The French Atlantic Cable Company (Société du Cable Transatlantique Francaise Limited) was established in 1869 to install a transatlantic telegraph cable independent of British territories. The cable ran 2,584 miles from Brest to Saint Pierre Island off the coast of Newfoundland, then a second leg ran 749 miles to land at Duxbury, Massachusetts , near Boston. The company also installed a second cable from Salcombe , on the south west coast of England, to the coast of Brittany, thereby bypassing traffic around British-owned cables across the English Channel.

#701298

75-607: Entry into this market created a fall in trans-Atlantic telegram prices initially; the Atlantic Telegraph Company negotiated an operating agreement with the French company, effectively fixing prices until additional competitors entered the business. In the event of a breakdown in either company's cable, the other company agreed to temporarily carry traffic until repairs were made. A second French cable company, Compagnie française du télégraphe de Paris à New-York ,

150-486: A "live" girdle around the world; the All Red Line . Additional cables were laid between Foilhommerum and Heart's Content in 1873, 1874, 1880, and 1894. By the end of the 19th century, British-, French-, German-, and American-owned cables linked Europe and North America in a sophisticated web of telegraphic communications. The original cables were not fitted with repeaters , which potentially could completely solve

225-557: A Morse "dash" and "dot" respectively (the standard system on submarine cables—as, unlike overland telegraphy, both pulses were of the same length). Thomson believed that he could use the instrument with the low voltages from regular telegraph equipment even over the vast length of the Atlantic cable. He successfully tested it on 2,700 miles (4,300 km) of cable in underwater storage at Plymouth . The mirror galvanometer proved yet another point of contention. Whitehouse wanted to work

300-452: A better method of detecting the telegraph signal was required. While waiting for the next voyage, he developed his mirror galvanometer , an extremely sensitive instrument, much better than any until then. He requested £2,000 from the board to build several, but was given only £500 for a prototype and permission to try it on the next voyage. It was extremely good at detecting the positive and negative edges of telegraph pulses that represented

375-527: A company, began building the landline. In 1854, businessman and financier Cyrus West Field invited Gisborne to his house to discuss the project. From his visitor, Field considered the idea that the cable to Newfoundland might be extended across the Atlantic Ocean. Field was ignorant of submarine cables and the deep sea. He consulted Morse and Lieutenant Matthew Maury , an authority on oceanography . The charts Maury constructed from soundings in

450-589: A connection. The second cable was laid in 1865 with improved material. It was laid from the ship SS Great Eastern , built by John Scott Russell and Isambard Kingdom Brunel and skippered by Sir James Anderson . More than halfway across, the cable broke, and after many rescue attempts, it was abandoned. In July 1866 a third cable was laid from The Anglo-American Cable house on the Telegraph Field, Foilhommerum. On July 13, Great Eastern steamed westward to Heart's Content, Newfoundland , and on July 27

525-547: A free hand to use his equipment without Whitehouse's interference. Although Thomson had the status of a mere advisor to engineer C. W. de Sauty, it was not long before all electrical decisions were deferred to him. Whitehouse, staying behind in Valentia, remained out of contact until the ship reached Ireland and landed the cable. Around this time, the board started having doubts over Whitehouse's generally negative attitude. Not only did he repeatedly clash with Thomson, but

600-453: A frustrating battle against rough seas. One time, a sailor even was flung across the deck when the grapnel rope snapped and recoiled around him. Great Eastern and another grappling ship, Medway , arrived to join the search on 12 August. It was not until over a fortnight later, in early September 1866, that the cable was finally retrieved so that it could be worked on; it took 26 hours to get it safely on board Great Eastern . The cable

675-471: A larger cable was needed to mitigate the retardation problem. In mid-1857, on his own initiative, he examined samples of copper core of allegedly identical specification and found variations in resistance up to a factor of two. But cable manufacture was already underway, and Whitehouse supported use of a thinner cable, so Field went with the cheaper option. Another point of contention was the itinerary for deployment. Thomson favoured starting mid-Atlantic and

750-496: A message and response on the same day. In the 1840s and 1850s several people proposed or advocated construction of a telegraph cable across the Atlantic, including Edward Thornton and Alonzo Jackman . As early as 1840 Samuel F. B. Morse proclaimed his faith in the idea of a submarine line across the Atlantic Ocean . By 1850 a cable was run between England and France. That year, Bishop John T. Mullock , head of

825-465: A message from England cited these words from the leader in The Times : "It is a great work, a glory to our age and nation, and the men who have achieved it deserve to be honoured among the benefactors of their race." The shore end was landed at Heart's Content Cable Station during the day by Medway . Congratulations poured in, and friendly telegrams were again exchanged between Queen Victoria and

SECTION 10

#1732802132702

900-467: A permanent cable connection between the continents. In the 1870s, duplex and quadruplex transmission and receiving systems were set up that could relay multiple messages over the cable. Before the first transatlantic cable, communications between Europe and the Americas had occurred only by ship and could be delayed for weeks by severe winter storms. By contrast, the transatlantic cable made possible

975-574: A preservative solution, and on the hemp were helically wound eighteen single strands of high tensile steel wire produced by Webster & Horsfall Ltd of Hay Mills Birmingham , each covered with fine strands of manila yarn steeped in the preservative. The weight of the new cable was 35.75 long hundredweight (4000 lb) per nautical mile (980 kg/km), or nearly twice the weight of the old. The Haymills site successfully manufactured 26,000 nautical miles (48,000 km) of wire (1,600 tons), made by 250 workers over eleven months. The new cable

1050-491: A scientific advisor. Morse, a shareholder in the Nova Scotia project and acting as the electrical advisor, was also on the board. The cable consisted of 7 copper wires, each weighing 26 kg/km (107  pounds per nautical mile ), covered with three coats of gutta-percha (as suggested by Jonathan Nash Hearder ), weighing 64 kg/km (261 pounds per nautical mile), and wound with tarred hemp , over which

1125-631: A severe storm, and the enterprise was nearly brought to a premature end. The ships were top-heavy with cable, which could not all fit in the holds, and the ships struggled to stay upright. Ten sailors were hurt, and Thomson's electrical cabin was flooded. The vessels arrived at the middle of the Atlantic on June 25 and spliced cable from the two ships together. Agamemnon payed out eastwards towards Valentia Island, and Niagara westward towards Newfoundland . The cable broke after less than 3 nautical miles (5.6 km; 3.5 mi), again after about 54 nautical miles (100 km; 62 mi), and for

1200-504: A sheath of 18 strands, each of 7 iron wires, was laid in a close helix. It weighed nearly 550 kg/km (1.1 tons per nautical mile), was relatively flexible, and could withstand tension of several tens of kilonewtons (several tons). The cable from the Gutta Percha Company was armoured separately by wire-rope manufacturers, the standard practice at the time. In the rush to proceed, only four months were allowed for

1275-446: A signal distortion; see telegrapher's equations . This has to be solved by iron tape or by load coils . It was not until the 20th century that message transmission speeds over transatlantic cables would reach even 120 words per minute. London became the world centre in telecommunications. Eventually, no fewer than eleven cables radiated from Porthcurno Cable Station near Land's End and formed with their Commonwealth links

1350-514: A telegraph line between America and Europe. The first step was to finish the line between St. John's and Nova Scotia, which was undertaken by Gisborne and Field's brother, Matthew. In 1855 an attempt was made to lay a cable across the Cabot Strait in the Gulf of Saint Lawrence . It was laid out from a barque in tow of a steamer. When half the cable was laid, a gale rose, and the line

1425-540: A third time when about 200 nautical miles (370 km; 230 mi) had been run out of each vessel. The expedition returned to Queenstown, County Cork , Ireland. Some directors were in favour of abandoning the project and selling off the cable, but Field persuaded them to keep going. The ships set out again on 17 July, and the middle splice was finished on 29 July 1858. The cable ran easily this time. Niagara arrived in Trinity Bay, Newfoundland on 4 August, and

1500-687: The Catholic Church in Newfoundland , proposed a telegraph line through the forest from St. John's to Cape Ray and cables across the Gulf of St. Lawrence from Cape Ray to Nova Scotia across the Cabot Strait . Around the same time, a similar plan occurred to Frederic Newton Gisborne , a telegraph engineer in Nova Scotia. In the spring of 1851 he procured a grant from the Newfoundland legislature and, having formed

1575-426: The 1858 cable, and it took two minutes to transmit just one character (a single letter or a single number), a rate of about 0.1  words per minute . This was despite the use of the highly sensitive mirror galvanometer. The inaugural message from Queen Victoria took 67 minutes to transmit to Newfoundland, but it took 16 hours for the confirmation copy to be transmitted back to Whitehouse in Valentia. For

SECTION 20

#1732802132702

1650-428: The 1866 cable, the methods of cable manufacture, as well as sending messages, had been vastly improved. The 1866 cable could transmit 8 words a minute —80 times faster than the 1858 cable. Oliver Heaviside and Mihajlo Idvorski Pupin in later decades understood that the bandwidth of a cable is hindered by an imbalance between capacitive and inductive reactance , which causes a severe dispersion and hence

1725-565: The 2500 miles (4022 km) of cable to Great Eastern , beginning in February 1865, an operation that took over three months. On the failure of the expedition to lay the second cable in 1865, a third company was formed to raise the capital for a further attempt, the Anglo-American Telegraph Company. Both the hulks and Great Eastern were put to use again in 1866 and again in 1869. The next expedition in 1866

1800-512: The Anglo-American Telegraph Company, 1866-1869, are held by BT Archives . Transatlantic telegraph cable Transatlantic telegraph cables were undersea cables running under the Atlantic Ocean for telegraph communications. Telegraphy is an obsolete form of communication, and the cables have long since been decommissioned, but telephone and data are still carried on other transatlantic telecommunications cables . The Atlantic Telegraph Company led by Cyrus West Field constructed

1875-721: The Atlantic Telegraph Company. It was incorporated in December, 1856 with £ 350,000 capital , raised principally in London , Liverpool , Manchester , and Glasgow . The board of directors was composed of eighteen members from the United Kingdom, nine from the United States, and three from Canada. The original three projectors were joined by E.O.W. Whitehouse , who oversaw the manufacturing of

1950-618: The Atlantic cable from the works at Enderby's wharf, in East Greenwich, London, to Great Eastern at her Sheerness mooring. A new subsidiary company, the Telegraph Construction and Maintenance Company , under the chairmanship of John Pender was formed to execute the new venture. The cable was coiled down into great cylindrical tanks at the Wharf before being fed into Great Eastern . Amethyst and Iris transferred

2025-779: The U.S. government, and a bill authorizing a subsidy was submitted in Congress . It passed the Senate by only a single vote, due to opposition from protectionist senators. It passed in the House of Representatives despite similar resistance and was signed by President Franklin Pierce . The first attempt, in 1857, was a failure. The cable-laying vessels were the converted warships HMS Agamemnon and USS Niagara , borrowed from their respective governments. Both were needed as neither could hold 2,500 nautical miles of cable alone. The cable

2100-604: The United Kingdom to President of the United States James Buchanan . Signal quality declined rapidly, slowing transmission to an almost unusable speed. The cable was destroyed after three weeks when Wildman Whitehouse applied excessive voltage to it while trying to achieve faster operation. It has been argued that the cable's faulty manufacture, storage and handling would have caused its premature failure in any case. Its short life undermined public and investor confidence and delayed efforts to restore

2175-460: The United States. In August 1866, several ships, including Great Eastern , put to sea again in order to grapple the lost cable of 1865. Their goal was to find the end of the lost cable, splice it to new cable, and complete the run to Newfoundland. They were determined to find it, and their search was based solely upon positions recorded "principally by Captain Moriarty, R. N.", who placed

2250-627: The assets of the New York, Newfoundland, and London Telegraph Company and later merged with The French Transatlantic Cable Company in 1869. The new company set out to recover the lost cable using the CS Albany and CS Medway, working together with The Atlantic Telegraph Company until the two merged in 1873. They then went on to lay two more cables in 1873 and 1874 from Hearts Content, Newfoundland to Valentia Island by CS Robert Lowe in 1873 and CS Minia in 1874. Secretariat records (two volumes) of

2325-406: The break was determined by measuring the resistance of the broken cable. The repair ship navigated to the location. The cable was hooked with a grapple and brought on board to test for electrical continuity. Buoys were deployed to mark the ends of good cable, and a splice was made between the two ends. Initially messages were sent by an operator using Morse code . The reception was very bad on

French Atlantic Cable Company - Misplaced Pages Continue

2400-494: The cable snapped near the stern of the ship, and the end was lost. Great Eastern steamed back to England, where Field issued another prospectus and formed the Anglo-American Telegraph Company , to lay a new cable and complete the broken one. On 13 July 1866, Great Eastern started paying out once more. Despite problems with the weather on the evening of Friday, 27 July, the expedition reached

2475-500: The cable to countermand an order for two regiments in Canada to embark for England, saving £50,000. A total of 732 messages were passed before the cable failed. Field was undaunted by the failure. He was eager to renew the work, but the public had lost confidence in the scheme, and his efforts to revive the company were futile. It was not until 1864 that, with the assistance of Thomas Brassey and John Pender , he succeeded in raising

2550-588: The cable with a very different scheme, driving it with a massive high-voltage induction coil producing several thousand volts, so enough current would be available to drive standard electromechanical printing telegraphs used on inland telegraphs. Thomson's instrument had to be read by eye and was not capable of printing. Nine years later, he invented the syphon recorder for the second transatlantic attempt in 1866. The decision to start mid-Atlantic, combined with Whitehouse dropping out of another voyage, left Thomson on board Agamemnon sailing towards Ireland, with

2625-624: The cable would be very slow due to an effect called retardation. To test the theory, Bright gave Whitehouse overnight access to the Magnetic Telegraph Company's long underground lines. Whitehouse joined several lines together to a distance similar to the transatlantic route and declared that there would be no problem. Morse was also present at this test and supported Whitehouse. Thomson believed that Whitehouse's measurements were flawed and that underground and underwater cables were not fully comparable. Thomson believed that

2700-407: The cable would prove "an additional link between the nations whose friendship is founded on their common interest and reciprocal esteem". The President responded: "It is a triumph more glorious, because far more useful to mankind, than was ever won by conqueror on the field of battle. May the Atlantic telegraph, under the blessing of Heaven, prove to be a bond of perpetual peace and friendship between

2775-433: The cable's completion. As no wire-rope maker had the capacity to make so much cable in such a short period, the task was shared by two English firms: Glass, Elliot & Co. of Greenwich and R.S. Newall and Company of Birkenhead . Late in manufacturing, it was discovered that the two batches had been made with strands twisted in opposite directions. This meant that they could not be directly spliced wire-to-wire, as

2850-422: The cables as chief electrician . Curtis M. Lampson served as vice-chairman for over a decade. The board recruited the physicist William Thomson (later Lord Kelvin), who had publicly disputed some of Whitehouse's claims. The two had a tense relationship before Whitehouse was dismissed when the first cable failed in 1858. Later that year, another attempt was made to connect North America and Europe. This attempt

2925-502: The churches were rung, and at night the city was illuminated. On 1 September there was a parade, followed by an evening torchlight procession and a fireworks display that caused a fire in the Town Hall. Bright was knighted for his part, the first such honour to the telegraph industry. Operation of the 1858 cable was plagued by conflict between two of the project's senior members – Thomson and Whitehouse. Whitehouse

3000-424: The end of the lost cable at longitude 38° 50' W. There were some who thought it hopeless to try, declaring that to locate a cable 2.5 mi (4.0 km) down would be like looking for a small needle in a large haystack. However, Robert Halpin , first officer of Great Eastern , navigated HMS Terrible and grappling ship Albany to the correct location. Albany moved slowly here and there, "fishing" for

3075-637: The first official message was sent via the cable: Directors of Atlantic Telegraph Company, Great Britain, to Directors in America:—Europe and America are united by telegraph. Glory to God in the highest ; on earth peace, good will towards men. Next was the text of a congratulatory telegram from Queen Victoria to President James Buchanan at his summer residence in the Bedford Springs Hotel in Pennsylvania , expressing hope that

French Atlantic Cable Company - Misplaced Pages Continue

3150-407: The first transatlantic telegraph cable. The project began in 1854 with the first cable laid from Valentia Island off the west coast of Ireland to Bay of Bulls , Trinity Bay , Newfoundland . The first communications occurred on August 16, 1858, but the line speed was poor. The first official telegram to pass between two continents that day was a letter of congratulations from Queen Victoria of

3225-540: The first transatlantic underwater telegraph cable after having been contacted by Frederic Newton Gisborne who attempted to connect St. John's, Newfoundland to New York City , but failed due to lack of funding. After inquiring about the feasibility of a transatlantic underwater cable to Lieutenant Matthew Fontaine Maury of the U.S. Navy , Field formed an agreement with the Englishmen John Watkins Brett and Charles Tilston Bright to create

3300-565: The greatest authority on submarine cables at the time. Brett's Submarine Telegraph Company laid the first ocean cable in 1850 across the English Channel , and his English and Irish Magnetic Telegraph Company had laid a cable to Ireland in 1853, the deepest cable to that date. Further reasons for the trip were that all the commercial manufacturers of submarine cable were in Britain, and Field had failed to raise significant funds for

3375-408: The iron wire on both cables would unwind when it was put under tension during laying. The problem was solved by splicing through an improvised wooden bracket to hold the wires in place, but the mistake created negative publicity for the project. The British government gave Field a subsidy of £1,400 a year (£170,000 today) and loaned ships for cable laying and support. Field also solicited aid from

3450-482: The kindred nations, and an instrument destined by Divine Providence to diffuse religion, civilization, liberty, and law throughout the world." The messages were hard to decipher; Queen Victoria's message of 98 words took 16 hours to send. Nonetheless, they engendered an outburst of enthusiasm. The next morning a grand salute of 100 guns resounded in New York City , streets were hung with flags, bells of

3525-416: The line was a mere hoax; others pronounced it a stock-exchange speculation. Whitehouse was recalled for the board's investigation, and Thomson took over in Valentia, tasked with reconstructing the events that Whitehouse had obfuscated. Whitehouse was held responsible for the failure and dismissed. The cable might have failed eventually anyway, but Whitehouse certainly brought it about much sooner. The cable

3600-498: The logs of multiple ships indicated that there was a feasible route across the Atlantic. It seemed so ideal for cable laying that Maury named it Telegraph Plateau . Maury's charts also indicated that a route directly to the US was too rugged to be tenable and considerably longer. Field adopted Gisborne's scheme as a preliminary step to the bigger undertaking and promoted the New York, Newfoundland and London Telegraph Company to establish

3675-421: The lost cable with a five-pronged grappling hook at the end of a stout rope. Suddenly, on 10 August, Albany "caught" the cable and brought it to the surface. It seemed to be an unrealistically easy success. During the night, the cable slipped from the buoy to which it had been secured, and the process had to start all over again. This happened several more times, with the cable slipping after being secured in

3750-429: The mirror galvanometer when he finally gave up trying with his own equipment. Whitehouse had the message reentered into his printing telegraph locally so he could send on the printed tape and pretend that it had been received that way. In September 1858, after several days of progressive deterioration of the insulation, the cable failed altogether. The reaction to the news was tremendous. Some writers even hinted that

3825-614: The necessary capital. The Glass, Elliot, and Gutta-Percha Companies were united to form the Telegraph Construction and Maintenance Company (Telcon, later part of BICC ), which undertook to manufacture and lay the new cable. C. F. Varley replaced Whitehouse as chief electrician. In the meantime, long cables had been submerged in the Mediterranean and the Red Sea . With this experience, an improved cable

SECTION 50

#1732802132702

3900-406: The next morning the shore end was landed. Agamemnon arrived at Valentia Island on 5 August; the shore end was landed at Knightstown and laid to the nearby cable house. Test messages were sent from Newfoundland beginning 10 August 1858. The first was successfully read at Valentia on 12 August and in Newfoundland on 13 August. Further test and configuration messages followed until 16 August, when

3975-558: The port of Heart's Content , Newfoundland in a thick fog. Daniel Gooch , chief engineer of the Telegraph Construction and Maintenance Company , who had been aboard the Great Eastern , sent a message to the Secretary of State for Foreign Affairs , Lord Stanley , saying "Perfect communication established between England and America; God grant it will be a lasting source of benefit to our country." The next morning at 9 a.m.

4050-530: The project in New York. Field pushed the project ahead with tremendous energy and speed. Even before forming a company to carry it out, he ordered 2,500 nautical miles (4,600 km; 2,900 mi) of cable from the Gutta Percha Company . The Atlantic Telegraph Company was formed in October 1856, with Brett as president and Field as vice president. Charles Tilston Bright , who already worked for Brett,

4125-517: The retardation problem and consequently speed up operation. Repeaters amplify the signal periodically along the line. On telegraph lines this is done with relays , but there was no practical way to power them in a submarine cable. The first transatlantic cable with repeaters was TAT-1 in 1956. This was a telephone cable and used a different technology for its repeaters. A 2018 study in the American Economic Review found that

4200-438: The successful connection was put into service. The 1865 cable was also retrieved and spliced, so two cables were in service. These cables proved more durable. Line speed was very good, and the slogan "Two weeks to two minutes" was coined to emphasize the great improvement over ship-borne dispatches. The cables altered the personal, commercial and political relations between people across the Atlantic. Since 1866, there has been

4275-573: The task. During this period, Morse clashed with Field, was removed from the board, and took no further part in the enterprise. The problems with breakage were due largely to difficulty controlling the cable tensions with the braking mechanism as the cable was payed out. A new mechanism was designed and successfully tested in the Bay of Biscay with Agamemnon in May 1858. On 10 June, Agamemnon and Niagara set sail to try again. Ten days out they encountered

4350-422: The two ships heading in opposite directions, which would halve the time required. Whitehouse wanted both ships to travel together from Ireland so that progress could be reported back to the base in Valentia through the cable. Whitehouse overruled Thomson's suggestion on the 1857 voyage, but Bright convinced the directors to approve a mid-ocean start on the subsequent 1858 voyage. Whitehouse, as chief electrician,

4425-453: The voyage using the mirror galvanometer, but Whitehouse immediately connected his own equipment. The effects of the cable's poor handling and design, and Whitehouse's repeated attempts to drive up to 2,000 volts through the cable, compromised the cable's insulation. Whitehouse attempted to hide the poor performance and was vague in his communications. The expected inaugural message from Queen Victoria had been widely publicised, and when it

4500-486: Was a medical doctor by training, but had taken an enthusiastic interest in the new electrical technology and given up his medical practice to follow a new career. He had no formal training in physics; all his knowledge was gained through practical experience. The two clashed even before the project began, when Whitehouse disputed Thomson's law of squares when the latter presented it to a British Association meeting in 1855. Thomson's law predicted that transmission speed on

4575-428: Was a success, also succeeding in recovering the lost second cable. The service generated revenues of £1000 in its first day of operation. The approximate price to send a telegram was: one word, one mile (1.6 km)= $ 0.0003809. The Atlantic Telegraph Company operated the only two trans-Atlantic cables without competition until 1869, when a French cable was laid. Shortly after this company was established, an agreement

SECTION 60

#1732802132702

4650-441: Was also critical of Field, and his repeated refusals to carry out his primary duty as chief electrician onboard ship made a very bad impression. With the removal of Morse, Whitehouse had lost his only ally on the board, but at this time no action was taken. When Agamemnon reached Valentia on 5 August, Thomson handed over to Whitehouse, and the project was declared a success to the press. Thomson received clear signals throughout

4725-472: Was carried to the electrician's room, where it was determined that the cable was connected. All on the ship cheered or wept as rockets were sent up into the sky to light the sea. The recovered cable was then spliced to a fresh cable in her hold and payed out to Heart's Content, Newfoundland , where she arrived on Saturday, 7 September. There were now two working telegraph lines. Broken cables required an elaborate repair procedure. The approximate distance to

4800-515: Was completed on August 5, 1858 and was celebrated by an exchange of messages between Queen Victoria of England and President Buchanan of the United States using the new cable line. When a second cable, under Thomson's supervision, was proposed, the Admiralty lent the hulks of HMS Amethyst and HMS Iris to the Company in 1864, both ships were then extensively modified in 1865 for ferrying

4875-424: Was cut to keep the barque from sinking. In 1856 a steamboat was fitted out for the purpose, and the link from Cape Ray, Newfoundland to Aspy Bay, Nova Scotia was successfully laid. The project's final cost exceeded $ 1 million, and the transatlantic segment would cost much more. In 1855, Field crossed the Atlantic, the first of 56 crossings in the course of the project, to consult with John Watkins Brett ,

4950-420: Was designed. The core consisted of seven twisted strands of very pure copper weighing 300 pounds per nautical mile (73 kg/km), coated with Chatterton's compound , then covered with four layers of gutta-percha , alternating with four thin layers of the compound cementing the whole, and bringing the weight of the insulator to 400 lb/nmi (98 kg/km). This core was covered with hemp saturated in

5025-476: Was established in 1879 and operated until 1895. This article related to telecommunications is a stub . You can help Misplaced Pages by expanding it . Atlantic Telegraph Company The Atlantic Telegraph Company was a company formed on 6 November 1856 to undertake and exploit a commercial telegraph cable across the Atlantic Ocean , the first such telecommunications link. Cyrus Field , American businessman and financier, set his sights on laying

5100-540: Was laid by the ship SS Great Eastern captained by Sir James Anderson . Her immense hull was fitted with three iron tanks for the reception of 2,300 nautical miles (4,300 km) of cable, and her decks furnished with the paying-out gear. At noon on 15 July 1865, Great Eastern left the Nore for Foilhommerum Bay, Valentia Island, where the shore end was laid by Caroline . This attempt failed on 2 August when, after 1,062 nautical miles (1,967 km) had been payed out,

5175-480: Was made chief engineer, and Wildman Whitehouse , a medical doctor self-educated in electrical engineering, was appointed chief electrician. Field provided a quarter of the capital himself. After the remaining shares were sold, largely to existing investors in Brett's company, an unpaid board of directors was formed, which included William Thomson (the future Lord Kelvin), a respected scientist. Thomson also acted as

5250-439: Was made to coordinate pricing of telegraph services and share revenues, effectively combining the French and Anglo-American interests into one combine. A second French company, compagnie française du télégraphe de Paris à New-York , was established in 1879. The Anglo-American Telegraph Company was founded after the failed attempt of laying a second cable by The Atlantic Telegraph Company in 1865. The new telegraph company took over

5325-509: Was no problem applying thousands of volts. However, a sample with a pinprick hole "lit up like a lantern" when tested, and a large hole was burned in the insulation. Although the cable was never put in service for public use and never worked well, there was time for a few messages to be passed that went beyond testing. The collision between the Cunard Line ships Europa and Arabia was reported on 17 August. The British Government used

5400-400: Was not forthcoming, the press speculated that there were problems. Whitehouse announced that five or six weeks would be required for "adjustments". The Queen's message had been received in Newfoundland, but Whitehouse was unable to read the confirmation copy sent back the other way. Finally, on 17 August, he announced receipt. What he did not announce was that the message had been received on

5475-423: Was particularly vulnerable in the first hundred miles from Ireland, consisting of the old 1857 cable that was spliced into the new lay and known to be poorly manufactured. Samples showed that in places the conductor was badly off-centre and could easily break through the insulation due to mechanical strains during laying. Tests were conducted on samples of cable submerged in seawater. When perfectly insulated, there

5550-517: Was started at the white strand near Ballycarbery Castle in County Kerry , on the southwest coast of Ireland , on August 5, 1857. It broke on the first day, but was grappled and repaired. It broke again over Telegraph Plateau, nearly 3,200 m (10,500 ft) deep, and the operation was abandoned for the year. Three hundred miles (480 km) of cable were lost, but the remaining 1,800 miles (2,900 km) were sufficient to complete

5625-434: Was supposed to be on board the cable-laying vessel, but repeatedly found excuses for the 1857 attempt, the trials in the Bay of Biscay , and the two attempts in 1858. In 1857, Thomson was sent in his place, and in 1858 Field diplomatically assigned the two to different ships to avoid conflict—but as Whitehouse continued to evade the voyage, Thomson went alone. After his experience on the 1857 voyage, Thomson realised that