glasgow Central

8496-473: The line is quadruple track between Warrington Bank Quay to Wigan North Western. At Newton-le-Willows, the slow tracks join the Liverpool to Manchester line to pass through the centre of the town, while the fast tracks take the direct route via the Golborne cut-off. There are two more stretches of quadruple track, otherwise the line is double track to Scotland. The first is from Euxton Balshaw Lane to Preston, and

8614-487: The line, was announced as opening on 12 December 2005, bringing the fastest journey between London and Glasgow to 4   hours 25   mins (down from 5   hours 10   minutes). However, considerable work remained, such as the quadrupling of the track in the Trent Valley, upgrading the slow lines, the second phase of remodelling Nuneaton, and the remodelling of Stafford, Rugby, Milton Keynes and Coventry stations, and these were completed in late 2008. The upgrading of

8732-462: The media concerning the knighthood awarded to John Armitt in the 2012 New Year Honours for services to engineering and construction. Armitt was Chief Executive of Network Rail at the time of the 2007 Grayrigg derailment and the family of a victim of the accident criticised the award, which coincidentally was conferred on the same day that Network Rail were prosecuted for the accident. In 2023, one of Network Rail's managing directors resigned after

8850-447: The multiple units and locomotives, Network Rail own and operate a large stock of rolling stock for particular testing duties and track maintenance. Network Rail also hire freight locomotives from various freight operators including DB Cargo UK , Freightliner , Colas Rail and GB Railfreight amongst others to operate engineers' trains in support of maintenance and renewal work. Network Rail's Infrastructure Monitoring fleet of test trains

8968-631: The northern end, the Caledonian replaced its original Southside terminus in Glasgow, with the much larger and better located Glasgow Central in 1879. To expand capacity, the line between London and Rugby was widened to four tracks in the 1870s. As part of this work, a new line, the Northampton Loop , was built, opening in 1881, connecting Northampton before rejoining the main line at Rugby. The worst-ever rail accident in UK history,

9086-492: The ongoing modernisation of the railway network by replacing track and signalling, continues to be carried out by private engineering firms under contract. The biggest renewals projects include the multibillion-pound upgrade of the London – Glasgow West Coast Main Line , which was completed in 2008, the Thameslink Programme to upgrade the north–south railway through London and work on the part of Crossrail which

9204-853: The original Philip Hardwick -designed terminus was demolished in 1962 amid much public outcry. Electrification of the Edinburgh branch was carried out in the late 1980s as part of the East Coast Main Line electrification project in order to allow InterCity 225 sets to access Glasgow via Carstairs Junction. Modernisation brought great improvements in speed and frequency. However some locations and lines were no longer served by through trains or through coaches from London, such as: Windermere ; Barrow-in-Furness , Whitehaven and Workington ; Huddersfield , Bradford Interchange , Leeds and Halifax (via Stockport); Blackpool South ; Colne (via Stockport); Morecambe and Heysham ; Southport (via Edge Hill ); Blackburn and Stranraer Harbour. Notable also

9322-444: The original Mark 3 rakes with a Driving Van Trailer and a Class 90 locomotive as a standby set to cover for Pendolino breakdowns. This set was retired from service on 25 October with a rail tour the following day. In November 2014, the "Pretendolino" was transferred to Norwich Crown Point depot to enter service with Abellio Greater Anglia having come to the end of its agreed lease to Virgin Trains. In September 2022, following

9440-603: The other main line between London and Scotland. The principal solution has been the adoption of tilting trains , initially with British Rail 's APT and latterly the Class 390 Pendolino trains constructed by Alstom and introduced by Virgin Trains in 2003. A 'conventional' attempt to raise line speeds as part of the InterCity 250 upgrade in the 1990s would have relaxed maximum cant levels on curves and seen some track realignments; this scheme faltered for lack of funding in

9558-700: The position for six years. He noted that as Network Rail moved to a "new phase in its development" it was appropriate for a new chairman to lead it there. Network Rail also has a 15-year lease on Square One in Manchester with 800 staff in one of Manchester's largest refurbished office spaces. During June 2012, work was completed on the company's new national centre, known as the Quadrant:MK . Based in Milton Keynes about five minutes' walk from Milton Keynes Central , it comprises four buildings connected to

9676-576: The process of reorganising its operational structure into nine semi-autonomous regional entities, each with their own managing director; the first two units to be created were Scotland and Wessex regions. The reorganisation has been interpreted as a move back towards vertical integration of track and train operations. In December 2016, the Transport Secretary, Chris Grayling announced that Network Rail would lose sole control of track maintenance and repairs, and instead would share this with

9794-408: The public through telephones located at level crossings. GAI-Tronics provides many of the telephones sited on trackside and at level crossings. They also provide Public Access Help Points on platforms and stations to provide passengers with easy access to Information and Emergency control centres. GSM-R radio systems are being introduced across Europe under EU legislation for interoperability. In

9912-500: The quality of work carried out by certain private firms and spiralling costs. In 2007, it was announced that the number of track renewal contractors would be reduced from six to four; Amey / SECO , Balfour Beatty , Babcock First Engineering and Jarvis plc . Network Rail has expanded its in-house engineering skills, including funding of apprenticeship and foundation degree schemes, and has reported significant savings from transferring work away from contracting companies. Additional work

10030-491: The rail network, £2.1 billion and freight £58 million. In 2019, it spent £3.1 billion on renewals (restoring existing infrastructure back to how it was when new) and £3.2 billion on enhancements, with the rest spent on maintenance and other costs. Network Rail covers 20,000 miles of track, and 30,000 bridges, tunnels and viaducts. They claim to run the world's largest third rail network. In February 2004, an operations centre at Waterloo station in London

10148-445: The railway tracks, signals, overhead wires, tunnels, bridges, level crossings and most stations, but not the passenger or commercial freight rolling stock, other than its limited departmental stock . While it owns over 2,500 railway stations, it manages only 20 of the biggest and busiest of them as all the other stations are managed by the various train operating companies (TOCs). Network Rail should not be confused with National Rail ,

10266-799: The replacement of a weak bridge in Watford allowed line-speeds to be increased from 90 mph (145 km/h) to 125 mph (201 km/h), decreasing journey times. The main spine of the WCML is quadruple track almost all of the route from London to south of Winsford . At Hanslope Junction (near Milton Keynes ), the line divides with one pair going direct to Rugby and the other pair diverting via Northampton to rejoin at Rugby. The spine continues north in quadruple track until Brinklow, where it reduces to triple track. The line between Brinklow and Nuneaton has three tracks, with one northbound track and fast and slow southbound tracks. The line then reverts to quadruple track at Nuneaton. North of Rugeley, there

10384-433: The rival East Coast Flying Scotsman (British Railways in the 1950s could not match this, but did achieve a London-Glasgow timing of 7   hours 15   minutes in the 1959–60 timetable by strictly limiting the number of coaches to eight and not stopping between London and Carlisle. ) In 1948, following nationalisation , the line came under the control of British Railways ' London Midland and Scottish Regions , when

10502-434: The river. The pillars of the viaduct have splayed bases, which give the structure a greater degree of stability. The viaduct cost of £54,440 (equivalent to £6,470,000 in 2023). Construction took place during 1836 and completed on 9 December of that year. It was noted at the time that there were no recorded losses of life or serious injury during its construction. Its completion was marked by a civic celebration. On 4 July 1837,

10620-550: The route was determined by avoiding large estates and hilly areas, such as the Chilterns ( Tring Cutting ); the Watford Gap and Northampton uplands, followed by the Trent Valley; the mountains of Cumbria , with a summit at Shap ; and Beattock Summit in South Lanarkshire . This legacy means the WCML has limitations as a long-distance main line, with lower maximum speeds than the East Coast Main Line (ECML) route,

10738-435: The route with overhead line equipment. The first stretch to be upgraded and electrified was Crewe to Manchester, completed on 12 September 1960. This was followed by Crewe to Liverpool, completed on 1 January 1962. Electrification was then extended south to London. The first electric trains from London ran on 12 November 1965, with a full public service to Manchester and Liverpool launched on 18 April 1966. Electrification of both

10856-966: The second and third years. Network Rail bought a residential centre from Cable and Wireless in the Westwood Business Centre near Coventry for leadership development. The company and other industry partners such as VolkerRail and Balfour Beatty also operate a Foundation Degree in conjunction with Sheffield Hallam University . In 2008, Network Rail piloted its first qualification in "track engineering". It has been given permission to develop courses equivalent to GCSE and A-levels. Network Rail operates various essential telecommunication circuits for signalling and electrification control systems, train radio systems, lineside communications, level crossing CCTV, station information and security systems as well as more general IT and business telephony needs. The fixed bearer network infrastructure comprises transmission systems and telephone exchanges linked by

10974-529: The second is a busy section around Glasgow. The WCML is noted for the diversity of branches served from the spine, notably those to/from the West Midlands and North Wales , Greater Manchester , and Liverpool. These are detailed in the route diagram . The complete route has been cleared for W10 loading gauge freight traffic, allowing use of higher 9 ft 6 in (2,896 mm) hi-cube shipping containers . The route passes through Nuneaton and

11092-681: The set lost in the Grayrigg derailment. Although the new stock was supplied in Virgin livery, it was not expected to enter traffic before 31 March 2012, when the InterCity West Coast franchise was due to be re-let, though the date for the new franchise was later put back to December 2012, and any effect of this on the timetable for introducing the new coaches remains unclear. Previous franchisees Central Trains and Silverlink (operating local and regional services partly over sections of

11210-460: The technical viability and cost of implementing moving block prior to promising the speed increase to Virgin and the government. By 1999, with little headway on the modernisation project made, it became apparent to engineers that the technology was not mature enough to be used on the line. The bankruptcy of Railtrack in 2001 and its replacement by Network Rail following the Hatfield crash brought

11328-409: The term "West Coast Main Line" came into use officially, although it had been used informally since at least 1912. As part of the 1955 modernisation plan , British Rail carried out a large programme of modernisation of the WCML in stages between 1959 and 1974; the modernisation involved upgrading the track and signaling to allow higher speeds, rebuilding a number of stations, and electrification of

11446-529: The track number, which can be any number from 00 to 99 inclusive, and are usually numbered sequentially. In 2006, Network Rail made public a high-tech plan to combat the effects of slippery rail . This plan involves the use of satellites for tracking trouble areas, water-jetting trains and crews using railhead scrubbers, sand sticks and a substance called Natrusolve, which dissolves leaf mulch. Network Rail owns more than 2,500 railway stations, divided into six categories . Management and operation of most of them

11564-462: The viaduct, which crossed the River Weaver . The route, surveyed by Locke, was relatively free of major engineering challenges, save for the section crossing the Weaver. The contractor for its construction was William Mackenzie . Dutton Viaduct was the first project to which Thomas Brassey submitted a tender. Brassey lost out to Mackenzie because his estimated cost was roughly £5,000 higher. Brassey

11682-511: The world's largest solar-powered bridge, adjacent to the remains of the old Blackfriars Railway Bridge , across the River Thames . The roof of the new railway bridge is covered with 4,400 photovoltaic panels, providing up to half of the energy requirement for London Blackfriars station . Solar panels are used at various locations across Network Rail's property portfolio, including stations and depots. In August 2022, an agreement between

11800-458: Was a defining moment in the collapse of Railtrack. The immediate major repairs undertaken across the whole British railway network were estimated to have cost in the order of £ 580 million and Railtrack had no idea how many more 'Hatfields' were waiting to happen because it had lost considerable in-house engineering skill following the sale or closure of many of the engineering and maintenance functions of British Rail to external companies; nor did

11918-442: Was also accused of financial impropriety involving unspecified payments to his business partner Victoria Pender during his tenure at Network Rail. An internal investigation held by Network Rail in 2010, vetted by its auditors PricewaterhouseCoopers , uncovered no evidence of wrongdoing. An independent enquiry headed by Anthony White QC in 2011 further examined the claims, but also exonerated Coucher. Critical commentary appeared in

12036-497: Was announced that this process would be delayed. Britain's railway system was built by private companies, but it was nationalised by the Transport Act 1947 and run by British Railways until re-privatisation which was begun in 1994 and completed in 1997. As a part of the privatisation process, the railway infrastructure, passenger and freight services were separated into separate organisations. Between 1994 and 2002,

12154-412: Was appointed as contractor for the smaller Penkridge Viaduct . Dutton Viaduct is 60 feet (18 m) high and 500 yards (457 m) long, and comprises 20 deep segmental arches. Primarily built of red sandstone , it has been estimated that roughly 700,000 cubic feet (20,000 m) of stone was used. The stonework features ashlar dressings, projecting copings, and cutaways on two of the arches that span

12272-484: Was complete on 9 December of that year. It was the longest viaduct on the Grand Junction Railway (GJR). The viaduct was built at a cost of £54,440 (equivalent to £6,470,000 in 2023). The engineers were Joseph Locke and George Stephenson , and William Mackenzie was its contractor. Since entering use in July 1837, Dutton Viaduct has remained in regular use. During its operating life, it has been subject to change; during

12390-419: Was described as "a classic example of disastrous project management". Central to the implementation of the plan was the adoption of moving block signalling , which had never been proven on anything more than simple metro lines and light rail systems – not on a complex high-speed heavy-rail network such as the WCML. Despite this, Railtrack made what would prove to be the fatal mistake of not properly assessing

12508-587: Was developed specifically for the operational railway; it provides radio coverage for 98% of the rail network through 500 base stations and 21 radio exchanges. The Radio Electronic Token Block RETB system is based on similar technology as the NRN and ORN but provides data communication for signalling token exchange as well as voice communication. Fixed communication at trackside is provided by telephone. These are primarily provided for signallers to communicate with train crew, via telephones mounted on signal posts, and with

12626-482: Was finally completed in December 2008. This allowed Virgin's VHF (very high frequency) timetable to be progressively introduced through early 2009, the highlights of which are a three-trains-per-hour service to both Birmingham and Manchester during off-peak periods, and nearly all London-Scottish timings brought under the 4   hours 30   minutes barrier – with one service (calling only at Preston) achieving

12744-399: Was later dropped) and offering journey times as London to Birmingham in 1 hour 35 minutes, and London to Manchester or Liverpool in 2   hours 40   minutes (and even 2   hours 30   minutes for the twice-daily Manchester Pullman ). This represented a big improvement on the 3   hours 30   minutes to Manchester and Liverpool of the fastest steam service. A new feature

12862-479: Was made 48   hours before the writ was issued for a by-election in South Ayrshire . The Observer commented that, if the £25 million decision was politically rather than financially motivated, it would have the makings of a major political scandal. A new set of high-speed long-distance services was introduced in 1966, launching British Rail's highly successful " Inter-City " brand (the hyphen

12980-445: Was mostly built between the 1830s and 1850s, but several cut-off routes and branches were built in later decades. In 1923, the entire route came under the ownership of the London, Midland and Scottish Railway (LMS) when the railway companies were grouped under the Railways Act 1921 . The LMS itself was nationalised in 1947 to form part of British Railways (BR). As the WCML is the most important long-distance railway trunk route in

13098-456: Was not originally conceived as a single route, but was built as a patchwork of local lines which were linked together, built by various companies, the largest of which amalgamated in 1846 to create the London and North Western Railway (LNWR), which then gradually absorbed most of the others; the exceptions were the Caledonian Railway in Scotland, and the North Staffordshire Railway (NSR) which both remained independent until 1923. The core route

13216-632: Was opened from 1837 to 1881. With additional lines deviating to Northampton , Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects the WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line . Several sections of the WCML form part of the suburban railway systems in London, Coventry , Birmingham, Manchester, Liverpool and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns. It

13334-573: Was opened, which was operated jointly by Network Rail and South West Trains . This was the first full collaboration of its kind since privatisation, and it is regarded as a model for other areas of the network, with a further six integrated Network Rail + TOC Control Centres having opened since then, at Blackfriars , Croydon (Leading Control for Thameslink), Swindon , Birmingham New Street , Glasgow and, most recently, Liverpool Street and South Wales based in Cardiff Canton. Track renewal,

13452-527: Was taken back in-house after the serious accident at Potters Bar and other accidents at Rotherham and King's Cross led to Jarvis's collapse into administration in March 2010. The company moved its headquarters to Kings Place, 90 York Way, from 40 Melton Street, Euston, in August 2008. Two months later, Sir Ian McAllister announced that he would not stand for re-election as chairman of Network Rail after holding

13570-479: Was that these fast trains were offered on a regular-interval service throughout the day: initially hourly to Birmingham, two-hourly to Manchester, and so on. The service proved to be so popular that in 1972 these InterCity service frequencies were doubled to deal with increased demand. With the completion of the northern electrification in 1974, London to Glasgow journey times were reduced from 6   hours to 5. Along with electrification came modern coaches such as

13688-417: Was then renamed and reconstituted as Network Rail Infrastructure Limited . The transaction was completed on 3 October 2002. The former company had thus never ceased to exist but continued under another name: for this reason Network Rail Infrastructure Ltd was the defendant in later prosecutions in respect of events which had occurred in the days of Railtrack. Network Rail owns the infrastructure, including

13806-568: Was transferred to Southern , and Fenchurch Street until November 2014 when it was transferred to c2c . Network Rail took over management of Bristol Temple Meads and Reading in April 2014. A DfT franchise report in 2014 stated Network Rail's intention to subsume more major stations into Network Rail's directly operated portfolio. The report earmarked York for Network Rail management, as well as Manchester Oxford Road and Manchester Victoria which are currently undergoing major rebuilding as part of

13924-693: Was written off in 2007 following the Grayrigg derailment . After the 2007 franchise "shake-up" in the Midlands, more SuperVoyagers were transferred to Virgin West Coast, instead of going to the new CrossCountry franchise. The SuperVoyagers are used on London–Chester and Holyhead services because the Chester/North Wales line is not electrified, so they run "under the wires" between London and Crewe. SuperVoyagers were also used on Virgin's London-Scotland via Birmingham services, even though this route