Misplaced Pages

Lockport Powerhouse

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Run-of-river hydroelectricity ( ROR ) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage . A plant without pondage is subject to seasonal river flows, so the plant will operate as an intermittent energy source . Conventional hydro uses reservoirs , which regulate water for flood control , dispatchable electrical power , and the provision of fresh water for agriculture .

#603396

34-624: The Lockport Powerhouse is an American run-of-the-river dam used by the Metropolitan Water Reclamation District of Greater Chicago to control the outflow of the Sanitary and Ship Canal and limit the diversion of water from Lake Michigan into the Des Plaines River . The Chicago Sanitary and Ship Canal reached Lockport, Illinois in the 1890s. As part of this construction, a lock and dam

68-433: A global testing ground for 10–50 MW run-of-river technology . As of March 2010, there were 628 applications pending for new water licences solely for power generation, representing more than 750 potential points of river diversion. In undeveloped areas, new access roads and transmission lines can cause habitat fragmentation , allowing the introduction of invasive species. Run-of-the-river projects strongly depend on

102-519: A laboratory recognition scheme also. SSI Facilitation Cell became operational since 26 May 1997. The aim of the Cell is to assist the small scale entrepreneurs who are backbone of the Indian industry. It has an incentive scheme to promote such units to get certified with ISI Mark . If any customer reports about the degraded quality of any certified product at Grievance Cell, BIS HQs, BIS gives redressal to

136-471: A river's flow (up to 95% of mean annual discharge) through a pipe and/or tunnel leading to electricity-generating turbines, then return the water back to the river downstream. Run-of-the-river projects are dramatically different in design and appearance from conventional hydroelectric projects. Traditional hydroelectric dams store enormous quantities of water in reservoirs , sometimes flooding large tracts of land. In contrast, run-of-river projects do not have

170-484: Is a comprehensive building code for regulating the building construction activities across the country which was first published in 1970. Preliminary Draft Amendment No. 1 to NBC 2005 Part 11 "Approach to Sustainability" was put into circulation a preliminary draft amendment and BIS accepted the feedback from people till 15 March 2013. The Bill was passed on 8 March 2016 by the Rajya Sabha. The new Bill will repeal

204-557: Is a process through which a third-party organization or certification body assesses and verifies that a product meets specific standards, specifications, or regulatory requirements. The primary purpose of product certification is to ensure that a product is safe, reliable, and compliant with the relevant quality and safety standards. It provides consumers with confidence that the product they are purchasing meets established criteria and has been independently tested and evaluated. Product Certifications are to be obtained voluntarily. For, some of

238-417: Is considered an "unfirm" source of power: a run-of-the-river project has little or no capacity for energy storage and so cannot co-ordinate the output of electricity generation to match consumer demand. It thus generates much more power when seasonal river flows are high (spring freshet ), and depending on location, much less during drier summer months or frozen winter months. Depending on location and type,

272-452: Is considered ideal for streams or rivers that can sustain a minimum flow or those regulated by a lake or reservoir upstream. A small dam is usually built to create a headpond ensuring that there is enough water entering the penstock pipes that lead to the turbines , which are at a lower elevation. Projects with pondage, as opposed to those without pondage, can store water for daily load demands. In general, projects divert some or most of

306-560: Is established by the Bureau of Indian Standards Act, 2016 which came into effect on 12 October 2017. The Minister in charge of the Ministry or Department having administrative control of the BIS is the ex-officio President of the BIS. BIS has 500 plus scientific officers working as Certification Officers, Member secretaries of technical committees and lab OIC's . The organisation was formerly

340-501: Is generally used to cover exclusively short-term peak times electricity demand. Diversion Weir is also heavily dependent on the natural river flow. Similar to a regular dam, water is stored from lull periods to be used during peak-times. This allows for the pondage dams to provide for the regulation of daily and/or weekly flows depending on location. When developed with care to footprint size and location, run-of-the-river hydro projects can create sustainable energy minimizing impacts to

374-441: Is rated at 1,853 MW. Some run-of-the-river projects are downstream of other dams and reservoirs. The reservoir was not built by the project but takes advantage of the water supplied by it. An example would be the 1995 1,436 MW La Grande-1 generating station . Previous upstream dams and reservoirs were part of the 1980s James Bay Project . There are also small and somewhat-mobile forms of a run-of-the-river power plants. One example

SECTION 10

#1732780951604

408-673: Is the so-called electricity buoy , a small floating hydroelectric power plant . Like most buoys, it is anchored to the ground, in this case in a river. The energy within the moving water propels a power generator and thereby creates electricity. Prototypes by commercial producers are generating power on the Middle Rhine river in Germany and on the Danube river in Austria. The advantages and disadvantages of run-of-river dams depends on

442-716: The Indian Standards Institution ( ISI ), set up under the Resolution of the Department of Industries and Supplies No. 1 Std.(4)/45, dated 3 September 1946. The ISI was registered under the Societies Registration Act, 1860. A new Bureau of Indian standards (BIS) Act 2016 which was notified on 22 March 2016, has been brought into force with effect from 12 October 2017. The Act establishes the Bureau of Indian Standards (BIS) as

476-915: The disadvantages associated with reservoirs and so cause fewer environmental impacts. The use of the term "run-of-the-river" for power projects varies around the world. Some may consider a project run-of-the-river if power is produced with no water storage, but limited storage is considered run-of-the-river by others. Developers may mislabel a project run-of-the-river to soothe public perception about its environmental or social effects. The European Network of Transmission System Operators for Electricity distinguishes run-of-the-river and pondage hydropower plants, which can hold enough water to allow generation for up to 24 hours (reservoir capacity / generating capacity ≤ 24 hours), from reservoir hydropower plants, which hold far more than 24 hours of generation without pumps. The Bureau of Indian Standards describes run-of-the-river hydroelectricity as: A power station utilizing

510-441: The BIS laboratories every year. In certain cases where it is economically not feasible to develop test facilities in BIS laboratories and also for other reasons like overloading of samples, equipment being out of order, the services of outside approved laboratories are also being availed. Except for the two labs, all the other labs are NABL (National Accreditation Board for Testing and Calibration Laboratories) accredited. It operates

544-692: The National Standards Body of India. As a National Standards Body, it has 25 members drawn from Central or State Governments, industry, scientific and research institutions, and consumer organisations. Its headquarters are in New Delhi , with regional offices in Eastern Region at Kolkata , southern Region at Chennai , Western Region at Mumbai , Northern Region at Chandigarh and Central Region at Delhi and 20 branch offices. It also works as WTO-TBT enquiry point for India. It

578-520: The consistent flow of water, as they lack reservoirs and depend on the natural flow of rivers. Consequently, these projects are more vulnerable to climate change compared to storage-based projects. Short-term climate anomalies such as the El Niño Southern Oscillation (ENSO) [1] can significantly disrupt the flow and can have a profound impact on the operation of these projects. Thus, incorporating climate change considerations into

612-868: The customer. BIS is a founder member of International Organization for Standardization (ISO). It represents India in the International Organization for Standardization (ISO), the International Electrotechnical Commission (IEC) and the World Standards Service Network (WSSN). One of the major functions of the Bureau is the formulation, recognition and promotion of the Indian Standards. As on 1 January 2019, over 20,000 Standards have been formulated by BIS, are in force. These cover important segments of economy, which help

646-412: The electricity needed by consumers and industry. Moreover, run-of-the-river hydroelectric plants do not have reservoirs, thus eliminating the methane and carbon dioxide emissions caused by the decomposition of organic matter in the reservoir of a conventional hydroelectric dam. That is a particular advantage in tropical countries, where methane generation can be a problem. Without a reservoir, flooding of

680-514: The existing Bureau of Indian Standards Act, 1986. The main objectives of the legislation are: It is a training institute of BIS which is set up in 1995. It is functioning from Noida , Uttar Pradesh , India. The primary activities of NITS are: To support the activities of product certification, BIS has a chain of 8 laboratories. These laboratories have established testing facilities for products of chemical, food, electrical and mechanical disciplines. Approximately, 25000 samples are being tested in

714-494: The industry in upgrading the quality of their products and services. BIS has identified 15 sectors which are important to Indian Industry. For formulation of Indian Standard, it has separate Division Council to oversee and supervise the work. The Standards are regularly reviewed and formulated in line with the technological development to maintain harmony with the International Standards. Product certification

SECTION 20

#1732780951604

748-409: The initial design and location selection of run-of-the-river projects can help mitigate the vulnerability of these projects to climate-related disruptions. Bureau of Indian Standards The Bureau of Indian Standards ( BIS ) is the National Standards Body of India under Department of Consumer affairs, Ministry of Consumer Affairs, Food & Public Distribution , Government of India . It

782-596: The manufacturer has to imprint one of two possible marks on the product label. The Standard Mark or the ISI Mark. The Standard Mark is compulsory for certain types of electronics and IT goods, whereas the ISI mark is mandatory for product categories such as cement, household electrical products, food products, steel materials, etc. The ISI mark is also used for several voluntary BIS certification product categories. Indian importers who intend to get Certification Mark may apply for

816-433: The plant will most likely have a lower head of water than from a dam, and will thus generate less power. The potential power at a site is a result of the head and flow of water. By damming a river, the head is available to generate power at the face of the dam. A dam may create a reservoir hundreds of kilometres long, but in run-of-the-river the head is usually delivered by a canal, pipe or tunnel constructed upstream of

850-442: The power house. The cost of upstream construction makes a steep drop desirable, such as falls or rapids. Small, well-sited run-of-the-river projects can be developed with minimal environmental impacts. Larger projects have more environmental concerns. For fish-bearing rivers, a ladder may be required, and dissolved gases downstream may affect fish. In British Columbia , the mountainous terrain and wealth of big rivers have made it

884-490: The products like Milk powder, Drinking Water, LPG Cylinders, etc., certification is mandatory. Because these products are concerned with health and safety. Foreign manufacturers of products who intend to export to India also may obtain a BIS product certification license. For some products various Indian government ministries/departments/agencies makes its compulsory to have BIS certification. Towards this, BIS launched its Product Certification Scheme for overseas manufacturers in

918-602: The run of the river flows for generation of power with sufficient pondage for supplying water for meeting diurnal or weekly fluctuations of demand. In such stations, the normal course of the river is not materially altered. Many of the larger run-of-the-river projects have been designed to a scale and generating capacity rivaling some traditional hydroelectric dams. For example, the Beauharnois Hydroelectric Generating Station in Quebec

952-417: The surrounding environment and nearby communities. Run-of-the-river harnesses the natural potential energy of water by eliminating the need to burn coal or natural gas to generate the electricity needed by consumers and industry. Advantages include: Like all hydro-electric power, run-of-the-river harnesses the natural potential energy of water by eliminating the need to burn coal or natural gas to generate

986-406: The type, the following sections generally refer to Dam-Toe unless otherwise stated. These are listed in order of least impact to most impact, as well as (on average) requisite project size. Dam-toe has no flow regulation and utilizes the natural flow of the river to turn the turbines. Electricity generation is heavily dependent on river flow. Diversion Weir has very little flow regulation, which

1020-450: The upper part of the river does not take place. As a result, people remain living at or near the river and existing habitats are not flooded. Any pre-existing pattern of flooding will continue unaltered, which presents a flood risk to the facility and downstream areas. Due to their low impact, run-of-the-river dams can be implemented in existing irrigation dams with little to no change in the local fluvial ecosystem. Run-of-the-river power

1054-406: The year 2000, which is called Foreign Manufacturers Certification Scheme. Under the provisions of this scheme, foreign manufacturers can seek certification from BIS for marking their product(s) with BIS Standard Mark. The foreign manufacturer needs to appoint an Authorized Indian Representative who will be an Indian Resident to act as an agent between BIS and the manufacturer. Depending on the product,

Lockport Powerhouse - Misplaced Pages Continue

1088-637: Was also the home of the waste gate controls. The lock and gates were designed to manage a 40-foot (12 m) drop in canal elevation between the two municipalities. A second phase of construction occurred from 1922 to 1933 to handle differing water loads following the opening of the Ohio River Standard Navigation Lock . First operational in 1907, the powerhouse is now recognized as the oldest hydroelectric plant in Illinois. The Lockport Lock, Dam and Power House Historic District

1122-789: Was built in Lockport. Seven waste gates, used to control the level of water in the canal and Des Plaines River , were part of this project. From 1903 to 1907, the canal was extended from Lockport to Joliet . Construction on the Lockport Powerhouse began as part of this extension in 1905. Designed by Frederick L. Barrett, the red-roofed Beaux Arts powerhouse was constructed with concrete blocks coursed to resemble stone. The powerhouse featured four Francis-style turbines to generate electrical power, capable of generating 40,000 horsepower (30,000 kW). These turbines have since been replaced with two vertical Kaplan turbines . The powerhouse

1156-778: Was recognized by the National Park Service with a listing on the National Register of Historic Places on March 10, 2004. The lock next to the dam & powerhouse is largely used for barge traffic and has a 39 foot (11.8 meters) drop. It is the second of eight locks on the Illinois Waterway connecting Lake Michigan to the Mississippi River. [REDACTED] Media related to Lockport Lock and Dam at Wikimedia Commons Run-of-the-river Run-of-the-river, or ROR, hydroelectricity

#603396