Misplaced Pages

Dun Mountain Railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#205794

50-530: The Dun Mountain Railway was a privately owned and operated 3 ft ( 914 mm ) narrow gauge , 21.5 km (13.4 mi) long horse-drawn tramway from chromite mines in the vicinity of Duppa Lode on the eastern slopes of Wooded Peak to Nelson port in the Tasman District of New Zealand 's South Island . It operated from 3 February 1862 to 30 May 1901, with the last mineral traffic on

100-659: A track gauge of 3 ft ( 914 mm ) or 1 yard . This gauge is a narrow gauge and is generally found throughout North , Central , and South America . In Ireland , many secondary and industrial lines were built to 3 ft gauge, and it is the dominant gauge on the Isle of Man , where it is known as the Manx Standard Gauge . Modern 3 ft gauge railways are most commonly found in isolated mountainous areas, on small islands, or in large-scale amusement parks and theme parks (see table below). This gauge

150-622: A 16-kilometre (9.9 mi) long light railway along the Maitai Valley - to be worked up the incline by horses and in the opposite direction by gravity. To determine the extent of the copper deposits on which the company could rely the directors employed mining engineer Thomas R. Hacket. A local management committee was appointed to assist Hacket, consisting of Wrey, Wells, merchant George Ridings and Maxwell Bury as secretary. Hacket arrived in Nelson on 31 October 1857 and set about appraising

200-543: A better route to Wooded Peak was to be had through the Brook Valley. This change in plans was not well received by the committee that had been appointed to study the proposal as submitted for the accompanying legislation, which was accordingly withdrawn by the company. The earthworks for the 5.8-kilometre (3.6 mi) long section between the mines and the Wairoa Saddle were put out to tender in 1861 and awarded

250-449: A gradient of 1:18 for the first 8 kilometres (5.0 mi) with the rest at 1:20. This was divided into seven sections that were put to tender and let on 3 June 1861 to, amongst others, the contractors Hale, Vercoe and party; John Ward and John Mitchell; John Brown and George Cummins; and W. Martin and John Avery. The company advertised for a supply of 20,000 sleepers after rejecting a trial in which sleepers had been cut from trees adjoining

300-460: A kiln built at Wooded Peak, gravel for use on the roads, and the leasing of wagons to local merchants for the transport of inbound goods from the port to Nelson. Traffic increased on the line to levels not seen for some time when the mining resumed. During 1863 the mines produced 595 tonnes (586 long tons; 656 short tons) of ore for export, over half of which was exported in November. Congestion at

350-574: A more direct route around Wooded Peak. Testing confirmed the high quality of the ore, later confirmed by Joseph Gibbs in June 1858. In 1859 Hacket demonstrated with underground prospecting that the deposits persisted below the surface. With his favourable reports extolling the extent of the ore available, the directors were convinced to begin mining, which would involve a tramway from the Coppermine Saddle to Nelson Port. On 24 February 1860 notice

400-464: A pioneer for narrow-gauge railways . In the early 1860s, Fitzgibbon was working at Dun Mountain Railway in Nelson, New Zealand , a horse-drawn line upon which he worked from 1860 ( 3 ft  / 914 mm gauge) Fitzgibbon arrived in the colony of Queensland in June 1863. He was appointed first chief engineer of Queensland Railways after a rise through the ranks in the early stages of

450-449: A return fare and use of the baths. The revival in the company's fortunes was short-lived. By the autumn of 1864, after exporting 768 tonnes of ore that year, it was discovered that the chromite deposits had been worked out, leaving only small pockets of low-grade ore. Again mining was suspended, though the company continued to use the incline to rail out firewood, rock and lime. 3 ft gauge railways Three foot gauge railways have

500-440: A soiree and ball. The tramway's act of parliament prohibited the use of locomotives within the city limits. This was no real problem for the company, as they had always intended to work the line with horses and rely on gravity for descending ore wagons. The horses averaged 4 miles per hour (6.4 km/h) when pulling empty wagons up the incline to the mines, where they were unhitched and returned to First House on Brook Street. Once

550-471: Is also popular in model railroading (particularly in G scale ), and model prototypes of these railways have been made by several model train brands around the world, such as Accucraft Trains (US), Aristo-Craft Trains (US), Bachmann Industries (Hong Kong) , Delton Locomotive Works (US), LGB (Germany) , and PIKO (Germany) . The Ferrocarril de Sóller and the Tranvía de Sóller are located on Majorca in

SECTION 10

#1732797483206

600-547: The Balearic Islands . The other railways of the Majorca rail network were also 3 ft ( 914 mm ) gauge, but with expansion and reconstruction of the network in the early 2000s, they were converted to 1,000 mm ( 3 ft  3 + 3 ⁄ 8  in ) metre gauge . Abraham Fitzgibbon Abraham 'Abram' Fitzgibbon (23 January 1823 – 4 April 1887) was an Irish-born railroad engineer and

650-609: The Dun Mountain Copper Mining Company Ltd. formed, and shareholders in the Cook's Straight Company previously formed by the mining syndicate were able to exchange their shares for fully paid-up ones in the new company, with a further 5,000 B shares reserved for sale in New Zealand. The first shareholders' meeting of the company took place on 22 July 1857. Investors learned of plans to construct

700-533: The Dun Mountain Bus or the City Bus, and later as a tram. It arrived in Nelson on 23 March 1862. The first operator of the tram was Thomas Nesbitt, a long-time local who arrived in Nelson in 1842. The inaugural service of the tram occurred on Saturday, 3 May 1862. A trial run between the city and the port showed, amongst other things, that fears the tram would be unstable when fully laden on account of

750-506: The allotted time could lead to the dismissal of the brakeman for speeding. On 23 March 1862 the capacity of the line was increased with the arrival of an additional 25 wagons. In late 1862 Fitzgibbon had to tell the directors in London that the ore was not available in such abundance as was first thought. It was no longer profitable to continue to mine the chromite, and after transporting around 1,400 tonnes (1,378 long tons; 1,543 short tons) of

800-438: The benefit of making the ride more comfortable and reducing wear on both the tram and rails. He also reduced the daylight running fare to 3d, though the after dark fare remained unaltered. McConkey's tenure as operator of the tram lasted to the mid-1860s, by which time he had become a timber merchant. An increase in confidence in the company's future subsequent to the resumption of mining activities in 1863 led to debate on whether

850-491: The bottom of the incline, the wagons usually retained sufficient momentum to continue unaided to the corner of Hardy and Rutherford Streets. The wagons were then hauled by horses at up to 4 miles per hour (6.4 km/h) through the city to the port where the ore was later shipped to England from the Provincial Government-owned wharf. In February 1862 the company prohibited the carriage of any persons in

900-535: The company depot in Brook Street for the port, with the Nelson Brass Band being seated in the first pair of wagons. The next set of wagons carried company officials and guests, also on temporary seating. The remaining wagons were loaded with ore. The procession proceeded along streets lined with the local inhabitants, who had earlier erected flags and banners. Once the procession reached the port and

950-503: The company dismissed Gibbs despite his protestations, and continued the work itself on 23 September. The final shipment of rails arrived on 25 October 1861, numbering 2,314, including 26 casks of bolts. The last rail was laid in January 1862. The railway was officially opened on 3 February 1862. Around £75,000 had been spent, of which approximately a third went into the construction of the railway. At noon, horse-drawn paired wagons left

1000-474: The company to institute at least one daily return service between the city and the port, except where the revenue from all services failed to exceed 10 shillings. The company already had wagons in which to conduct its freight traffic, so for the passenger services they ordered a horse-drawn tram in late 1861 from the Australian firm of Keary and Company . The tram was soon known as a bus, also referred to as

1050-583: The company to sell 1,400 tonnes (1,378 long tons; 1,543 short tons) of ore and receive forward orders for an additional 2,100 tonnes (2,067 long tons; 2,315 short tons) either stored in England or en route from Nelson. In order to stabilise the demand for its ore, the company purchased a controlling stake in Connah's Quay Chemical Company , a dye manufacturer due to be established in North Wales. Confident in

SECTION 20

#1732797483206

1100-414: The conditions imposed by the company on the operator, he had to provide services between 0900 and sunset at not more than 6d per fare (the fare cap did not apply to services operated outside these times). As the company was originally established to profit from the chromite ore, which was at the time making them in excess of £1,000 in revenue per week, the local management saw no need to burden themselves with

1150-475: The copper deposits, which he found wanting. Rather than make known in Nelson his disappointing first impression, he allowed the survey for the Maitai Valley railway to go ahead. On completion of the survey, conducted by local engineer Edward Moody, the first consignment of tramway materials arrived from London on 11 January 1858. They were stored in the company's yard on Haven Road pending the enactment of

1200-410: The following February to contractors Charles Ambler, John Davis and Robert Carter, each working on approximately equal lengths. The work included a 1.8-metre (5 ft 11 in) wide ledge in the side of Wooded Peak, drainage and six bridges. The route of the next 11-kilometre (6.8 mi) section from Brook Street to the Wairoa Saddle was debated amongst the engineers, but they eventually settled on

1250-424: The horses. At some point an additional tram was purchased, with the original tram thereafter only being used when passenger demand or maintenance on the new tram required it. Crewdson had been unable to come to an acceptable agreement regarding the sale of the tram service to the council, so in June 1884 he sold the operation to its last owner, Jonathan Harle. Though Harle was interested in maximising his revenue from

1300-416: The hour and half-hour, with Port departures 15 minutes later. At around the time Cock arrived, further changes were made to the operation of the tram. In July 1864 railway by-laws were introduced that forbade smoking on the tram and the carrying of inebriated passengers, and introduced penalties for failing to purchase a ticket. By April 1866 the tram was being operated by William Weeden and Alfred Brind. It

1350-405: The incline section operated in January 1866. This line was the first "railway" to be opened and operated in New Zealand, preceding the first public railway and the first railway to be operated by steam trains, the line between Ferrymead and Christchurch , which opened on 1 December 1863. The city of Nelson had the first city tramway to both open and close in New Zealand. Prominent advocates for

1400-450: The line should be extended into Trafalgar and Bridge Streets. Despite popular support for such a move no-one was prepared to finance it, and there was a small band of vocal opponents, including competing transport operators. Though their concerns were largely commercial, it is easy to see that the tram was providing strong competition, for in mid-February 1864 the services were increased to half-hourly in both directions. City departures were on

1450-502: The line was essentially passenger only, with only the occasional carriage of goods on the line for Crewdson. The line was still subject to the provisions of the Dun Mountain Railway Act. Crewdson renovated the service, including rehabilitating the line and painting the tram. The service was renamed to Crewdson's City Bus , and employed several drivers in addition to Crewdson himself and several stable hands to tend to

1500-449: The mineral belt, Hacket was sufficiently impressed with the chromite deposits that had earlier been found on Wooded Peak. The directors were thus dissuaded from liquidating the company while awaiting the testing of chromite samples forwarded to England. As these new mineral deposits were at a higher elevation on Wooded Peak the earlier proposed route of the tramway along the Maitai Valley had become redundant, and Hacket set about investigating

1550-687: The mineral deposits a tramway would need to transport the product back to Nelson. After attempts to raise capital for the project locally failed in August 1853, Wrey headed to England in October to raise further capital. His efforts were successful, resulting in the formation of the New Zealand Land Fund Association backed by 20 London financiers, who had each contributed £500. Wrey returned to New Zealand on 8 August 1855 with 24 miners and an engineer, Jeremiah How. In early 1857

Dun Mountain Railway - Misplaced Pages Continue

1600-523: The mining of mineral deposits found on Wooded Peak included a syndicate formed by William Long Wrey, William Travers and William Wells. In the winter of 1853 a local runholder, George Duppa, discovered a large deposit of chromite between Wooded Peak and Dun Mountain , about 8 kilometres south-east of Nelson township. It was named the Duppa Lode, but considered to be of no commercial value at the time. The syndicate readily agreed that in order to exploit

1650-578: The narrow gauge were not warranted. Vibrations were experienced, however, due to the wheels being locked to the axles. Fare-paying passengers were carried throughout the day, with regular services commencing at 0900 the following Monday. The tram departed every half-hour from either the Port or Hardy Street termini, providing a reliable daily service. Though the legislation specified a speed limit of 4 mph (6.4 km/h), in practice average speeds of 6 to 7 mph (9.7 to 11.3 km/h) were maintained. Among

1700-459: The necessary railway legislation. By 1858 word had spread locally of Hacket's negative reports on the deposits, causing considerable antagonism between Hacket and Wrey. Some of the shareholders in London were sufficiently angry to claim that Wrey had defrauded them. Though Wrey was never subjected to legal action, he was removed from the Nelson management committee. Though it was realised that there were no commercially exploitable copper deposits in

1750-472: The ore had been dumped at the privately owned Albion Wharf, they returned to town. In gratitude for the efforts of the men who had been involved in the construction of the line, the company gave each of them a paid holiday, and treated them to a lunch at the Freemasons' Hall. As was then customary several speeches were given, after which a toast was offered to Wrey. The day's festivities were concluded with

1800-430: The ore mining operations were suspended from early 1863. Thereafter, the company relied on sales of firewood, timber, flagstones and road gravel from its own land, and revenue from the passenger "city bus" (a horse-dawn tram) to meet their overheads. This generated only around £1,300 per year, approximately a quarter from the passenger operation. However, by mid-1863 the chromite market showed signs of improvement, allowing

1850-492: The port was such that permission was obtained from the Board of Works to install a loop siding on Haven Road at Auckland Point, though it is not known if this work was completed. Other small safety improvements were also made. Though the railway was initially used only for the transport of ore to the port, the company had made provision for the operation of both freight and passenger services. The railway's act of Parliament required

1900-462: The rail formation. The price they were quoted in response was £1 per hundred more than the price they had earlier received for sleepers supplied from their own land, but having spent two months on the tender process they decided to proceed with the tenders received from the sawmills. Approximately 24,000 sleepers were required. On 17 August the Act authorising the construction of the railway on public lands

1950-552: The railway department development. The first operations of the Queensland Railways opened in 1865. There was debate regarding the choice of gauge, 3 ft 6 in ( 1,067 mm ) versus 4 ft  8 + 1 ⁄ 2  in ( 1,435 mm ) standard gauge . It is claimed that Fitzgibbon said that the narrow gauge would be sufficient to last 25 or 30 years and was cheaper. Despite opposition from contemporaries, he successfully advocated for

2000-416: The running of passenger services. Later that year the company realised that in not taking an interest in the passenger services they were forgoing a reasonable source of revenue, and accordingly entered into a leasing arrangement with the operator. Late in 1863 James McConkey purchased the lease on the tram and introduced some changes, including freeing the wheels to turn independently of the axles. This had

2050-488: The security of the market for chromite, the company resumed mining on Wooded Peak later that year. With the departure of Hacket, the company sought to hire someone with mining experience to support the Nelson management team, and accordingly appointed an experienced mining engineer by the name of Joseph Cock from Tavistock in Devon as the new manager. The company had also developed some new sources of revenue, including lime from

Dun Mountain Railway - Misplaced Pages Continue

2100-487: The service he was equally determined to spend as little on maintenance as possible, with the only apparent change to the service on the transfer of ownership being the removal of Crewdson's name from the livery. He continued with the postal delivery contract established by his predecessor, and came to an arrangement with the proprietor of the Marine Baths on Wakefield Quay whereby he could sell concession tickets covering

2150-407: The town section was completed within four months. At around the same time work commenced on the formation between the incline and the port, Dudderidge Gibbs submitted a successful tender for track laying work on the incline section. This work started on 4 September 1861, but it was soon clear that it would not be completed by the end of the year as expected. Eager to begin revenue traffic on the line,

2200-492: The use of narrow gauge or 3 ft 6 in ( 1,067 mm ) track in Australia. By 1867, the controversies included the termination of Fitzgibbon's contract. Fitzgibbon died on 4 April 1887 at Moorside, Bushey Heath , Hertfordshire , England. The Fitzgibbon suburb of Brisbane is named after Abraham Fitzgibbon. Queensland railways continue to be 1,067 mm ( 3 ft 6 in ) gauge to

2250-462: The wagons on the line as the entire capacity of the 20 wagons was required for the transport of the ore. Horses hauled the empty wagons up to the mine in the mornings, and once loaded they departed for the port under gravity at 13:15. The distance was expected to be covered in 45 minutes to Third House, with a further 1 hour and 30 minutes to the Alton Street depot. Any trip conducted in less than

2300-399: The wagons were full, they descended to Nelson in pairs under the control of a brakeman. Trials were undertaken to determine safe working procedures for descending wagons. It was soon discovered that as the line had over 700 corners ranging from 20 to 200 metres (22 to 219 yards) radius, descending speeds in excess of 4 miles per hour (6.4 km/h) meant an unacceptable risk of derailment. At

2350-465: Was briefly taken over by William Taylor, who had earlier worked as a driver of the tram for the Brays. The following year, the lease passed to Stevenson and McGlashan, and in early 1872 to Thomas Newton. In the winding up of the company the line between Nelson and the port, including the passenger operation, was sold in June 1872 as a going concern to Moses Crewdson by Levien. With the mining operation gone

2400-408: Was during their tenure that the tram received its first refurbishment, during which time passenger services were provided using wagons with temporary seating. On encountering financial difficulties in the winter of 1866 Weeden terminated his connection with the tram, with Brind doing likewise soon after. The lease was picked up by the Brays. In 1870 the Brays relinquished the lease on the tram, which

2450-493: Was given of the company's intention to seek legislative approval for the construction of a tramway along a route chosen by Hacket. Two Irish engineers with railway experience, William Doyne assisted by Abraham Fitzgibbon , were engaged by the directors to manage the construction of the line. They arrived in Nelson along with the Fitzgibbon's family on 18 July 1860. They quickly dismissed Hacket's proposal and agreed that

2500-558: Was passed. It was based on earlier bills from the Provincial Council and one of 1860 which was withdrawn over the issue of the route of the line. The act allowed the company to begin construction of the line from the incline section through Nelson, following Brook, Tasman, Manuka, Alton, Hardy, and Rutherford Streets, and along the shoreline on Haven Road to the port. Three contracts for this section were let in late August 1861 to contractors Mark Blythe and Robert Carter. Work on

#205794