Misplaced Pages

Lochdale, Burnaby

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Lochdale is a single-family neighbourhood in the north-eastern part of Burnaby , near Burnaby Mountain . It lies between Kensington Ave to the west and Duthie Ave to the east. Hastings Street marks its northern limits while Halifax Street closes the rectangle in the south. Additionally, a large hillside residential area between Burnaby Mountain Parkway and Greystone Drive also belongs to Lochdale. Several major thoroughfares connecting north and south run through this neighbourhood - the earlier mentioned Kensington Avenue, Duthie Avenue, and Sperling Avenue .

#124875

89-440: Similar to neighbouring Parkcrest and Montecito (also known as Sperling-Broadway ), Lochdale's elevation gradually subsides southwards where it approaches Burnaby Lake which gave this old neighbourhood its Scottish name. The Lochdale district was founded at Hastings Street and Sperling Avenue in 1912 and absorbed many immigrants of different European backgrounds before World War 2, whose children and grandchildren still live in

178-498: A Quester Tangent brake assurance monitor (BAM) that controls propulsion and braking systems. The VCCs have a command-line-console, but normally the trains are controlled through a system known as the SMC, which also provides scheduling. All commands from the SMC are verified to be safe by the VCC before execution. However if the SMC fails, the system can still be operated through the VCC. This

267-672: A Burnaby factory. Similar trains are used in Kuala Lumpur's Kelana Jaya Line , New York's JFK AirTrain , and the Beijing Airport Express . These trains are run in four-car configurations on the Expo Line, and two-car configurations on the Millennium Line. Each pair of cars is semi-permanently joined together in a twin unit or "married pair", with a length of 33.4 metres (110 ft). Mark II trains have

356-432: A Compass Card or a 90-minute paper Compass ticket to operate. This means that a bus rider paying cash is required to pay a second fare to transfer to SkyTrain or SeaBus. Those transit users paying cash but beginning their trips at a SkyTrain or SeaBus station are not subject to this second fare because they are issued Compass tickets which are accepted as valid transfers on TransLink buses. Construction of SkyTrain fare gates

445-638: A different design from the Expo and Millennium Lines' Bombardier-built fleet. They use conventional electric motors rather than linear induction motor technology. Canada Line tracks do not interconnect with the rest of the SkyTrain network, and there is a separate fleet maintenance depot. SkyTrain provides high-frequency service, with trains arriving every 2 to 6 minutes at all stations during peak hours. Trains operate between 4:48 a.m. and approximately 1:30 a.m. on weekdays, with reduced hours on weekends on

534-405: A nearby ice arena (off Curtis St) used for hockey and skating by local residents. Soccer and baseball are also played on nearby well-lit sports fields. The playground at Aubrey Elementary occupies a high point offering panoramic views from the nearby wood-covered Burnaby Mountain to the distant Mt. Slesse, Tomyhoi, Larrabee, American Border Peak and Canadian Border Peak beyond Montecito in

623-569: A rapid transit line as early as 1979 but such a project was not funded until the early 2000s with the approval of the Canada Line. The line opened on August 17, 2009, 15 weeks ahead of schedule and on budget. Ridership rose three years ahead of forecasts, hitting 100,000 passengers per weekday in May 2010 and 136,000 passengers per weekday in June 2011. The Canada Line is operationally independent from

712-582: A regional government transportation agency. The Canada Line is operated on the same principles by the private concessionaire ProTrans BC under contract to TransLink and is an integrated part of the regional transport system. SkyTrain uses a fare system shared with other local transit services and is policed by the Metro Vancouver Transit Police . SkyTrain attendants (STAs) provide first aid, emergency response, directions and customer service, inspect fares, monitor train faults, and operate

801-510: A security hazard. On-board speaker phones provide two-way communication between passengers and control operators. In 2007, it was reported that the entire surveillance system was upgraded from analogue two-hour tape recording to digital technology, which was to allow police to retrieve previous footage for up to seven days. However, incidents since the upgrade have still limited police to a two-hour loop, resulting in loss of potential evidence. By November 2008, at least 54 deaths had occurred on

890-479: A shortage of trains, the Mark IIIs are being used on the Expo Line, while 2-car Innovia 200 (Mk2) serve the Millennium Line. On December 16, 2016, TransLink ordered 28 more Mark III cars, bringing the total of Mark III cars to 56 by the end of 2019. On February 22, 2018, TransLink announced a further order of 28 Mark III cars, which will bring the total number of Mark III cars to 84 once all trains are in service by

979-734: A single-day record of 567,000 on February 20, 2010. At times, every available train was in service on all three lines. After the Olympics ended, overall transit usage remained 7.8 percent above the previous year. The cost of operating SkyTrain in 2008, with an estimated 73.5   million boardings, was $ 83   million. To cover this, TransLink draws mostly from transit fares, advertising ($ 360   million in 2008) and tax ($ 262   million from fuel taxes and $ 298   million from property taxes in 2008), funds which are also shared with bus services, roads and bridge maintenance, and other infrastructure and services. The capital costs of building

SECTION 10

#1732791327125

1068-614: A small strip mall is available and it is at the very bottom of the hill, along Broadway, though three large local shopping malls are all within a few minutes. The area is served by two bus routes (#134 and #136) connecting it to Brentwood Mall , Forest Grove and the Skytrain stations in the Lake City area. The closest Skytrain station is at the foot of Holdom Ave right by the Lougheed Highway. Being part of North Burnaby,

1157-401: A streamlined front and rear, an articulated joint allowing passengers to walk the length of a married pair, white/grey/blue interior, and six doors per car, three per side. TransLink also ordered 48 Mark II ART (2009/2010 model) in 2009 to further supplement supply and integrate new features like CCTV and visual maps with LED lights. The Bombardier ART model has undergone several redesigns from

1246-558: A third platform at the station was roughed-in in anticipation of the extension. Phase II was postponed following a change in provincial government and a shuffling of priorities that led to prioritizing building the Canada Line due to Vancouver's hosting of the 2010 Olympics. Preliminary construction of the Evergreen Extension began in July 2012 and major construction started in June 2013 with the construction of support columns for

1335-491: A total length of 562 m (1844 ft), with shorter 47-metre (154 ft) towers necessitated by its proximity to the Vancouver International Airport , and also has a pedestrian/bicycle deck connecting the bicycle networks of Vancouver and Richmond. The Middle Arm Bridge is a shorter box girder bridge . The signalling technology used on all three SkyTrain lines to run trains automatically

1424-441: A valid Go-Card and the elderly. Children under 12 have been able to ride the system for free since September 2021. Until April 2016, SkyTrain's fare system was a proof-of-payment system; there were no turnstiles at the entrances to train platforms. Instead, fares were typically enforced by random ticket inspections – usually by police or transit security but occasionally by SkyTrain attendants – through trains and stations. This

1513-411: A whole, TransLink had $ 1.1   billion in long-term debt in 2006, of which $ 508   million was transferred from the province in 1999 when responsibility for SkyTrain was given to TransLink. The province retained ownership of the causeway, bridge, certain services, and a portion of SkyTrain's debt. Law enforcement services are provided by the Metro Vancouver Transit Police (MVTP). They replaced

1602-551: Is a hillside neighbourhood in North Burnaby , British Columbia adjacent to Kensington Park which gave it its name. It has a long rectangular shape stretched north to south and is bounded by Springer Avenue to the west and Kensington Avenue to the east. To the north its border runs along Hastings Street , its southern border lies along the Lougheed Highway and Skytrain tracks. Its elevation gradually lowers to

1691-407: Is a popular shopping centre with a number of shops and services and a post-office. A stretch of Hastings between Kensington Ave and Clare Ave also has a number of small shops and restaurants. There are two elementary schools in this area - Lochdale Community and Westridge . Burnaby North Secondary School serves this and neighbouring areas. Although Korean and Chinese population is highly visible in

1780-404: Is a six-car configuration, totalling 76.2 metres (250 ft). The SkyTrain fleet includes 150 Mark I cars. These trains have a mix of forward-, reverse- and side-facing seats; red, white, and blue interiors; and four doors per car, two per side. When the Millennium Line was built, TransLink ordered new-generation Mark II ART trains from Bombardier Transportation , some of which were assembled in

1869-419: Is also added to trips initiated at Sea Island stations for travel east to Bridgeport station and beyond using Compass Card stored value or DayPasses. It is not applied to trips using monthly passes, nor to trips travelling to the airport using DayPasses or single-use Compass tickets which were purchased and activated off Sea Island. The YVR AddFare came into effect on January 18, 2010. The revenue collected from

SECTION 20

#1732791327125

1958-504: Is generated and the command is ignored. The VCC communicates with the train's vehicle on board computer (VOBC), whose data is transmitted through coax cables laid along the tracks. There are up to two VOBCs per married-pair trains, i.e. 4-car train would have two VOBCs. If the VCCs fail or communication between the VCC and the VOBC is lost, the train will "time-out" and emergency-brake (EB) through

2047-490: Is known as "degraded mode". The SkyTrain health monitoring unit (HMU) developed by Quester Tangent provides monitoring and diagnostic functionality for vehicle maintenance by connecting to CAN vehicle network and providing a maintenance display in the Hostler Panel. SkyTrain's signalling system later provided the basis of SelTrac , which is currently maintained and sold by Thales and has equipped many lines around

2136-562: Is provided for deaf individuals through real-time English signage and displays at stations and on newer trains, although a reliance on verbal communication for service disruptions has been identified as a transportation barrier. The distinctive three-tone chime used in the SkyTrain system was recorded in 1984–85 at Little Mountain Sound Studios in Vancouver. The automated train announcements have been voiced by Laureen Regan since

2225-554: Is the medium-capacity rapid transit system serving the Metro Vancouver region in British Columbia, Canada. SkyTrain has 79.6 km (49.5 mi) of track and uses fully automated trains on grade-separated tracks running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability. In 2023, the system had a ridership of 141,339,300, or about 455,700 per weekday as of

2314-427: Is three years ahead of ridership forecasts. SkyTrain's highest ridership came during the 2010 Winter Olympics when each event ticket included unlimited day-of transit usage. During the 17-day event, Canada Line ridership rose 110 per cent to an average of 228,000 per day, with a single-day record of 287,400 on February 19, 2010. Expo and Millennium Line ridership rose 64 per cent to an average of 394,000 per day, with

2403-510: The AddFare goes back to TransLink. Passengers on SkyTrain made an average of 526,400 trips on weekdays by the end of September 2019 . Overall in 2017, the network carried a total of 151   million passengers. This compares to 117.4   million passengers in 2010: 38,447,725 on the Canada Line and 78,965,214 on the interlined Expo and Millennium Lines. The Canada Line carried an average of 110,000 passengers per weekday in early 2011, and

2492-589: The Canada Line splits into two branches, one heading west to the YVR–Airport station at Vancouver International Airport and the other continuing south to the Richmond–Brighouse station in Richmond's city centre. Opened on August 17, 2009, the Canada Line added 15 stations and 19.2 km (11.9 mi) to the SkyTrain network. Waterfront station is the only station where the Canada Line directly connects with

2581-778: The Evergreen Line during construction, is the second phase of the Millennium Line, extending from Lougheed Mall in Burnaby to the Douglas College campus in Coquitlam. Originally referred to as the Port Moody-Coquitlam (PMC) Line, it provides a "one-seat ride" from Coquitlam to Vancouver. Switches to the PMC Line were installed to the east of Lougheed Town Centre station during its initial construction and

2670-466: The Expo Line from Waterfront station to Columbia station in New Westminster, then continued along its own elevated route through North Burnaby and East Vancouver , ending at VCC–Clark station , near Vancouver Community College 's Broadway campus. It was built on a $ 1.2-billion budget and the final extension from Commercial Drive station (now Commercial–Broadway station ) to VCC–Clark station

2759-485: The Expo Line. The Canada Line travels southward from Waterfront station in Downtown Vancouver to Richmond , where the track splits at Bridgeport station ; trains alternate between a southern branch ending at Richmond–Brighouse station and a western branch ending at Vancouver International Airport . Although most of the system is elevated, SkyTrain runs at or below grade through Downtown Vancouver, for

Lochdale, Burnaby - Misplaced Pages Continue

2848-527: The Expo Line; however, Vancouver City Centre station is within a three-minute walk from Granville station via the Pacific Centre mall, making an unofficial transfer to the Expo Line. The Canada Line cost $ 1.9   billion, financed by the Governments of Canada and British Columbia, TransLink, and InTransitBC. The Canada Line's trains, built by Hyundai Rotem , are fully automated, but are of

2937-608: The Expo and Millennium lines. SkyTrain has longer hours of service during special events, such as New Year's Eve, the Vancouver 2010 Olympics , and marathons. TransLink's SkyTrain service area is divided into three zones, with fares varying depending on how many zone boundaries are crossed during one trip (two- and three-zone passengers are charged the one zone rate after 6:30 pm rush hour, and on weekends and statutory holidays). Customers may purchase fares using cash, debit cards, or credit cards from self-serve ticket vending machines at

3026-601: The Hastings St area where some low-income housing already exists. Sperling–Burnaby Lake station of the Millennium Line is located directly to the south of this neighbourhood, across the Lougheed Highway. The area is well served by public transit with buses providing connections to all three shopping malls in this part of Burnaby - Kensington Square, Lougheed Mall and Brentwood Mall . Kensington Square (aka Kensington Plaza) at Hastings Street and Kensington Ave

3115-443: The Millennium Line opened in 2002, with Braid and Sapperton stations. Most of the remaining portion began operating later that year, serving North Burnaby and East Vancouver . Phase I of the Millennium Line was completed $ 50   million under budget. Critics of the project dubbed it the "SkyTrain to Nowhere", claiming that the route of the new line was based on political concerns, not the needs of commuters. One illustration of

3204-407: The Millennium Line shortly after it was completed. The new, wider edges are brighter and are tiled to provide a safer environment for the visually impaired. The Canada Line also uses this safety feature in its stations. Since the opening of the Millennium Line, aside from platform tile upgrading, many Expo line stations have also been refitted with new signage and ticket vending machines. Accessibility

3293-564: The Millennium Line's Evergreen Extension , from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Coquitlam, was completed in 2016 and it was opened for revenue service on December 2, 2016. This extension adds 11 km (6.8 mi) and 6 new stations to the Millennium Line. The Canada Line begins at the Waterfront station hub, then continues south through Vancouver into the City of Richmond and Sea Island. From Bridgeport station ,

3382-403: The Vancouver portion of the Canada Line until just before it reaches Richmond at Marine Drive station, through the 2.1-kilometre (1.3 mi) tunnel used by the Millennium Line between Coquitlam and Port Moody, through the 0.6-kilometre (0.4 mi) tunnel between Columbia and Sapperton stations in New Westminster, and for short stretches in Burnaby and New Westminster. SkyTrain's Expo Line uses

3471-683: The West Coast Express commuter train ( Moody Centre and Coquitlam Central ). The original Millennium Line's stations were designed by British Columbia's top architects and are very different from those on the Expo Line. In 2004, Busby and Associates Architects, designers of the Brentwood Town Centre station in Burnaby , were honoured for their work with a Governor General's Medal in Architecture . Construction on

3560-539: The area has a distinct Italian feel to it as many homes were built to reflect certain Mediterranean-influenced architectural elements like arches, balconies and window shutters, with grape vines often decorating their façades. Most Italian-owned homes have backyard gardens with greenhouses for tomatoes and other southern plants, as well as traditional bean poles. The biggest attraction is probably Kensington Park with its pitch and putt facilities and

3649-536: The area. The Lochdale Community Hall at the corner of Hastings St and Sperling Ave is Burnaby's last remaining early community hall building and is protected as a heritage site by the Council since 1992. The Hall was constructed with volunteer labour and donated materials in 1925 through the efforts of the Lochdale Social Club. It is rented for special occasions. The area is mostly single-family except

Lochdale, Burnaby - Misplaced Pages Continue

3738-404: The bus system, bus loops, and SeaBus. SkyTrain attendants provide customer service and first aid, troubleshoot train and station operations, and perform fare checks alongside the transit police force. SkyTrain attendants can be identified by their uniforms which say "SkyTrain" on them. Over the years, violence and other criminal activities have been concerns at time, but TransLink maintains that

3827-469: The construction of such a system. During the same period, Urban Transportation Development Corporation , then an Ontario crown corporation, was developing a new rapid transit technology known as an "Intermediate Capacity Transit System". In 1980, the "Advanced Light Rapid Transit" system was selected by the British Columbia provincial government for use on one of two planned corridors, connecting Vancouver to New Westminster in time for Expo 86 . SkyTrain

3916-614: The driving force of the investment, though it did not disaggregate the general growth in that area. There are three main routes: the Expo Line, Millennium Line and Canada Line. The Expo Line travels between Waterfront station in Downtown Vancouver and Columbia station in New Westminster , serving the cities of Vancouver, Burnaby , and New Westminster. From Columbia, the Expo Line splits into two branches. One branch travels through Surrey to King George station , while

4005-527: The east, to the snow-covered Mount Baker and Mount Shuksan in the south-east to Burnaby Lake , New Westminster , Glacier Peak and Metrotown in the south, to Downtown Vancouver and the mountains of Vancouver Island in the west with its highest peak Golden Hinde (British Columbia) , and to the North Shore Mountains with Grouse Mountain, the Lions , Cathedral Mountain and Mt. Seymour in

4094-457: The end of 2020. The Canada Line uses Hyundai Rotem EMU vehicles, with cars powered by conventional electric motors instead of the linear induction motor (LIM) technology used by the Expo and Millennium Line vehicles; as a result, the Canada Line vehicles cannot be used on the Expo and Millennium Lines. There are 20 trains, which operate as two-carriage articulated units and can reach a speed of 80 km/h (49.7 mph). They are maintained at

4183-424: The end-to-end average speed is 45 km/h (28.0 mph), three times faster than a bus and almost twice as fast as a B-Line express bus. During cold weather, TransLink crews use hockey sticks to clear snow and ice from train doors, which would otherwise prevent some doors from being able to open. The trains are also slowed and staffed by TransLink attendants, who can manually override the automatic controls in

4272-406: The entire North Burnaby area, Lochdale's distinct Italian flavour still demonstrates itself in its attractive residential architecture and gardening styles which are also very similar to those of Parkcrest's. There are a few parks in the area - Sumas Park and Sperling Park in the south, Lochdale Park off Cliff Ave, and Halifax Park on Halifax Avenue which has a remaining stand of old trees right in

4361-578: The event of an obstruction caused by snow or ice. The initial fleet consisted of 12.7 m (41 ft 8 in) lightweight Mark I ICTS cars from Urban Transportation Development Corporation , similar to those used by Toronto's Line 3 Scarborough and the Detroit People Mover . Mark I vehicles are composed of mated pairs and normally run as six-car trains and only on the Expo Line, but can be run in two-, four-, or six-car configurations. The maximum based on current station platform lengths

4450-527: The expense of implementing, maintaining, and enforcing them would exceed the losses prevented. In 2005, TransLink estimated it was losing $ 4   million (5 percent of revenue attributed to SkyTrain) annually to fare evasion on SkyTrain. While the Canada Line stations, along with those on the Millennium Line, were designed to allow for future fare gates, the Canada Line opened in 2009 without them, despite stated intentions to include them. Expo Line stations have since been redesigned and retrofitted to accommodate

4539-486: The fare-paid zone. Starting in April 2016, they were initially fully closed only during peak hours, with one gate remaining open during off-peak times for people with accessibility issues who could not reach their Compass Cards to the fare gates to tap in or out. Full implementation of the fare gates was also delayed by problems with Compass Cards when riders were tapping out as they exited buses. The tapping-out process on buses

SECTION 50

#1732791327125

4628-506: The gates in place by the end of 2010. However, in August 2009, a TransLink spokesman said the gates would not be installed before 2012, and that a smart card system would be implemented at the same time. It was announced on August 14, 2013, that bus-issued transfers (magnetic strip paper cards) would continue to be issued for cash fares paid on buses, but that these transfers would not work at SkyTrain or SeaBus station fare gates, which require

4717-413: The heart of the neighbourhood. Kensington Park with its pitch and putt is steps away. An outdoor swimming pool is located on a small hill opposite Kensington Square Shopping Centre, just across Kensington Avenue. A bicycle overpass built in the mid-1990s over high-traffic Hastings Street allows cyclists to travel north to the picturesque shores of Burrard Inlet . Parkcrest Parkcrest

4806-406: The legitimacy of this complaint is that the end of the Millennium Line is located in a vacant field, chosen because it was supposed to be the location for a new high-tech development and is close to the head office of QLT Inc., but additional development was slow to get off the ground. That station, VCC–Clark near Clark Drive and Broadway, did not open until 2006 due to the struggles of negotiating

4895-399: The line. The extension began revenue service on December 2, 2016. The Canada Line was built as a public–private partnership, with the winning consortium (now known as ProTransBC), led by SNC-Lavalin , contributing funds toward its construction and operating it for 35 years. A minimum ridership was guaranteed to ProTransBC by TransLink. The Richmond–Vancouver corridor had been considered for

4984-766: The longest rapid transit system in Canada and the longest fully automated driverless system in the world. The total lengths of the automated lines of the Shanghai Metro , Singapore MRT , Kuala Lumpur Rapid KL and Dubai Metro have since surpassed those of SkyTrain. SkyTrain has 53 stations served by three lines: the Expo Line , the Millennium Line , and the Canada Line . The Expo and Millennium Lines are operated by British Columbia Rapid Transit Company under contract from TransLink (originally BC Transit),

5073-634: The mezzanine level of each station. A variety of transit passes are available, such as the pre-paid FareSaver ticket, daily DayPass, monthly FareCard, annual EmployerPass, post-secondary student U-Pass , and other specialized passes. Canadian National Institute for the Blind identification cards are accepted without the need to be read by the fare box. One-time fares are valid for 90 minutes on any mode of transportation with any number of transfers, including all SkyTrain lines and bus and SeaBus routes. Concession fares are available for secondary school students with

5162-487: The new fare gate system. The 2008 Provincial Transit Plan outlined several SkyTrain system upgrades, including replacement of the proof-of-payment system with a gated-ticket system. According to Minister of Transportation Kevin Falcon , the gated-ticket system was to be implemented by a private company by 2010. In April 2009, it was announced that the provincial and federal governments would spend $ 100   million to put

5251-427: The north. Sunsets are amazing at any time of the year. Although the elevation is not as high as on Capitol Hill, Burnaby , it is still a good place to see the annual fireworks in late July and early August over English Bay away from the crowds and midnight traffic. 49°16′21″N 122°58′44″W  /  49.2726°N 122.9790°W  / 49.2726; -122.9790 Skytrain (Vancouver) SkyTrain

5340-470: The old TransLink Special Provincial Constables , who had limited authority. On December 4, 2005, MVTP officers became the first and only transit police force in Canada to have full police powers and carry firearms. There was public concern in March 2005 when it was announced that transit police would carry firearms. Solicitor General of British Columbia John Les defended the move at the time, saying that it

5429-399: The opening of the Millennium Line in 2002, and by Karen Kelm between 1985 and 2001. The Expo Line and Millennium Line use Bombardier 's Advanced Rapid Transit (ART) system, a system of automated trains driven by linear induction motors , formerly known as Intermediate Capacity Transit System (ICTS). These trains reach speeds of 90 km/h (55.9 mph); including wait times at stops,

SECTION 60

#1732791327125

5518-555: The original UTDC ICTS model, and the Mark II design has been updated by Bombardier, with this newest offering being the Innovia Metro 300 . Dimensions are similar to the Mark II, with capacity improvements offered over the outgoing model through redesigned car layout. TransLink ordered 28 Mark III cars, which began delivery in 2015, and went into service beginning in August 2016. The vehicles appear sleeker, with larger windows on

5607-509: The other SkyTrain lines, using different rolling stock (shorter overall train and station length, but wider cars) that is incompatible with the Expo and Millennium Lines. SkyTrain has had a significant impact on the development of areas near stations, and has helped to shape urban density in Metro Vancouver. Between 1991 and 2001, the population living within 500 m (1,640 ft) of SkyTrain increased by 37 percent, compared to

5696-463: The other travels through New Westminster and Burnaby, terminating at Production Way–University station . Millennium Line trains travel between VCC–Clark station and Lafarge Lake–Douglas station in the city of Coquitlam . Near the western end of the line is a major transfer point with the Expo Line at Commercial–Broadway station. Further east, Lougheed Town Centre station and Production Way–University station serve as two more transfer points with

5785-429: The platforms and tracks of the Expo and Millennium Lines. 44 of those deaths were suicides, while the remaining ten were accidental. Vancouver had plans as early as the 1950s to build a monorail system, with modernist architect Wells Coates to design it; that project was abandoned. The lack of a rapid transit system was said to be the cause of traffic problems in the 1970s, and the municipal government could not fund

5874-421: The previous Millennium Line service between Waterfront and that station. During peak periods, trains between Waterfront and Columbia arrive every 2 to 3 minutes. Between Waterfront and King George, trains arrive every 2 to 5 minutes during peak hours, while trains between Waterfront and Production Way arrive every 6 to 7 minutes in the peak hours. Prior to October 22, 2016, the Millennium Line shared tracks with

5963-417: The regional average of 24 percent. Since SkyTrain opened, the total population of the service area rose from 400,000 to 1.3   million people. According to BC Transit's document SkyTrain: A catalyst for development , more than $ 5   billion of private money had been invested within a 10–15 minute walking distance of the SkyTrain and SeaBus . The report claimed that the two modes of transportation were

6052-403: The right-of-way with BNSF, the owner of the freight tracks beside the station, but it is still five kilometres short of the original proposed Phase II terminus at Granville Street and 10th Avenue. At the time VCC–Clark station opened, it was revealed that the additional westward extension and its three stations was out of favour and "not a high priority anymore". The Evergreen Extension, known as

6141-573: The sides of the train, and redesigned windows and headlights on the ends of the cars. The interior is largely similar to the second generation of Mark II cars, with the some seats removed to better accommodate bicycles and strollers. TransLink has claimed that the interior of the Mark III offers better sound and heat insulation. TransLink ordered the cars for the Evergreen Extension in a 4-car articulated configuration, with two centre cars, to allow full-length train movements by passengers. However, due to

6230-574: The south and ends up in Central Valley, quite low above the level of Burnaby Lake . Though some low-rise apartments exist, the housing is predominantly single-family. Real-estate prices reflect the status of North Burnaby as a prestigious, high-middle-class neighbourhood. There are two elementary schools at two opposite ends of the neighbourhood - Aubrey and Parkcrest.<ref> "Parkrest Elementary School" . Parkrest Elementary School . Retrieved 7 February 2011 . In terms of shopping, only

6319-490: The system are shared with other government agencies. Capital expenses were $ 216   million in 2008. For example, the cost of building the Canada Line was shared between TransLink ($ 335   million or 22 percent), the federal government (29 percent), the provincial government (28 percent), the airport authority (19 percent), and the City of Vancouver (2 percent). While TransLink has run surpluses for operating costs since 2001, it incurs debt to cover these capital costs. As

6408-506: The system has been in full operation since. Travel on the Canada Line is free between the three Sea Island stations near the Vancouver International Airport: Templeton , Sea Island Centre , and YVR–Airport. Single-use Compass tickets purchased with cash at Compass vending machines in stations on Sea Island include a surcharge, the "YVR AddFare", of $ 5.00 on top of the normal fare. This charge

6497-667: The system is safe. In 2009, Inspector Kash Heed of the Vancouver Police Department said that little crime takes place in the stations themselves; however, criminal activity becomes more visible 400–700 metres (1,000–2,000 ft) outside them. Each station is monitored with an average of 23 closed-circuit television cameras, allowing SkyTrain operators to monitor passenger and station activity. Designated waiting areas have enhanced lighting, benches, and emergency telephones. Trains have yellow strips above each window which, when pressed, silently alert operators of

6586-557: The system, from Waterfront to New Westminster station , opened for limited and fare-free service on December 11, 1985. Revenue service began on January 3, 1986, and within its first year the line had carried over 30 million passengers—including visitors to Expo 86. The following year, construction began on an extension including the SkyBridge, Columbia station, and Scott Road station , extending service by 3.1 kilometres (1.9 mi) to Surrey; it opened on March 16, 1990. The line

6675-588: The third quarter of 2024. The name "SkyTrain" was coined for the system during Expo 86 because the first line (Expo) principally runs on elevated guideway outside of Downtown Vancouver , providing panoramic views of the metropolitan area. SkyTrain uses the world's third-longest cable-supported transit-only bridge, known as SkyBridge , to cross the Fraser River . With the opening of the Evergreen Extension on December 2, 2016, SkyTrain became

6764-674: The trains manually if necessary. The Expo Line connects Waterfront station in Vancouver to King George station in Surrey , principally along a route established by the Westminster and Vancouver Tramway Company as an interurban line in 1890. The Expo Line (originally referred to as simply "SkyTrain" until the opening of the Millennium Line) was built in 1985 in time for Expo 86 . It now has 24 stations. The Expo Line ran only as far as New Westminster station initially. In 1989, it

6853-560: The world's second longest bridge dedicated to transit services, the SkyBridge, which crosses the Fraser River between New Westminster and Surrey. It is a 616-metre-long (2021 ft) cable-stayed bridge , with 123-metre-tall (404 ft) towers. Two additional transit-only bridges, the North Arm Bridge and the Middle Arm Bridge , were built for the Canada Line. The North Arm Bridge is an extradosed bridge with

6942-598: The world. Largely as a result of this, the Expo and Millennium Lines have a combined punctuality record of over 96 percent; the principal cause of train delays is passenger interference with train doors. There have been two derailments during revenue service in the system's history. The SkyTrain network is fully mobility-needs accessible, including vehicles and stations. Mark I train cars have one designated wheelchair position, Mark II, Mark III and Hyundai Rotem cars have two, and all stations have elevators. TransLink upgraded all Expo Line platform station edges to match those on

7031-454: The yard. Additional VCCs were added as Skytrain expanded. Each VCC is a cluster of three IBM Type 7588 rack-mount single-board computers with Intel-IA32 Pentium processors and proprietary hardware in a fault-tolerant configuration. For example, VCC3 is composed of CPU1, CPU2, and CPU3. For every command that is sent to a train, at least two of the CPUs must agree with the action, otherwise an error

7120-417: Was completed in May 2014, but they remained open until April 2016 owing to multiple system problems. While open for the nearly two-year period, holders of paper-based monthly passes, bus-issued transfers, and FareSaver tickets continued to pass through the gates into the stations' fare-paid zones unimpeded, although they were subject to having their fare inspected by transit security or transit police once inside

7209-712: Was conceived as a legacy project of Expo 86 and the first line was finished in time to showcase the fair's theme: "Transportation and Communication: World in Motion – World in Touch". Construction was funded by the provincial and federal governments and began in March 1982. It was built through the Dunsmuir Tunnel under downtown, which had originally been built for the Canadian Pacific Railway , to save costs. The first 21.4 kilometres (13.3 mi) of

7298-404: Was expanded again in 1994 with the opening of Gateway , Surrey Central , and King George stations. SkyTrain is part of the 1996 Greater Vancouver Regional District 's (GVRD) Livable Region Strategic Plan, which discusses strategies to deal with the anticipated increase of population in the region. These strategies include increasing transportation choices and transit use. The first section of

7387-601: Was extended to Columbia station and in 1990, once the Skybridge was finished, it continued across the Fraser River to Scott Road station in Surrey. In 1994, the terminus of the Expo Line became King George station in central Surrey. It was built on a budget of $ 854   million (1986 dollars). Effective October 22, 2016, Expo Line trains began operating on a new branch to Production Way–University station , taking over

7476-640: Was necessary to enhance SkyTrain security. Transit officers receive the same training as officers in municipal and RCMP forces. They may arrest people for outstanding warrants, enforce drug laws, enforce the criminal code beyond TransLink property, and deal with offences that begin off TransLink property and make their way onto it. They issue tickets for fare evasion and other infractions on SkyTrain, transit buses, SeaBus , and West Coast Express . Transit police officers and Transit Security officers inspect fares at Skytrain stations as part of TransLink's fare audit. Transit Security officers mostly focus their efforts on

7565-489: Was opened on January 6, 2006. From October 22, 2016, to December 1, 2016, the Millennium Line operated from VCC–Clark to Lougheed Town Centre station. As of December 2, 2016, the Millennium Line operates between VCC–Clark station in Vancouver and Lafarge Lake–Douglas station in Coquitlam. The Millennium Line has 17 stations, three of which are transfer stations with the Expo Line (Commercial–Broadway, Production Way–University, and Lougheed Town Centre) and two which connect with

7654-402: Was originally developed by Alcatel and loaded from a 3.5" diskette . There were initially four systems called the vehicle control computer (VCC) with three divided over the mainline and one for the storage yard. VCC1 controls trains from Waterfront to Royal Oak; VCC2 controls trains from Royal Oak to King George (it now also controls a portion of the Millennium Line); and VCC3 controls trains in

7743-413: Was supplemented by controlled access – with the payment of a fare or proof of payment required to pass through a staffed gate – at special events where extremely high ridership was expected, such as immediately after BC Lions or Vancouver Canucks games. Installing faregates to prevent fare evasion was considered as early as at the time of the system's opening, but was rejected multiple times because

7832-421: Was supposed to be operational by 2013. A solution was finally implemented where the requirement to tap out of buses was removed and all bus travel was considered as within a single zone, creating significant savings for those travelling multiple zones using buses only and in some cases changing transit usage patterns. The last fare gates left open for users with accessibility issues were closed on July 25, 2016, and

7921-406: Was too slow and did not always record the tap which—because the system initially deducted a three-zone fare until a tap-out was recorded and a refund was issued to those having only travelled one or two zones—often resulted in customers being charged for travelling through three zones when in fact they had only travelled through one or two. This was a serious setback for TransLink as the entire system

#124875