Misplaced Pages

Kuala Lumpur Hospital

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

3°10′24″N 101°41′44″E  /  3.173296°N 101.695555°E  / 3.173296; 101.695555

#597402

30-406:  AG3   SP3   MR11   PY17  Titiwangsa station Kuala Lumpur Hospital ( Malay : Hospital Kuala Lumpur , abbr: HKL ) is the largest Malaysian government-owned public hospital and higher specialised hospital in Kuala Lumpur , the capital city of Malaysia Kuala Lumpur Hospital opened in 1870, HKL is a not-for-profit institution and serves as

60-469: A nonprofit organisation , also categorises several public transport systems as "light metro". The main reason to build a light metro instead of a regular metro is to reduce costs, mainly because this system employs shorter vehicles and shorter stations. Light metros may operate faster than heavy-rail rapid transit systems due to shorter dwell times at stations, and the faster acceleration and deceleration of lighter trains. For example, express trains on

90-676: A daily basis was over 360 cases, with over 44,500 surgeries and 14 million lab investigations were conducted annually. Among the facilities available at the Kuala Lumpur Hospital include banking & finance, cafeteria, convenience stores, gymnasium, tennis court, police station and a post office. The library and resource center for HKL patients and visitors is located at the main block. Mobile library services are available in selected wards. HKL also provides subsidized intermediate care and short-term accommodation for patients and caregivers who are not able to afford high living costs in

120-417: A medium-capacity system (as it used shorter 4-car SP1950 trains, compared to 7- to 12-car trains on other heavy rail lines) but can attain up to 32,000 p/h/d which is comparable to the passenger capacity of some full metro transit networks. However, it was built to the full heavy rail standard as it was designed to be extended. Full-length, 8-car trains were deployed on the line in advance of its extension and

150-520: A section of single track rail) can only achieve lesser headways (e.g. every 15 minutes) which result in lower passenger volume capacities, and thus would be more accurately defined as "light metro" or "medium-capacity" systems as a result. An example is the LA Metro B/D line during the COVID-19 pandemic, as headways were reduced to every 12-20 minutes on each line. In addition to MCS, light metro

180-400: Is a rail transport system with a capacity greater than light rail , but less than typical heavy-rail rapid transit . MCS trains are usually 1 to 4 cars. Most medium-capacity rail systems are automated or use light-rail type vehicles. Since ridership determines the scale of a rapid transit system, statistical modeling allows planners to size the rail system for the needs of the area. When

210-492: Is a common alternative word in European countries, India, and South Korea. In some countries, however, light metro systems are conflated with light rail . In South Korea, light rail is used as the translation for the original Korean term, "경전철" – its literal translation is "light metro", but it actually means "Any railway transit other than heavy rail, which has capacity between heavy rail and bus transit". For example,

240-420: Is created from relative lower capacity and/or train configuration comparisons to other heavy rail systems in the same area. For example, the train in an MCS may have a shorter configuration than the standard metro system, usually three (though, in some cases, just two) to six traincars , allowing for shorter platforms to be built and used. Rather than using steel wheels, rubber-tyred metro technology, such as

270-713: Is the latest addition to the integrated station, serving the Putrajaya line which opened on 16 March 2023. Titiwangsa is one of the Putrajaya Line's 3 interchanges with the Ampang/Sri Petaling Line, the other two being Chan Sow Lin and Sungai Besi . The station's theme encapsulates the essence of "rhythm", capturing a dynamic and harmonious arrangement characterized by regular, repetitive patterns of movement or sound, emphasizing elements such as pattern, flow and tempo. The selected color palette for

300-647: The Kelana Jaya , Ampang and Sri Petaling lines as "light rail transit" systems; when originally opened, the original Malay abbreviations for the lines, PUTRA-LRT ( Projek Usahasama Transit Ringan Automatik /Automatic Light Transit Joint Venture Project) and STAR-LRT ( Sistem Transit Aliran Ringan /Light Flow Transit System) did not clearly distinguish between light rail and light rapid transit. Some articles in India also refer to some "light metro"-type systems as "light rail". The Light Rail Transit Association (LRTA),

330-752: The New York City Subway are about as fast as the Vancouver SkyTrain , but these express trains skip most stops on lines where they operate. Medium-capacity systems have restricted growth capacities as ridership increases. For example, it is difficult to extend station platforms once a system is in operation, especially for underground railway systems, since this work must be done without interfering with traffic. Some railway systems, like Hong Kong and Wuhan, may make advance provisions for longer platforms, for example, so that they will be able to accommodate trains with more, or longer cars, in

SECTION 10

#1732780952598

360-674: The Taiwan Ministry of Transportation and Communications states that each MCS system can board around 6,000 to 20,000 passengers per hour per direction (p/h/d or PPHPD), while the Taiwan Department of Rapid Transit Systems (TCG) suggests an MCS has a capability of boarding around 20,000 to 30,000 p/h/d, and a report from the World Bank places the capacity of an MCS at 15,000 to 30,000 p/h/d. For comparison, ridership capacity of more than 30,000 p/h/d has been quoted as

390-510: The U Line in Uijeongbu utilises VAL system, a variant of medium-capacity rail transport, and is therefore categorised "light metro" by LRTA and others, though the operator itself and South Korean sources refer to the U Line as "light rail". Busan–Gimhae Light Rail Transit is also akin to a light metro in its appearance and features, thought the operator refers it as a "light rail". Likewise, Malaysian officials and media commonly refer to

420-579: The VAL system used on the Taipei Metro , is sometimes recommended, due to its low running noise , as well as the ability to climb steeper grades and turn tighter curves, thus allowing more flexible alignments. Fully heavy rail or metro systems generally have train headways of 10 minutes or better during peak hours. Some systems that qualify as heavy rail/metro in every other way (e.g. are fully grade separated ), but which have network inadequacies (e.g.

450-1297: The LRT and monorail stations, which previously operated as two separate stations, were linked up with a footbridge, allowing passengers to transfer without needing to buy new tokens for the first time since the monorail became operational in 2003. The Titiwangsa station is located close to a bus hub, also known as the Pekeliling Bus Station, just north beside the Gombak River and simply consisting of several rows of shelters. The station serves multiple local bus services , primarily by Rapid Bus and Go KL City Bus . There are intercity bus services from here to main townships in West Pahang including Genting Highlands (Aerobus), Bentong (MARA Liner, Central Pahang, Pahang Lin Siong), Raub (MARA Liner, Central Pahang, Pahang Lin Siong), Kuala Lipis (Pahang Lin Siong), Cameron Highlands , Jerantut (Trans Malaya), Temerloh (Temerloh) and Triang . Light rapid transit A medium-capacity system ( MCS ), also known as light rapid transit or light metro ,

480-470: The LRT line, is elevated, with platforms located on the top floor and ticketing facilities located on the mid-level concourse. The Monorail station is a later addition in the area that is intended to connect the LRT station with the KL Monorail . The station was constructed over Jalan Tun Razak and was completed in 2003, serving as the northern terminus of KL Monorail, with a buffer stop directly after

510-725: The STAR line, a 15 km track with 11 stations was built to serve the northern and southern areas of Kuala Lumpur to cater for the Commonwealth Village and the National Sports Complex in Bukit Jalil , during the 1998 Commonwealth Games in Kuala Lumpur. At that time, Titiwangsa station was named as "Tun Razak" station. The Titiwangsa LRT station is a light rapid transit (LRT) station along

540-584: The city. The hospital is accessible within walking distance east of the Titiwangsa Station . However, when the MRT Putrajaya line phase 2 opens in 2023, Hospital KL station will better serve the hospital and the surrounding vicinity. Bus stop and taxi stands are available. There are 1,950 car park bays at HKL equipped with wireless parking lot detection and guidance system. By the end of 2017, there will be additional 1,270 car park bays with

570-451: The common route of the Ampang line and Sri Petaling line for trains travelling south towards Ampang or Putra Heights , or north towards Sentul Timur . Opened in 1998 as part of the former STAR LRT line's second phase of development, the station was intended to connect Titiwangsa to other parts of the city and surrounding areas. The station, like all stations along the northern stretch of

600-454: The distance between stations is much longer than typically found on heavy rail networks. An MCS may also be suitable for branch line connections to another mode of a heavy-capacity transport system, such as an airport or a main route of a metro network. The definition of a medium-capacity system varies due to its non- standardisation . Inconsistencies in international definitions are even reflected within individual countries. For example,

630-785: The flagship hospital of the Malaysian public healthcare system. This hospital serves as a tertiary and referral hospital. It is located on 150 acres of prime land in the city with 84 wards and 2,300 beds, making it one of the largest hospitals in the world. More than 90 per cent of the beds in HKL are allocated for subsidized patients, providing access to an internationally established standard of affordable healthcare. The Kuala Lumpur Hospital or HKL has 54 different departments and units which include 29 clinical departments and 15 clinical support services. HKL has approximately 11,000 staff with almost 2,300 professionals in various fields and disciplines. Out of

SECTION 20

#1732780952598

660-733: The future. Taipei Metro , for example, constructed extra space for two extra cars in all its Wenhu Line stations. The following is the list of currently-operating MCSs which are categorised as light metros by the Light Rail Transit Association (LRTA) as of March 2018 , unless otherwise indicated. The list does not include, for example, monorails and urban maglev , despite most of them also being "medium-capacity rail system". Bombardier Innovia Metro 300 Trains: 4-car configuration AMPANG AND SRI PETALING LINES: CRRC Zhuzhou LRV Trains: 6-car configuration SHAH ALAM LINE: 3-car CRRC Light Rail vehicles The following

690-658: The line was extended into the Tuen Ma line in June 2021. Two other lines, the Disneyland Resort line shuttle service to Hong Kong Disneyland Resort since 2005 and the South Island line since December 2016, are also classified as MCS because of their shorter trains and smaller capacity, however they use the same technology as the full-capacity rapid transit lines. Generally speaking, medium capacity designation

720-784: The opening of the Women and Children’s Hospital (WCH) in HKL. Titiwangsa station Titiwangsa station is a rapid transit interchange station in Kuala Lumpur , Malaysia. The station is served by the LRT Ampang and Sri Petaling Lines , the KL Monorail Line and the MRT Putrajaya Line . The station allows seamless physical and fare integration between the four train lines. Situated on Jalan Tun Razak (English: Tun Razak Road , formerly Circular Road ) in

750-437: The predicted ridership falls between the service requirements of a light rail and heavy rail or metro system, an MCS project is indicated. An MCS may also result when a rapid transit service fails to achieve the requisite ridership due to network inadequacies (e.g. single-tracking ) or changing demographics. In contrast with light rail systems, an MCS runs on a fully grade separated exclusive right-of-way . In some cases,

780-465: The standard for metro or "heavy rail" standards rapid transit systems, while light rail systems have passenger capacity volumes of around 10,000 to 12,000 p/h/d or 12,000 to 18,000 p/h/d. VAL (Véhicule Automatique Léger) systems are categorised in the medium-capacity rail systems because their manufacturer defines their passenger capacities as being up to 30,000 p/h/d. In Hong Kong , MTR 's Ma On Shan line could, in some contexts, are classified as

810-579: The station. Like the LRT station, the monorail station sports somewhat similar level designs. The station was constructed with a Spanish solution layout, similar to the KL Sentral Monorail station . The station is one of two KL Monorail stations that are designated as an interchange with the Ampang and Sri Petaling Lines, the other being the Hang Tuah station . The underground MRT station

840-615: The subdistrict of Titiwangsa , the station is also located beside the Gombak River and an adjoining bus station known as Titiwangsa Sentral . The station is planned to be an interchange with the Circle Line of the KVMRT project . First opened in 1998 as part of the former STAR LRT line's second phase of development, the station was intended to connect Titiwangsa to other parts of the city and surrounding areas. Under Phase 2 of

870-566: The theme is "ocean blue", inspired by Titiwangsa , a district named after the Titiwangsa Lake Park , which was previously an area of tin mines. An elevated station has also been planned for the MRT3 Circle Line in the future, making it as the next metro hub in the city with 5 integrated transit lines. Seamless transfer and fare integration was achieved on 1 March 2012 when the "paid-area" or restricted areas of both

900-568: The total number of staff, there are 300 medical consultants and specialists, 1,300 medical officers, 72 matrons, 253 sisters (ward managers) and 3,500 registered nurses and 258 community nurses. North Ward Block, Radiotherapy Department and Hostels for staff were built. HKL handled over one million outpatients and 131,639 in-patients in 2015. In 2015, the total management expenditure for HKL reached RM 1 billion whilst development expenditure exceeded RM 17 million. On average, HKL handles over 3,300 outpatient cases daily. The average hospital admission on

#597402