The Highliner is a bilevel electric multiple unit (EMU) railcar. The original series of railcars were built in 1971 by the St. Louis Car Company for commuter service on the Illinois Central Railroad , in south Chicago, Illinois , with an additional batch later produced by Bombardier . A second generation featuring a completely new design was produced by Nippon Sharyo beginning in 2005.
35-573: In 1926, the Illinois Central's commuter rail lines were electrified, and began operating as the " IC Electric ". For almost 40 years, the IC Electric continued to operate the original fleet of heavyweight cars, until the railroad decided that a more modern railcar was needed to improve commuter operations. The Chicago South Suburban Mass Transit District was formed in 1967 in order to qualify for federal funding to purchase new equipment for
70-634: A "South Lakefront Study" that is anticipated to yield either one or two new transit projects that are eligible for Federal transit funding. An extension to Peotone, Illinois or the Proposed Chicago south suburban airport with a stop in Monee has been considered since the SouthWest Service was extended to Manhattan. On May 24, 2017, Metra announced new schedule proposals for the line. The new schedule will provide rapid service for
105-471: A longstanding non-compete agreement, South Shore trains stopping at stations shared with the Electric District only pick up passengers heading eastbound (outbound from Chicago) and only discharge passengers heading westbound (inbound to the city). The Electric District has more frequent service than any other Metra line. As of August 2023 , Metra operates 131 trains (64 inbound and 67 outbound) on
140-700: A new station at the south end of the coach storage yard, in 1946. The main line had six tracks between Roosevelt Road (Central Station) and 53rd Street (reduced to four in 1962), four to 111th Street, then two. The South Chicago branch is double tracked, and the Blue Island branch has a single track with a passing siding at West Pullman . The Illinois Central Gulf commuter rail crash , the worst rail accident in Chicago history, occurred on October 30, 1972. A commuter train made up of new lightweight bi-level Highliner cars, inbound to Randolph Street Station during
175-406: A rapid transit line, by running trains more frequently (every ten minutes between 6am and midnight) with reduced-fare transfers to CTA buses and trains. Unlike the current service, which bypasses many stations to reach suburban stations more quickly, it would make all stops within the city. It would run from Millennium Station to South Chicago (93rd Street) at an estimated cost at $ 160 million. Since
210-470: A trench from the near south side into the city proper, eliminating all grade crossings on the main line except one just south of the Richton Park station. The University Park extension required the line to cross a very long private driveway. The South Chicago branch runs at grade, crossing many city streets. The grade crossing elimination project was followed by electrification. The IC electrified
245-542: Is the only Metra line powered by overhead lines , the only line with high-level platforms and level boarding, and the only line with three service branches. Trains operate on 1,500 V DC . The main line north of Kensington/115th Street is shared with the Northern Indiana Commuter Transportation District (NICTD)'s South Shore Line , an electric interurban line through northern Indiana to South Bend . Per
280-541: Is the only Metra line running entirely on dedicated passenger tracks, with no freight trains operating anywhere on the actual route itself (the only exceptions perhaps being occasional work or repair trains). The line is the only one in the Metra system with more than one station in Downtown Chicago, the only line with no stations in fare zone 4, and also has the highest number of stations (49) of any Metra line. It
315-643: The BNSF , UP-NW , UP-N , and UP-W Lines with nearly 7.7 million annual riders. While Metra does not explicitly refer to any of its lines by color, the timetable accents for the Metra Electric District are printed in bright "Panama orange" to reflect the line's origins with the Illinois Central Railroad (IC) and its Panama Limited passenger train . Apart from the spots where its tracks run parallel to other main lines, it
350-545: The Blue Island branch (one outbound train to Blue Island, No. 245, originates from Kensington/115th Street, not Millennium Station ). On Saturdays, Metra operates 41 roundtrip trains on the line, including 21 on the main line to University Park, 16 trains on the South Chicago branch, and four on the Blue Island branch. On Sunday and holidays, Metra operates 22 trains on the line, with 12 roundtrips operating on
385-512: The COVID-19 pandemic , ridership dropped to 2,019,403 passengers in 2020 and to 1,836,723 in 2021. The Metra Electric District uses second-generation bi-level Highliner multiple unit cars built by Nippon Sharyo . These will be supplemented by additional EMUs built at Nippon Sharyo's new Rochelle, Illinois facility opened in 2012. In 2005, these began to replace the original Highliner fleet built by St. Louis Car Company and Bombardier in
SECTION 10
#1732780666212420-619: The Regional Transportation Authority signed a contract with Illinois Central Gulf to fund its commuter service. The next year an extension of 2.3 miles (3.7 km) was built to the current terminal at University Park (originally named Park Forest South). On May 1, 1987 Metra bought the line and its branches for $ 28 million ($ 75.1 million adjusted for inflation). The line is now operated by Northeast Illinois Regional Commuter Rail Corporation, Metra's operating subsidiary. Two inter-city freight tracks retained by
455-555: The 1970s. On February 12, 2016, the original Highliners left on their last run in revenue service. Metra confirmed in a Facebook post that twenty-four cars are being sent to museums around the Midwestern United States, including the Illinois Railway Museum, while an unconfirmed source stated that some cars were sent to Mendota, Illinois to be scrapped. The branch leaves the mainline south of
490-639: The Canadian National Railroad. Off-peak and Saturday service is frequent, while Sunday service operates hourly north of 63rd Street and every 2 hours south of 63rd. On January 4, 2021, fares on the Metra Electric line, along with the Rock Island line , were cut in half for all passengers. The proposed Gold Line, derived from the earlier and more extensive Gray Line plan would have the Electric District operate more like
525-603: The Gold Line was proposed, the idea of providing rapid transit service along Chicago's south lakefront has gained considerable support from neighborhoods along its route. Despite its popular support, officials from CTA and Metra have largely dismissed the plan, focusing on other expansion projects. In response to this and other concerns, in 2009 the RTA and the Chicago Department of Transportation authorized $ 450,000 for
560-722: The Hyde Park stations every 20 minutes on weekdays until 7 p.m. and every half-hour on Saturdays. The proposed schedule also calls for boosting service on the main line from 63rd Street to Kensington, from every two hours to every hour. However, the proposed schedule also calls for the elimination of lightly used Blue Island trains, including all Saturday service. After reviewing community feedback, Metra decided to keep four Saturday Blue Island trains and one late night trip to South Chicago. The new service went into effect September 11, 2017. Between 2014 and 2019, annual ridership declined 23% from 9.4 million to 7.3 million passengers. Due to
595-686: The IC Electric commuter service. In 1983, the RTA created Metra , Chicago's commuter rail service, and in 1987, Metra purchased the IC Electric line, forming the Metra Electric Line . An additional batch of 36 Highliners was built from 1978 to 1979 by the Bombardier company. Starting in 2005, the aged original fleet, which was increasingly prone to breakage and experiencing soaring maintenance costs, began to be phased out. They were replaced by new Highliners built by Nippon Sharyo of Japan ,
630-509: The IC moved its intercity operations to Central Station in 1893, it built Randolph Street Terminal on the former site of Great Central to handle its growing commuter operations. By the early 20th century the IC operated up to 300 steam trains each day. In 1919, the IC and the Chicago city government collaborated to build a berm from the far south suburb of Homewood into the city. They also dug
665-705: The ICG are now part of the Canadian National Railway , used by Amtrak 's City of New Orleans , Illini and Saluki trains. From 1988 onward, Randolph Street Terminal was under near-perpetual construction. The construction of Millennium Park moved the station completely underground, and in 2005 it was renamed Millennium Station. The Metra Electric is the only line on the Metra system in which all stations (except 18th and 47th Streets, both flag stops ) have ticket vending machines. The machines originally sold magnetically encoded tickets which unlocked
700-414: The Metra Electric schedule is the similarity of the weekday and Saturday timetables. Many express trains run throughout the day in both directions. On other Metra lines, express service operates exclusively during the morning and afternoon rush hours. It is the only Metra line where all trackage is used exclusively for commuter service. Freight trains and Amtrak trains run on a pair of adjacent tracks owned by
735-515: The best on-time performance of all Metra lines, averaging only one late train a month in 2014. Trains operate at a maximum speed of 65 miles per hour (105 km/h); as of February 2024, work is underway to increase the maximum speed to 79 miles per hour (127 km/h), with an increase to 90 miles per hour (140 km/h) in certain sections potentially following. The line was built by the Illinois Central Railroad, one of
SECTION 20
#1732780666212770-462: The bi-level train. A major contributing factor was that Illinois Central Gulf used a dark gray color scheme on the front ends of the Highliner fleet, which was very difficult to see on the cloudy morning of the accident. After the accident the ends of all of the ICG 1926 heavyweight still in use and Highliner MU fleet were partially painted with bright orange added for additional visibility. In 1976
805-442: The commuter tracks in 1926, from downtown to Matteson . In addition to the removal of all grade crossings, the tracks were separated from, and moved to the west side of, the two freight and inter-city tracks. At McCormick Place just south of downtown Chicago, the two non-electrified tracks to Central Station crossed over the new electric alignment. The electric tracks continued north to Randolph Street Terminal. The "IC Electric"
840-404: The fire, remains of buildings destroyed by the fire were dumped into the lake, creating landfill that forms the foundation of Grant Park , which the Metra Electric District runs through. Two branches were added: from Brookdale southeast to South Chicago in the early 1880s, and from Kensington southwest to Blue Island in the early 1890s, both later electrified along with the main line. When
875-616: The first commuter services outside the major metropolitan areas of the northeastern United States. It opened on July 21, 1856 between the IC's then-downtown station, Great Central Station , (now Millennium Station) and Hyde Park . Part of the line was elevated for the World's Columbian Exposition of 1893 in Jackson Park . The line predates the 1871 Great Chicago Fire , and ran on a trestle just offshore in Lake Michigan . After
910-700: The former 67th Street station. The branch leaves the main line south of Kensington/115th Street . List of railway electrification systems#1,500 V DC This is a list of the power supply systems that are, or have been, used for railway electrification . Note that the voltages are nominal and vary depending on load and distance from the substation. As of 2023 many trams and trains use on-board solid-state electronics to convert these supplies to run three-phase AC traction motors. Tram electrification systems are listed here . Voltages are defined by two standards: BS EN 50163 and IEC 60850. Gudogai (BCh) route for Vilnius – Minsk (Belarus) services
945-535: The gallery cars used on Metra's diesel lines. The South Shore Line , which operates on the Metra Electric from Millennium Station to Kensington/115th Street before diverging east to Indiana, also purchased and operates the Highliner II to supplement its fleet of EMUs. Metra has begun testing 90mph operations on part of the Metra Electric District and has committed to getting the entire network to 79mph. Signaling and catenary work has begun. The previous 65mph limit
980-485: The line on weekdays. On the main line, 27 inbound trains originate from University Park , four from Homewood , and three from Kensington/115th Street , while three outbound trains terminate at Kensington/115th Street, four at Homewood, and the remaining 26 at University Park. There are also 20 inbound and 22 outbound trains on the South Chicago (93rd Street) branch, as well as ten inbound and 12 outbound trains on
1015-520: The main line to University Park and 10 trains operating on the South Chicago branch. Service on the Blue Island branch is suspended during these times. The trunk stretch of the line shared between all branches from Millennium Station to 63rd Street is the most heavily traveled section on the entire Metra system. At 55th-56th-57th Street , passengers may transfer between main line and South Chicago/Blue Island branch services, as well as to South Shore Line service to Indiana. The Metra Electric District has
1050-469: The morning rush hour, overshot the 27th Street platform and backed up into the station. The bi-level train had already tripped the signals to green for the next train, an older, heavy steel single-level express train. As the bi-level train was backing up at 11 miles per hour (18 km/h), it was struck by the single-level train at full speed. The single-level train telescoped the bi-level train, killing 45 passengers and injuring hundreds more, primarily in
1085-465: The route. The original 130 car Highliner fleet had a cost of approximately $ 40 million; $ 26.6 million was funded by a federal grant, with the remainder coming from the Illinois Central. The railcars operated on electric catenary and were more efficient than their heavyweight predecessors. A typical Highliner was able to seat 156 passengers and run faster than the heavyweight fleet. In 1976, the newly formed Regional Transportation Authority began to fund
Highliner - Misplaced Pages Continue
1120-462: The same company that is currently in charge of production of Metra's fleet of gallery cars . The last revenue run of the original Highliner cars was on February 12, 2016. Metra confirmed in a Facebook post that twenty-four cars are being sent to museums around the Midwestern United States, including the Illinois Railway Museum, while the other cars were sent to Mendota, Illinois to be scrapped. The Nippon Sharyo Highliners are similar in appearance to
1155-588: The turnstiles. People with paper tickets or weekend passes, on reduced fares or who had trouble with the vending machines had to use a blue or orange pal phone to contact an operator who would unlock the turnstiles. Complaints from passengers who missed their trains caused Metra to remove the turnstiles in November 2003. The main line and South Chicago branch run daily, but the Blue Island Branch does not operate on Sundays or holidays. A unique feature of
1190-442: Was a result of 1926 Pullman stock braking algorithms which were replaced by Highliner I and no longer relevant. Metra Electric Line The Metra Electric District is an electrified commuter rail line owned and operated by Metra which connects Millennium Station (formerly Randolph Street Station), in downtown Chicago , with the city's southern suburbs . As of 2018, it is the fifth busiest of Metra's 11 lines, after
1225-414: Was once Chicago's busiest suburban railroad, and carried a great deal of traffic within the city as well as to suburban communities. The three lines carried 26 million passengers in 1927, the first full year of electrified operation. Ridership rose to 35 million in 1929, and reached an all-time peak of 47 million in 1946. Service was extended 1.1 miles (1.8 km) southward from Matteson to Richton Park ,
#211788