A through arch bridge , also known as a through-type arch bridge , is a bridge that is made from materials such as steel or reinforced concrete, in which the base of an arch structure is below the deck but the top rises above it. It can either be lower bearing or mid-bearing . Thus, the deck is within the arch, and cables or beams that are in tension suspend the central part of the deck from the arch.
25-667: The Harbor Bridge Project (or New Harbor Bridge or US 181 Harbor Bridge ) is the replacement of the existing through arch bridge that crosses the Corpus Christi Ship Channel , which serves the Port of Corpus Christi in Corpus Christi, Texas , with a modern cable-stayed bridge design. The route will connect with SH 286 (the Crosstown Expressway) at its southern terminus and US 181 on
50-539: A 170-year estimated life. Construction was originally slated to finish in 2020. On October 15, 2019, it was announced that the Harbor Bridge would not be completed until 2023. On November 15, 2019, design activities on the new Harbor Bridge were suspended by the Texas Department of Transportation. In a statement, the Texas Department of Transportation says it asked Flatiron Dragados, the firm building
75-447: A TxDOT-ordered independent review by International Bridge Technologies found significant design flaws that persisted in its design, including five primary areas of concern. TxDOT subsequently suspended work on the bridge. The developer Flatiron/Dragados disputes some of these findings, and as of September 2022 discussion were ongoing with TxDOT regarding future construction and potential design remedies. TxDOT and Arup-CFC resolved one of
100-713: A semi-circular arch, the height is half of the span. Bridges across deep, narrow gorges can have their arch placed entirely beneath a flat roadway, but bridges in flatter country rise above their road approaches. A wide bridge may require an arch so tall as to become a significant obstacle and incline for the roadway. Small bridges can be hump-backed , but larger bridges such as the Old Bridge, Pontypridd may become so steep as to require steps, making their use for wheeled traffic difficult. Railways also find arched bridges difficult as they are even less tolerant of inclines. Where simple arched bridges are used for railways on flat terrain
125-570: Is a through arch bridge in Corpus Christi, Texas , that carries six lanes of U.S. Route 181 (US 181) and Texas State Highway 35 (SH 35) from downtown Corpus Christi to Rincon Point, known to locals as North Beach . The bridge crosses the Corpus Christi Ship Channel and handles nearly 26,000 vehicles daily. A new bridge called the New Harbor Bridge is under construction. When complete, it will allow larger ships to pass beneath, permit safer pedestrian transit, and reconfigure
150-518: Is constructed in place or lifted into position. In some cases, this type of arch has been created by constructing cantilevers from each side, with the shoreside ends bolted securely down into heavy piers. The incomplete channel ends are then constructed toward each other and either filled by construction or by lifting a prefabricated center section. This type of construction was used in the Sydney Harbour Bridge illustrated above, with
175-399: Is not practical to support the arch from beneath during construction. In modern construction, temporary towers are erected and supported by cables anchored in the ground. Temporary cables fly from each side to support arch segments as they are constructed. When the arches are almost complete a jacking bridge is placed over or beneath the gap to force the arches apart, whence the final section
200-975: The Chaotianmen Bridge in China, the world's longest through arch bridge; Tyne Bridge of Newcastle upon Tyne ; the Bayonne Bridge that connects New York City to New Jersey , which is longer than the Sydney Harbour Bridge; the Ahwaz White Bridge ; the Bourne Bridge and Sagamore Bridge , smaller, near-twin bridges over the Cape Cod Canal ; the Pennybacker Bridge in Austin , Texas and as
225-676: The Hernando de Soto Bridge in Memphis, Tennessee . Wylam Railway Bridge is an early through arch bridge upstream of the Tyne Bridge. The through arch bridge usually consists of two ribs, although there are examples like the Hulme Arch Bridge of through arches with a single rib. When the two arches are built in parallel planes, the structure is a parallel rib arch bridge. When the two arch ribs lean together and shorten
250-474: The Port of Corpus Christi to larger ship vessels (including Panamax ). Texas Department of Transportation (TxDOT) awarded developer Flatiron / Dragados with the design–build contract for the project. The old bridge will be demolished upon project completion. The new design is a cable-stayed bridge made up of twin precast concrete delta frame segmental box girders that spans 1,661 feet (506 m) across
275-413: The bridge, to suspend the design activities until a replacement for FIGG Bridge Engineers Inc. was found, after the pedestrian bridge at Florida International University ; which was designed by that company, collapsed on March 15, 2018, while it was under construction at the time of collapse. In July 2020, Arup and Carlos Fernandez Casado S.L. was hired to review, recertify, and complete the main span of
SECTION 10
#1732776081494300-485: The bridge. In August 2022, TxDOT halted construction after deficiencies were found within the superstructure of the new bridge. Construction resumed in December 2022 once these problems were resolved. Through arch bridge For a specific construction method, especially for masonry arches, the proportions of the arch remain similar no matter what the size: wider arches are thus required to be taller arches. For
325-770: The chief probable cause for the Florida bridge collapse was an error in design by the FIGG Bridge Group. FIGG was also the engineer for the Harbor Bridge Project. This prompted a design review by TxDOT who in 2019 ultimately asked the bridge developer Flatiron/Dragados to remove FIGG and select a different engineering firm. In July 2020 the developer designated the new engineer for the project as Arup - CFC [ es ] , who expected no major changes. Construction resumed in August 2021. In July 2022
350-425: The cost of building long approach embankments may be considerable. Further issues are the foundations for the bridge. Arch bridges generate large side thrusts on their footings and so may require a solid bedrock foundation. Flattening the arch shape to avoid the humpback problem, such as for Brunel's Maidenhead bridge , increases this side thrust. It is often impossible to achieve a flat enough arch, simply owing to
375-405: The deck from the arch by tension rods, chains or cables and allow a gap in the arch, so the deck can pass through it. The first of these in particular cannot be achieved with masonry construction and requires wrought iron or steel. The use of a through arch does not change the proportions or size of the arch: a large span will still require a tall arch, although this can now reach any height above
400-623: The deck without obstructing traffic. The arch may also reach downwards at its sides, to either reach strong foundations or to place the roadway at a convenient height for spanning a deep valley from a plateau above. The Tyne Bridge demonstrates both of these advantages. A well-known example of this type is the Sydney Harbour Bridge in Australia, which is based on the Hell Gate Bridge in New York City . Other bridges include
425-491: The deliberate tension member that is the key to a tied-arch. Although visually similar, tied- and untied- through-arch bridges are quite distinct structurally and are unrelated in how they distribute their loads. In particular, cast iron bridges such as the Stanley Ferry Aqueduct may resemble tied-arch bridges, but as cast iron is weak in tension they are not structurally a tied arch. In some locations it
450-408: The distance between the arches near the top, the span is a basket handle arch bridge. Many tied-arch bridges are also through-arch bridges. As well as tying the side-loads of the arch, the tension member is also at a convenient height to form the bridge deck, as for a through-arch. The converse is not true: through-arch bridges do not imply that they are tied-arch bridges, unless they also provide
475-515: The entire ship channel bank-to-bank, providing 205 feet (62 m) of clearance above the water. The twin parallel cable-stays are arranged in a fan along middle of the mixed-use deck 134 feet (41 m) wide that carry six lanes of US 181 and a bicycle and pedestrian path with a mid-span belvedere facing the Corpus Christi Bay . The approaches are of the same box girder type supported by columns 180 feet (55 m) apart. To assemble
500-513: The five design issues, deciding to add additional steel reinforcement to the delta box girders, and work resumed on those sections as of November 3, 2022. Construction of the approach spans has continued despite the halt on the main span and towers, and were over 80% complete as of October 28, 2022. TxDOT and Flatiron/Dragados resolved the four remaining design issues in April 2023. Corpus Christi Harbor Bridge The Corpus Christi Harbor Bridge
525-438: The highway interchange system in the surrounding community. In 2008, local, state, and federal authorities began the replacement process. The new Harbor Bridge will be a cable-stayed suspension bridge with a 1661-foot span, rising to a height of 538 feet at the peak of each support pylon. The bridge will allow passage of ships up to 205 feet above-waterline height. The concrete construction technique used for bridge segments have
SECTION 20
#1732776081494550-403: The limitations of the foundations – particularly in flat country. Historically, such bridges often became viaducts of multiple small arches. With the availability of iron or concrete as structural materials, it became possible to construct a through arch bridge : a bridge where the deck does not have to be carried over the top of the arch. This requires a structure that can both support
575-564: The longest cable-stayed span in the North America. Corpus Christi's nearby John F. Kennedy Memorial Causeway , which has a similar construction method, is the first precast concrete post-tensioned segmental box girder bridge in the United States. In March 2018, a pedestrian bridge collapse in Florida prompted extensive reevaluation of bridge construction across the United States. An NTSB investigation ultimately concluded that
600-412: The north. Groundbreaking on construction took place on August 8, 2016 and was scheduled to be completed by the spring of 2020, but was extensively delayed by engineering and design issues, and is tentatively planned to be completed in 2025. Planning for the bridge began in 2003 to address the maintenance and safety issues of the existing Corpus Christi Harbor Bridge as well as provide long term access to
625-529: The superstructure, box girders cast near the bridge site are lifted and brought into place using a self-propelled gantry crane , and then the tendons are post-tensioned before the crane moves to the next segment and repeats. The structure is slated to be the longest cable-stayed, concrete segmental bridge in North America. If completed before the Gordie Howe International Bridge , also under construction, it will also briefly have