57-591: Headstone Lane is a London Overground station on the Lioness line , located near Headstone in the London Borough of Harrow . The station is in Travelcard Zone 5 . The typical off-peak service is four trains per hour to London Euston , and four trains to Watford Junction , calling at all stations. The trains to Watford Junction are northbound and are accessed through a gateway and by going down
114-474: A 50:50 joint venture between Laing Rail and MTR Corporation , was chosen by TfL on 19 June 2007. The contract was signed on 2 July 2007 for seven years with the option of a two-year extension. In preparation for the launch of the Overground, MTR Laing renamed itself London Overground Rail Operations. In February 2013, it was awarded a concession extension until 14 November 2016. In April 2015, TfL placed
171-492: A combination of local opposition, complex choices and engineering at the start of the route, cost, and insufficient return on investment. It could have run either overland or via a tunnel to Turnham Green and on the existing track through Gunnersbury to Richmond (which would have lost the District line service) and thence to Kingston. The station has seven platforms numbered from south to north: As of September 2011, work
228-709: A considerable portion of the network in Zone 2 . The network also uses Euston in central London, the southern terminus of the Watford DC line. The network interchanges with the Bakerloo , Central , Circle , District , Hammersmith & City , Jubilee , Metropolitan , Northern and Victoria tube lines, and also with the Docklands Light Railway , Elizabeth line and Tramlink networks. The Overground lines appear on Tube maps issued by TfL, and
285-415: A flight of stairs, whereas the other platform is southbound and is directed towards London Euston. This is accessed by crossing over a bridge and also going down a flight of stairs to reach the platform. On the northbound platform, there is a gate exit which now has an Oyster reader, so passengers can exit through the gate without having to climb the stairs. There are also Oyster readers at the main entrance at
342-610: A light green background. This ticket stock, coded "TFL" on the reverse, was introduced in November 2007. Oyster PAYG is charged on the same zone-based rules as for the Underground and the Docklands Light Railway . Stations outside Greater London (except Watford Junction) are included in the new Travelcard Zones 7-9 . On 2 January 2008 Acton Central was moved from zone 2 to 3, Hampstead Heath from 3 to 2 and Willesden Junction from 3 to both 2 and 3. Paper tickets are charged on
399-501: A model similar to that used for the Docklands Light Railway , TfL invited tenders for operation of the Overground. Unlike other National Rail operators under the franchise control of the Department for Transport , TfL sets fares, procures rolling stock and decides service levels. The operator takes only a small element of revenue risk, with TfL taking 90% and the operator 10%. The first operator, London Overground Rail Operations ,
456-603: A notice in the Official Journal of the European Union , inviting expressions of interest in operating the next concession. In March 2016, TfL announced that Arriva Rail London had won the right to operate the London Overground concession, starting from 13 November 2016. In June 2023, Arriva announced a contract extension had been secured with TfL, pushing the expiry date to May 2026. Ticketing
513-516: A number of stations. The stations that did not have barriers when TfL took over have been fitted with standalone Oyster card readers similar to those at ungated Underground and DLR stations. The validators at Blackhorse Road which were needed to enter/exit the Oyster card system when changing to and from the Victoria line were replaced with route validators, coloured pink: these are used to show that
570-617: A route from Clapham Junction to the Greenwich Peninsula , intended to improve access from south London to the Millennium Dome . However, this was thwarted by architect Richard Rogers who considered that a railway route on a viaduct could cause "community severance", and so the Victorian brick viaduct was demolished. Nothing further happened to develop this network until after the new Greater London Authority (GLA)
627-558: A separate map of the system is available. Much of London Overground passes through less affluent areas, and is seen as contributing to their regeneration. The North London and Gospel Oak to Barking lines were previously considered by the Transport Committee of the London Assembly to be neglected and not developed to their full potential. The new London Overground line names and colours were introduced across
SECTION 10
#1732798681019684-636: A service from Paddington to Richmond via the Hammersmith & City Railway (now the Hammersmith & City line ) tracks to Grove Road and then over the L&SWR tracks through Turnham Green . On 1 June 1877, the District Railway (DR) linked its then terminus at Hammersmith to the nearby L&SWR tracks east of the present Ravenscourt Park station. The DR began running trains over
741-507: A traveller using Oyster PAYG changed lines at that station, showing which of the possible routes was used. Typically, this avoids paying for zone 1 when the passenger did not travel into it. Ticket stock is common National Rail stock, as Overground services remain part of the National Rail network, but sometimes with a large TfL roundel in the centre and the repeated legend " Rail Settlement Plan " or on newer versions "National Rail" on
798-572: Is a mix of paper, Oyster cards , electronic smart cards and contactless payment cards for "pay-as-you-go" travel. As with all National Rail and TfL services in London, passengers can use a Travelcard (daily, seven-day, monthly or annual); as on other National Rail services in London, paper single, return and cheap day return tickets priced under the zonal fare scheme are also available. As part of an effort to improve safety and protect revenue, TfL has announced that it will introduce ticket barriers at
855-688: Is a western terminus of both the District line of the London Underground and the Mildmay line of the London Overground . South Western Railway services on the Waterloo to Reading Line are routed through Richmond, which is between North Sheen and St Margarets stations, 9 miles 57 chains (15.6 km) down the line from London Waterloo . The new London Overground line names and colours were introduced across
912-516: Is maintained at Willesden Junction and New Cross Gate TMDs , the latter being newly built for the extended East London line. There are also sidings at Silwood Triangle (just north of New Cross depot), built in 2013–14. Satellite locations for stabling trains include Stratford, London Euston and sidings (mainly used by London Northwestern Railway ), and c2c 's East Ham Depot. Train crews are based at stations including Euston, Willesden Junction, Watford Junction, New Cross, Stratford and Gospel Oak. Up to
969-794: The Department for Transport (DfT) announced a review of the rail industry in Great Britain. As part of that review, TfL proposed a "London Regional Rail Authority" to give TfL regulatory powers over rail services in and around Greater London. A result of this consultation was agreement by the Secretary of State for Transport , Alistair Darling , to transfer the Silverlink Metro services from DfT to TfL control. Silverlink had two areas of operation: Silverlink County regional services from Euston to Northampton , St Albans Abbey , Bletchley and Bedford ; and Silverlink Metro within
1026-411: The District line . The typical off-peak service in trains per hour is: Additional services, including trains to and from Shepperton , Camberley , Aldershot and London Waterloo via Hounslow call at the station during the peak hours. London Buses routes 33 , 65 , 110 , 190 , 337 , 371 , 419 , 490 , 493 , H37 , R68 , R70 , mobility route 969 and night routes N22 and N65 serve
1083-664: The GWR began sharing the MR Richmond service, resulting in Gunnersbury having the services of five operators. After electrifying its tracks north of Acton Town in 1903, the DR funded the electrification, completed on 1 August 1905, from Gunnersbury to Richmond. The DR ran electric trains on the branch, while the L&SWR, NLR, GWR and MR services continued to be steam hauled. MR services ceased on 31 December 1906 and those of
1140-558: The Greater London Council (GLC) decided to sponsor an improved service from Camden Road , on the North London line, to North Woolwich, opening up a previously freight-only line between Dalston and Stratford and linking it to an improved Stratford – North Woolwich service. This was given the marketing name Crosstown Linkline , and operated with basic two-car diesel multiple units. The next initiative came from
1197-684: The North & South Western Junction Railway (N&SWJR) near Gunnersbury . Most of this line is now part of the London Underground District line ; the line south from Gunnersbury was also served by the North London Railway (NLR) and is now used also by London Overground. Before this line was built, services north from Richmond ran somewhat circuitously via chords at Kew Bridge and Barnes . The Great Western Railway (GWR) briefly (1 June to 31 October 1870) ran
SECTION 20
#17327986810191254-538: The North London Railway routes from Silverlink Metro. The following day there was an official launch ceremony at Hampstead Heath station with the Mayor of London , Ken Livingstone ; there was also a later media event on the bay platform at Willesden Junction . The launch was accompanied by a marketing campaign entitled "London's new train set", with posters and leaflets carrying an image of model railway packaging containing new Overground trains, tracks and staff. At
1311-524: The ON – Overground Network brand. TfL introduced consistent information displays, station signage and maps on the selected routes in South London. Although this pilot was primarily an exercise in branding, some service improvements were introduced, and it was the first instance of the newly created TfL having a visible influence over National Rail services. The pilot scheme was later dropped. In January 2004
1368-624: The grouping of 1923 , the L&SWR became part of the Southern Railway (SR) and the NLR became part of the London, Midland and Scottish Railway (LMS); both were subsequently nationalised into British Railways . On 1 August 1937, the SR opened its rebuilt station with the station building and the through platforms moved east to be next to the terminal platforms. At around the same time, the SR moved
1425-663: The East London line became part of the London Overground network when the Phase 1 extension was completed. The former London Underground line was extended northwards, mostly along the former Broad Street viaduct of the North London line, to the re-opened Dalston Junction , and southwards to Crystal Palace and West Croydon . Operations began with a limited preview service between Dalston Junction and New Cross/New Cross Gate, with full operation between Dalston Junction and West Croydon/Crystal Palace on 23 May. On 28 February 2011,
1482-560: The GLC in 1984, when the government supported the Broadgate development that would entail the demolition of Broad Street station. The closure process was convoluted because of problems in making alternative arrangements for the North London line, and the remaining services operating from Watford Junction to the City . These eventually ran to and from Liverpool Street via a new section of track,
1539-520: The GWR on 31 December 1910, leaving operations northwards through Kew Gardens and Gunnersbury to the DR, the NLR and L&SWR. On 3 June 1916, the L&SWR withdrew its service from Richmond to Addison Road through Hammersmith due to competition from the District line , leaving the District as the sole operator over that route and the NLR providing main line services via Willesden Junction . Under
1596-541: The Graham Road Curve. British Rail replaced the existing three-car Class 501 electric trains (built 1957) with slightly newer but shorter two-car Class 416 electric trains (built 1959 ), leading to overcrowding . In 1988, by reorganising and reducing services on the Great Northern routes from Moorgate , about 18 relatively modern Class 313 dual-voltage electric trains were transferred to operate
1653-625: The L&SWR tracks to Richmond. On 1 October 1877, the Metropolitan Railway (MR, now the Metropolitan line ) restarted the former GWR service to Richmond via Grove Road station. The DR route from Richmond to central London via Hammersmith was more direct than those of the NLR via Willesden Junction , of the L&SWR and the MR via Grove Road station and of the L&SWR via Clapham Junction to Waterloo . From 1 January 1894,
1710-521: The London Overground network. The initial network, service levels and timetables were a continuation of Silverlink Metro services, a set of routes primarily built and electrified by the North London and London & North Western railway companies in the 19th and early 20th centuries. As the Overground name implies, the majority of the network is above ground, and it mostly consists of railway lines that connect areas outside Central London , with
1767-462: The London rail network in November 2024 London Buses routes H18 and H19 serve the station. [REDACTED] London transport portal London Overground London Overground (also known simply as the Overground ) is a suburban rail network serving London and its environs. Established in 2007 to take over Silverlink Metro routes, it now serves a large part of Greater London as well as Hertfordshire , with 113 stations on
Headstone Lane railway station - Misplaced Pages Continue
1824-401: The London rail network in November 2024 As of May 2023 , the typical off-peak service pattern is: Battersea Park railway station is served by an infrequent parliamentary train service from Dalston Junction , which terminates at Battersea Park instead of Clapham Junction . Since the reorganization of services into the London Overground network, this has been the only service to use
1881-586: The London rail network in November 2024 The station building, designed by James Robb Scott in Portland stone and dating from 1937, is in Art Deco style and its facade includes a square clock. The area in front of the station main entrance was pedestrianised in 2013 and includes a war memorial to soldier Bernard Freyberg , who was born in Richmond. The Richmond and West End Railway (R&WER) opened
1938-595: The London urban area. When the franchise was split up in 2007, County services were taken over by the London Midland franchise, and the Metro services came under TfL control. TfL decided to let this franchise as a management contract, with TfL taking the revenue risk. On 20 February 2006, the DfT announced that TfL would take over management of services then provided by Silverlink Metro . Tenders were invited to operate
1995-695: The North London and Watford services, from both Euston and Liverpool Street. Several voluntary sector groups, the Railway Development Society (RDS, later Railfuture ), Transport 2000's then London groups, and the Capital Transport Campaign, launched a series of leaflets and briefings promoting a concept called Outer Circle. This name had once been used for a semi-circular service from Broad Street to Mansion House , which ceased during World War I. The pamphlets and briefings, first issued in 1997, initially suggested
2052-540: The North London line trains at Stratford moved to new high-level platforms 1 and 2 from low-level platforms 1 and 2, which were needed for the Docklands Light Railway 's Stratford International service. The new platforms 1 and 2 are an island platform with step-free access to platform 12 and subway links to platforms 3–11. On 27 September 2009, Imperial Wharf station opened on the West London line , between West Brompton and Clapham Junction . On 27 April 2010,
2109-456: The South London line, calling at Queens Road Peckham , Peckham Rye , Denmark Hill , Clapham High Street and Wandsworth Road . The extension uses an alignment between Surrey Quays and just north of Queen's Road Peckham that had been disused since 1911; new track was laid after some major civil engineering works. Passive provision has also been made for a new station at Surrey Canal , to be constructed when funding becomes fully available. This
2166-431: The early 2010s, London Overground operated with a conductor or guard on its North London, West London and Gospel Oak services. With the other 60% of Overground services already operated by only a driver, it was decided in 2013 to convert these remaining two-person operated trains to driver only . The London Overground is currently operated by Arriva Rail London under a contract with TfL which expires in 2026. Following
2223-676: The extended tracks and slightly west of the present through platforms. Both the R&WER and WS&SWR were subsidiary companies of the London and South Western Railway (L&SWR). On 1 January 1869, the L&SWR opened the Kensington and Richmond line from north of Addison Road station (now Kensington (Olympia) station ) on the West London Joint Railway . This line ran through Hammersmith (Grove Road) station , since closed, and Turnham Green and had connection with
2280-401: The first station at Richmond on 27 July 1846, as the terminus of its line from Clapham Junction . This station was on a site to the south of the present through platforms, which later became a goods yard and where a multi-storey car park now stands. The Windsor, Staines and South Western Railway (WS&SWR) extended the line westward, resiting the station to the west side of The Quadrant, on
2337-413: The goods yard from the site of the original terminus to a new location north-east of the station. On 18 September 1987, an accident occurred at Richmond when a westbound District line hit the buffers of platform 6 and broke the glass/perspex panels behind. No passengers were seriously injured. A Crossrail branch to Kingston upon Thames via Richmond was proposed in 2003, but was dropped in 2004 due to
Headstone Lane railway station - Misplaced Pages Continue
2394-671: The historic Thames Tunnel , the oldest tunnel under a navigable river in the world. A peculiarity is that at Whitechapel the London Overground runs below the London Underground (though there are other parts of the network where this occurs, e.g. the Watford Junction to Euston route between Kenton and South Kenton – shared with the Bakerloo line – passes under the Metropolitan line between Northwick Park and Preston Road ). The next addition opened on 9 December 2012, from Surrey Quays to Clapham Junction via
2451-698: The independently produced Ringrail proposals in the early 1970s. Some of these were evaluated in the London Rail Study of 1974 (the Barren Report) and Barren suggested consideration of a North London Network of orbital services, based on a later suggestion by the Ringrail Group, which involved using many existing rail routes, rather than the new construction suggested in earlier drafts of the Ringrail Plan. The proposal from Barren
2508-451: The launch, TfL undertook to revamp the routes by improving service frequencies and station facilities, staffing all stations, introducing new rolling stock and allowing Oyster pay as you go throughout the network from the outset. After the takeover, all stations were "deep-cleaned", and Silverlink branding removed. Station signage was replaced with Overground-branded signs using TfL's corporate New Johnston typeface. On 15 April 2009,
2565-445: The line between Dalston Junction and Highbury & Islington was opened. In attendance were the Mayor of London and London Underground 's Managing Director. TfL announced in November 2010 that ridership was ahead of forecast at 92,000 a day, and that patronage at Surrey Quays had "gone through the roof". The incorporation of the East London line into the Overground network has added substantial sections of line in tunnel, including
2622-624: The link from platform 2 at Battersea Park to Wandsworth Road . Highbury & Islington to New Cross, Clapham Junction, Crystal Palace and West Croydon services are served by New Cross Gate Depot . Richmond and Clapham Junction to Stratford, Watford Junction to Euston, and Gospel Oak to Barking services are served by Willesden Traction Maintenance Depot . London Liverpool Street to Enfield Town, Cheshunt and Chingford, and Romford to Upminster are served by Ilford EMU Depot , Chingford sidings and Gidea Park Sidings. London Overground's head office and control centre are at Swiss Cottage . Rolling stock
2679-493: The same zone-based rules as for Underground and DLR paper tickets, which were expanded to take in the extra zones covered. Watford Junction has its own fare scale. Paper tickets are significantly more expensive than using Oyster PAYG. Richmond station, London Richmond , also known as Richmond (London) , is an interchange station in Richmond , Greater London on the Waterloo to Reading and North London lines. It
2736-446: The service under the provisional name of the North London Railway . On 5 September 2006, London Overground branding was announced, and it was confirmed that the extended East London line would be included. On 25 June 2007, a statutory instrument was laid before parliament to exclude the ex-Silverlink metro lines from the franchising process, which enabled them to be operated as a concession. On 11 November 2007, TfL took over
2793-564: The six lines that make up the network. The Overground forms part of the United Kingdom's National Rail network but it is under the concession control and branding of Transport for London (TfL). Operation has been contracted to Arriva Rail London since 2016. TfL previously assigned orange as a mode-specific colour for the Overground in branding and publicity including the roundel , on the Tube map , trains and stations. In 2024, it
2850-403: The station: four eatery-cafés on alternate sides of the barriers (two on the rail side being thin and smaller) similarly two kiosks, the upper one being a hot drinks kiosk through to a M&S Simply Food grocery store. A florist and a WH Smith flank the entrance. Services at Richmond are operated by South Western Railway , London Overground on the Mildmay line and London Underground on
2907-724: The top of the bridge. During the Silverlink era, the gate was rarely opened – however in recent times, London Overground always leaves the gate open. The station was previously also served by the Bakerloo line of the London Underground between 16 April 1917 and 24 September 1982. Since the takeover of this station from Silverlink to London Overground the ticket office opening hours have significantly reduced to information only and two ticket machines were installed which has now been reduced to one and offer Oyster Cards facilities, card payments are also accepted. The new London Overground line names and colours were introduced across
SECTION 50
#17327986810192964-499: Was announced that, while orange would remain the overall Overground brand colour and continue to appear on the roundels, each of the six Overground lines would be given distinct colours and names. Rail services in Great Britain are mostly run under franchises operated by private train operating companies, marketed together as National Rail. The concept of developing a network of orbital services around London goes back to
3021-571: Was criticised by local politicians during the planning phase of the project. No stations are planned at these locations as the line is on high railway arches, making the cost of any station construction prohibitive. On 31 May 2015, the Liverpool Street to Enfield Town , Cheshunt (via Seven Sisters ) and Chingford services, as well as the Romford to Upminster service, were transferred from Greater Anglia to TfL to become part of
3078-612: Was for several overlapping services mainly using the North London line , generally at 20-minute intervals. The suggested routes followed the original North London line service from Broad Street to Richmond , new services from Barking to Clapham Junction , and a third service from Ealing Broadway to North Woolwich . However, the Wilson government 's continuing antipathy to the railways, along with British Rail 's management's lack of interest in minor local train services, meant that few of these initiatives were carried forward. In 1979,
3135-608: Was launched in 2000. But the lobbying discreetly continued, with a series of short briefings published by one RDS member based in North London. Mayoral and GLA candidates were approached to discuss the viability of the Outer Circle concept. The principle was widely supported and was adopted into the first Mayor's Transport Plan, published in 2001. Meanwhile, a pilot scheme was launched in 2003 to bring several National Rail local services, mainly in South London, operated by Connex South Eastern , Southern and South West Trains under
3192-579: Was put on hold in 2009, although a suitable station 'foundation structure' has been built to facilitate completion in the future. Funding for the railway rebuilding project was secured in February 2009, including £64 million from the Department for Transport (DfT) and £15 million from TfL, and construction began in May 2011. The route passes over both Loughborough Junction and Brixton stations without stopping, and this lack of interchange stations
3249-447: Was under way to extend platforms 1 and 2 to accept 10-car trains. The bulk of the lengthening was to be at the west (country) end; extending eastwards was deemed unviable by Network Rail as Church Road Bridge would have needed widening. As part of these works, the platform canopies were also being refurbished. The wide gap between platforms 3 and 4 originally had a third, run-around track for steam locomotives. Eight retail units are at
#18981